Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Ground Motion Measurementin Accelerator Test Facility
at KEK
・ KEK・ ICEPP (Univ. of Tokyo)
・ J-Power
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Research Team and Members 】
(KEK)R.Sugahara, S.Takeda,M.Yoshioka, H.Yamaoka
(J-Power)
T.Itoh, K.TadaY.Nakayama
(ICEPP)
S.KomamiyaS.Yamashita
Joint Research
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Contents of the measurement 】①Huddling test ②Measurement
around the beam line
- Natural frequency of the trestle ?
- Movement and operation of instruments
- Ground Motion in Accelerator Test Facility ?
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Measurement Instrument 】
- Servo type velocity meter “VSE355G2” -(manufactured by Tokyo Sokushin Co.,Ltd.)
Type VSE-355G2Frequency Band 0.012~70 Hz
Component Horizontal:2, Vertical:1Range 200kine、2000gal
Sensitivity 100mV/kine(2× 50mV/kine)and 2.5V/kine
Resolution 10-6galDamping 100%Range of
Temperature-30℃~70℃
Allowed Acc. 30G(<0.1sec)
- Specification -
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
- Measurement Points -
30 minutes consecutive duration for 12 hours6pm, Feb. 9, 2004 - 6am, Feb. 10, 2004
P1JP1JP2JP2J
P3JP3J P4JP4J
【 Huddling Test (1) 】
- Observation -
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
- Power Spectrum Density and Coherence -
【 Huddling Test (2) 】
Component : X ( Orthogonal to the beam line )
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
- Power Spectrum Density and Coherence -
【 Huddling Test (3) 】
Component : Y ( Parallel to the beam line )
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
- Power Spectrum Density and Coherence -
【 Huddling Test (4) 】
Component : Z ( Vertical )
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
30 minutes consecutive duration for 28 hours2pm, Feb. 10, 2004 – 6pm, Feb. 11, 2004
【 Measurement around the beam line (1) 】
P1JP1J
P2JP2JP3JP3J
P4JP4J
P1JP1J
P2JP2JP3JP3J
P4JP4J
- Measurement Points -
- Observation -
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : X ( Orthogonal to the beam line )
Daytime12:00-12:30, Feb. 11, 2004
Nighttime22:00-22:30, Feb. 10, 2004
P1J
P2J
P3J
P4J
“ Time Series in Velocity (1) “
【 Measurement around the beam line (2) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Y ( Parallel to the beam line )
P1J
P2J
P3J
P4J
“ Time Series in Velocity (2) “
【 Measurement around the beam line (3) 】
Daytime12:00-12:30, Feb. 11, 2004
Nighttime22:00-22:30, Feb. 10, 2004
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Z ( Vertical )
P1J
P2J
P3J
P4J
“ Time Series in Velocity (3) “
【 Measurement around the beam line (4) 】
Daytime12:00-12:30, Feb. 11, 2004
Nighttime22:00-22:30, Feb. 10, 2004
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : X ( Orthogonal to the beam line )Standard Deviation in Velocity ( Component : X )
0
0.0005
0.001
0.0015
0.002
0.0025
0.003
0.0035
0.004
0.0045
0.0052/
10 1
4:00
-14:
30
2/10
15:
00-1
5:30
2/10
16:
00-1
6:30
2/10
17:
00-1
7:30
2/10
18:
00-1
8:30
2/10
19:
00-1
9:30
2/10
20:
00-2
0:30
2/10
21:
00-2
1:30
2/10
22:
00-2
2:30
2/10
23:
00-2
3:30
2/11
00:
00-0
0:30
2/11
01:
00-0
1:30
2/11
02:
00-0
2:30
2/11
03:
00-0
3:30
2/11
04:
00-0
4:30
2/11
05:
00-0
5:30
2/11
06:
00-0
6:30
2/11
07:
00-0
7:30
2/11
08:
00-0
8:30
2/11
09:
00-0
9:30
2/11
10:
00-1
0:30
2/11
11:
00-1
1:30
2/11
12:
00-1
2:30
2/11
13:
00-1
3:30
2/11
14:
00-1
4:30
2/11
15:
00-1
5:30
2/11
16:
00-1
6:30
2/11
17:
00-1
7:30
SD
in V
eloc
ity (k
ine,
cm
/sec
) On the tresleP1J ( )P2J
On the concrete floorP3J ( )P4J
MagnetPower ON
Artificial Noise in Exp. Hall ?
Earthquake
Ave. Spectra were analyized.(The earthquake data was excluded.)
