FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July 3, 2002 ERM Project No. A3197.IZ 30057205 Superfund Environmental Resources Management 1630 Heritage Landing Drive Suite 100 St. Charles, MO 63303 ERM.

Transcript of Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc....

Page 1: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

FINAL REPORT

RECEIVED

JUL 1 I 2QQ2 j

TRW Inc.

Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri

July 3, 2002

ERM Project No. A3197.IZ

30057205

Superfund

Environmental Resources Management 1630 Heritage Landing Drive

Suite 100 St. Charles, MO 63303

ERM.

Page 2: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

FINAL REPORT

TRW Inc.

Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri

July 3, 2002

ERM Project No. A3197.IZ

Environmental Resources Management 1630 Heritage Landing Drive

Suite 100 St: Charles, MO 63303

Page 3: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Prepared and approved by:

C. George Lynn "^ Missouri Registered Geologist No. i b J Expires: l f l " I »

Page 4: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

CONTENTS

1.0 INTRODUCTION 1

2.0 GROUND WATER SAMPLING 2

2.1 WELL PURGING ACTIVITIES 2

2.2 DECONTAMINATION PROCEDURES 3

2.3 SAMPLE COLLECTION PROCEDURES 4

2.4 QUALITY CONTROL SAMPLE COLLECTION 4

3.0 GROUND WATER FLOW DIRECTION 6

4.0 ANALYnCAL RESULTS 7

5.0 LANDFILL INSPECTION INFORMATION 8

6.0 SUMMARY 9

APPENDICES:

A FIELD DATA SHEETS

B LABORATORY REPORT AND CHAIN-OF-CUSTODY FORMS

C LANDFILL INSPECTION REPORTS - JANUARY 1999 THROUGH MAY 2002

Page 5: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

LIST OF TABLES

1 Well Summary - May 13-14, 2002

2 Summary of Detected Analytes - May 13-14, 2002

3 Historic Summary of Detected Ground Water Analytes

11

Page 6: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

LIST OF FIGURES

1 Site Plan and Well Locations

2 Potentiometric Surface Map - May 13, 2002

111

Page 7: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1.0 INTRODUCTION

This report summarizes the ground water monitoring activities, which took place on May 13 and 14,2002 at the closed Sullivan Landfill site located in Sullivan, Missouri. Environmental Resources Management (ERM), Inc. of St. Charles, Missouri, performed the groimd water sampling activities. Additionally, this report serves as documentation of monthly landfill inspection activities for the period from January 1999 through May 2002, which was performed by City of Sullivan Water Department personnel.

ENVIRONMENTAL RESOURCES MANAGEMENT i GROUND WATER MONITORING 2002 BIENNIAL REPORT SULLIVAN LANDHLL - SULLIVAN, MISSOURI

f:\cpf\a31\a3197\iz\wp\rpls\l-report.doc JULY 3, 2002

Page 8: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

2.0 GROUND WATER SAMPLING

This section describes the sampling procedures used to collect the ground water samples. It describes the well purging activities, decontamination procedures, sample collection procedures, and quality control samples.

In a letter dated February 29,2000, that outlined post-closure groimd water monitoring requirements for the landfill, the Missouri Department of Natural Resources (MDNR) requested some alterations to the historical sampling program in anticipation of the approval of the post-closure monitoring program for the landfill. The post-closure ground water monitoring requirements indicated that sampling frequency for the wells could be reduced from annual to biennial. The analyte lead was added to the parameter list, and inorganic samples were to be analyzed for dissolved parameters. The monitoring wells MW102A, MW102B, and B201 were no longer required to be sampled, and MW104 was included as a sample point. This biennial ground water monitoring program was included with the landfill closure plat that was filed with the Franklin County Recorder of Deeds on September 6, 2000.

2.1 WELL PURGING ACTIVITIES

There are seven ground water monitoring wells currently surrounding the landfill. There is also a ground water production well located near the landfill designated as the "Voss Well". The locations of these wells are shown on Figure 1. Table 1 displays a summary of the well numbers and applicable physical measurements.

Ground water sampling activities were conducted generally following the methodologies presented in the March 1994 Ground Water Monitoring Plan (the Work Plan) prepared by ABB Environmental Services, Inc. (ABB) of Portland, Maine, and approved by the MDNR.

Prior to well purging, depth to water measurements were collected from the monitoring wells (Table 1) and the casing volume of each well to be sampled was calculated. The Voss Well has a permanent pump and is sealed, so no water level reading was collected from this well.

As described in the Work Plan, some of the wells will not accept a submersible Grimdfos pump. Therefore, in order to use a consistent method of purging and sampling for all of the wells, purging of the ground water monitoring wells was completed with dedicated PVC bailers. The bailers were lowered and raised with an electric motor operated outrigger unit. A stainless steel line was

ENVIRONMENTAL RESOURCES MANAGEMENT Z GROUND WATER MONTTORING 2002 BIENNIAL REPORT

SULLIVAN LANDFILL - SULLIVAN, MISSOURI f:\cpf\i31\a3197\iz\wp\rpts\l-report .doc JLILYS, 2002

Page 9: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

connected to the bailers and they were lowered approximately 10 feet below the water surface before retrieval.

The Voss well is fitted with an automatic chlorination device, therefore, prior to purging, the chlorinator was disconnected. The well was then purged at a rate of approximately 4 gallon per minute using the existing pump until approximately 230 gallons had been removed.

Ground water from monitoring wells was tested, after approximately each full casing volume was removed, for the following field-measured parameters: pH, temperature, specific conductance, and turbidity. These readings were recorded on Field Data Sheets, which are included as Appendix A. As described in the Work Plan, if two well volumes have been removed and field-measured parameters (except turbidity) have stabilized within 10%, the well is considered purged and may be sampled. As shown in the Field Data Sheets, the field-measured parameters for all of the monitoring wells were generally stable after two casing volumes had been removed.

According to the Work Plan, the Voss Well is considered to be purged after it is allowed to run for a minimum of 10 minutes. During this sampling event it was allowed to run for approximately 1 hour prior to sample collection since it was allowed to purge at a relatively slow rate. The purge rate was set low to avoid excessive ponding of water where the purge water was discharged. Field-measured parameters were collected from the Voss Well just before sample collection and were recorded on a Field Data Sheet (see Appendix A).

Purge water from all the wells, except the Voss Well, was disposed of in the city of Sullivan sanitary sewer, as approved by the MDNR project manager for this site. Purge water from the Voss Well was allowed to discharge on the ground, in accordance with the Work Plan.

2.2 DECONTAMINATION PROCEDURES

Dedicated bailers were used in all of the monitoring wells. Each bailer is stored by hanging it within the individual wells. Decontamination consisted of a rinse with distilled water prior to use. The stainless steel line used to retrieve bailers was decontaminated between wells with an Alconox detergent and distilled water solution followed by a distilled water rinse.

ENVIRONMENTAL RESOURCES MANAGEMENT O GROUND WATER MONITORING 2002 BIENNIAL REPORT

SULLIVAN LANDFILL - SULLIVAN, MISSOURI f:\cpf\a31\a3197\iz\wp\rpls\l-report.doc JULY 3, 2002

Page 10: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

2.3 SAMPLE COLLECTION PROCEDURES

Samples were collected from each well for volatile organic compounds (VOCs) and dissolved barium, chromium, and lead.

Laboratory-supplied containers that had been pre-preserved were used for sample collection. Following sample collection, the containers were held on ice in an insulated cooler.

Samples from the monitoring wells were collected directly from the bailers used to purge the wells. Samples collected for inorganic analysis were initially placed in a laboratory-supplied clean unpreserved container and then field filtered into a laboratory-supplied pre-preserved container. Field filtering was conducted using a peristaltic pump, using dedicated tubing and 0.45 micron filters for each well sampled.

At the Voss Well, the ground water samples were collected from a short length of hose attached to the well spigot. This was the same length of hose that had been used for well purging.

2.4 QUALITY CONTROL SAMPLES

A trip blank was included for field sampling quality control purposes. The trip blank consisted of a laboratory-supplied sample for VOCs only, which accompanied the sample containers to the field, during storage, and during delivery to the analytical laboratory.

The laboratory analyzed a method blank and a laboratory control sample for quality control purposes. The method blank sample consisted of a laboratory grade water blank analyzed for VOCs, barium, chromium, and lead. The laboratory control sample consisted of a laboratory grade water blank spiked with a known quantity of VOCs, barium, chromium, and lead. The control sample was then analyzed and a percent recovery value calculated based on the amount of VOCs, barium, chromium, and lead detected as compared to the amount with which the sample was spiked.

The method blank exhibited concentrations of acetone and methylene chloride above detection limits. These compounds are common laboratory artifacts. The percent recovery values for the laboratory control samples were all within acceptable limits.

Sample surrogate recovery for Toluene-d8 in the Voss Well was outside the established Quality control limits established by the analytical laboratory. The

ENVIRONMENTAL RESOURCES MANAGEMENT ' i GROUND WATER MONITORING 2002 BIENNIAL REPORT

SULLIVAN LANDFILL - SULLIVAN, MISSOURI f:\cpf\a31\a3197\iz\wp\rpts\l-report.doc JULY 3, 2002

Page 11: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Voss Well sample was rerun by the analytical laboratory to confirm the low recovery of the surrogate. The rerim result confirmed the initial analysis. According to the analytical laboratory this quality control excursion is attributed to matrix interferences in the sample and should not affect the overall quality of the laboratory data.

ENVIRONMENTAL RESOURCES MANAGEMENT . D GROUND WATER MONITORING 2002 BIENNIAL REPORT

SULLIVAN LANDHLL - SULLIVAN, MISSOURI f:\cpf\a31\a3197\iz\wp\rpts\l-report.doc JULY 3, 2002

Page 12: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

3.0 GROUND WATER FLOW DIRECTION

On May 13,2002 a round of water level measurements was collected from the all of the monitoring wells at the site. The depth-to-water measurements and ground water elevations are shown in Table 1.

The water level elevations for MW-101, MW-102B, MW-103, and MW-105 were used in the construction of the potentiometric surface map (see Figure 2). These four wells were chosen because the screened elevations of these wells are the most similar. Previous potentiometric maps constructed by ABB Environmental Services, Inc. also utilized only these four wells.

As shown in Figure 2, the ground water flow direction is generally to the north, based on the measurements collected on May 13,2002. The flow direction is similar to that determined during the last biennial monitoring event in May 2000.

ENVIRONMENTAL RESOURCES MANAGEMENT

f:\cpf\a31\a3197\iz\wp\rpts\l-report.doc

GROUND WATER MONITORING 2002 BIENNIAL REPORT

SULUVAN LANDFILL - SULLIVAN, MISSOURI JULY 3, 2002

Page 13: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

4.0 ANALYnCAL RESULTS

The ground water samples were hand delivered by ERM to Severn Trent Laboratories (STL) in St. Louis, Missouri for laboratory analyses. The samples were held, transported, and delivered following strict chain-of-custody procedures.

The collected samples were analyzed for VOCs by Method 8260B, and dissolved barium, chromium, and lead by Method 6010B. The laboratory analytical report and completed chain-of-custody forms are included as Appendix B.

A summary of detected VOCs and inorganic analytes is attached as Table 2.

Four VOCs were found above laboratory detection limits: 1,1-dichloroethane, 1,1,1-trichloroethane, trichioroethene, and tetrachloroethene. The compound 1,1-dichloroethane was found at 7.6 ug / l in MW105 and at 5.5 ug / l in the Voss Well. These two wells are upgradient and sidegradient of the landfill, respectively (see Figure 2). The compound 1,1,1-trichloroethane was found at 1.5 ug / l in the Voss Well. As previously described, this well is sidegradient of the landfill. Trichioroethene was found at 1.2 ug / l in MWlOl, 6.8 ug / l in MW104, 2.5 ug / l in MW105, and 1.2 ug / l in the Voss Well. As shown in Figure 2, these four wells are all upgradient or sidegradient from the landfill.

Except for the previously described three compounds, all other VOCs were found at estimated levels below the laboratory detection limits.

The analytical results for dissolved barium, chromium, and lead show that for all of the samples submitted, dissolved chromium and lead levels were below the instrument detection limit. Dissolved barium concentrations however, were detected in all five wells at estimated concentrations below the instrument detection limit of 200 ug/l .

ENVIRONMENTAL RESOURCES MANAGEMENT / GROUND WATER MONITORING 2002 BIENNIAL REPORT

SULLIVAN LANDFILL - SULLIVAN, MISSOURI f:\cpf\a31\a3197\i2\wp\rpt3\l-report.doc JULY 3, 2002

Page 14: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

5.0 LANDFILL INSPECnON INFORMAnON

According to the post-closure monitoring requirements for the Sullivan Landfill as set forth by the MDNR and contained on the closure plat for the landfill filed with the Franklin County, Missouri Recorder of Deeds on September 6, 2000, semiannual visual inspections and maintenance, as necessary, are to be performed on the landfill. The landfill is typically mowed twice per year depending upon vegetation growth. Presently, personnel from the City of Sullivan Water Department perform these inspection and maintenance activities. Although only required to be inspected twice per year, the City of Sullivan performs monthly inspections of the landfill noting any need for maintenance and scheduling the completion of the maintenance activities, usually prior to the next month's inspection. City personnel complete a checklist to document their monthly inspection and any maintenance activities. Enclosed in Appendix C are copies of the landfill inspection reports from January 1999 through May 2002. As can be seen in these inspection reports, only routine maintenance activities have been necessary at the landfill since January 1999.

ENVIRONMENTAL RESOURCES MANAGEMENT O GROUND WATER MONrrORING 2002 BIENNIAL REPORT

SULLIVAN LANDFILL - SULLIVAN, MISSOURI f:\cpf\a31\a3197\iz\wp\rpts\l-report.doc JULY 3, 2002

Page 15: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

6.0 SUMMARY

On May 13 and 14, 2002, ground water samples were collected for VOCs and dissolved barium, chromium, and lead from five wells around the Sullivan Landfill located in Sullivan, Missouri. As described in Section 4.0 of this report, the only analytes fovmd at levels above the detection limit were 1,1-dichloroethane, 1,1,1-trichloroethane, trichioroethene, and tetrachloroethene. The analytes were found in several monitoring wells at varied concentrations as shown in Table 2. The concentrations of these VOCs found in the ground water samples are only slightly above the detection limits of 1 ug /L and are below the maximum contaminant levels (MCLs) promulgated by the U.S. Environmental Protection Agency (USEPA), except for the trichioroethene concentration in MW-104. The trichioroethene concentration in MW-104 was 6.8 mg/ l , slightly above the USEPA MCL of 5.0 mg/l . This was the first sampling event that an MCL was exceeded for any detected analyte.

In order to provide a comparison to previous sampling results, a historical summary of detected VOCs, as well as total and dissolved barium, chromium, and lead from all previous sampling events has been included as Table 3. As shown in this table, the measurements in all of the wells have remained relatively consistent over time since sampling activities began.

A potentiometric surface map was completed based on depth-to-water measurements collected on May 13, 2002 and indicates a northerly ground water flow direction, which is similar to what has been previously measured.

No outstanding inspection or maintenance issues appear to be present at the landfill in association with the monthly inspection activities performed by the City of Sullivan. Additionally, during the performance of the 2002 biennial ground water sampling event, ERM did not notice any areas of concem associated with excess vegetation, site security, site access, condition of the landfill cover, monitoring wells, or gas vents. In general, the landfill appears to be well maintained.

ENVIRONMENTAL RESOURCES MANAGEMENT 7 GROUND WATER MONITORING 2002 BIENNIAL REPORT

SULLIVAN LANDFILL - SULLIVAN, MISSOURI f;\cpf\a31\a3197\iz\wp\rpts\l-report.doc JULY 3, 2002

Page 16: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TABLES

•y 'y

,'^:^'^\yy'jA • ' ' . ' L '•••' ' ' . '"ist-

• L y L y p ^

• • • ' - ' v -

- " * . y:Ai

- ! . ' ' " ' •

.,ii- r . • ' ••

' ' . / ' • - .

: ' . • - '

y y y ' . - • • • • • ,

• • - ; . .

.'v V. v.-

^:'ZKL • ^ • > ' ' . • ' - > . •

T- • ' ^ ' , - " , i> ; . \ , , , : s ^ •'

,"\ • - * " . ' • • , • • '

. • ' > l ' . - ^ - '

Am y ^ '- A-•-•:«/.; • : ' r .

.• r ' -• * . • ; ; «

. 'T ,.. T'

' i j ^ ^

A t • • : - ; . £

4v^i^s^ ::f'#

-;i 'f '" ' • ^ i ^

V-- ' T L ' - : ^ - ,

^ ;v^ i^

-'•^i^ ' • 1 ' - ^ i .

- A. 1 :' -\.;;

• - • ' ^ ' • • !

y 0 • m

; . ; , ; . ••-.-ujj-

- ' • - . • V ?

: A M

Page 17: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

T A B L E 1

WELL SUMMARY SULLIVAN LANDFILL SAMPLING *" May T3& 14, 2002

SULLIVAN, MISSOURI

Well

MW-101

MW-102 A

MW-102B

MW-103

MW-104

MW-105

B-201

Voss

TOC Elevation (2)

887.08

895.5

896.01

878.46

898.95

881.69

NC

NC

Depth-to-Water from TOC

152

176.86

165.00

177.18

177.13

140.79

14.30

NC

Ground Water

Elevation '^'

735.08

718.64

731.01

701.28

721.82

740.9

NC

NC

Total Well Deptii rroin

TOC

185

275

210

208

202

177

20.2

NC

Total Boring Depth from Ground

Surface

243

283

214

243

205

203

17.5

NC

Base of Well

Elevation ' *

702.08

620.5

686.01

670.46

696.95

704.69

NC

NC

Formation Screened

Gasconade

Gasconade

Gasconade

Gasconade

NC

Gasconade

Roubidoux

NC

NOTES: *'' All measurements arc expressed in feet.

'^' Elevations are based on the North American Vertical Datum of 1988. KEY: TOC = Top of casing.

NC = Not collected.

Page 18: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

I A B L E 2

SUMMARY OF DETECTED ANALYTES ' " May 13 & 14,2002

SULLIVAN LANDFILL SULLIVAN, MISSOURI

MCL'^' Volatile Organic'Analvies^f??,>'^!>^?i??i-

Acetone

2-Butanone

Clilorobeiizene

Dibromocliloromethane

Chlorofomi

1,1-Dichloroethane

1,2-Dichloroelhane

1,1-Dichloroethene

1,2-Dichloroethene

Methylene Chloride

Toluene

1,1,1-Trichloroethane

Bromodichloromethane

Trichioroethene

Tetrachloroethene

Bromoform

cis-1,2-Dichloroethene

(3)

(3)

IOO (3)

0)

(3)

5

7

5

5

1,000

200 (3)

5

5 (3)

70

lnorEa'nic'Analvtes|dissblvedV.^ iv" :•

Barium

Chromium

Lead

2000

IOO

15

Detection Limit

v y y y y - s 2

5

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

•^^^'••yyAy'

200

10

5

MVV-IOI ; • ' ' ; • • • • : • ; " : • ; , ; ; / • : • ; . ; • • • • ; ' : = ; • ,

1.4 J, B — — — -. .. — — --

0.44 J, B --— — 1.2

— —

0.29 J

A y : ' - y : r ' A y

62.1 B

— -

MW-103 iip:.^-:':--''-!^^:y-

— — — — —

0.39 J — — --

0.76 J, B --

0.82 J —

0.55 J

0.73 J

— —

'•;;y^^:--yr'::;^y:':\\y::\

58.6 B — -

Sample MVV-104

:;« ::•.yh-.y.ff/::

1.4 J, B

— — —

0.23 J

0.82 J — — —

0.37 J, B --

0.95 J —

6.8

1.1

— 0.55 J

y:-y:yy!:/y 90.3 B

— -

S umber MW-105

yM^yy/if^i 6.4 B

— — —

0.27 J

7.6 __ — __

0.86 J, B .-

0.80 J --

2.5

0.59 J —

0.47 J •!^:'A^;Ay^yii

143 B .. -

Voss i:!:';!-C:ii:. i.;^/;^r;-

6.3 B

— — —

0.89 J

5.5 — — _-

0.99 J, B .-1.5

0.38 J

3.3

1.2

0.44 J

0.24 J

v:'Ams;A 94.8 B

---

Trip Blank

y:}:?:'--^'iy-:'-

4.3 B

0.49 J

— — — — — — --

0.30 J, B

0.30 J — — — — — —

y^y::A^A. N/A

N/A

N/A

NOTES: Results expressed in ug/l. (2)

<3)

U.S. Environmental Protection Agency maximum contaminant level.

