Ground Motion Measurement in Accelerator Test Facility at KEK

33
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd. Ground Motion Measuremen in Accelerator Test Facil at KEK KEK ICEPP (Univ. of Tokyo) J-Power

description

Ground Motion Measurement in Accelerator Test Facility at KEK. ・KEK ・ICEPP ( Univ . of Tokyo ) ・J-Power. Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd. 【 Research Team and Members】. ( KEK). - PowerPoint PPT Presentation

Transcript of Ground Motion Measurement in Accelerator Test Facility at KEK

Page 1: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Ground Motion Measurementin Accelerator Test Facility

at KEK

・ KEK・ ICEPP (Univ. of Tokyo)

・ J-Power

Page 2: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Research Team and Members 】

(KEK)R.Sugahara, S.Takeda,M.Yoshioka, H.Yamaoka

(J-Power)

T.Itoh, K.TadaY.Nakayama

(ICEPP)

S.KomamiyaS.Yamashita

Joint Research

Page 3: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Contents of the measurement 】①Huddling test ②Measurement

around the beam line

- Natural frequency of the trestle ?

- Movement and operation of instruments

- Ground Motion in Accelerator Test Facility ?

Page 4: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Measurement Instrument 】

- Servo type velocity meter “VSE355G2” -(manufactured by Tokyo Sokushin Co.,Ltd.)

Type VSE-355G2Frequency Band 0.012~70  Hz

Component Horizontal:2, Vertical:1Range 200kine、2000gal

Sensitivity 100mV/kine(2× 50mV/kine)and 2.5V/kine

Resolution 10-6galDamping 100%Range of

Temperature-30℃~70℃

Allowed Acc. 30G(<0.1sec)

- Specification -

Page 5: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

- Measurement Points -

30 minutes consecutive duration for 12 hours6pm, Feb. 9, 2004 - 6am, Feb. 10, 2004

P1JP1JP2JP2J

P3JP3J P4JP4J

【 Huddling Test (1) 】

- Observation -

Page 6: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

- Power Spectrum Density and Coherence -

【 Huddling Test (2) 】

Component : X ( Orthogonal to the beam line )

Page 7: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

- Power Spectrum Density and Coherence -

【 Huddling Test (3) 】

Component : Y ( Parallel to the beam line )

Page 8: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

- Power Spectrum Density and Coherence -

【 Huddling Test (4) 】

Component : Z ( Vertical )

Page 9: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

30 minutes consecutive duration for 28 hours2pm, Feb. 10, 2004 – 6pm, Feb. 11, 2004

【 Measurement around the beam line (1) 】

P1JP1J

P2JP2JP3JP3J

P4JP4J

P1JP1J

P2JP2JP3JP3J

P4JP4J

- Measurement Points -

- Observation -

Page 10: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : X ( Orthogonal to the beam line )

Daytime12:00-12:30, Feb. 11, 2004

Nighttime22:00-22:30, Feb. 10, 2004

P1J

P2J

P3J

P4J

“ Time Series in Velocity (1) “

【 Measurement around the beam line (2) 】

Page 11: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Y ( Parallel to the beam line )

P1J

P2J

P3J

P4J

“ Time Series in Velocity (2) “

【 Measurement around the beam line (3) 】

Daytime12:00-12:30, Feb. 11, 2004

Nighttime22:00-22:30, Feb. 10, 2004

Page 12: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Z ( Vertical )

P1J

P2J

P3J

P4J

“ Time Series in Velocity (3) “

【 Measurement around the beam line (4) 】

Daytime12:00-12:30, Feb. 11, 2004

Nighttime22:00-22:30, Feb. 10, 2004

Page 13: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : X ( Orthogonal to the beam line )Standard Deviation in Velocity ( Component : X )

0

0.0005

0.001

0.0015

0.002

0.0025

0.003

0.0035

0.004

0.0045

0.0052/

10 1

4:00

-14:

30

2/10

15:

00-1

5:30

2/10

16:

00-1

6:30

2/10

17:

00-1

7:30

2/10

18:

00-1

8:30

2/10

19:

00-1

9:30

2/10

20:

00-2

0:30

2/10

21:

00-2

1:30

2/10

22:

00-2

2:30

2/10

23:

00-2

3:30

2/11

00:

00-0

0:30

2/11

01:

00-0

1:30

2/11

02:

00-0

2:30

2/11

03:

00-0

3:30

2/11

04:

00-0

4:30

2/11

05:

00-0

5:30

2/11

06:

00-0

6:30

2/11

07:

00-0

7:30

2/11

08:

00-0

8:30

2/11

09:

00-0

9:30

2/11

10:

00-1

0:30

2/11

11:

00-1

1:30

2/11

12:

00-1

2:30

2/11

13:

00-1

3:30

2/11

14:

00-1

4:30

2/11

15:

00-1

5:30

2/11

16:

00-1

6:30

2/11

17:

00-1

7:30

SD

in V

eloc

ity (k

ine,

cm

/sec

) On the tresleP1J ( )P2J

On the concrete floorP3J ( )P4J

MagnetPower ON

Artificial Noise in Exp. Hall ?

Earthquake

Ave. Spectra were analyized.(The earthquake data was excluded.)

(Nighttime : 19:00-03:00)

Earthquake

Artificial Noise in Exp. Hall ?

Ave. Spectra were analyized.(The earthquake data was excluded.)

Daytime : 09:00-17:00

“ Standard Deviation in Velocity (1) “

【 Measurement around the beam line (5) 】

Page 14: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Y ( Parallel to the beam line )Standard Deviation in Velocity ( Component : Y )

0

0.0005

0.001

0.0015

0.002

0.0025

0.003

0.0035

0.004

0.0045

0.0052/

10 1

4:00

-14:

30

2/10

15:

00-1

5:30

2/10

16:

00-1

6:30

2/10

17:

00-1

7:30

2/10

18:

00-1

8:30

2/10

19:

00-1

9:30

2/10

20:

00-2

0:30

2/10

21:

00-2

1:30

2/10

22:

00-2

2:30

2/10

23:

00-2

3:30

2/11

00:

00-0

0:30

2/11

01:

00-0

1:30

2/11

02:

00-0

2:30

2/11

03:

00-0

3:30

2/11

04:

00-0

4:30

2/11

05:

00-0

5:30

2/11

06:

00-0

6:30

2/11

07:

00-0

7:30

2/11

08:

00-0

8:30

2/11

09:

00-0

9:30

2/11

10:

00-1

0:30

2/11

11:

00-1

1:30

2/11

12:

00-1

2:30

2/11

13:

00-1

3:30

2/11

14:

00-1

4:30

2/11

15:

00-1

5:30

2/11

16:

00-1

6:30

2/11

17:

00-1

7:30

SD

in V

eloc

ity (k

ine,

cm

/sec

) On the tresleP1J ( )P2J

On the concrete floorP3J ( )P4J

MagnetPower ON

Artificial Noise in Exp. Hall ?

Earthquake

Ave. Spectra were analyized.(The earthquake data was excluded.)

(Nighttime : 19:00-03:00)

Earthquake

Artificial Noise in Exp. Hall ?

Ave. Spectra were analyized.(The earthquake data was excluded.)

Daytime : 09:00-17:00

“ Standard Deviation in Velocity (2) “

【 Measurement around the beam line (6) 】

Page 15: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Z ( Vertical )Standard Deviation in Velocity ( Component : Z )

0

0.0005

0.001

0.0015

0.002

0.0025

0.003

0.0035

0.004

0.0045

0.0052/

10 1

4:00

-14:

30

2/10

15:

00-1

5:30

2/10

16:

00-1

6:30

2/10

17:

00-1

7:30

2/10

18:

00-1

8:30

2/10

19:

00-1

9:30

2/10

20:

00-2

0:30

2/10

21:

00-2

1:30

2/10

22:

00-2

2:30

2/10

23:

00-2

3:30

2/11

00:

00-0

0:30

2/11

01:

00-0

1:30

2/11

02:

00-0

2:30

2/11

03:

00-0

3:30

2/11

04:

00-0

4:30

2/11

05:

00-0

5:30

2/11

06:

00-0

6:30

2/11

07:

00-0

7:30

2/11

08:

00-0

8:30

2/11

09:

00-0

9:30

2/11

10:

00-1

0:30

2/11

11:

00-1

1:30

2/11

12:

00-1

2:30

2/11

13:

00-1

3:30

2/11

14:

00-1

4:30

2/11

15:

00-1

5:30

2/11

16:

00-1

6:30

2/11

17:

00-1

7:30

SD

in V

eloc

ity (k

ine,

cm

/sec

) On the tresleP1J ( )P2J

On the concrete floorP3J ( )P4J

MagnetPower ON

Artificial Noise in Exp. Hall ?