(Nighttime : 19:00-03:00)
Earthquake
Artificial Noise in Exp. Hall ?
Ave. Spectra were analyized.(The earthquake data was excluded.)
Daytime : 09:00-17:00
“ Standard Deviation in Velocity (1) “
【 Measurement around the beam line (5) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Y ( Parallel to the beam line )Standard Deviation in Velocity ( Component : Y )
0
0.0005
0.001
0.0015
0.002
0.0025
0.003
0.0035
0.004
0.0045
0.0052/
10 1
4:00
-14:
30
2/10
15:
00-1
5:30
2/10
16:
00-1
6:30
2/10
17:
00-1
7:30
2/10
18:
00-1
8:30
2/10
19:
00-1
9:30
2/10
20:
00-2
0:30
2/10
21:
00-2
1:30
2/10
22:
00-2
2:30
2/10
23:
00-2
3:30
2/11
00:
00-0
0:30
2/11
01:
00-0
1:30
2/11
02:
00-0
2:30
2/11
03:
00-0
3:30
2/11
04:
00-0
4:30
2/11
05:
00-0
5:30
2/11
06:
00-0
6:30
2/11
07:
00-0
7:30
2/11
08:
00-0
8:30
2/11
09:
00-0
9:30
2/11
10:
00-1
0:30
2/11
11:
00-1
1:30
2/11
12:
00-1
2:30
2/11
13:
00-1
3:30
2/11
14:
00-1
4:30
2/11
15:
00-1
5:30
2/11
16:
00-1
6:30
2/11
17:
00-1
7:30
SD
in V
eloc
ity (k
ine,
cm
/sec
) On the tresleP1J ( )P2J
On the concrete floorP3J ( )P4J
MagnetPower ON
Artificial Noise in Exp. Hall ?
Earthquake
Ave. Spectra were analyized.(The earthquake data was excluded.)
(Nighttime : 19:00-03:00)
Earthquake
Artificial Noise in Exp. Hall ?
Ave. Spectra were analyized.(The earthquake data was excluded.)
Daytime : 09:00-17:00
“ Standard Deviation in Velocity (2) “
【 Measurement around the beam line (6) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Z ( Vertical )Standard Deviation in Velocity ( Component : Z )
0
0.0005
0.001
0.0015
0.002
0.0025
0.003
0.0035
0.004
0.0045
0.0052/
10 1
4:00
-14:
30
2/10
15:
00-1
5:30
2/10
16:
00-1
6:30
2/10
17:
00-1
7:30
2/10
18:
00-1
8:30
2/10
19:
00-1
9:30
2/10
20:
00-2
0:30
2/10
21:
00-2
1:30
2/10
22:
00-2
2:30
2/10
23:
00-2
3:30
2/11
00:
00-0
0:30
2/11
01:
00-0
1:30
2/11
02:
00-0
2:30
2/11
03:
00-0
3:30
2/11
04:
00-0
4:30
2/11
05:
00-0
5:30
2/11
06:
00-0
6:30
2/11
07:
00-0
7:30
2/11
08:
00-0
8:30
2/11
09:
00-0
9:30
2/11
10:
00-1
0:30
2/11
11:
00-1
1:30
2/11
12:
00-1
2:30
2/11
13:
00-1
3:30
2/11
14:
00-1
4:30
2/11
15:
00-1
5:30
2/11
16:
00-1
6:30
2/11
17:
00-1
7:30
SD
in V
eloc
ity (k
ine,
cm
/sec
) On the tresleP1J ( )P2J
On the concrete floorP3J ( )P4J
MagnetPower ON
Artificial Noise in Exp. Hall ?
Earthquake
Ave. Spectra were analyized.(The earthquake data was excluded.)
(Nighttime : 19:00-03:00)
Earthquake
Artificial Noise in Exp. Hall ?
Ave. Spectra were analyized.(The earthquake data was excluded.)