No MCL is associated with this compound.

KEY: - = Not Detected B = Organic qualifier indicating that this compound was also delected in the associated laboratory method blank. B = Inorganic qualifier indicating that this analyte was found below the instrument detection limit, but above Ihc

client-required detection limit. J = Estimated value (Organics Only). NA = Not Analyzed

Page 19: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TABLE 3

MW-101 HISTORIC SUMMARY OF DETECTED GROUND WATER ANALYTES

SULLIVAN LA(VDF(LL

Volatile Organic eompoundS:(u Acetone 2-Bulanone (MEK.) 4-Methyl-2-Pentanone (MIBK) 1,1-Dichloroethane 1,1-Dichloroethene Methylene Chloride 1,1,1 -Trichloroethane Trichioroethene Tetrachloroethene Toluene Dibromochloromethane Dichlorodifluoromethane Trichlorofluoromethane Dichlorofluoromethane cis-1,2-Dichloroethene

5/23/92

imym-— •

— — — — „

4 J — —

NA NA NA -

IribrganicAiialytes (total) |ug/l)iV^;;?'>;: ' Barium Chromium Lead

90 -

10

Inorganic Analytes (dissolved) (ug/l) ; Barium Chromium Lead

NA NA NA

7/22/92

y!MyA — -— -— -— ---~

NA NA NA -

— -

8 A A A L ' •'y'--'

NA NA NA

2/13/93

wAy.-' -. . -— --— — --— — -

51 30 -

• • " • . • ' • ' , • • - . • "

NA NA NA

M r ^ ^ - ' - . : • ' • ;••.•:

— -

-

8/30/93 •:,0^/-:^!it

. . -—

' — -—

4.2 -—

3.3 J -

31 26 -

NA NA NA

• • : :y^iy-- :

53 —

-

5/24/94 ^ - Vr f . ' ' ^> ; : ' • ; . : ; • ; ,

— — — —

— —

1.9 — —

2.2 —

26.2 18.6 —

52 --—

60 —

-

Page

9/6/94 ; • • ; . • ; , ; • : . ; ' : ; : • . • • • • • : : :

— — — — — — —

3.7 — — — —

43.8 23.7

-

53 -—

58 -

-

of 5

S 3/24/95

' • • • . • • i ^ ' ' ' 7 ' - : . - : ' - :

— -— -— -—

2.1 -— —

2.1 26.8 16.3 -

• • ; , . • • • • • • : • • : : - u -

56 --

: • • : : • • • : • • • . • • " ; • . : . : • • '

64 -

-

ample Event 6/28/95

'X''7:s:.'' •P:w

-------

2.2 ~

1.8 —

1.9 24.8 19.4

-

51 -__

^v • . • ; : • : : • •:•••• \ - V ^

57 -

-

9/15/95 V'^'v/;!'^;;:- /'--^

-

----—

3.7 -— —

3 32.4 22.5

-• : • • • : • • . '

53 -—

•• ' : i ' . ' ' . ' ' • • • •

56 -

-

12/18/95

yy^'Wy

-----

4.1 ----

4.9 42.3 39.8

-

58 --

yy"\y::-55 —

~

5/3/96

yii -y^yM-

--— -

3.2 --—

4.8 32.9 25.5

-

63 -—

: . . ; , . . . ; , • . - , ; , :

54 -

-

6/23/97

Ay'yy;: -

3 J --— -— --—

NA NA NA NA -

• . ' • • ; • ' •• ' / i : ; '

61.1 -—

NA NA NA

7/22/98

y y y y y 4 BJ

----

1 BJ -

3 J — -

NA NA NA NA -

:";-:.i,\..::;':,--';

67 B 4.5 B

NA y :: ^ :ii''\\^\i

NA NA NA

6/29/99

''AA^'W. --—

0.3 J ~

0.2 J —

2.3 0.3 J

-

NA NA NA NA ~

^ i y • : y • ' y • .

. .

39 NA

yyi<yry' i-NA NA NA

5/22/00 »?ir.v:i.v-:-.i-'v-".v^ •i4-:5j;j?::;.W3V:i

-~ —

0.4 J -~

0.4 J 3.8

0.4 J 0.1 J

NA NA NA —

' ' t .V'>>' ' .v- ' ' . ' '~! 'V"

NA NA NA

AMAA . . —

5/14/02

mmmii 1.4 J.B

--~ ~

0.4 J.B — 1.2 — — -

NA NA NA

0.3 J l..Vi'''.:.^.-,5i.'.*r:a.-;^.'; ;!•..•,• St.2-:;;.n'(.iii

NA NA NA

Aim;m 62 B

-

KEY: - = Not Detected B = Organic qualifier indicating that this compound was also detected in the associated laboratory mediod blank. B = Inorganic qualifier indicating that this analyte was found below the instrument detection limit, but above the client-required detection limit. J = Estimated value (Organics Only). NA = Not Analyzed

Page 20: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TABLE 3

MW-103

HISTORIC SUMMARY OF DETECTED GROUND WATER ANALYTES SULLIVAN LANDFILL

V6latilcl:Organic:C6iinp6iinUs''(ii

Acetone

2-Butanone (MEK)

4-Methyl-2-Pentanone (MIBK)

1,1-Dichloroethane

1,1-Dichloroethene

Methylene Chloride

1,1,1 -Trichloroethane

Trichioroethene

Tetrachloroethene

Toluene

Dibromochloromethane

Dichlorodifluoromethane

Trichlorofluoromethane

Dichlorofluoromethane

Page: . o f 5

S a m p l e Even t

5/20/92

imA'y — — — — — — — — -—

NA

NA

NA

7/22/92

x^-y0?ipSf

— — — — — .. .. — — — —

NA

NA

NA

2/11/93

yy^y-e-— — . — — — — — — — — — — 63

8/30/93 .?>;: •'•.:.^::f-ij>;:

_. — — — — — — — — — — — 76

5.6

5/24/94

y y y y ^ — — — — — — 1.1

— — — —

4.7

14.4

24.4

9/6/94

y^'yyyi — — — — — — 1.4

— — — —

3.6

18.5

37.5

3/29/95 1 6/28/95 | 9/28/95 S-:;;y;iv; :'• ^ ::;•;;";:S';:*?• ^ ••'•-"Si'V- v^ --

--— — — — 1.3

— — --

7.7

176

43.3

— — — — — — 1.1

— — — — 6

174

42

— -— — — — 1.4

— — — —

6.1

179

54.2

12/18/95 :;;':;r;; ^ :;.;: :v

— --— — — 1.9

— — --

7.5

175

88.8

5/3/96

y-yyi-y --— — — — 1

— — — —

lO.I

185

74.1

6/24/97

ymym --— — — — — — — —

NA

NA

NA

NA

7/23/98

mmw 4 BJ

--— -

35 B

2 J

1 J

— —

NA

NA

NA

NA

6/30/99 1 5/23/00 •^if^i^:,^sj:^r:--^-::Y'''y:'-^-i^::'"i.

---

0.4 J

0.3 J

0.6 J

2

0.5 J

1.2

--

NA

NA

NA

----— -

0.8 J

-0.7 J

— -

NA

NA

NA

5/13/02

AmAm -~ -

0.4 J

— 0.8 J,B

0.8 J

0.6 J

0.7 J

— -

NA

NA

NA

l n b r g a n i c - A n a l y t e s ( t o t a l ) ( u g / l ) •••.;•..'-•-..i-.-: ..•..•••:•:/.• :.•; . ^v. •••.•• :-v-•••••.-\-...v-^-"':'-./^:-^-./'V;!.^-v:;; .:-.- ^

Barium

Chromium

Lead

NA

NA

NA

Inbrgariic;^nalytes:(dissbived)(iig/I)^^^-: : ^

Bar ium

Chromium

Lead

NA

NA

NA

— 70

10

'•'r^'iyy::':

NA

NA

NA

— 70

160

y:-:y^y''i:-NA

NA

NA

NA

NA

NA

L>:r-A': •'''•'•','A

50

— -

52

— ~

" • ' ^ ' • • ^ ^ V ; ' - ' ' r ? ' - - ;

52

— -

48

— ~

^ • i - ' . ' ' " - • • ^ ^ ^ ; ; ' ;

55

— -

52

— 198

48

— 119

54

— 119

A.-•iA..y_'':',y^^'\\.':*':.'y.. •'••"•.'• •.'. i" ' . ' i 'y'-"A;' '•

58

— -

51

— ~

90

— -

56

— 119

'i^^'.yy''-'^ 53

— -

54

— ' ' . • • . ' • ' • . ' ^ ' . ' . ^ i l ' . ' l : ' ^ '

58

— —

57.1 B

— -

:^V;J'ii^:i"^:>i' • • ' . . • » - ' I j t i . • . • • • . - . • . - . • ' . : • . . ;

NA

NA

NA

117 B

17.4 B

NA i:;. >K.;j;iy,:;v

NA

NA

NA

— 12.0

NA

NA

NA

NA

mAmAm^mm NA

NA

NA

— — -

NA

NA

NA

mm$m 59 B

— -

KEY: - = Not Detected

B = Organic qualifier indicating that this compound was also detected in the associated laboratory method blank.

B = Inorganic qualifier indicating that this analyte was found below the instrument detection limit, but above the client-required detection limit.

J = Estimated value (Organics Only).

NA = Not Analyzed

Page 21: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TABLE 3

MW-104 HISTORIC SUMMARY OF DETECTED GROUND WATER ANALYTES

SVLUy.\N LANDFILL

Page 3 of 5

Volatile Organic GoriipbuhdS;(ii Acetone 2-Dulanone(MEK) |4-Methyl-2-Pentanone (MIBK) 1,1-Dichloroethane

11,1-Dichloroethene Chlorofomi Methylene Chloride 1,1,1 -Trichloroethane Trichioroethene Tetrachloroethene [Toluene Dibromochloromethane Dichlorodifluoromethane Trichlorofluoromethane Dichlorofluoromethane cis-1,2-Dichloroethene

Sample Event | 5/23/92 7/22/92 2/13/93 8/30/93 5/23/00 5/14/02

l/iy-y-':-y..-^r .'L.:[:'y\ •• : ' • ' :A^' ' -y ' - . r -^: ;yyAyAAA 4 J —

30 J

— —

4 J — -

NA NA NA NA —

---—

— -— -— -

NA NA NA NA -

---------— ---89 52 -

— -— —

— ~ —

— -— — 58

. 60 —

0.92 J --

0.35 J — — —

0.37 J 4.3 0.49

-—

NA NA NA -

1.4 J,B -—

0.82 J —

0.23 J 0.37 J.B 0.95 J

6.8 1.1 -—

NA NA NA

0.55 J Inorganic.Analytes'(total)'(ug/l) •'.; '.y ::'• • y :!':': '• yy ' -Vyy- \ Barium Chromium Lead Inorganic Analytes (dissolved) ( Barium Chromium Lead

NA NA NA

ig/l) 70

— -

-60 60

- •• • ' • : - ' y ' '

NA NA NA

NA NA NA

: • • : ' • • , i ; : . V . - ; . . • .

---

NA NA NA

56 -

3.1

NA NA NA

,^:.):'vy-;'i ---

NA NA NA

'y'-yxy-90.3 B

KEY: - = Not Detected B = Organic qualifier indicating that this compound was also

detected in the associated laboratory method blank. B = Inorganic qualifier indicating that this analyte was found

below the instrument detection limit, but above the client-required detection limit.

J = Estimated value (Organics Only). NA = Not Analyzed

Page 22: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TABLE 3

MW-IOS HISTORIC SUMMARY OF DETECTED GROUND WATER ANALYTES

SULLIVAN LANDFILL

Page 4 of 5

Vbla tile .Organic;Gbmpourid$'(ii Acetone 2-Butanone (MEK) 4-Methyl-2-Pentanone (MIBK) 1,1-Dichloroethane 1,1-Dichloroethene Chloroform Methylene Chloride 1,1,1-Trichloroethane Trichioroethene Tetrachloroethene Toluene Dibromochloromethane Dichlorodi fl uoromethane Trichlorofiuoromethane Dichlorofluoromethane cis-1,2-Dichloroethene

5/24/92

m ^ y y y

— — 21 — —

3 J 5 6 — — —

NA NA NA —

Inbrgahic^nalyitM'(trital) Xiig/l)-i 'V-^ ; • Barium Ciiromium Lead

300 30 120

lnbrganic;Analytes(dissbIved)'(ug/l);f -; Barium Chromium Lead

NA NA NA

7/22/92 •lyf^yy^--^.

..

..

.. __ — .. .. .. .. — — —

NA NA NA —

iyryyyi 120 — 50

A.yAy.y-i'-r^

NA NA NA

2/2/93 :-"i.-.-:-:'y.yu:

— — — 27 — — — — — — — — — 89 320 —

t:'t;;^E'i:M NA NA NA

^i^iyA:'--120

— -

8/30/93 •:: :;:xfi p-/y.

— — — — — — — — — — —

23 J --

120

— ymy--^-y.

NA NA NA

•:^\A.-'A<'.y.:.i':.

120

— -

5/24/94 y y i y y y

— — —

8.0 — — —

9.4 2.5 — — —

2.7 31

84.1 —

iy : i :yyy 152

-—

• U ; ; : . ; ^ : j : : ' ;

-— -

9/6/94 y - • • . : - ^

— — —

11.7 — — —

9.6 4.3 — ---

50.6 114 —

'V'-'r y - y ' ^ r

123 --

139 — -

s 3/29/95

---

11.5 — — — 8.9 3.6

--

4.4 44.2 121

-•;V;t^i:,'Ov;-:-;;S

136

--

yyyyyyi: 153

--

imple Event 6/28/95

•.^•.••:}'^'ir.r,y.:y

— — —

10.1 — — —

7.1 2.6 -1.2 -

2.3 29.5 88.8 —

yyyi-yfi::: 121

--

136

--

9/22/95 ; , : ; > ; . ; : . : : • ; : • ; . : • ; ; ;

— — —

12.5 — — —

6.2 5.4 — — -

2.8 26.7 104 —

':yy'-o<' 'it-.;..

129 -—

. • v ^ • • : ; : • ; ; ^ ^ y ; ^ ;

131 — -

12/18/95 1 :''V''--"iVS--'-:'^'

-— —

8.1 — — — 3.6 2.9 — --

3.6 25.6 114

— si;Amiy

139

-—

':j<ff,ryuVi^

145 — -

5/3/96 )y-y'\- :i: -'y

— — —

17.1 — — — 1.7 4.8 — — —

7.7 197

28.9 —

y~:yy:y: 160 —

5.8

A y i ' A k 173 — -

6/23/97

-— — — — — — — -— -

NA NA NA NA —

yX:j}y^sy\{ 158 B

-—

':y':..i;yy'' NA NA NA

7/22/98

--—

- 12 1 J -

2 BJ 3 J 4 J

--

NA NA NA NA -

::-:-y'^yy 144 B 1.5 B

NA

'^yiy^y NA NA NA

6/29/99 :-':it±y;.ii-

-— — 13

0.9 J

-0.7 J

2.5 3.9

0.6 J

— —

NA NA NA

— :'}^{:yi'yA

— —

NA

'•^syAAi NA NA NA

5/23/00

•yp^yiiy}: ---

8.0 0.2 J

— 0.4 J

I.I 3.0

0.7 J

— -

NA NA NA —

ii?i&^>=fi'/i NA NA NA

^^0Ay — -

5/13/02

yAyi':^!i 6.4 B

--

7.6

'" 0.3 J 0.9 J,B 0.8 J

2.5 0.6 J

--

NA NA NA

0.5 J

•mf^m> NA NA NA

iytimm 143 B

— ~

KEY: - = Not Delected B = Organic qualifier indicating (hat Uiis compound was also detected in the associated laboratory method blank. B = Inorganic qualifier indicating Ihal Ihis analyte was found below the instrument detection limit, but above the client-required detection limit. J = Estimated value (Organics Only). NA = Not Analyzed

Page 23: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TABLE 3

v o s s WELL HISTORIC SUMMARY OF DETECTED GROUND WATER ANALYTES

SULLIVAN LANDFILL

Vblatiie'Organic CompbiindS/fii Acetone 2-Butanone (MEK) 4-Methyl-2-Pentanone (MIBK) 1.1-Dichloroethane 1.1-Dichloroethene Chlorofonn Methylene Chloride 1,1,1-Trichloroethane Trichioroethene Tetrachloroethene Toluene Bromodichloromethane Bromoform Dibromochloromethane Dichlorodifluoromethane Trichlorofluoromethane DichlorofluoroiTiethane cis-1.2-DichIoroethene

Page. ) 0 f 5

Sample Event 1 2/12/93

?/l) — — — — — — — — — — — -

NA 120 150 -

Iiibrganic Analytes ' ' ' ( u g / l j ; Barium Chromium Lead

NA NA NA

Iiiorgaiiic<Analytes (dissolved) (iig/O'V : y Barium Chromium Lead

90 -~

8/31/93 yy^wy"^'

— — — — — — — — — — — — ~ — -

15 J 19 J

-

NA NA NA

• • y y y ' - y i y

76 --

5/24/94 yy"::y-y.-<-

— — — 1.9 — — — 1.7 2.5 — — — -—

3.9 73.9 70 -

76

— y y y y - y

78

-

9/6/94 y y - . y y .

— — — •

2.0

— — 1.7 2.4 — — — ~ —

3.8 —

66.7 ~

82 — —

[•:-:^y'':yyy'^'

91 --

3/29/95 : y ' yy : yy^

— — —

2.3 — — — 1.5 2.8 — — — ~ —

4.7 70.1 76.7 —

• : • • ' • • • : :

82 — —

93 --

6/28/95 V. : ;V% ;>;::.

— — —

3.1 — — — 1.6 2.7 — — — -—

5.2 90.3 97.4 —

69 — —

'•^pyyifyy 78 — ~

9/22/95 12/18/95 .•:::^V.V.-.--. ,--V--\- :••;•:• • ' : ' : - : - y :

— — —

2.6

— — 1.5 2.8 — — — -—

5.7 81.4 80.8 ~

— —

3.1 — — — 1.8 3.1 — — — ~ — 7

88.7 161 —

83 — —

83 — —

''-v^iy'-y y^^ryyytiy^'j'^i^

85 — -

86 — -

5/3/96 :'.;: -.^ii^y^y/y

— — —

3.5 — —

1.6 3.4 — — — -—

8.7 92.7 192 —

85 — —

•^tif'-t*;!®'^!

96 — -

6/23/97 :yfii-jy'yy .y:

-— — — — — — — — 8 ~ — -

NA NA NA NA —

'. • - ••• • : : . ] : ' . ' . • •

88.2 B — —

i - Asiy::*: NA NA NA

1122199, • y y y y - y

--—

4J — —

2 BJ 2 J 3 J 1 J — — -

NA NA NA NA —

83 B —

NA yAAff &)

NA NA NA

6/30/99

mAym — —

5.2 — —

0.85 J 1.9 2.6

1 — — -

0.11 J NA NA NA —

ALyAA

— NA

^<?i5Jt5SSiv NA NA NA

5/23/00

wm^m& — — —

3.6

— —

1.2 J 1.6 J

0.93 J ~ ~ -—

NA NA NA —

'AAyL--NA NA NA

im'^^f^M — — -

5/14/02

"Ay^m^ 6.3 B

-—

5.5

0.89 J 0.99 1. B

1.5 3.3 1.2 -

0.38 J 0.44 J

— NA NA NA

0.24 J

A\yA"i NA NA NA

^M^^mB i 94.8 B

— ~

KEY: - = Not Detected B = Organic qualifier indicating that this compound was also detected in the associated laboratory method blank. B = Inorganic qualifier indicating that this analyte was found below the instrument detection limit, but above the client-required detection limit. J = Estimated value (Organics Only). NA = Not Analyzed

Page 24: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

AiA0A;^^0 ;^L&ir^^ i^ AWA^y- 'AA^^Ay^^^y A'AA-i

FIGURES

-.ijyi't

Ai'-' • ! - . - '

" ' * • • .

• • " ; - - ^

^ ^

'•A^A :• A L : • - . " . - . • . • ' > • • . •

•••••.•f J . '

• . - • ^ . ' ' j O L .

. ' - ••j.^L.-'S^

ri-^:k;;-••;-i?sy>*f? ts

. . '-• - . V -

',*"'.

•*.r*.-

• •' • ^" •?

^ • • " • ' i t - '

.iV^V

. ; • : ; • ; ^

• . - V . -

r^. • - " " '

.y.-

<

>" .. .xi.

i

A':m^A

yySy-Ai A'-:'A-: - ' -

. .•:1;: ' jAAyy

" • y.i.~'y:.'-.''y'-.''-'-

Page 25: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

DAW H:\A31\A3197\ACAD\FG1.DWG - June 25, 2002 - 15:15:06

APPROXIMATE EDGE OF LANDFILL

APPROX. SCALE (ft.)

0 300

SYMBOL LEGEND

® WELL LOCATION

MW-101

I

I I ®

/ voss WELL

1

/ © MW-102 A/B

/ / B-201

I

MW-105

FIGURE 1 SITE PLAN AND WELL LOCATIONS

SULLIVAN LANDFILL SULLIVAN, MISSOURI

ERM

Page 26: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

DAW H:\A31\A3197\ACAD\FG2_WL.DWG - June 25, 2002 - 12:05:44

APPROXIMATE EDGE OF LANDFILL

0

APPROX. SCALC (ft.)

300

SYMBOL LEGEND

® WELL LOCATION

GROUND WATER FLOW DIRECTION

— 7 2 5 — EQUIPOTENTIAL LINE

MW-101 735.08

L..

CONTOUR INTERVAL = 10 FT.

/ ® Mw-io2n / 731.01

B-201 I

-J MW-105 740.90

FIGURE 2 POTENTIOMETRIC SURFACE MAP

MAY 13, 2002 SULLIVAN LANDFILL SULLIAN, MISSOURI

ERM

Page 27: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

• • U y

APPENDIX A

FIELD DATA SHEETS

•v::^-,-v. ji- .ty-ir.

' y M • " . ' . ^

*". .-'."•.

"..

... , . t • ; .

. . ' - ; • « • ;

^-.-^JS.

• • M . ; S

';;;^;jr;,-,;;^rT'v

y^'-AiM

Page 28: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Environmental Resources Management Ground Water Sampling

Field Data Form ERM

Project* A3197

Project Description:

Samplers: AJC DAW

Sample I.D. MW-101 Date

2002 Biennial Ground Water Sampling Event

Affiliation: Observers: ERM None ERM

5/14/02 Time 9:10

Affiliation:

Well Number MW-101

Material PVC

Pre-Purge 152.00

Length of Water Column

Pumping Method

Turbidity (NTU)

95 80 60 100

Total Depth 185 (ft)

Screened Interval

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge

33 Casing Volume

Dedicated Bailer Sampling Method De

STABILIZATION TEST

Conductance Te pH (umhos/cm)

7.97 398 8.05 388 7.73 386 7.89 383

I.D. 2

Sampling

5.4 (gal)

Jdicated Bailer

mperature (F)

60.3 59.4 58.3 58.2

(in)

(ft)

Cumulative Volume (gal)

6 8 10 12

'

OBSERVATIONS Collected samples for VOCs and dissolved metals (BE J, Pb, Cr)@ 1005

Page 29: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Project # A3197

Project Description:

Samplers: AJC DAW

Environmental Resources Managem Ground Water Sampling

Field Data Form

Sample I.D. MW-102A Date

2002 Biennial Ground Water Sampling Event

Affiliation: Observers: ERM None ERM

ent

5/14/02 Time

1 1

^ ^

ERM

8:35

Affiliation:

Well Number MW-102A

Material PVC

Pre-Purge 176.86

Length of Water Column

Pumping Method

Turbidity (NTU)

Total Depth 275 (ft)

Screened Interval

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge

98.14 Casing Volume

I.D. 2 (in

(ft)

Sampling

16.0 (gal)

)

Sampling Method

STABILIZATION TEST

Conductance Temperature Cumulative pH (umhos/cm) (F) Volume (gal)

OBSERVATIONS No samples collected from well, only depth to water measurement.

Page 30: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Environmental Resources Management Ground Water Sampling

Field Data Form

1

9 J ^ ^ ERM.

Project # A3197 Sample I.D. MW-102B Date 5/14/02

Project Description: 2002 Biennial Ground Water Sampling Event

Samplers: AJC DAW

Well Number MW-102B

Material PVC

Affiliation: ERM

Observers: None

ERM

Total Depth 210 (ft)

Screened Interval

I.D.

Time 8:30

Affiliation;

.(in)

(ft)

Pre-Purge 165.00

Length of Water Column 45

Pumping Method

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge Sampling

7.3 Casing Volume _

Sampling Method

(gal)

Turbidity (NTU) pH

STABILIZATION TEST

Conductance (umhos/cm)

Temperature (F)

Cumulative Volume (gal)

OBSERVATIONS No samples collected from well, only depth to water measurement.

Page 31: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Project # A3197

Project Description:

Samplers: AJC DAW

Environmental Resources Management Ground Water Sampling

Field Data Form

Sample I.D. MW-102B Date 5/14/02

2002 Biennial Ground Water Sampling Event

Affiliation: Observers: ERM None ERM

Time

1 : I ' l l " \ i ' i l V.-i ' CK h ^ ' ERM.

8:30

Affiliation:

Well Number MW-102B

Material PVC

Pre-Purge 165.00

Length of Water Column

Pumping Method

Turbidity (NTU)

Total Depth 210 (ft) I.D.

Screened Interval

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge Sampling

45 Casing Volume 7.3 (gal)

Sampling Method

STABILIZATION TEST

Conductance Temperature pH (umhos/cm) (F)

2 (in

(ft>

C Vc

)

jmulative lume (gal)

OBSERVATIONS No samples collected from well, only depth to water measurement.

Page 32: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Projects A3197

Project Description:

Samplers: AJC DAW

Environmental Resources Management Ground Water Sampling

1 i c i i u L ^ d i a 1 W i l l i

Sample I.D. MW-103 Date

2002 Biennial Ground Water Sampling Event

Affiliation: Observers: ERM None ERM

I •' "H ' i

ERM.

5/13/02 Time 11:00

Affiliation:

Well Number MW-103

Material PVC

Pre-Purge 177.18

Length of Water Column

Pumping Method

Turbidity (NTU)

110 450

1000+ 1000+

OBSERVATIONS

30.82

Total Depth 208 (ft)

Screened Interval

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge

Casing Volume

Dedicated Bailer Sampling Method Df

pH 6.99 7.55 7.94 7.90

Collectec

STABILIZATION TEST

I.D. 2

Sampling

5.0 (gal)

'dicated Bailer

Conductance Temperature (umhos/cm) (F)

314 59.4 322 317 316

1 samples for VOCs and dissolved metals (BE

65.5 64.7 64.5

3, Pb, Cr) @ 1200 Turbidity Meter has an upper maximum reading of 1000 NTU

(in)

(ft)

Cumulative Volume (gal)

2 5 8 11

Page 33: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Project* A3197

Project Description:

Samplers: AJC DAW

Er

2002 Bie

ivironmental Resources Managem Ground Water Sampling

Field Data Form

Sample I.D. MW-104 Date

nnial Ground Water Sampling Event

Affiliation: Observers: ERM None ERM

ent

5/14/02 T ime

l.jM • ,.V

Sr^ ERM.

10:45

Affiliation:

Well Number MW-104

Material PVC

Pre-Purge 177.13

Length of Water Column

Pumping Method

Turbidity (NTU) 300 450 450

24.87

Total Depth 202 (ft)

Screened Interval

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge

Casing Volume

Dedicated Bailer Sampling Method De

STABILIZATION TEST

Conductance Te pH (umhos/cm) 7.8 632

7.74 7.86

612 603

I.D. 2

Sampling

4.1 (gal)

jdicated Bailer

mperature (F)

64.9 64.1 63.2

(in

(ft]

)

Cumulative Volume (gal)

4 6 8

.

OBSERVATIONS Collectec samples for VOCs and dissolved metals (BE J, Pb, Cr)@1130

Page 34: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Projects A3197

Project Description:

Samplers: AJC DAW

Environmental Resources Managem Ground Water Sampling

Field Data Form

Sample I.D. MW-IOS Date

2002 Biennial Ground Water Sampling Event

Affiliation: Observers: ERM None ERM

ent

5/13/02 T ime

hr^"' P ^ hfH

ERMJ

13:40

Affiliation:

Well Number MW-105

Material PVC

Pre-Purge 140.79

Length of Water Column

Pumping Method

Turbidity (NTU) 220 170 80 70

Total Depth 177 (ft)

Screened Interval

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge

36.21 Casing Volume

Dedicated Bailer Sampling Method De

STABILIZATION TEST

Conductance Te pH (umhos/cm)

6.76 648 7.54 622 7.94 653 7.59 639

I.D. 2

Sampling

5.9 (gal)

dicated Bailer

mperature (F)

61.0 61.4 63.6 60.4

(in

(ft]

)

Cumulative Volume (gal)

7 12 18 20

OBSERVATIONS Collected samples for VOCs and dissolved metals (BE i, Pb, Cr) @ 1445

Page 35: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Project # A3197

Project Description:

Samplers: AJC DAW

Environmental Resources Management Ground Water Sampling

Field Data Form

Sample I.D. MW-201 Date 5/14/02 Time

2002 Biennial Ground Water Sampling Event

1 V i • 1 ; j 1 i - 1 1 ' ,

^ ^ M s f i

ERMJ

12:00

Affiliation: Observers: Affiliation: ERM None ERM

Well Number MW-201

Material PVC

Pre-Purge 9.37

Length of Water Column

Pumping Method

Turbidity (NTU)

Total Depth 20.2 (ft) I.D. 2 (in

Screened Interval (ft

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge Sampling

10.83 Casing Volume 1.8 (gal)

Sampling Method

STABILIZATION TEST

Conductance Temperature C p'H (umhos/cm) (F) Vc

)

umulative )lume (gal)

OBSERVATIONS No samples collected from well, only depth to water measurement.

Page 36: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Environmental Resources Management Ground Water Sampling

Field Data Form ERM

Project # A3197 Sample I.D. Voss Weil Date 5/13/02 Time 10:15

Project Description: 2002 Biennial Ground Water Sampling Event

Samplers: AJC DAW

Affiliation: ERM

Observers: None

ERM

Affiliation:

Number Voss

Material PVC

re-Purge

gth of Water Column

Pumping Method

Total Depth (ft) I.D. 2

Screened Interval

WATER LEVEL TO TOP OF CASING (ft)

Post-Purge Sampling

Casing Volume (gal)

Dedicated Pump Sampling Method Dedicated Pump

_ ( i n )

_ ( f t )

STABILIZATION TEST

Turbidity (NTU)

0.0 0.0 1.1 0.0

pH 7.18 7.18 7.22 7.29

Conductance (umhos/cm)

425 415 415 412

Temperature (F)

59.2

Cumulative Volume (gal)

.-58.0 57.6 57.5 230

OBSERVATIONS Cumulative volume based on flow meter readings before and after purging. Water sample collected from spigot on well daytank after purging. Collected samples for VOCs and dissolved metals (Ba, Pb, Cr) @ 1030

Page 37: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

U'!:^^^^^^^Aiy^.if^AiyvyA^y^^y-''' •"

APPENDIK B

LABORATORY REPORT AND CHAIN-OF-CUSTODY FORMS

y *;;

• • ' ' . >S 'T . -S .

y " ? ••

• , . . v.,-VJ"•-,>•• " ' r ^ -

-riJiky::: yy

Page 38: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

; T L S T . LOUIS

ANALYTICAL REPORT

PROJECT NO. A3197

TRW Sullivan Landfill

Lot #: F2E140264

Alan Cork

ERM Inc 1630 Heritage Landing Drive

Siiite 100 St. Charles, MO 63303

SSVERH TRENT LABORATORIES, INC.

fflUJOA^}

MARTI HARD Project Manager

May 28, 2002

STL St. Lcxjis is a part of Severn Trent Laboratories, Inc.

S E V E R N

T R E N T

SI-RVICI S

S T L S t LAui*

13715 Rider Trail North

Eartti City, MO 63045

Tel 314 298 8566

Fax 314 298 8757

www.stt-inc.com

LOT# F2E140264

Page 39: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

; T L S T . LOUIS

May 29, 2002

STL LOT NUMBER: F2E140264

S E V E R N

T R E N T SI RVICI S

Castlebay, INC Earth aty, MO 63045 1175 William Pitt Way Pittsburgh. PA 15238 Tel 3W 298 8566

" Fax 314 298 8757 »n»w.s1Wjic.com

Dear Paul Jack,

This report contains the analytical results for the six samples received under chain of custody by Severn Trent Laboratories (STL) on iVIay 14, 2002. These samples are associated with your TRW Sullivan Landfill project (A3197).

All applicable quality control procedures met method-specified acceptance criteria except as noted on the following page.

This report shall not be reproduced except in full, without the written approval of the laboratory. This report is incomplete without the Case Narrative. Results are reported "as received" (i.e. wet weight) unless otherwise noted.

If you have a n / questions, please feel free to call me at (314) 298-8566.

Sincerely,

Marti Ward Project Manager cc; Alan Cork ERM Inc. cc: Project File

STL SL Louis is a part of Severn Trent LatxiratDries, Inc.

LOT* F2E140264

Page 40: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

STL S T . LOUIS

S E V E R N

T R E N r

si;uvu IS

STL SL Loiri*

LOT NUMBER F2E140264

Nonconformance 06-10498

Affected Samples: F2E140264 (1): VOSS WELL

Affected Methods: 8260 Volatiles

Case Narrative: Sample surrogate recovery for Toluene-d8 is outside established QC limits. This excursion is attributed to a matrix interference which is physically evident in the sample.

Corrective Action: The sample was rerun to confirm the low recovery of Toluene-d8 and the result of the reanalysis confirmed the first run. The lab will report both runs of the sample.

i\ STL SL Louis Is a part of Sei«m Trent Lalmatones, Inc.

LOT# F2E140264

Page 41: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

STL S T . LOUIS

SAMPLE SUMMARY

F2E14 0264

SAMPLED SAJ WQ # SAMPLS# CLIENT SAMPLE ID . DATE TIT

ElELP 001 VOSS WELL 05/13/02 10 ElELR 002 MW-103 05/13/02 12 ElELT 003 MW-105 05/13/02 14 ElELX 004 MW-101 05/14/02 10 ElELO 005 MW-104 05/14/02 11 ElELl 006 TRIP BLANK 05/14/02

NOTE (S) : A - The analytical results of ttie samples listed above are presented on the fallowing pages.

' All calculaiiDiu are perfonned before rounling to avoid round-off errors io calculated results.

- Results noted as ' N C ' were not detecud at or above the stated limit.

- TTiis repott tmist not be reproduced, except in fiifl, without tbe written approval of tbe laboratory.

- Results for tbe following parameters are never reported on a dty weight basis: color, corrosivity. density, flashpoint, ignitability, layen. odor,

paint filter test. pH. porosity pressure, reaciivicy, iedo& potentitl. specific gravity, spot tesa. solids, sohibility, tempeiaiure. viscosity, and weight.

LOT# F2E140264

Page 42: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL S T . LOUIS

METHODS SUMMARY

F2E140264

ANALYTICAL PREPARATION PARAMETER METHOD METHOD

Trace Inductively Coupled Plasma (ICP) Metals SW846 6010B SW846 3010A Volatile Organics by GC/MS SWa46 8260B SW846 50308/826

References:

SW846 "Test Methods for Evaluating Solid Waste, Physical/Chemical Methods", Third Edition, November 1986 and its updates.

LOT# F2E140264

Page 43: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

; T L S T . LOUIS

TRW INC

C l i e n t Sani>le ID: VOSS WELL

GC/MS V o l a t i l e s

L o t - S a n p l e # . . . D a t e S a m p l e d . . . P r e p D a t e Prep Batcb #... Dilution Factor

PARAMETER

F2E140264-001 Work Order #... 05/13/02 10:30 Date Received.. 05/23/02 Analysis Date.. 2144143 Analysis Time.. 1

Method

Chloromethane Vinyl chloride Bromomethane Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1,1-Dichloroethane 2-Butanone Chlorofonn 1,1,1 -Trichloroethane Carbon tetrachloride 1,2-Dichloroethane Benzene Trichioroethene 1,2-Dichloropropane Bromodi rh3 oromerhane 4-Methyl-2-pentanone cis-l,3-Dichloropropene Toluene trans-1,3-Dichloropropene 1,1, 2 -Trichloroethcine 2-Hexanone Tetrachloroethene Dibromochloromethane Chlorobenz ene Ethylbenzene xylenes (total) Styrene Bromoform 1,1,2,2-Tetrachloroethane 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene 1,2-Dibromo-3-chloro­

propane 1,2-Dibromoethane

RESULT ND ND ND ND 6.3 B ND 0.99 J,B ND 5.5 ND 0.89 J 1.5 ND ND ND 3.3 ND 0.38 J ND ND ND ND ND ND 1.2 ND ND ND ND ND 0.44 J ND ND ND ND ND

ND 1.0

(Continued on next page)

EIELPIAA 05/14/02 05/23/02 10:42

Matrix

SW846 8260B

REPORTING LIMIT 2.0: 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L tig/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L

WATER

ug/L

LOT* F2E140264

Page 44: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL S T . LOUIS

TRW INC

C l i e n t S a n p l e XD: VOSS WELL

GC/HS V o l a t i l e s

L o t - S a n p l e # . . . : F2E140264-001 Work O r d e r # . . . : EIELPIAA

PARAMETER 1,2,4-Trichloro­

benzene cis-1,2-Dichloroethene trauis -1,2 -Dichloroethene

RESULT

SURROGATE Toluene-da Dibromofluoromethane 1,2-Dichloroethane-d4 4-Bromofluorobenzene

ND

0.24 J ND

PERCENT RECOVERY

REPORTING LIMIT 1.0

1.0 1.0

RECOVERY LIMITS

Matrix : WATER

UNITS ug/L

ug/L ug/L

4.4 * 101 105 104

(85 (85 (85 (85

115) 119) 117) 115)

NcrrB(s) * Surrogate recovery is outaide sated control limits.

B Method blank ccntaminadoo. The associared metbod blank contains die target analyte at a repoiabic level.

J F.irimated result. Result is less than RL.

LOT# F2E140264

Page 45: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

5TL S T , LOUIS

TRW INC

C l i e n t S a n p l e XD: VOSS WKLL

GC/MS V o l a t i l e s

L o t - S a n p l e # . . . D a t e S a n p l e d . . . P r e p D a t e Prep Batch #... Dilution Factor

PARAMETER

F2E140264-001 Work Order #... 05/13/02 10:30 Date Received..

Analysis Date.. Ancd.y5is Time..

05/23/02 2144143 1

Method.