Daytime : 09:00-17:00
“ Standard Deviation in Velocity (3) “
【 Measurement around the beam line (7) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
“ Power Spectrum Density (1) “Component : X ( Orthogonal to the beam line )
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
【 Measurement around the beam line (8) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Y ( Parallel to the beam line )
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Power Spectrum Density (2) “【 Measurement around the beam line (9) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Z ( Vertical )
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Power Spectrum Density (3) “【 Measurement around the beam line (10) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : X ( Orthogonal to the beam line )
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Integrated Spectrum (1) “【 Measurement around the beam line (11) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Y ( Parallel to the beam line )
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Integrated Spectrum (2) “【 Measurement around the beam line (12) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Component : Z ( Vertical )
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Integrated Spectrum (3) “【 Measurement around the beam line (13) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
“ Coherence (1) ”
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
Component : X ( Orthogonal )
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
【 Measurement around the beam line (14) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Coherence (2) ” Component : Y ( Parallel )
【 Measurement around the beam line (15) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
Daytime Daytime (09:00-17:00)(09:00-17:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Coherence (3) ” Component : Z ( Vertical )
【 Measurement around the beam line (16) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Earthquake record (1) 】
Tsukuba
Epicenter
Date : 21:07, Feb. 10, 2004 ( When measuring around the beam line )
Epicenter : East of ChibaDepth of hypocenter:65kmJMA Magnitude:4.2
P1J
P2J
P3J
P4J
【 X : Orthogonal 】
【 Z : Vertical 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
P1J
P2J
P3J
P4J
【 X : Orthogonal 】
【 Z : Vertical 】
Tsukuba
Epicenter
【 Earthquake record (2) 】Date : 14:04, Feb. 11, 2004 ( When measuring around the beam line )
Epicenter : South of IbarakiDepth of hypocenter:70kmJMA Magnitude:3.7
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
“ Minimum and Maximum in velocity, Amplification ratio “
component : X Component : Y Component : ZMin.(kine) Max.(kine) Min.(kine) Max.(kine) Min.(kine) Max.(kine)
P1J(P1J/P3J)
-0.02088(1.12)
0.02025(1.50)
-0.01663(1.22)
0.02494(1.34)
-0.00855(1.07)
0.00829(1.10)
P2J(P2J/P3J)
-0.01901(1.02)
0.01376(1.02)
-0.01389(1.02)
0.01908(1.02)
-0.00737(0.92)
0.00756(1.00)
P3J -0.01862 0.01349 -0.01359 0.01855 -0.00799 0.00753
P4J(P4J/P3J)
-0.01979(1.06)
0.01398(1.04)
-0.01367(1.00)
0.01904(1.03)
-0.00803(1.00)
0.00694(0.92)
component : X Component : Y Component : ZMin.(kine) Max.(kine) Min.(kine) Max.(kine) Min.(kine) Max.(kine)
P1J(P1J/P3J)
-0.04841(1.47)
0.05130(1.92)
-0.04665(1.25)
0.04180(1.36)
-0.01851(1.44)
0.01641(1.42)
P2J(P2J/P3J)
-0.03389(1.03)
0.02800(1.05)
-0.03878(1.04)
0.03178(1.04)
-0.01449(1.13)
0.01353(1.17)
P3J -0.03293 0.02673 -0.03724 0.03066 -0.01285 0.01154
P4J(P4J/P3J)
-0.03259(0.99)
0.02820(1.05)
-0.03855(1.04)
0.03084(1.01)
-0.01063(0.83)
0.01156(1.00)
〔 Earthquake 1 : 21:07, 2004.2.10 , Epicenter : East of Chiba 〕
〔 Earthquake 2 : 14:04, 2004.2.11 , Epicenter : South of Ibaraki 〕
【 Earthquake record (3) 】
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Comparison (1) 】1) “ATF at KEK” Feb. 10, 2004 – Feb. 11, 20042) “D03 P.S.Bldg. at KEK” Dec. 27, 2002 – Dec. 28, 20023) “SPring-8” June 14, 2003 – June 15, 2003
SPring-8SPring-8ATFATF
D3 P.S.Bldg.D3 P.S.Bldg.
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Comparison(2) 】Component : X
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Power Spectrum Density and Integrated Spectrum “
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Comparison(3) 】Component : Y
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Power Spectrum Density and Integrated Spectrum “
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Comparison(4) 】Component : Z
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
Nighttime Nighttime (19:00-03:00)(19:00-03:00)
“ Power Spectrum Density and Integrated Spectrum “
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Summary 】
- ATF at KEK -
•The peak around 0.2Hz and 3Hz is observed in allmeasurement points.•Horizontal natural frequency of the trestle in ATFis thought to be around 10 - 12 Hz.•As the peak excited only P1J can’t be observed,vertical natural frequency of the trestle in ATF isnot clear.•In the P1J (the measurement point on the trestle), the vibration is amplified during the earthquake.
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.
【 Summary 】
•The level of ground motion in the KEK is muchhigher than that in the SPring-8.•The amplitude of the peak around 2-3Hz is almost the same between the ATF and the D3 power supplybuilding at the KEK. •There is a difference in the peak around 0.2Hz,because the observed season is different.
- Comparison (KEK, SPring-8) -