Chloromethane Vinyl chloride Bromome thane Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1,1-Dichloroethane 2-Butanone Chloroform 1/1,1-Trichloroethane Carbon tetrachloride 1,2-Dichloroethane Benzene Trichloroetheae 1,2-Dichloropropane R-rraiyyi-i r-Ti 1 ri-n-nn«»Miar|o

4-Methyl-2-pentanone cis-l,3-Dichloropropene Toluene trans-1,3-Dichloropropene 1,1,2-Trichloroethane 2-Hexanone Tetrachloroethene Dibromochloromethane Chlorobenzene Ethylbenzene Xylenes (total) Styrene Broooform 1,1,2,2-Tetrachloroethane 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene 1,2-Dibromo-3-chloro-

propane 1,2-Dibromoethane

RESULT 1.2 J ND ND ND 11 B ND 0.87 J,B ND 5.5 ND 1.2 1.6 ND ND ND 3.2 ND 1.1 ND ND ND ND ND ND 1.2 ND ND ND ND ND 1.7 ND ND ND ND ND

ND 1.0

(Continued on next page)

E1ELP2AA 05/14/02 05/23/02 13:10

Matrix

SW846 8260B

REPORTING LIMIT 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L. ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L

.: WATER

ug/L

LOT# F 2 E 1 4 0 2 6 4

Page 46: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

!TL ST. LOUIS

TRW INC

Client Sanple ID: VOSS WELL

GC/MS Volatiles

PARAMETER 1,2,4-Trichloro­

benzene cis-1,2-Dichloroethene trans-1,2-Dichloroethene

SURROGATE Toluene-ds Dibromofluoromethane 1,2-Dichloroethane-d4 4-Bromofluorobenzene

Work Order #

RESULT ND

ND ND

PERCENT RKCOVKRVr 4.0 * 109 108 103

. . . : E1ELP2AA

REPORTING LIMIT 1.0

1.0 1.0

RECOVERY LIMITS (85 - 115) (85 - 119) (85 - 117) (85 - 115)

Matrix....

UNITS ug/L

ug/L ug/L

: WATER

MOTB(S): * Surrogate recovery is outside stated control limits.

J Estimated result. ResuU is less than RL.

S Method blank contamination. Tbe associated method blank contains the target analyte at a reportable level.

LOT# F2E140264

Page 47: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

PL ST. LOUIS

TBW IHC

Client Sanple XD: VOSS WELL

TOTAL Metals

Lot-Sanple «...: F2E140264-0Q1

Date Sanpled...: 05/13/02 10:30 Date Received..: 05/14/02

REPORTING PARAMETER ' RESULT LIMIT UNITS METHOD

Matrix. WATER

PREPARATION- WORK ANALYSIS DATE ORDER »

Prep Batch #...: 2135157 Barium 94.8 B 200 ug/L SW846 6010B 05/15-05/16/02 BIKLPOA

Dilutiion Factor: 1 Analysis Time. . : 14:27 ;

; Chromiiim

L e a d

MOTB(S)

ND

ND

B Estimated result. Result is less dian RL.

1 0 . 0 u g / L SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 EIELPIA Di lu t ion Factor: 1 Analysis Time. . : 14:27

5 . 0 u g / L SW846 6010B . 0 5 / 1 5 - 0 5 / 1 6 / 0 2 EIELPIA Di lu t ion Factor: 1 Analysis Time. . : 14:27

LOT# F 2 E 1 4 0 2 6 4 1 0

Page 48: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

STL S T . LOUIS

L o t - S a n p l e # . . . D a t e S a m p l e d . . . P r e p D a t e Prep Batch #... Dilution Factor

PARAMETER

TRW INC

C l i e n t S a n p l e ID: MJ-IOS

GC/MS Volatiles

F2E140264-002 Work Order #...: EIELRIAA 05/13/02 12:00 Date Received..: 05/14/02 05/23/02 Analysis Date..: 05/23/02 2144143 Analysis Time..: 11:12 1

Method : SW846 8260B

Matrix. WATER

Chloromethane • Vinyl chloride Bromome thcine Chloroethane Acetone 1,1-Dichloroethene Methylene chloride, Carbon disulfide 1,1-Dichloroethane 2-Butanone Chloroform 1,1,1-Trichloroethane Carbon tetrachloride 1,2-Dichloroethane Benzene Trichioroethene 1,2 -DichloropropEuie Bromodichloromethane 4-Methyl-2-pentanone cis-1,3-Dichloropropene Toluene trans-1,3-Dichloropropene 1,1,2-Trichloroethane 2-Hexanone Tetrachloroethene D ib romo chloromethane Chlorobenzene Ethylbenzene Xylenes (total) Styrene Bromoform 1,1,2,2-Tetrachloroethane 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene cis-1,2-Dichloroethene trans-1,2-Dichloroethene 1,2-Dibromo-3-chloro­

propane

RESULT ND ND ND ND ND ND 0.76 J.B ND 0.39 J ND ND 0.82 J ND ND ND 0.55 J ND ND ND ND ND ND ND ND 0.73 J ND ND ND ND ND ND ND ND ND ND ND ND ND

REPORTING LIMIT 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 . 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L Tig/L ug/L . ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L

(Continued on next page)

LOT# F2E140264

Page 49: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL ST. LOUIS

TRW INC

Client Sanple ID: MW-103

GC/MS Volatiles

Lot-Sanple #...: F2E140264-002 Work Order #...: EIELRIAA

REPORTING

Matrix. WATER

PARAMETER RESULT LIMIT UNITS 1,2-Dibromoethane 1,2,4-Trichioro-

benzene

SURROGATE Toluene-da Dibromofluoromethane 1,2-Dichloroethane-d4 4-Bromofluorobenzene

ND ND

PERCENT RECOVERY 94 104 106 106

1.0 1.0

RECOVERY LIMITS (85 - 115) (85 - 119) (85 - 117) (85 - 115)

ug/L ug/L

laOTB(S) J Estimated resulL Result is less dian RL.

B Method blank contaniinaiion. The assodaied method blank contains the target analyte at a reportable level.

LOT# F2E140264 12

Page 50: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

STL S T . LOUIS

TRW INC

Client Sample XD: MW-103

TOTAL Metals

Lot-Sanple #... : F2E140264-002

Date Sanpled...: 05/13/02 12:00 Date Received..: 05/14/02

Matrix. WATER

PARAMETER RESULT REPORTING LIMIT UNITS METHOD

PREPARATION- WORK ANALYSIS DATE ORDER

prep Batch #...: 2135157 Barium

Chromium

58.6 B

ND

Lead

NDTB(S):

ND

B Esdinatsd result. Result is less dun RL.

LOT# F2E140264

200 u g / L Dilution Factor: 1

10 .0 ug/L Dilution Factor: 1

5 .0 ug/L Dilution Factor: 1

SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 BIELRX Analysia Time..; 14:33

SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 ElELRU Analysis Time...- 14:33

SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 ElELRi; Analysis Time..: 14:33

i ;

Page 51: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL S T . LOUIS

TRW XHC

C l i e n t S a n p l e ID: MJ-105

GC/MS Volatiles

Lot-Sanple #...: F2E140264-003 Work Order #. Date Sanpled...: 05/13/02 14 Prep Date : 05/23/02 Prep Batch #...: 2144143 Dilution Factor: 1

PARAMETER Chloromethane vinyl chloride Bromomethcuie Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1.1-Dichloroethane 2-Butanone Chloroform 1,1,1-Trichloroethane Carbon tetrachloride 1,2-Dichloroethane Benzene Trichioroethene 1,2-Dichloropropane Bromodichloromethane 4-Methyl-2-pentanone cis-1,3-Dichloropropene Toluene t r ans -1 ,3 -Dich loropropene 1,1,2 -Tr ich lo roe thcine 2-Hexanone Tetrachloroethene Dibromochloromethane Chlorobenzene Ethylbenzene Xylenes (total) Styrene Bromoform 1,1,2,2- Te trachloroethaine 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene cis -1,2 -Dichloroethene trans-1,2-Dichloroethene 1,2-Dibromo-3-chloro­

propane

:45 Date Received. Analysis Date. Analysis Time.

Method

RESULT ND ND ND ND 6.4 B ND 0.86 J,B ND 7.6 ND 0.27 J 0.80 J ND ND ND 2.5 ND ND ND ND ND ND ND ND 0.S9 J ND ND ND ND ND ND ND ND ND ND 0.47 J ND ND

(Continued on next page)

EIELTIAA 05/14/02 05/23/02 11:42

Matrix

SW846 8260B

REPORTING LIMIT 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L

WATER

LOT# F2E1402 64 14

Page 52: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

!TL S T . LOUIS

TRW INC

C l i e n t S a n p l e XD: MW-105

GC/MS V o l a t i l e s

L o t - S a n p l e # . . . : F2E140264-003 Work O r d e r # . . . : EIELTIAA

REPORTING

Matrix : WATER

PARAMETER RESULT LIMIT UNITS 1,2-Dibromoethane 1,2,4-Trichloro-

benzene

SURROGATE Toluene-d8 Dibromofluoromethane 1,2-Dichloroethane-d4 4-Bromofluorobenzene

ND ND

PERCENT RECOVERY 96 106 107 105

1.0 1.0

RECOVERY LIMITS (85 - lis) (85 - 119) (85 - 117) (85 - 115)

ug/L ug/L

HOTB(S) B Mettiod blank contaminatian. The associated mediod blank comains the target analyte at a reportable level.

J Estimated result. Result is less than RL.

LOT# F 2 E 1 4 0 2 6 4 IE

Page 53: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL ST. LOUIS

TRW INC

Client Sample ID: )1W-105

TOTAL Metals

Lot-Sanple #...: F2E140264-003

Date Sanpled...: 05/13/02 14:45 Date Received..: 05/14/02 Matrix. WATER

PARAMETER RESULT REPORTING LIMIT UNITS METHOD

PREPARATION- WORK ANALYSIS DATE ORDER #

P r e p B a t c h # . . . : 2 1 3 5 1 5 7 Bari\im 143 B

Chromium

Lead

NOTg(S)

ND

ND

200 u g / L Dilution Factor: 1

10 .0 ug /L Dilution Factor: 1

5.0 ug /L Dilution Factor: 1

SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 EIELTIAC Analysis Time. . : 14:39

SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 EIELTIAI Analysis Time. . : 14:39

SW846 6010B . 0 5 / 1 5 - 0 5 / 1 6 / 0 2 EIELTIAI Analysis Time. . : 14:39

B Estimaied result. Result is less than RL.

LOT# F2E140264 16

Page 54: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

JTL S T . LOUIS

TRW INC

C l i e n t S a n p l e ED: MW-101

GC/MS V o l a t i l e s

L o t - S a n p l e # . . . D a t e S a n p l e d . . . P r e p D a t e Prep Batch #... Dilution Factor

PARAMETER

F2E140264-004 Work Order #... 05/14/02 10:05 Date Received.. 05/23/02 Analysis Date.. 2144143 Analysis Time.. 1

Method

RESULT Chloromethane Vinyl chloride B romome t hane Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1,1-Dichloroethane 2-Butanone Chloroform 1,1,1-Trichloroethane Carbon tetrachloride 1,2-Dichloroethane Benzene Trichioroethene 1,2-Dichloropropane Bromodichloromethane 4-Methyl-2-pentanone cis-l,3-Dichloropropene Toluene trans-1, 3-Dichloropropene 1,1,2-Trichloroethane 2-Hexanone Tetrachloroethene Dibromochloromethane Chlorobenzene Ethylbenzene Xylenes (total) Styrene Bromoform 1,1,2,2-Tetrachloroethane 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene cis -1,2-Dichloroethene trans-1,2-Dichloroethene 1,2-Dibromo-3-chloro­

propane

J,B

ND ND ND ND 1.4 ND 0.44 J,B ND ND ND ND ND ND ND ND 1.2 ND, ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND 0.29 J ND ND

(Continued on next page)

ElELXlAA 05/14/02 05/23/02 12:11

Matrix

SW846 8260B

REPORTING LIMIT 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L

WATER

LOT# F 2 E 1 4 0 2 6 4

Page 55: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL ST. LOUIS

TRW INC

Client Sanple ID: MW-101

GC/MS Volatiles

Lot-Sanple #...: F2E140264-004 Work Order #...: EIELXIAA Matrix. : WATER

PARAMETER RESULT REPORTING LIMIT UNITS

1,2 -Dibromoethcuie 1,2,4-Trichloro-

benzene

SURROGATE Toluene-de Dibromofluoromethane 1,2 -Dichloroethcm.e-d4 4-Bromofluorobenzene

ND ND

PERCENT RECOVERY 98 105 105 105

1.0 1.0

RECOVERY LIMITS (85 - 115) (85 - 119) (85 - 117) (85 - 115)

ug/L ug/L

HOTS(S) J Estimated resulL Result is lesi than RL.

B Method blank contamination. The Msoriatfd metbod blank contains die target analyte at a reportable lev^i.

LOT# F2E140264 1 8

Page 56: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

PL ST. LOUIS

TRW IHC

Client Sanple XD: Mf-101

TOTAL Metals

Lot-Sanple #...: F2E140264-004

Date Sanpled...: 05/14/02 10:05 Date Received..: 05/14/02 Matrix. WATER

PARAMETER RESULT REPORTING LIMIT UNITS METHOD

PREPARATION- WORK ANALYSIS DATE ORDER #

Prep Batch #...: 2135157 Barium 62.1 B

Chromium

Lead

NOTE(S)

ND

ND

B Estimated result. Result is leas than RL.

LOT# F2E140264

200 u g / L Dilution Factor: 1

10.0 ug /L Dilution Factor: 1

5 .0 ug /L Dilution Factor: 1

SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 BlELZlAt Analysis Time..: 14:44

SW846 6010B 0 5 / 1 5 - 0 5 / 1 5 / 0 2 EIELXIAI Analysis Time..: 14:44

SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 ElELXlAi Analysis Time..: 14:44

19

Page 57: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

STL S T . LOUIS

TRW INC

C l i e n t S a n p l e XD: MW-104

GC/MS V o l a t i l e s

lot-Sample «... Date Sanpled Prep Date Prep Batch # Dilution Factor

P2E140264-005 05/14/02 11:30 05/23/02

. 2144143

. 1

PARAMETER Chloromethane Vinyl chloride Bromomethane Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1,1-Dirhl oroethane 2-Butanone Chloroform 1,1,1-TrichloToethane Carbon tetrachloride 1,2 -Dichloroethcine Benzene "Ilirlil oroethene 1,2-Dichloropropane Bromodichloromethane 4-Methyl-2-pentanone cis-1,3-Dichloropropene Toluene trans-1,3-Dichloropropene 1,1,2-Trichloroethane 2-Hexanone Tetrarhloroethene Dibromochloromethane Chlorobenzene Ethylbenzene Xylenes (total) Styrene Bromoform 1,1,2,2-Tetrachloroethane 1,2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene cis-l,2-Dichloroethene trans-1,2-Dichloroethene 1,2-Dibromo-3-chloro­

propane

Work Date

Order #... Received..

Analysis Date.. Analysis Time..

Method

RESULT ND ND ND ND 1.4 J,B ND 0.37 ND 0.82 ND 0.23 0.95 ND ND ND 6.8 ND ND ND ND ND ND ND ND 1.1 ND ND ND ND ND ND ND ND ND ND 0.55 ND ND

J,B

J

J

a

J

EIELOIAA 05/14/02 05/23/02 12:41

Matrix

• SW846 8260B

REPORTING LIMIT 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 3.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L

WATER

(Cont inued on n e x t page)

LOT# F 2 E 1 4 0 2 6 4

Page 58: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

ITL ST. LOUIS

TRW INC

Client Sanple XD: MW-104

GC/MS Volatiles

Lot-Sanple #...: F2E140264-005 Work Order #...: EIELOIAA Matrix. WATER

PARAMETER RESULT REPORTING LIMIT UNITS

1,2-Dibromoethane 1,2,4-Trichloro-

benzene

SURROGATE Toluene-da Dibromofluoromethane 1,2 -Dichloroethane-d4 4-Bromofluorobenzene

ND ND

PERCENT RECOVERY 102 103 104 109-

1.0 1.0

RECOVERY LIMITS (85 - 115) (85 - 119) (85 - 117) (85 - 115-)

ug/L ug/L

NOTB(S) J Fqimated result. Result is less dun RL.

B Method blank conumination. The asaiciatwi method blank comains Ihe target analyte at a repoiable level.

LOT# F2E140264 2 1

Page 59: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

JTL S T . LOUIS

TRW INC

C l i e n t S a n p l e XD: MW-104

TOTAL M e t a l s

L o t - S a n p l e # . . . : F2E140264-005 Da te S a m p l e d . . . : 05 /14 /02 11:30 Da te R e c e i v e d . . : 0 5 / 1 4 / 0 2

REPORTING PARAMETER RESULT LIMIT UNITS METHOD

Matrix. WATER

PREPARATION- WORK ANALYSIS DATE ORDER

Prep Batch #...: 2135157 Bairium 90.3 B 200 ug/L SW846 6010B 05/15-05/16/02 BlELOl?

Dilution Factor: 1 Analysis Time..: 14:50

Chromium

Lead

ND

ND

10 .0 ug /L SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 ElELOl^ Dilution Factor: 1 Analysis Time..: 14:50

5 .0 ug /L SW846 6010B 0 5 / 1 5 - 0 5 / 1 6 / 0 2 ElELOU Dilution Factor: 1 Analysis Time..: 14:50

NOTB(S) :. B Estimattd result. Result ts less than RL.

LOT# F 2 E 1 4 0 2 6 4 22

Page 60: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL ST. LOUIS

TRW IHC

Client Sanple XD: TRIP BLANK

GC/MS Volatiles

TKDt-Sanple # — Date Sanpled... Prep Date Prep Batch # Dilution Factor

F2E140264-006 05/14/02 05/23/02

: 2144143 : 1

PARAMETER Chloromethane Vinyl chloride Bromomethane Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1,1-Dichloroethane 2-ButeUione Chloroform 1,1,1-Trichloroethane Carbon tetrachloride 1,2-Dichloroethane Benzene Trichioroethene 1, 2 -Dichloropropeine Bromodichloromethane 4-Methyl-2-pentanone cis-1,3-Dichloropropene Toluene trans-1,3-Dichloropropene 1,1,2-Trichloroethane 2-Hexanone Tetrachloroethene Dibromochloromethane Chlorobenzene Ethylbenzene Xylenes (total) Styrene Bromoform 1,1,2,2-Tetrachloroethane 1, 2-Dichlorobenzene 1,3-Dichlorobenzene 1,4-Dichlorobenzene cis-1,2-Dichloroethene trans-1,2-Dichloroethene 1,2-Dibromo-3-chloro-

Work Date

Order #... Received..

Analysis Date.. Analysis Time..

Method

RESULT ND ND ND ND 4.3 B ND 0.30 ND ND 0.49 ND ND ND ND ND ND ND ND ND ND 0.30 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND

J,B

J

J

ElELllAA 05/14/02 05/23/02 10:12

Matrix

: SW846 8260B

REPORTING LIMIT . 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 3.0 1.0 X.O 1.0 1.0 1.0 1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L •ug/L

. . . . : WATER

propane

(Continued on next page)

LOT# F2E140264

Page 61: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

rL ST. LOUIS

TRW INC

Client Sanple ID: TRIP BLANK

GC/MS Volatiles

Lot-Sasple #.

PARAMETER

F2E140264-006

1,2-Dibromoethane 1,2,4-Trichloro­

benzene

SURROGATE Toluene-da Dibromofluoromethane 1,2-Dichloroethane-d4 4-Bromofluorobenzene

?fork Order #..

RESULT ND ND

PERCENT RECOVERY 95 99 101 101

. : ElELllAA

REPORTING LIMIT 1.0 1.0

RECOVERY LIMITS (85 - 115) (85 - 119) (85 - 117) (85 - 115)

Matrix

UNITS ug/L ug/L

WATER

NOTB(S) ; B Method blank contaminatioo. The awociateri mediod bbmk contains die target analyte at a reportable level.

J Estimated result. Result is less than RL.

LOT# F 2 E 1 4 0 2 64 24

Page 62: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

ITL ST. LOUIS

C l i e n t Lot # . . . : MB Lot-Sanple #:

Analysis D a t e . . : D i lu t i on Fac to r :

PARAMETER

F2E140264 F2E240000-

05/23/02 1

143

Chloromethcine Vinyl chloride Bromome thane Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1,1-Dichloroethane 2-Butanone Chloroform 1,1,1-Trichloroethane Carbon tetrachloride 1,2-Dichloroethane Benzene Tri chloroethene 1, 2-Dichloropropane Bromodichloromethane 4-Methyl-2-pentanone cis-1,3-Dichloropropene Toluene trans-1,3-Dichloropropene 1,1,2-Trichloroethane 2-Hexanone Tetrachloroethene Dibromochloromethane Chlorobenzene Ethylbenzene Xylenes (total) Styrene Bromoform 1,1,2,2-Tetrachloroethane 1,2-Dichlorobenzene 1, 3-Dichlorobenzene 1,4 -Dichlorobenzene 1,2-Dibromo-3-chloro-propane

1,2-Dibromoethane cis-l,2-Dichloroethene trans -1,2-Dichloroethene 1,2, 4-Trichloro-

b e n z e n e

METHOD BU^NK REPORT

GC/MS Volatiles

Work Order #...: E108T1AA

Prep Date... . Prep Batc:h #.

RESULT ND ND ND ND 2.2 ND 1.5 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND .ND ND

ND ND ND ND

: 05/23/02 : 2144143

REPORTING LIMIT 2.0 2.0

1.0 1.0 1.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1-0 1.0 S.O 1.0 1.0 1.0

1. 5. 1. 1. 1. 1, 3. 1 1 1.0 1.0 1.0 1.0 1.0

1.0 1.0 1.0 1.0

UNITS ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L ug/L

ug/L ug/L ug/L ug/L

Matrix : WATER

Analysis Time..: 09:01

METHOD SW846 S260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SWB46 8260B SW846 8260B SW846 8260B SW846 8260B SW84e 8260B SW846 8260B SW846 8260B SW846 8260B SWe46 8260B SWS46 8260B SW846 8260B SWS46 8260B SW846 8260B SW846 8260B SW846 8260B SWS46 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 8260B SW846 82e0B 5W846 8260B

SW846 8260B SW846 8260B SW846 8260B SW846 8260B

(Continued on next page)

LOT* F2E140264

Page 63: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

r L S T . LOUIS

C l i e n t L o t # . . . : F2E140264

PARAMETER

METHOD BLANK REPORT

GC/MS Volatiles

Work Order *...: E108T1AA Matrix. WATER

RESULT REPORTING LIMIT UNITS METHOD

SURROGATE Toluene-da Dibromofluoromethane 1,2-Dichloroethane-d4 4-Bromofluorobenzene

PERCENT RECOVERY 96 104 100 103

RECOVERY LIMITS (85 -(85 -(85 -(85 -

115) 119) 117) 115)

HOTB(S) Calculations are performed before rounling to avoid rouod.off errors in calculated results.

LOT# F 2 E 1 4 0 2 6 4 2 6

Page 64: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

PL ST. LOUIS

Client Lot #...: F2E140264

PARAMETER RESULT

METHOD BLANK REPORT

TOTAL Metals

REPORTING LIMIT UNITS METHOD

Matrix. WATER

MB Lot-Sanple #: F2E150000-157 Prep Batch #...: 2135157 Barium

Chromium

Lead

NOTE(S)

ND

ND

ND

200 u g / L Di lu t ion Factor: 1 Analysis Time. . : 12:23

10 u g / L Di lut ion Factor: 1 Analysis Time. . : 12:23

5 u g / L Dilution. Factor: 1 Analysis Time. . : 12:23

SW846 6010B

SW846 6010B

SW846 6010B

Calculations are perfonned before rounding to avoid roundK>ff errors ic calculated resuhs.

PREPARATION- WORK ANALYSIS DATE ORDER #

0 5 / 1 5 - 0 5 / 1 6 / 0 2 E1E7K1AK

0 5 / 1 5 - 0 5 / 1 6 / 0 2 E1E7K1AM

0 5 / 1 5 - 0 5 / 1 6 / 0 2 E1E7K1AG

LOT# F2E140264 27

Page 65: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

STL S T . LOUIS

LABORATORY CONTROL SAMPLE EVAUmnON REPORT

GC/MS V o l a t i l e s

C l i e n t Lot # . . . LCS L o t - S a n p l e # P r e p D a t e Prep Batch #... Dilution Factor

PARAMETER

F2E140264 F2E240000-05/23/02 2144143 1

L43

rhioromethane Vinyl chloride Bromomethane Chloroethane Acetone 1,1-Dichloroethene Methylene chloride Carbon disulfide 1,1-Dichloroethane 2-Butanone Chloroform 1,1,1-Trichloroethane Car±}on tetrachloride 1,2-Dichloroethane Benzene Trichioroethene 1,2-Dichloropropane Bromodichloromethane 1,2-Dichloroethene

(total) 4-Methyl-2-pentanone cis-1,3-Dichloropropene Toluene trans-1,3-Dichlorpprppene 1,1,2 -Trichloroethane 2-Hexanone Tetrachloroethene Dihromochloromethaiie Chlorobenzene Ethylbenzene Styrene Bromoform 1.1,2,2-Tetrachloroethane 1,2 -Dictalorobenzenf^

Work Orde

Analysis

Analysis

PERCENT RECOVERY

94

100 60 91 81 85 84 90 97

113 98 94 91 100 100 90 102 106 98

120 106 95 106 98 120 84 103

99 96 104 108 108 104

sr #...:

Date..:

Time..:

E108T1AC

05/23/02

09:37

RECOVERY LIMITS

(13 (32 (30 (51 (57

(63 (47 (60

(81 (62 (85 (85 (82 (78 (85 (76 (85 (85 (84

(62 (85 (83 (83 (80

(55 (70 (85

(85 (84 (85 (81 (74 (85

- 150)

- 150) - ISO) - ISO)

- 116) - 150} - 125) - 150) - 120)

- 115) - 124)

- 136) - 140) - 128) - lis) - 128) - lis) - 124) - 118)

- 123) - lis) - 115) - 118) - 115) - 124) - 118) - 125)

- 115) - 115) - 115) - 129) - 122) - 115)

Matrix

METHOD SW846

SW846 SW846 SW846 SW846

SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846

SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846 SW846

8260B

8260B

8260B 8260B 8260B 8260B 8260B 8260B

8260B 8260B 8260B

8260B 8260B

8260B 8260B 8260B 8260B 8260B 8260B

8260B

8260B 8260B 8260B 8260B 8260B 8260B 8260B

8260B 8260B 8260B

8260B 8260B 8260B

: WATER

(Cont inued on nex t page)

LOT# F2E140264 2f

Page 66: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

ITL ST. LOUIS

LABORATORY CCNTROL SAMPLE EVALT]AnC»r REPORT

GC/MS Volatiles

Client Lot »...: LCS Lot-Sanple#:

F2E140264 Work Order #. F2E240000-143

. : E108T1AC Matrix. WATER

PARAMETER 1,3-Dichlorobenzene 1,4-Dichiorobenzene m-Xylene & p-Xylene o-Xylene

SURROGATE Toluene-da Dibromo fluoromethane 1,2-Dichloroethane-d4 4-Bromofluorobenzene

PERCENT RECOVERY

101 98 98

105

RECOVERY LIMITS

(85 - 115) (85 - 115) (85 - 115) (85 - 115)

PERCENT RECOVERY 99

100 101 105

METHOD SW846 8260B SW846 8260B SW846 8260B SW846 8260B

RECOVERY LIMITS (85 - 115) (85 - 117)

(85 - 119) (85 - 115)

SDTB(S): Calculations are performed before rounding to avoid tound-ofT errors in calculated results.

Bold prim denotes control parameiers

LOT# F2E140264 2 9

Page 67: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

PL ST. LOUIS

LABORATORY CONTROL SAMPLE EVALUATIOH REPORT

TOTAL Metals

Client Lot #...: F2E140264 Matarix. WATER

PARAMETER PERCENT RECOVERY RECOVERY LIMITS METHOD

LCS I iOt -Sanp le# : F2E150000-157 P r e p Ba t ch # . . . : 2135157 Lead

Barium

Chromium

NOTB(S)

96

102

96

(80 - 120) SW846 6010B Dilut ion Factor: 1 Analysis Time. . : 12:29

(80 - 120) SW846 6010B Dilut ion Factor: 1 Analysis Time.. ; 12:29

(80 - 120) SW846 6010B Dilut ion Factor: 1 Analysis Time. . : 12:29

PREPARATION-ANALYSIS DATS WORK ORDER »

05/15-05/16/02 E1E7K1A3

05/15-05/16/02 E1E7K1A6

05/15-05/16/02 ElE7KlAa

Cakoilaiions are performed before rounding to avoid rtJund^ilT errors in calculated results.

LOT# F 2 E 1 4 0 2 6 4 30

Page 68: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL ST. LOUIS

PSL20300 Page 1

SEVERN TRENT LABORATORIES, INC CLIENT ANALYSIS SUMMARY

STL St. Louis

Run Date Time

User Id.

5/14/02 15:47:18 CLARKEJ

CLIENT: 8011 ERM INC PROJECrr MANAGER: MARTI WARD PROJECT #: A3149 REPORT TO: Alan Cork P.O. NUMBER: SITE: TRW Sullivan Landfill AMOUNT REC"D: 3XVIAL40,500P STORAGE' LOC: VE2 , METS LOT COMMENTS: metals were filtered in the field MATRIX: WATER USAF MATRIX: SAMPLE ID: VOSS WELL QC PACKAGE: Reporc SAMPLE COMMENTS:

QUOTE/SAR #: 47683 LAB ID: F-2E140264-001 WORK ORDER: ElELP RECEIVING DATE SAMPLING DATE

ANALYTICAL DUE DATE REPORT DUE DATE

PRIORITY SAMPLING TIME

RECEIVING TIME

SDG#

5/14/02 5/13/02 5/23/02N 5/24/02 09

10:30 14:20

Beginning Depth: .00 Ending Depth:

***** ANALYSIS *****

Volatile Organics, GC/MS (8260B) PURGE AND TRAP - 25 mL purge (Waters) STL: SW-846 8260B (I-25-QK-01) ElELP-1-AA Protocol: A

.00

WRK LOC

06

REQUEST DATE

5/14/02

EXTRACTION EXP DATE

0/00/00

ANALYSIS EXP DATE

5/27/02

QC Program: STANDARD TEST SET

5/14/02 0/00/00 Inductively Coupled Plasma (6010B Trace) 06 METALS, TOTAL - Waters MT6010_L BA,CR,PB (I-05-QM-01) ElELP Protocol: A QC Program: STANDARD TEST SET

11/09/02

LOT# F2E140264 3 1

Page 69: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL ST. LOUIS

PSL20300 Page 1

SEVERN TRENT LABORATORIES, INC CLIENT ANALYSIS SUMMARY

STL St. Louis

Rxm Date Time

User Id.

5/14/02 15:47:18 CLARKEJ

CLIENT: 8011 ERM INC PROJECT MANAGER: MARTI WARD PROJECT #: A3149 REPORT TO: Alan Corlc P.O. NUMBER: SITE: TRW Sullivan Landfill AMOUNT REC"D: 3XVIAL40,500P STORAGE LOC: VE2,METS LOT COMMENTS: metals were filtered in the field MATRIX: WATER USAF MATRIX: SAMPLE ID: MW-103 QC PACKAGE: Report SAMPLE COMMENTS:

QUOTE/SAR #: 47683 LAB ID: F-2E140264-002 WORK ORDER: ElELR RECJEIVING DATE SAMPLING DATE

ANALYTICAL DUE DATE REPORT DUE DATE

PRIORITY SAMPLING TIME

RECEIVING TIME

SDG#

5/14/02 5/13/02 5/23/02N 5/24/02

09 12:00 14:20

Beginning Depth: 00 Ending Depth:

ANALYSIS

Volatile Organics, GC/MS (8260B) PURGE AND TRAP - 25 mL purge (Waters) STL: SW-846 8260B (I-25-QK-01) ElELR-1-AA Protocol: A

.00

WRK LOC

06

REQUEST DATE

5/14/02

EXTRACTION EXP DATE

0/00/00

ANALYSIS EXP DATE

5/27/02

QC Program: STANDARD TEST SET

5/14/02 0/00/00 Inductively Coupled Plasma (6010B Trace) 06 METALS, TOTAL - Waters MT6010_L BA,CR,PB (I-05-QM-01) ElELR Protocol: A QC Program: STANDARD TEST SET

11/09/02

LOT# F2E140264 32

Page 70: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

rL ST. LOUIS

PSL20300 Page 1

SEVERN TRENT LABORATORIES, INC CLIENT ANALYSIS SUMMARY

STL St. Louis

Run Date Time

User Id.

5/14/02 15:47:18 CLARKEJ

CLIENT: 8011 ERM INC PROJECT MANAGER: MARTI WARD PROJECT #: A3149 REPORT TO: Alan Cork P.O. NUMBER: SITE: TRW Sullivan Landfill AMOUNT RECD: 3XVIAL40 , 500P STORAGE LOC: VE2,METS LOT COMMENTS: metals were filtered in Che field MATRIX: WATER USAF MATRIX: SAMPLE ID: MW-105 QC PACKAGE: Report SAMPLE COMMENTS:

QUOTE/SAR #: 47S83 LAB ID: F-2E140264-003 WORK ORDER: ElELT RECEIVING DATE SAMPLING DATE

ANALYTICAL DUE DATE REPORT DUE DATE

PRIORITY SAMPLING TIME RECEIVING TIME

SDG#

5/14/02 5/13/02 5/23/02N 5/24/02 '

09 14:45 14:20

Beginning Depth: .00 Ending Depth:

***** ANALYSIS *****

Volatile Organics, GC/MS (8260B) PURGE AND TRAP - 25 mL purge (Waters) STL: SW-846 8260B (I-25-QK-01) ElELT-1-AA Protocol: A

.00

WRK LOC

06

REQUEST DATE

5/14/02

EXTRACTION EXP DATE

0/00/00

ANALYSIS EXP DATE

5/27/02

QC Program: STANDARD TEST SET

5/14/02 0/00/00 Inductively Coupled Plasma (6010B Trace) 06 METALS, TOTAL - Waters MT6010_L BA,CR,PB (I-05-QM-01) ElELT Protocol: A QC Program: STANDARD TEST SET

1 1 / 0 9 / 0 2

LOT# F 2 E 1 4 0 2 6 4 33

Page 71: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

TL ST. LOUIS

PSL20300 Page 1

SEVERN TRENT LABORATORIES, INC CLIENT ANALYSIS SUMMARY

STL St. Louis

Run Date Time

User Id.

5/14/02 15:47:19 CLARKEJ

CLIENT: 8011 ERM INC PROJECT MANAGER: MARTI WARD PROJECT #: A3149 REPORT TO: Alan Cork P.O. NUMBER: SITE: TRW Sullivan Landfill AMOUNT RECD: 3XVIAL40 , 500P STORAGE LOC: VE2,METS LOT COMMENTS: metals were filtered in the field MATRIX: WATER USAF MATRIX: SAMPLE ID: MW-101 QC PACKAGE: Repor t SAMPLE COMMENTS:

QUOTE/SAR #: 47683 LAB ID: F-2E140264-004 WORK ORDER: ElELX RECEIVING DATE SAMPLING DATE

ANALYTICAL DUE DATE REPORT DUE DATE

PRIORITY SAMPLING TIME

RECEIVING TIME

SDG# :

5/14/02 5/14/02 5/23/02N 5/24/02 09

10:05 14:20

Beginning Depth: .00 Ending Depth:

***** ANALYSIS *****

Volatile Organics, GC/MS (8260B) PURGE AND TRAP - 25 mL purge (Waters) STL: SW-846 8260B (I-25-QK-01) ElELX-1-AA Protocol: A

,00

WRK LOC

0€

REQUEST DATE

5/14/02

EXTRACTION ANALYSIS EXP DATE EXP DATE

0/00/00 5/28/02

QC Program: STANDARD TEST SET

5/14/02 0/00/00 Inductively Coupled Plasma {6010B Trace) 06 METALS, TOTAL - Waters MT6010_L BA,CR,PB (I-05-QM-01) ElELX Protocol: A QC Program: STANDARD TEST SET

11/10/02

LOT# F2E140264 34

Page 72: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

•TL ST. LOUIS

PSL2030C Page 1

SEVERN TRENT LABORATORIES, INC CLIENT ANALYSIS SUMMARY

STL St. Louis

Run Date Time

User Id.

5 / 1 4 / 0 2 1 5 : 4 7 : 1 9 CLARKEJ

CLIENT: 8011 ERM INC PROJECT MANAGER: MARTI WARD PROJECT #: A3149 REPORT TO: Alan Cork P.O. NUMBER: SITE: TRW Sullivan Landfill AMOUNT REC"D: 3XVIAL4 0,500P STORAGE LOC: VE2,METS LOT COMMENTS: metals were filtered in the field MATRIX: WATER USAF MATRIX; SAMPLE ID: MW-104 QC PACKAGE: Report SAMPLE COMMENTS:

QUOTE/SAR #: 47683 LAB ID: F-2E140264-005 WORK ORDER: ElELO RECEIVING DATE SAMPLING DATE

ANALYTICAL DUE DATE REPORT DUE DATE

PRIORITY SAMPLING TIME

RECEIVING TIME

SDG#

5/14/02 5/14/02 5/23/02N 5/24/02 09

11:30 14:20

Beginning Depth: 00 Ending Depth:

***** ANALYSIS *****

Volatile Organics, GC/MS (8260B) PURGE AND TRAP - 25 mL purge (Waters) STL: SW-846 8260B (I-25-QK-01) ElELO-1-AA Protocol: i

.00

WRK LOC

06

REQUEST EXTRACTION DATE EXP DATE

5/14/02 0/00/00

ANALYSIS EXP DATE

5/28/02

QC Program: STANDARD TEST SET

5/14/02 0/00/00 11/10/02 Inductively Coupled Plasma (6010B Trace) 06 METALS, TOTAL - Waters MT601Q_L BA,CR,PB (I-05-QM-01) ElELO Protocol: A QC Program: STANDARD TEST SET

LOT# F2E1402 64 35

Page 73: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

CL ST. LOUIS

PSL20300 Page 1

SEVERN TRENT LABORATORIES, INC CLIENT ANALYSIS SUMMARY

STL St. Louis

Rvin Date Time

User Id.

5/14/02 15:47:19 CLPKRKEJ

CLIENT: 8011 ERM INC PROJECT MANAGER: MARTI WARD PROJECT #: A3149 REPORT TO: Alan Cork P.O. NUMBER: SITE: TRW Sullivan Landfill AMOUNT RECD: 3XVIAL40 STORAGE LOC: VE2 LOT COMMENTS: metals were filtered in the field MATRIX: WATER USAF MATRIX: SAMPLE ID: TRIP BLANK QC PACKAGE: Report SAMPLE COMMENTS:

QUOTE/SAR #: 47683 LAB ID: F-2E140264-006 WORK ORDER: ElELl RECEIVING DATE SAMPLING DATE

ANALYTICAL DUE DATE REPORT DUE DATE

PRIORITY SAMPLING TIME

RECEIVING TIME

SDG#

5/14/02 5/14/02 5/23/02N 5/24/02

09

14:20

Beginning Depth: 00 Ending Depth:

ANALYSIS

.00

WRK LOC

REQUEST EXTRACTION ANALYSIS DATE EXP DATE EXP DATE

Volatile Organics, GC/MS (8260B) PURGE AND TRAP - 25 mL purge (Waters) STL: SW-846 8260B (I-25-QK-01) ElELl-1-AA Protocol: A

06 5/14/02 0/00/00 5/28/02

QC Program: STANDARD TEST SET

LOT# F2E140264 36

Page 74: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

Chain of

o

w Custody Record O ST1.-4I24 (0901(

w

S H V F R ,NJ

1 R K N T

Address I ' Z ~ aaress i '

Project Manager

^ V ^ ^ y C J L A M A A ^ Telephone Number (Area Code)/ fax Number

• 3

0} • 3

• Severn Trent Laboratories, Inc.ti

o _ d

H (0

Data 1 , 1

Lab fjumber/

"Z. Criain of Custody Number

138117 P a g o . I of I

?>K CUc^Us Kli Zip Code Sfte Contact Lab Contact

Project Name and Location (State)

St^jlivtwio Lt**vjl-»'ll Pt'eni fA.! ( :M)^f^Li, Carrier/Waybill Number

Contract/Purchase Oider/Ouoie No

1V\AJ M S A gc-k^ Sample I.D. No. artd Descriptiort

iContainers for eacti sample may be combined on one line) Date Time

Matrix Containers & Preservatives

Analysis (Attach list if i t ^ more space is rieeded)

1 £

Special Instructions/ Conditions of Receipt

Voe^ Wgui^ hK\t -\03>

|\ lo i^M K X 2C sls^Mt llDO )i

^ p ^Pci-^^

A W - 1 0 ^ 5 / » 3 / Q ^ /M5' 2< K X ^^^ i-iQl g/i4/( OT- /OO^" X K MW-104- ^ i ^ / o > j 2a ^ 2 IZ.

Tr:pgU^l< Da X 3vit//aJ5 ^ 0 Possible Hazard tdentilicalion

^ ^ N o n - H a z a r d CD Flammable (Z) Sd/n /rrrfanr CU Poison B CD L/n/trwivn

Sample Disposal

CD flafum To C//en( jSl^O/sposal fly Lab D Arcl^ive For . (A Ice may be assessed i l samples are retained

Months longer than I month)

Turn Around Time Required

[ 2 24 Hours D 46 Hours Q r o a y s O 14 Days O 2t Days 0 O i h e r J ^ - ^ J ^ ^ ^ " ^ ^ ^ 1 }

OC Flequirements (Specify)

^pRecelved By W ^ Date y I I Time .Date

lH^» Time

Vj/ol I /Y^o Date Time Date Time

3 Relinquished By .Da le

^"sLO-.^b ^-^p^j- -QM f ^ l W ^

Time 3. Received By Date Time

U) ^ DISTRIBUTION: WHITE Returned to CHeni with Reporj: CANARY • Slays with the Sample: PINK • Field Copy

Page 75: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

JTL ?;iL V L R N

T R E N T

SERVICES

hoX^o.:£ZBi^d Z(fi

Client: TfZu

Cooditioo Upon Receipt Form St Louis Laboratory

Date: Time: HS((

Quote No:. ^ny%s ^ w Initiated by:_

Shipger/No: C J i ^ b o D p q p 6".<tj-Q^ COC/RFA N u i n b e n i : . Z 2 £ ^

Condition/Variance (Circle "Y" for yes and "N" for no. If "N" is circled, see notes for explanation):

2. ^ N

Sample received in undamaged condition.

Sample received within 4-C ± 2<:*

Record temperature: 0 ^

Sample volume sufficient for analysis.

Sample received with Chain of Custody.

5. ^ N

6. ^ N

7. / ^ N Chain of Custody matches sample IDs on containers.

8. Y i ^ P C;ustody seal received intact and tamper evident on cooler.

9. Y A J J Custody seal received intaa and tamper evident on bottles.

* Temperature Variance Does Not Affect the FoUowing Analyses: / / J^>7ZX-^5^ ^ J ^ / W O z ,

** For DOE>AL<Fantex, LANL, Sandia, Timet) sites, remember to pH all containers received, except for VGA, TOX, and soils.

3. ( 3 / N N/A Sample received with proper pH**.

4. ( ^ y ^ Sample received in proper containers.

Corrective Action:

D Client's Name:

a Client's Name:

D Sample(s) processed "as is".

• Sample(s) on hold until:

Informed verbally on:

Informed in writing on;

By:

By:

If released, notify:

Sample Control Supervisor (or designate) Review: C J - ^ (^ y../lt J-JQJ^—-Date: O ' / V " O C~

Project Management Review:

SIGiVED OiUGI^AL IVfUST BE RETAINED IN THE PROJECT FILE THIS FORM IVfUST BE COMPLETED AT THE TIME THE ITEMS ARE BEING CHECKED

IF ANY ITEM IS COMPLETED BY SOMEONE OTHER THAN THE INITUTOR, THEN THAT PERSON IS REQUIRED TO APPLY THEIR INITIALS AND THE DATE NEXT TO THAT ITEM

LOT# F2E140264

2 7 1 4 SL-ADMIN-O004, Revised 5/24/01 \\Qstlmo05 < a\FORMS\ST-LOUlS\ADMIN\Admin004_rBV_5_24_01.doc

38

Page 76: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

. „ •.' i -1 -

• • ' . = : ; . '

APPENDIX C

LANDFILL INSPECTION REPORTS JANUARY 1999 THROUGH MAY 2002

vl->

• • - • ; J ! ? : T

-Wit;

• a ^ i

- * . « - • ; , : : : . o

. . ' • • • ^ • ^

Page 77: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist

Date: / " ^ ~ 7 f

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. Evidence of Site Vandalism.

Weather CorAAd.ojis\ t COMMENT

AA_ A^A

yiAL 2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

AAL yiAy

AA. 3. Leachate Collection

a. Latest Volmne and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing AAyA^AAAA

W0O29S44.08O 8940-aZ.

Page 78: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settlement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outlets Qear

8. Groundwater Monitorins; Wells (9) Undisturbed

COMMENT

AA. A±.

-t::^

.A

9. MisceUaneous AA^.^.^AA ^

10. Describe any spedfic actions taken, to address concerns listed above:

Inspected by: - ? '

W0029544.080

'••.• '!-A^.yy--'

••••'• r ' - ' ^ y ^ J ^ : - . ' • ' " •

'\-^.-AAAA A--^r'-.yiyyr?yfy • •..

':• ?AA^'''AiA

vi^^mwn^::-

^SS

Page 79: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

^H

DATE

1 } 11

H .•>

13

I ' 15

1 ^ _17

1 ^ 19

1 0

T2I 1 2

T23 • 1^4

25

| .

27 gi

I'-B 29

I30 31

• - - . ..

SULLIVAN LANDFILL ^ ^ _

U\NDF1LL RAINFALL

/.i)

. 3

. y

'

. 2

Page 80: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Date:

InspectiGn Checklist

, ^ " ^ / "" / / Weather Conditions:,

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing' Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

<^L^i-on

COMMENT

Hj^ AJL

.A^

j ± A ^A-y>A i(?A

\

• \

. ^ '

# - ^

7 / . •

V

, ^ .

• • : . " .

. • - . . ; .» - . . ;X^

W0029544.080 894(Ma.

Page 81: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

nk 6. Gas Vent Risers (16) Undisturbed Q ^

7. Perimeter Drain Outiets Qear D 1 ^

5. Settiement Platform Risers (7) Undisturbed

8. Groimdwater Monitoring WeUs /^ / \ , (9) Undisturbed

9. MisceUaneous

10. Describe any spedfic actions taken to address concems listed above:

Inspected ^ - A ^ ^ .

: • ' : » : • • • - . - : ; •

^yyrC:^y:- '

•^y7',yy>yiy.. .

• • ' • - • ' . • ' • • • • • > ' L ; > ^ j y ^ ' - ^ . • • - • • ' • • - ••.•••"-vij-oi.r^r.v..•-_..

' • • ^ ^ y ' i ' ^ d ^ ^ ! ! : ^ ^ - : •..•'•.•x^^ssr'^-.'Jif:-:-

W0029544.080 ^-^•.: ' ' r 8 9 4 W a - T ' - ' •"•—•

- ' • - • . - : : » j ^

- • " r - ^ ^ y A ^ ? ^ ^ y ' ' -

Page 82: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 V

DATE

1 •

1 1 5

1 • i 7

1 9

1 11

1 13

1 . 15

|l^ 17

1 19

Ih 21

1^ 23

I I II 4 • l ' ' Ie • ^ IzB

29

1 30

• '' 1

SULLIVAN LANDFILL

^ LANDFILL AtJ>Al

--

RAINFALL

^^ s-

. S

, ^

, s

Page 83: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Date:

Inspection Checklist

c-J ^ J y ^ ' f Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level ia Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

^/C AA. AA

y f ^ A A -

^Z. Ayt^

'P^-A-fP^=y^^

W0029544.080 894(Ma:

Page 84: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

i

i i

I

SULLIVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

^ /

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

5. Settiement Platform Risers (7) Undisturbed

8. Groundwater Monitoring Wells (9) Undisturbed

9. MisceUaneous

10. Describe any specific actions taken to address concems listed above:

•yy / " ' -^ .y ' ' ' .

':i^^^M.iy.

Inspected by: . ^ f e ^ ^ ^ . ^ ^ > ^ W ^ • " - - ^ ' u ^ ^ ^ g ^ ^

W0029544.080 !^' •• '^ .8 '**:^ 'Ji '^ . : ' •

Page 85: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

-O ^ ^ 9 SULUVAN LANDFILL

1 DATE

1

1 3

1 5

1 7

1 9

1 11

1 ^ 1 • " 1 A lis l l ' ' I I 0 l l ' '

V ^ 2 3

II 4 I I ' ' 1 6

l " hs , 2 9

IBO

3,

LANDFILL

RAINFALL

. ?

A /

^ O?

Page 86: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist

Date: A-S^'9f

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. Evidence of Site Vandalism

Weather Conditions: T

COMMENT

^ -

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta, #1 Operational

d. Pump Sta. #2 Operational

e. Pump. Sta. #3 Operational

4. Date of Last Grass Mowing

AA yAt-A/<: A U .

^:-A~it

W0029544.080 S94(WU.

Page 87: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

il_ 6. Gas Vent Risers (16) Undisturbed ^ / ^

1. Perimeter Drain Outiets Qear ^ A '

5. Settiement Platform Risers (7) Undisturbed

8. Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

^ ^

10. Describe any specific actions taken to address concems listed above:

: : r . ^ • • • y '• i '

AyA^^'AA.'-

• • ' . ^ i C ' . . ; . - ' - * ^ : ' ^ - ' . ^ : '

. ' • -•:-.-.i.^>^v-.c?^3V>ra.-.v ,

-Vr-;-:- " • • . ' . • . • i f ! : ^ j i a^ r^ • • • ' - ^ -^ • . - . • • • • •

Inspectedby: A A - ' j A y (-A / /V^^^-T^-V^—N •'^^'••'•y^^i^rTf^si^^^^s^r-:•--••• . - - • • • • • . ; „ • • • . • • ~ . i . ' ^ - ' . ? ? 3 : « ^ > ^ . ^ • • . • • • - .

W0029544.080 • .y^- A-i^^'^^.A^y-'-. • ••-yy.-^A'^''^0^y^'yy.-

Page 88: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1

1 DATE

1

1 : 3

1 5

1 7

1 9

1° 11

Ih 13

Ih 15

Ie 17 • I

| l B

• ^ ' 1-- 2 1

1 22

J 23 • 24

. 2 5

1 26

1 ' ' 1 28

1 ' ' 1 30

• '' 1

S "^ ^ 3 ^ ' I SULLIVAN LANDFILL

LANDFILL

RAINFALL

y

A . /

y

. y

/ . ^ ' '

. ^

Page 89: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist

Date '^~/3A9 Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of BuiTOwing Animals .

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

% ^

COMMENT

AA. ALA

AJy.

^A ^A

AA^ /TA

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta, #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta, #3 Operational

4. Date of Last Grass Mowing

\ y ^ AAil

AA. -' • y

PrSAr^.P

.'•-.. y^iz.

A ^

W0O29544.080 8940-aZ.

Page 90: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groimdwater Monitoring Wells (9) Undisturbed

COMMENT

9. MisceUaneous

AA. AAA

AA.

J A ^

A. 2^ r,(4lf ')l ^^>^ )=^'>^/A>-^<^^ A . i ^ AM^A^^yf '^A/^AA^A^

10. Describe any specific actions takento address concerns listed above: -

Inspected by:

••-yi^AA^A-:. '

"•^j.^-.y^-A':''--.:.' '

•• . .• j^ ' ' -}-t . ' --- ;- . . . -. .• i.ri:x;>r-:^..--~-:-• .

W0029544.080

' - •"^V."- '**-^ '

• . : ^ ^ • ' » « w ^ 2 ^ ^ ' ^ . • v ^ • - • - - • * ',

A-^^^^^Mi-A- : '

Page 91: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 1 jATE

1

1 3 • 1 1 1 1 i 1 d 1 i' h 1,13

II4 , - 1 5

1,6

1 1 ' l i e | | 1 9

I20 | 2 1

1 22

J 23 •

• 24

1 "' 1 26

1 "" 1 28

1 "' 1 30

1 ' '

'' •• y -2 ^ ^ S U L L I V A I H LANDFILL

1 LANDFILL

y

..

RAINFALL

/ . /

. 3

^ . . { X ^ ^

. 7 > /

. /

.

Page 92: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist

Date: A-Y'?^ Weather Conditions.-/^^rn^i^::*^' Al' ^S^ L'yy -

7 ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

COMMENT

AA yy

/7A

^ y AA y^A yjA

3. Leachate CoUection

a. Latest Volmne and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing A :- A ~?P : -A

W0029544.080 8940-aZ.

Page 93: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

7. Perimeter Drain Outiets Qear

rOMMENT

6. Gas Vent Risers (16) Undisturbed

^lA—

8. Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

10. Describe any spedfic actions taken to address concems listed above: .

Inspected by:

W0029544.080

.,•-_.••..-. . . . . . .y -k is iL^ j f : . : - - ' . - - . -

?Ji:.V*r?2^vi;?:.'

r- - ••"••.•iip%r$-\:-?5r'--.-'.".

X^-'A:^^Ay

A ^ A / - : ^ ^ ^ ^ ^ : ^ A

Page 94: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist

Date: 7 - / -^ ^ ^ Weatiier Conditions: /^^-^t^^^t^ / & <:^^--7-^

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

/^JC ^ A : A 2 A ^

^ / c ^ . / ^

^jt. ^ J ^

'-//.-? f

W0029544.080 S94(Ma.

Page 95: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

nwiXK-»ij5i55«:;=i«:=fi=:'~''>=="

SULLIVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

9. MisceUaneous

COMMENT

^2A—— sA

AAA2^^yA A^.,^p ' . / % ^

10. Describe any specific actions takento address concems hsted above. .

..»r..;.;v»

Inspected by:

W0OZ9544.08O

• ::-yiy^^i-y-:y

-'mmim-A. -y.yA'rSiH^SyByzy-::

A ••A^-^hAty^r'^A'-y y . y A f ^ ^ ^ A -

Page 96: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

• I SULLIVAN LANDFILL

1 1 O^TE

1

1 3

1 5

1 7

1 9

1 11

1 • ' 1 ri' IB J^ I B

i ' ' l o d' h

23

I4 i f I26

• "" I28

II "' 1 30

1^^

7 — / - f 7 LANDFILL _RAINFALL

^ ^

.

.Z

A 5

. 7

~

Page 97: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

jncuu;iutuJiia,&jLusi

SLTLLIVAN LANDHLL

Date: <? ^ ~ 9 "j

Inspection Checklist

Weather Conditions:

ITEM DESCRIPTION COMMENT

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d.. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volmne and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta_ #3 Operational

4. Date of Last Grass Mowing

AA^ lAA

..2=^

^ ^

A A. ^ A A< ^ AiA^Al -*iA>^

W0029544.0SO 8940-01.

Page 98: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

il^aU^i-'r-tftiiiHiHr^ i;ii 5l*2f isubiy :«iiL^ .til is^^^

SULLTVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Weils (9) Undisturbed

9. MisceUaneous

COMMENT

AA.

). Describe any spedfic actions te^ento address concems Hsted above:

/{prrtyA i '-. 10. Describe any ^eo^c ^ ^ J y y - A j ^ s A ^ ^ ^ ^ ^ ^ ^ ^

Inspected br- A-c^

-t^-~r--.

^5 i ^^^^A^A

W0029544.0SO

: & ' r ^ ^ ^ ^ ^ ^ ^ ^ ' , • - ' • ' • y ' ' i S ^ - X ^ ; - y : : :

Page 99: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 • 1 DATE

f 3

1 5

1 •n 7

1 9

1 11

1 13

P' 15

r 17

l » 19

II 0 21

• 1

| .

J 23

1-25

l ^ e 27

m

1 28

29

1 30

31 f -

SULLIVAN LANDFILL

LANDFILL y u . / u RAINFALL

, ^

A

. y

Page 100: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

I'-llvniiil^asP:? mmM!^imm<sjs^s?am^miS-::^^i^'i:s!^:'

SULLIVAN LANDFILL

Inspection CheckHst

Date: ^ A ^ f f Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

A A AA 0 A

oA A A

AAL 'A.A

7'.

W0029544.080 894<Wa.

Page 101: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

"•" ''"TJ J= • i-tiiii"*! J-»:.-3!ttiS ,i».iir.t-4J(HTrrcaaT:j(w; i;i 3S .-m: Mx.r_Ti'. K' Ml „ b ^ ^.

SULLTVAN LANDFILL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

-C7

AA. AJ^

8. Groundwater Monitoring WeUs (9) Undistinrbed

9. MisceUaneous

10. Describe any spedfic actions taken to address concems listed above:

. : : . v . :•.•• y - y ' s i ^ j j ^ i : ' y ' - . ' ' •

.7;.-. 'yyAAAA, A-A '•':. • .yAiyA^^.y-"y

•--•i - i A ^ 0 ^ ^ - A ' •;•-•:. -• -.•.•.i.r>,:-:;i^3r;..-,?.-;.•

Iiispected by: / ^ c d ^ Z ^ j O ^ A ^ K - ^ ^ ^ • ' " ••" -'ygffy."

•••- •.rr7:-:^?755ii.-=.vrr.

W0029544.080 • • .A ''A.P^f?^:^A^/

Page 102: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

I f- ^-^f

1

fz: 3

5

SULLIVAN LANDFILL

LANDFILL RAINFALL

\

I

l' I

J l I )

.13

15

3

17

8

19

0

2 1

L2

23

'.4

25

'-6

27

28

29

30

31

T

Page 103: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: / P ' ^ A ' j Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a,. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

/ A ^ y^. ^ ^ ^ ^

COMMENT

IA AL

AA

y>A AA_

AA. ^/c

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. # 1 Operational

d. Pump Sta. # 2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing A-y?.

W0O29544.08O 8940-aZ.

Page 104: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLTVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

9. MisceUaneous

COMMENT

_AA

AA. ^ J A

AAC

10. Describe any spedfic actions taken to Sdrfes concems Hsted above:

Inspected by:

W0029544.0SO

'AA^^^f^^ '- : : . •

••'••^'••^'S^S'A'-'A'- •

•uZjfrA*.^. T^-'..

Page 105: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

"r :K^i l : :W:3tkaniei&=i i6 i t t i«»- i .«r f . : . - . .«M.. , , . . ,vmr.«.^ -.. . .

- ^ A 9 ? 1 DATE

1 1

1 3

1 5

1 7

1 9

1 11

I: 13

l< A V Il7

If a 19

•1 '

l o . 21

1-• ' ' 1 4

r ' ' 1 26

. 27

28

, 29

30

31

SULLIVAN LANDFILL

LANDFILL

~

RAINFALL

. y

, 3

.Jl

0 AP

Page 106: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

COMMENT

"zr

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

-t-^' '-•

Ty^

9. MisceUaneous

10. Describe any specific actions taken to ad

^ ^AL-^ i ' ^^A^^ '^

.•.• vi-.-sjta-JS;. -•;'.•

..:-.;r.= -1rti:--\ '

' . ' . J . i i - - - ^ . - ' ' ^ - ' -

Inspected by:

7 W0029544.0SO

A ' ^ A^?

•A^^^^^^4lA yd-'Pi ^$^ iA'y.-'y~Af g XA:iL '•

. . ' '• r^-v'"- •;'."•

894002

A... A-^^^^^ikA

AA-A^00L;i^^::

Page 107: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

DATE

1 r 1 P k •

11

1 m 13

h II

15 11. II

17 | 1 8 | l

19

I z o 1 '

21

[ 2 2 1

23 | 2 4 1

1 ^ [ 26 1

27

28

29

; 30

31

/ O O SULLIVAN LANDFILL

L^NDFILL RAINFALL

.7

Page 108: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: / - i > ~ " - ^ ^ ^ ^ Weather Conditions:

ITEM DESCRIPTION

1. Site Seonity

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operatidnal

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

AA ^ A

AX-

y>y. ^ . ^

/ ^ ^

AJl.

A y^A • • - A

•..". A - ' ^ y

A \ A - . A-A9.

• - . . - J ^ ^ ' : ^

• • - i ^ ^ ' .

W0O29544.08O 8940J3Z.

Page 109: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

5. Settiement Platform Risers (7) Undisturbed AA

6. Gas Vent Risers (16) Undisturbed AA-7. Perimeter Drain Outiets Qear yiP

8. Groundwater Monitoring WeUs (9) Undisturbed

AA^

9. MisceUaneous

10. Describe any spedfic actions takento address concems listed above:

Inspectedby: j / ^ ~

W0029544.080

" - . - • * . • - . . • ;

'• ' 'A^^^ir^Wi.y '-'-'••• " ' , • • - i : ' = ^ > ? \ ^ ^ ? " V - ' •

^Ayy^^s?s>mf^ r

'.-•'^•t:^'.'^-':-''-^'

Page 110: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

' /

1 DATE

I P 1 P 1 • 1 f 1 1 1 m

11

1 H

13 1 15

1 • 17

1 19

h I I 21

Ih •if 23

11 1' 25

I I . 27

|za 29

1 30

1 '^

SULLIVAN LANDFILL

UXNDFILL

-

RAINFALL

. J ?

A 5-

/ , 0

* A

Page 111: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDFILL

Inspection Checklist

Date: ^ - 5 ' :ido^ Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a,. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

COMMENT

^ A A A vA

DK oy ay

AA. 3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

\

• \ A ' ^ A\ y \

.y-,99 '• •.- . y ^ y

y r y ^

. ' • ' • 1 - V

W0029544.080 894(Ka.

Page 112: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring WeUs (9) Undisturbed

COMMENT

AlA 6. Gas Vent Risers (16) Undisturbed JA^^/y-^^jAi^ A A ^ ^ - ^ /

V r

dA oA

9. MisceUaneous

10. Describe any spedfic actions takento address concems listed above: .:• . yy,

/Zi t- A^At z ,.: ,... V ^ ^ c^^-^A^ -^SA%^

A ^ A > ^ ^ ^ / , ; ^ ^ ; I ^ ^ A A ^ ^ ^ j ^ ^ •• •

Inspected by: S r ^ l M ^

"^^^A^AAAA:.. -. - . . . • . • - . . i . - j '^ jLa. jO^- : - . ' ' - " " •

<.-y':'',S^.r:>rriyy.-'- \ : " • . . • " • ^ > . 3 ^ i . ' - r - - . . •• .• i . i ;>.-^»3rf ;^: .- ,s. ; . -

•:^A^:mt^~^-y:y

W0029544.080 'cAfS^0^'-y:L

••. A'^^'^;-Ad-- A^ •

Page 113: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

\y~. RATE

m J li 1 i 1 • i g 1 ff^ 1 ,

l'^ •3

r 1.

w •7

IP " .

11 0 •21 11.2

• 2 3

| 2 4

25

0 ' 26. •

27

| 2 8

• 1 29 • 30

31

^ J - lA}A)A) SULLIVAN LANDFILL

LANDFILL

-

RAINFALL

rAL

. / .

. %

I

Page 114: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANTIHLL

Inspection CheckHst

Date: S - J ^J^D^^ Weather Conditions:

ITEM DESCRIPTION

1. Site Secority

a.. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. Evidence of Site Vandalism

COMMENT

A A AA^

.^Ay 2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

AA AA .Ml A A

3. Leachate CoUecrion

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

\ X ' ••-. ... A^ 'A^

. / \ •

A \ "" .Ar-A' .

• - - • • r Sr

• T-^?

W0O29544.080 8940-02.

Page 115: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION COMMENT

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

5. Settiement Platform Risers (7) Undisturbed

- C 5 ^

yA

AA 8. Groundwater Morutoring Wells

(9) Undisturbed

9. MisceUaneous

(fA

10. Describe any spedfic actions takento address concems listed above:

••y'''-'AP^^- -. ' :"

Inspectedby: ^ ^ .

• ' • r . .y . \ : r7 : - .

'.:• ' * ' • ' * ' Z ' . ' -

• ' • ' : - . . i ' " . - - ; - ' : 'vr^^^f ; •*-- . - J..

Page 116: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 1

1

1 m

1 1 DATE

1 P 1 P 1 1 1 i 1 • 9

1 • 11

1 1 13

h t 15

h 17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

SULLIVAN LANDFILL

LANDFILL RAINFALL

/ - ^

. ^

. / .

5,^

Page 117: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: / ^ ' / ^ ^ ^ Weatiier Conditions: / C / ^ ^ ^

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

COMMENT

AA AA.

ylL y)A-

c. Emma Lane Culverts Free of Sediment/Debris

^ d. Drainage Ditches Free of Debris AAJUA^T/J TU^^K^r^^-MO^ ^3aAi y t ^ ^ A ^

3. Leachate CoUecrion

a. Latest Volmne and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

\ A . y\ y... ..." -J-j-T-•'

X y \ .

<A-r.f'7' : • * " " ^ t - . ^

_'-TT-^

«.' .

W0O29544.08O 89*3-02.

Page 118: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION COMMENT

5. Settiement Platfomi Risers (7) A / • Undisturbed Q AJ.

6. Gas Vent Risers (16) Undisturbed / j j ^

7. Perimeter Drain Outiets Qear ^ / c

8. Groundwater Monitoring Wells / ^ j A (9) Undisturbed

9. MisceUaneous T / A ^ / m . J p ( ^ r^k ' /lAA

10. Describe any spedfic actions takento address concems listed above: - , .-.,;";.;.::-...

A7^A:o AMA ^ AUyAA/^ Ao A^A^h<^

/^ AA^ AAA'

• X. '^ . -^Vi

Inspected by:

^ A 'A '^^ W0029544.080 :•..-. •:-. • • - T A Z ^ . ^ i i ^ - • -

'*^^>S^"'*?-<-v^'

Page 119: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist

Date; 7 - S'-AAiAt

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

Weather Conditions • /M.^ ,^ - r -^ r^y^A-Cto.y- \

COMMENT

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Bxirrowing Animals

c. Emma Lane Culverts Free of S e diment/D e b ris

d. Drainage Ditches Free of Debris

A^

3, Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4, Date of Last Grass Mowing

—yy—-•A • - " " • r i ? ' ^ - ' "

• / \ • '

. A

y ^ g ^ ^ ^ • - . . y^Y^y^

"-* >^

"• , " • < " V

W0029544.080 894O-0Z.

Page 120: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Dram Outiets Qear

8. Groundwater Monitoring WeUs (9) Undisturbed

COMMEN'T

9. MisceUaneous

takento address concer^ Hsted above

y*' '°-'-A, AAl AA^ :^U^ AlZr<n . AT W M ^ ^ ^ - ^ ^ ^JyyfTZ

Inspectedby:

W0029544.080

":v.i-iT-:r:;-"-..'

'z:^^?(yAI'A 'AA^0kit^.^

,--.>7=t.ri<r>>:!r.V

A^- 8940411 A ^ : y'• • ••-

••*'- A \ * ^ ^ ^ ' y . • > • ' . '

Page 121: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

b- S' a & ^ SULLIVAN LANDFILL

l .XTE LANDFILL

1 i 1 i 1 i 1 i 1 i" 1 ! " • II, l,M

Ih 11' l l y

I f 11.9 1 - .0

1 1 1 ^2

1/3 1 24

I 25 l ' 26

hr j 28

' 29

1 30

1 31

RAINFALL

. V

, /y A

3.(^

/ A

. ^

Page 122: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: ^ ^ 3 ^ ^ ^ ^ ^

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

Weatiier Conditions: X % . ^ ^ ^ ^ ^ ^

COMMENT

AAL A A o A

AA A-A /9 y

A4.

\ •

\ / - ^ ^

A - — •.« A \

A~ J 0 ~ i ^ '~r. y ^

• T ' -^ : .

W0a29544.08O 8940-02.

Page 123: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION COMMENT

^A 6. Gas Vent Risers (16) Undisturbed

5. Settiement Platfonn Risers (7) Undisturbed

AA 7. Perimeter Drain Outiets Qear 0 / c

8. Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

AJA

10. Describe any spedfic actions taken to address concems Hsted above:

> T r . } . £ - - _ , . , ,

Inspectedby: a / r—4-7^^0 A:Jt^^J'^'~A<~-~^ ' •'-"'•''•^-Ay=^^$3i?^AAA--

W0O29544.0SO - " . 'y:- : A^:P^j^,_^ --"• 8940-07 '

Page 124: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 1 DATE

1 P 1 P 1 f 1 f 1 f 1 •

1 • 13

1 15

IP r V 11

19

11° J2t r

23

| .

25

| a a

27

1 28

29

1 30

31

SULLIVAN LANDFILL

F - J ^ ^ ^ ^ LANDFILL

.

RAINFALL

lA^

A

. f

Page 125: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist

Date: / - < ^ Weatiier Conditions:

ITEM DESCRIPTION

1. Site Security

a,. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Einma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. # 1 Operational

d. Pmnp Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

^/ f A^

AAIL.

AA • ^ ^

HAL

^ -

\ /

• \ x A\

• y A •

yS-A-^AlidP

. . . - • • • ' * ' ; ; . ' *

• -

• •• • • x t ^ y ^

• --3

• ' ' . • A T ^ - ^ ' -

W0O29544.08O 8940-02.

Page 126: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

9. MisceUaneous

COMMENT

r A -

rjA A

^ ^ I i3A/L AA-un- ^ AAAA^A

10. Descn"be any spedfic actions takento address concems Hsted above:

- . • i - t - S t L j ^ -•;•'.

yyr,,Kz^^

m^&

Inspected by:

W0029544.080

A^!i^^^^<A^r:. :

Page 127: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 ^ SULLIVAN LANDFILL 9-3 -y&^

1 BATE I 1 1 1 1 1 I P 1 P • P 1 P 1 \

1 1 /

1 • 19

1 l i 1 Is l « 1 . 25

p II

27

Ih II 29

Ih II 31

LANDFILL RAINFALL

m/^A

.3

/,y

/ ' ^

Page 128: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: A ^ S ^ ^^(>^ Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level tn Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

AA A A AM.

At At ^ A

-AyA.

-AJ5yJ^:^^

W0029544.080 894002.

Page 129: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed AJ / t

7. Perimeter Drain Outiets Qear S^y \_

8. Groundwater Monitoring Wells (9) Undisturbed

9. MisceUaneous

il

10. Describe any specific actions taken to address concems Hsted above:

. v .•:*•"•••.

•.•.""tVj*-=r-:ir:"-^- '*-•

' y-y>^iAi 'AA' '

Inspected by: / ^ ^ ^ ^ ' C ^ jt^A^K- ' . ' ^ XT!-^''^^^XAy . • .: ;•-._ •.; •r7"'.Vii:i«'D^'7S"r'..---' •

W0029544.0S0 . . . . : - ;. .•Ayz^..-?is^

Page 130: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

I SULLIVAN LANDFILL

1 DATE

1 P 1 P 1 P 1 P 1 f 1 P 1

1J

1 • l b

1 •

1 • 19

1 11 21

I I ' I I 23

Ih I I 25

Ih I I 27

1' • 1 29

Ih 11 31

LANDFILL

'

RAINFALL

-

A

/ .2 . /

Page 131: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: / / " / - ^ ^ 0~^ Weather Conditions: { y C ^ QAXAl

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. ^v^^ of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

ALA AA

.yA

AAC AAL

AA. ^

<^S^ %bc^

W0029S44.D80 8940-02.

Page 132: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMEN'T

5. Settiement Platfonn Risers (7) Undisturbed ALL

6. Gas Vent Risers (16) Undisturbed A ) JT^

7. Perimeter Drain Outiets Qear A l y \

8. Groundwater Monitoring WeUs A ^ /A (9) Undisturbed ^

9. MisceUaneous

10. Describe any spedfic actions taken to address concems listed above:

.A,^^^ ^ ^ A J ^ O A A A ^ '^ :fy^ p A ^

' • ^ ^ K : : : :r.'

^:^:Sy-j^-<Ak:"[

.•..•-••• . ' " . • - - . ' =^^ - : i - ' 5*>5>\ / - . : -

Inspectedby: /TY^^^A fJ^^^^ \ _ •" "' -'" ^ j ^g":

• •N.'.'.'j " ^

W0029544.C80 •.•.' A'-^^S^-.ii^-'-. • • ' A - ^ ^ ^ ' ^ ^ A : .

Page 133: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

/ / • / - I T l V Z ) SULUVAN LANDFILL

1 DATE

1 P 1 P 1 P 1 P 1 • 9

1 • 11

1 13

1 • . 15

1 17

1 r-1

21

h 23

i T2S

v 27

1' 29

:o

31

LANDFILL RAINFALL

I.Od

. y -

J. V

Page 134: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist

Date: / Z -5 ^ ^ 2 ^ ^ d

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Warning I'gas, Secure

c. Evidence of Site Vandalism

yi--7 Weather Conditions:

COMMENT

A A AA

y > t 1. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

^ A

A A

A A A A -

,. A • • • • \ ^

• ' .

' • •• •^t~;rr '

• A %

• • • , " - ^ " . V

W0O29544.08O 8940-02.

Page 135: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION •

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

COMMENT

T L ^ ' •" V"

yy TZ^ ' S

A-A-AA

9. MisceUaneous

10. Describe any spedfic actions takento address concems Hsted above:

. ' • ' • ' • • . T - '

::—A±!<iry~'.:- .-

Inspected by:

:~irfy^Y^ii'i-^ry.-. -

W0029544.080

' ' v S s ^ ^ ^ rAuf^^i;!i~^=y^:

Page 136: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1

D A T E

1 P 1 P 1 P 1 P 1 P 1 P 1 • l o

1 • I D

1 • 1 • 1 • i 21

1 • 23

1 • 25

1 IB

27

Ih I 29

r I I 31

SULLIVAN LANDFILL

LANDFILL

-

RAINFALL

. y

/ . 3

.1

A

A

y.A-3:^X3

Page 137: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist

Date: / - l ^ - ^ 0 ^ / Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

AAl t ^ /

A A L A L A

yy A y2.A

• \ ^ •

\ A •-..•

- '/\

• / \

• / \

A- A ^ ;

• V . : : ' • ' • . .

." • - - i ^ ^ - . ^

'-"T "y^

W0029544.080 8940-02.

Page 138: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

COMMENT

AAA 6. Gas Vent Risers (16) Undisturbed oA. 7. Perimeter Drain Outiets Qear c

8. Groundwater Monitoring Wells (9) Undisturbed

oA. 9. MisceUaneous

7/ Af /AAA^^^ArA.

10. Describe any spedfic actions takento address concems listed above: .•

- . : ' . ' - . i : . - » » J . . ' . A : : - • ' " . • • • • •

• .:':yA:yrj^yA'y.A

•y.-i:rit.^;irr:s,.'.,^:.-

Inspected by: 3-^^^'OA'-

''y^:^y^^~-ii'r}-~y ' •

W0029544.080 ^-" 894<WI2-.if •-•• •^•-

^ • r - V - - - ^ ;•<• .

y -^ ' ^ ' i f i i ^ ^^ ! - : : ! - ' : - ^ - -

Page 139: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1

UATE

I i 1 1 1 I • 1 1 i 1' •

11

1 P. 1 1

IO

l > II

• \ 1

V II

19

Ih I I

21

Ih I I

23

Ih 11 25

Ih II 27

I I ' II 29

| | « 1

31

SULLIVAN LANDFILL

LANDFILL ^ -

n ^ i\fUAA\ / / ^

.

RAINFALL

^

I

Page 140: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist

Date; ^ ^ <^ T ^ ^ ^ / Weather Conditions:

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

COMMENT

AUL .AT / ^

AJ /A

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

y r AA.

AA ^ \

K ~/n A A

• A - • A ^AAA^

- / - -

/

A~A ^^^ • • •• ' ^ i ^ y ^

• ' " . • • ' T " V

W0029544.080 8940412.

Page 141: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMEN'T

5. Settiement Platform Risers (7) Undisturbed AA

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

^ / T '

^ / C

o/^

9. MisceUaneous

10. Describe any specific actions taken to address concems Hsted above:

Inspected by: ^ ^

' . ' ' • ^ : ^ ' » J : : - ' T *

• • . • • • - v 2 - ^ , - i - • - ^ , ' - ' - . . ,

•AA^^^^A:: A^!^iy^$iAr(\y- ^

W0029544.080 A^- 8940412-^%r'".

Page 142: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 1 DATE

1 P 1 P 1 P 1 P 1 9

1 11

1 • 13 1 • 15

1 • 17

1 IB

19

I I ' IB -21

1 23

1 Tzs 1

| : e

'127

( a 129-

1 30 31

SULLIVAN U\NDFILL

J ] - ^-J/^^ ' 'U\NDf\LL RAINFALL

A

y '6 ,±

Page 143: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Cnec.kHst

Date: A l A A y A y A J . A A ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. # 2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

Weather Conditions: (AAhA^AA A

COMMENT

/ oA 'AA-

2 1 ^ ~ 0 '

A y y^A AA AZ.

\

\A' \ •-.. . A

/ \ " • '

\ • '

'• iP ' - . .

\ <-y&

.9- XOD0 '•-* y ^

• • ^ s $

W002g544.080 8940-02.

Page 144: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION COMMENT

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells

A ^ AA-

AA

(9) Undisturbed

9. MisceUaneous A^^ A ^ yy/A^i^^^A^

f/ryAJ AAA> '^A.^^f^i-^.^

10. Describe any specific actions taken to address concems listed above:

" A . . • ' • ' • • ' " '. • i "

. ; • • - - • • . > - * > r

Inspected by:

; v > ' - » - ' ^ . - i - ' ; - . i.i:.^.7£Vir;2---"~-'

r r • . '^»i«TJi>-^rrr ' .- ' - . ' '

W0029544.080 -.•:- 8940Ja2 . ^ . T - -

A^^^^^MM r - 1-r- .ii§s^.y---.-V^-?-*^-::-.;v:VS??^'ii-'0:rr- !•• . - • • " ^ : : ' " T f . ^ - T : ^ - > > • . \ : • - ; - • - • • . • • : • •

, • - - • . - : ^ - ^ - ^ - . — _ ; _ ; J I ^ , ^ = . » . .' . ' ^

" . - • 0 ; « * ^ ^ ~ * — • » « " * ' • . " • • " " .

.....•..:.«.•£:,«-; ..-^--v--' .

y / :

'

Page 145: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

I DATE

A - ^gy ] SULLIVAN LANDFILL

LANDFILL RAINFALL

>J

17

i

19

)

21

A

15 ^

4

25

6

27

18

29

50

31

Al i:

Page 146: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANTIHLL

Inspection CheckHst

D ate: ^ - 1 ^ ^ ^ ^ Z Weather Conditions

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. # 1 Operational

d. Pmnp Sta. # 2 Operational

e. Pump Sta. # 3 Operational

4. Date of Last Grass Mowing

• / y ^ ^

AA

COMMENT

AA-y/y

AA

y^y

^A:

yiA y A

':f7^^0aZ>

W0O29544.080 8940-02.

Page 147: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16)'Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

COMMENT

AA

OAA

10. Descrioe any specific actions takento address concems Hsted above:

y ^ .

y ' " ' - . . • ' ' * • • . . • " • ' '.

WM^AyA'

•.}~'i--,~Jr--.^'-:.

Inspected by: A^^^^^A

W0029544.0SO

A'^3^0JXi:-^y' 'y;;--

:-^^s?^^Cr=Vv:^:--

Page 148: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

DATE

17

11' r r •1

21

Ih I I 23

J2S he

27

( s

; 29

h° 31

SULLIVAN LANDFILL

LANDFILL i; 'A^A^

RAINFALL

AA . 3

.s

. ^

Page 149: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: A> " ' ^ -J. d ^ ) Weatiier

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a_ Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

. c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUecrion

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. # 1 Operational

d. Pump Sta. # 2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

Conditions: / ^ ^ 9^/ f^^^

COMMENT

ay ML

y i ^

^ y ^AA ^ x f -AA

W0029544.080 8940-02.

_^AALALA^^-..

Page 150: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEMJDESCRIPTIQN

5. Settiement Platfonn Risers (7) D J C Undisturbed

COMMirNT

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

9. MisceUaneous

^A-^ A

A A

-^yyAl-AA-^A^AS^yA v : i W :•'••:

"V^T.^^^Jr;-:.":

AiiAAA-y

Inspected by:

W0O29544.08O

•/^r-^.--:^ r . . •.-.'--,-^j^T-**'.j.:,r^-.r:.-v-•: ••» i . - - i - ~ i > C i - . • ( . ; . -••;•• : ' • ' . •

n^-y::^.^i':~

Page 151: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 y-

1 DATE

1 I 1 P 1 3

1 P 1 1 1 • 11

1 13

1 • 15

1 • 17

1 19

I I ' 11 21

Ih-23

11 1 25

1' 1 27

| s m • -

1 29

| , 0

31

SULLIVAN LANDFILL

LANDFILL

'

' I"

RAINFALL

/A"

,r-, / "

. 7 .Z

y n

Page 152: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: /^ - / '^^- 0 ^ ^ ] Weatiier Conditions: ^ ; 2^?, >. . cz^

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. E'/idence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

COMMENT

^ A L A£L ^A-

A A -^j-

^ K yyA-

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. # 1 Operational

d. Pmnp Sta. # 2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

• \

V A \ v • A A \

A \ ••

^ _ ^ ^ 5 ^ Z >

• - . •

.- . - -^t^^;—

• _ • - ? : > - ^

. • • ' . - • • •JT '^ i

W0029544.080 8940-02.

Page 153: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Morutoring WeUs (9) Undisturbed

9. MisceUaneous

COMMENT

AY. yAc

10. Describe any spedfic actions takento address concems Hsted above:

Inspected by:

W0029544.080

Page 154: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

\ ^ J A ^ '/ ^

DATE

1 -7

9

\A 11

SULLIVAN U\NDFILL

LANDFILL

I 13

I 15

i 17

I to

21

•2

23

A

25

E 27

28

29

[ 30

31

RAINFALL

Z

jyi

Page 155: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: / " ^ " ^ ^ ^ 7 Weatiier Conditions: C A C ^ ^ ^ I ^

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site VandaHsm

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta, #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

(AA

A^ yc ^ ^

^ A n L £L

^

\ A

• / (

• / \

A ^

' - • •

• - - • • i T * : ^ ^

A ^ ' ^ .

^

. • .- ' 'A^^i

W0029544.080 8940-02.

Page 156: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16)'Undisturbed

7. Perimeter Drain Outiets Qeax

8. Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

COMMENT

^yA ^AA

A A

10, Descrioe any specific actions takento address concems Hsted above:

. . . ' ^ A L j i ' y . - - . . . •'•

W0029544.080

• 'y:y i ^ ^ . 89«WIZ-.^'-:V •••••

. " . . . • • ^ • - • • i - T - K > - ~ : ' : \ : - y - : • . •^ . •

Page 157: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 { 7 -1 3ATE

1 1 j

i 7

1 9

1 11

i 13

1 15

i 17

1 ^ 1 i21

1 23

IB " II l»^' r i" 1 i 2 .

| o

J31

/ „ , SULLIVAN LANDFILL

LANDFILL RAINFALL

/A . /

. 7 ,Z

.5~

.2 .

Page 158: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist

Date: f-l^"^^^) Weather Conditions: AlA AP^^^ -

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Qilverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

COMMENT

AAA 2yy. d<

a A AAL A A

A A

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

\ / - ^ V

• • Y ^ -• . > : - ' ^ ' ' : ' '

• ^ : • • • -

^ / A • -• A

?-Aoy) •

• • •• • ' • ^ • r ^ : ^

_ - - r ? ^

• : ' - ' A - 5

WD029544.080 8940-02.

Page 159: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION ^ COMMENT

/}A

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

5. Settiement Platfonn Risers (7) Undisturbed

AA

M 8. Groundwater Monitoring WeUs

(9) Undisturbed

9. MisceUaneous

6 A

10. Describe any spedfic actions takento address concems listed above: -, ?A ::z...._

/\Ayrh^i^ . H- ^^^^^ ^S-^Af A^A/^ ^ / 2 > ^ A % I A ^ y ^ ^ i A ^ i ^

iA^A^-^JA^.Aty-^A^Ay^ii, A

r

A:.'A-Ay^^AAiyy ' • y . - ^ . j i ^ - . ^ •

Inspected, by: -:A_ 'AA^^yyA^A-

- -•:' • • ^v : : ' ^ • ' •=^ ' : ^^ i^^s^^S!^^ :

W0Cr2S544.08O y . ~ - Z S O J a - ^ - ' - : •':•••'• .

•^AA^&?rAl'

Page 160: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

A ^ ^ - ' A A - A ? D ) SULLIVAN LANDFILL

i DATE

1 m 1

1 BI 3 1 5

1 7

1 9

1 11

1 13

i 15

1 17

1 19

1 21

h 23

r 25

l « 127

V 29

l » 31

LANDFILL RAINFALL

, 1 ^ . y

- •

Page 161: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: / ^ ^ 3 'A lDiA? Weather Conditions: AA ^ ^ ^

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. E^/idence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c- Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Qirrent Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

COMMENT

0 k y ^

y> y

aA ;_

• ' \ y ^ A

• A • / V ..

cp _ ^ / ^ y

. -_

- . •

• •••A^Q-

_ "-T ?-^

• . - y ^ ' ^ - .

WCO29544.0SO 8940-02.

Page 162: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Insnection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. GcLS Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring Wells (9) Undisturbed

COMMENT

\

AA AA A

9. MisceUaneous

~ - o'^nm takento address concems Hsted above: 10. Descn-be any speonc actions ta^en ^° ^ ^ . ^ .

A,yAA. .c, / 3 ^ ^ ^ 1 //5-/ / ^ ^ ^ ^ ^ ^ ^ ^ l^'7n^^/A^A^^^./A^^^^-"--^--

r t T

Inspected by:

AAA^AAAAA W0Cr29544.08O

. . . — . . . ^ T

••; ~.-rv«-=:--r---.. '•.•.'•• * : 5 - ^ \ ^ - > i ; ? : - ' " ' . '--•"i- '^'T'-- '-^^'-"; '-^-'-".-* .,". ::^-*i%r>-i^ * - > - . •.-^'^. *•--..

>/..<J?tritrI>;rXir.";-:-: .

Page 163: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

i 1 DATE

1 P 1 P 1 P 1 P 1 P I • n

1 • 13

1 C I m

17

Ih I I 19

Ih 21

Ih l i 23

11 T25 1

^ : e

27

1 8 B

29

1 30 1

31

SULLIVAN LANDFILL

. ^ .LANDFILL / A ~ A ^ ^ ]

RAINFALL

A/

, : i o .7

, PP

Page 164: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SUXLIVAN LANDFILL

Inspection Checklist

Date: AAi^lA'c^ ~ g ^ ^ ^ / Weatiier Conditions: / 2 ^ & t ^ ^ / f o ^ . ^ ^

ITEM DESCRIPTION

1. Site Security .

a_. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. E^/idence of Site VandaHsm

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

CO^tMENT

AA yjA-yA

AA y? A

y> y (74

3. Leachate CoUecrion

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

\A\ X • ^ r-

/ \

• -

\ -•••:•••£;.

"p-X^i^) • ':•••. f f

• yyiAi.

W0029544.0SO 8940-02.

Page 165: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEMJDESCRiniQN

5. Settiement Platfonn Risers (7) Undisturbed

6. Gas Vent Risers (16) Undismrbed

7. Perimeter Dram Outiets Qear

8. Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

COMMENT

A K — A-A OAA

/AL

10. Descn"be any spedfic actions takento address concems Hsted above:

Inspected by:

A-AA'^^:^yA:A- '••:-

W0029544.0SO A:} &AA;AAAy

- ' J- ' ' . ' -^ - ' i y • '-i «- T . • • ' .

Page 166: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

i . -. SULLIVAN LANDFILL

i DATE

1 P 1 P 1 m 5

1 7

1 9

1 11

1 13

1 r 1

17

y 19

Ih 21

h 23

: .

25

[ . 27

| 2 S

j 29

1 30

31 •

LANDFILL

RAINFALL

A

. F - S^

. ( .

. f . ^

Page 167: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst

Date: / J - ^ - J A A? Weatiier Conditions: / A ^ j ^ n ^ J ^ M . ^ S I A T ^ T ^ A C ^

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site VandaHsm

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

COMMENT

AA ^ A -AA

A t n A A A

A A

3. Leachate CoUection

a. Latest Volmne and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta, #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

\ • ^ . - - : • v / -^ A\ A V A A ^ A

• - .

•• y y y .

. '"^ '''^

• - ' • ^ " V

7/0029544.080 8940-02.

Page 168: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16)'Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

COMMENT

nA y A - ' - ' - -

/? / r

flA

10, Descabe any specific actions takento address concerns listed above:

•AyA^^^^^i^f^A.

AA^A^S^^sSA^-' f t ? . .

W0O29544.08O

. ' --• 8940JIi-

Sr^r ; - . - ' : .'

AA .rr, ........ ,..-

Page 169: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

• / .

iSiTE

I i 'a i 1 P 1 P t P 1 P 1 1 1 P= 1

1 l y

1 21

ir I I 23

Ih I I 25

1' 9 i 27

1' ' -| , 0

T31 1

A A A A J SULLIVAN LANDFILL

LANDFILL RAINFALL

, ^

,

-

'

5^:i . s

/ 6 . ^

Page 170: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIV.AN IANT)HLL

Insuection Checklist

Date: / ^ 3-^ ^ ^ ^^% Weatiier Conditions: A j 6 ^ ^ / Z J J

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. Evidence of Site VandaHsm

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

COM?v£ENT

/ y t y) A

AL

AA o t A A -^ A

3. Leachate CoUecrion

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. #1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing Ap^Xj^l

7/0029544.080 8940-02.

Page 171: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

ITEM DESCRIPTION

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed

7. Perimeter Drain Outiets Qear

8. Groundwater Monitoring WeUs (9) Undisturbed

COMMENT

AAA A A

9. MisceUaneous

10. Describe any spedfic actions taken to address concems Hsted above: .

Inspectedby:

W0029544.080

- .'•'. siJ*cxr'*•>-:.^-'•

Page 172: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

InsDection CheckHst

Date : 2 - 6 ' A^AOA

ITEM DESCRIPTION

1. Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Warning Signs Secure

c. E'^/idence ,of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrowing Animals

c. Emma Lane Culverts Free of Sediment/Debris

d.- Drainage Ditches Free of Debris

Weatiier Conditions: A A ^ . - C ^ ' ^ .

COMMENT

yA ay

A A

A A y. y

lA. /o / y

3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta, # 1 Operational

d. Pump Sta. # 2 Operational

e. Pump Sta. #3 Operational

4, Date of Last Grass Mowing

W0OZ9544.0SO S940-QZ.

Page 173: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

i A> d . a o ] SULLIVAN LANDFILL

I I

LANDFILL RAINFALL

9 i i I I I I

. ?

I I

' l c

I 2

I

OA)I>/I, 7f}c,^^wrJ 2 ^ S

/.^

zt>

2 /

29

. /

31

Page 174: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

5. Settiement Platform Risers (7) Undisturbed AA-

6. Gas Vent Risers (16) Undisturbed /Ay 7. Perimeter Drain Outiets Qear AA 8. Groundwater Monitoring Wells

(9) Undisturbed A)

9. MisceUaneous

10. Describe any specific actions takiento address concems listed above:

Inspected by:

W0029544.0SO •-->• 8940-02 • ' i lpi;

"-AAAA;i ! 0C Ayy.

Page 175: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 ^ •/;^^x_ 9- ^ ^ ^ SULLIVAN LANDFILL

" ^ T E

, J

If f'' r f-= r "Li 112

IL3

IP" •25 , | . 6

^ -| S

• 2 9 • ' 30

• 3 1

LANDFILL

,

RAINFALL

;s.^i?

. 7 ' ?

I

Page 176: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Chedtiist

Date: A ^ - 5 ' . - ' ' ^ ^ L . " Weatiier Conditions: A ^ A A A ^ ^

ITEM DESCRIPTION

L Site Security

a.. Gates Qosed/Locks Secure

b. Fence/Waming Signs Secure

c. E'/idence of Site Vandalism

2. Erosion Control

a. Cap Sideslopes Intact (no erosion)

b. Signs of Burrosving Animals

c. Emma Lane Culverts Free of Sediment/Debris

d. Drainage Ditches Free of Debris

COMMENT

AAL AA

t y "

A A ie..<^A'^-A^A^A

AAL 3. Leachate CoUection

a. Latest Volume and Date Removed from Tank

b. Current Level in Tank

c. Pump Sta. # 1 Operational

d. Pump Sta. #2 Operational

e. Pump Sta. #3 Operational

4. Date of Last Grass Mowing

\

\

• • ' A . y\

y ^

- ^ 1 _ 1

, yyi^.:'-'

" - •

. ' • - . . - y r - ^

A-Ai^O) . ' ' ' ' • ' ' —

-A---

WCO29544.08O 8940-02.

Page 177: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection Checklist (continued)

ITEM DESCRIPTION COMMENT

5. Settiement Platform Risers (7) Undisturbed

6. Gas Vent Risers (16) Undisturbed A A-1. Perimeter Drain Outiets Qear

8, Groundwater Monitoring WeUs (9) Undisturbed

9. MisceUaneous

10. Describe any spedfic actions taken to address concems listed above:

Inspectedby: A- AA^^AAA^-'•LA^^^^AAy

W0029544.0SO S 9 4 0 J n - ^ '

" / ^ ' r:^-

Page 178: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

1 1 DATE

1 P 1 P 1 P 1 P 1 9

1 m Vl

1 •

13 1 .• • i £17

| 3

h g

• o 21

Ih 23

1' 25

I I -27

| . a

29

[30

J -

S- ' J l A ^ o l ^ SULLIVAN UKNDFILL

LANDFILL RAINFALL

,

A)A.' yAA.r.J . AA

-

.R

. 8

OAJIAJ UJie/uA . 7

Page 179: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN lANDHLL

Inspection Checklist

Date:. A ^ - / A ? 'o^^O%' Weatiier Conditions: QAATi^J^-^

T-rrnvT riK.SCRTPTION

\, L;:.-Site. Security .-

•:' -\v' •^S:S^lSGatlS;Qosed/^ Secure

'yy:yAA^AAA^!§&^ Signs Secure A A m A ^ ^ M ^ ^ A ^ y A A y y y"'-: ^^^ : ; IS^ i : i fe#cepSi te ' ^yan^

2. Erosion Control

. a.. Cap Sideslopes Intact (no erosion)

b. -^i^is,.of.Burrowing Animals

;.:-:-'v^c. ./Emma-Lane Culverts Free of A Sediment/Debris

,d. Drainage Ditches Free of Debris

- 3. Leachate CoUection

..-v.a.'t-La.te.st.Volume and Date Removed

iA iy:from.Ta^

l | J : i 3 i | ( ^ e n t | | i v e L ^ . :'AAi^A^A^?AMAA':--^..-.: yAcA^?mnn"Si£- #1 Operational 'm^Ammmm-y.: • -:xs;:d.:;. ;lKrnip:S ;.: ;• f Ve ;/Ihi&p Sta. #3 Operational

l;i4ii^ID3ie|gfJ;^Ll^

COMMENT

A A A-A

ALA

AA A A A OA

/ ^ Al-

/

- X -

AdO)

•yi^MiSify:..'.

: .! ;WP029S44.CB0;ijvj

gS40-a2.

Page 180: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

SULLIVAN LANDHLL

Inspection CheckHst (continued)

:Z. - -A$yAy^0i00AAyyy •.••• •. •.•

ifS^SiijpTioN • 5.-Settiement:Platform Risers (7)

Undisturbed

6.:"^Gas/yent:Risers (16)'Undisturbed

;:^:ilPenmctep;Itam'Ou^ Qear

8. Groundwater Monitoring WeUs (9) Undisturbed

COMMENT

": .(-

At A t LA

9. MisceUaneous

10. Desdnbe any spedfic actions takento address concems Hsted above:

yAA?^i^mi^00AA.AAy \::&::fmmmmymAyy' -•. \AAmm smMmAyy • • :AyyAs^AAAyAAyy • • •

fAAMMmlmy v-:J;.--;.,-;.^y,/;...V„5T:^v;.^^,:;

' A y ; i $ ^ 0 ^ y

^r:A>?^^yA--^

.••: . - ^ - r r - K '

Page 181: Ground Water Monitoring 2002 Biennial Report · FINAL REPORT RECEIVED JUL 1 I 2QQ2 j TRW Inc. Ground Water Monitoring 2002 Biennial Report Sullivan Landfill Sullivan, Missouri July

I 1

DATE

1 • 1

1 II 3

1 •

5

1 7

1 9

h 11

h 13

h 15

| a 17 ..

js 19

| . o 21

\ -

23 1 1- -:

25

Z6

27

28: yAA

\ 2£ : ' • / ' : 'A

3 0 . • • • A K

' 3 1 . ^

^ / « # - 3™„.»„„. ^aw& ju? ! •:-AyAAAyy:'.

• • ;';--';if''-|:^nLANDFILL .:.'•• A A A A - - y'-

'' V y • : A A A A y ' ' y •':•

-•:-LlAMmAtAA '-: :.yy^'^A0AAAyy-

• ' h - y - • " " •

• ' • • • I , ' • • • • • ' .

. , , • . : . , y . : • / ( , , •

.. ..;:.:.y:y.v-:yy:,-y:yyi-.y^i::-.. •-. , •

.y .yyAAAAyyy::-

• • • ? : : " v ^ ^ • •.

• • • . ^ % . /

., • . y .••'•yy--:y-y:y'--

-V'o^.-^fe&^K^-•: . : ; : :• ;•••• - - •

AA^A^m tA-' AAAtAMAAAA '-- •••-' :-AAAmmAA>---. -.-

. • ' _ • ' • • • . : • :

'. ••'; y A y y A y A ' ^ " " - - ' - ^ <; •' ••

• •• • - . . . - y r ^ - y y r y y y : y ... ••• -yy:yy--^^. : i :y .y .y; :yr- -^

\AAAsmmmAA-'- - • AAAAffAAA^AA}-: '--. ' ••• . AAAAAAAyA-A'myAAAAyA::: •

Ml MISIX&AAAAA. . ^ ^ m m m A A 0 • l i i i l i i i i i W f e •• •. • lAfWStmA y •

/

RAINFALL

i

. 7

. V

\

. 1

.2y.

.

/ . i ^ •