Earthquake

Ave. Spectra were analyized.(The earthquake data was excluded.)

(Nighttime : 19:00-03:00)

Earthquake

Artificial Noise in Exp. Hall ?

Ave. Spectra were analyized.(The earthquake data was excluded.)

Daytime : 09:00-17:00

“ Standard Deviation in Velocity (3) “

【 Measurement around the beam line (7) 】

Page 16: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

“ Power Spectrum Density (1) “Component : X ( Orthogonal to the beam line )

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

【 Measurement around the beam line (8) 】

Page 17: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Y ( Parallel to the beam line )

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Power Spectrum Density (2) “【 Measurement around the beam line (9) 】

Page 18: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Z ( Vertical )

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Power Spectrum Density (3) “【 Measurement around the beam line (10) 】

Page 19: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : X ( Orthogonal to the beam line )

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Integrated Spectrum (1) “【 Measurement around the beam line (11) 】

Page 20: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Y ( Parallel to the beam line )

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Integrated Spectrum (2) “【 Measurement around the beam line (12) 】

Page 21: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Component : Z ( Vertical )

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Integrated Spectrum (3) “【 Measurement around the beam line (13) 】

Page 22: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

“ Coherence (1) ”

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

Component : X ( Orthogonal )

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

【 Measurement around the beam line (14) 】

Page 23: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Coherence (2) ” Component : Y ( Parallel )

【 Measurement around the beam line (15) 】

Page 24: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

Daytime Daytime (09:00-17:00)(09:00-17:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Coherence (3) ” Component : Z ( Vertical )

【 Measurement around the beam line (16) 】

Page 25: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Earthquake record (1) 】

Tsukuba

Epicenter

Date : 21:07, Feb. 10, 2004 ( When measuring around the beam line )

Epicenter : East of ChibaDepth of hypocenter:65kmJMA Magnitude:4.2

P1J

P2J

P3J

P4J

【 X : Orthogonal 】

【 Z : Vertical 】

Page 26: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

P1J

P2J

P3J

P4J

【 X : Orthogonal 】

【 Z : Vertical 】

Tsukuba

Epicenter

【 Earthquake record (2) 】Date : 14:04, Feb. 11, 2004 ( When measuring around the beam line )

Epicenter : South of IbarakiDepth of hypocenter:70kmJMA Magnitude:3.7

Page 27: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

“ Minimum and Maximum in velocity, Amplification ratio “

component : X Component : Y Component : ZMin.(kine) Max.(kine) Min.(kine) Max.(kine) Min.(kine) Max.(kine)

P1J(P1J/P3J)

-0.02088(1.12)

0.02025(1.50)

-0.01663(1.22)

0.02494(1.34)

-0.00855(1.07)

0.00829(1.10)

P2J(P2J/P3J)

-0.01901(1.02)

0.01376(1.02)

-0.01389(1.02)

0.01908(1.02)

-0.00737(0.92)

0.00756(1.00)

P3J -0.01862 0.01349 -0.01359 0.01855 -0.00799 0.00753

P4J(P4J/P3J)

-0.01979(1.06)

0.01398(1.04)

-0.01367(1.00)

0.01904(1.03)

-0.00803(1.00)

0.00694(0.92)

component : X Component : Y Component : ZMin.(kine) Max.(kine) Min.(kine) Max.(kine) Min.(kine) Max.(kine)

P1J(P1J/P3J)

-0.04841(1.47)

0.05130(1.92)

-0.04665(1.25)

0.04180(1.36)

-0.01851(1.44)

0.01641(1.42)

P2J(P2J/P3J)

-0.03389(1.03)

0.02800(1.05)

-0.03878(1.04)

0.03178(1.04)

-0.01449(1.13)

0.01353(1.17)

P3J -0.03293 0.02673 -0.03724 0.03066 -0.01285 0.01154

P4J(P4J/P3J)

-0.03259(0.99)

0.02820(1.05)

-0.03855(1.04)

0.03084(1.01)

-0.01063(0.83)

0.01156(1.00)

〔 Earthquake 1 : 21:07, 2004.2.10 , Epicenter : East of Chiba 〕

〔 Earthquake 2 : 14:04, 2004.2.11 , Epicenter : South of Ibaraki 〕

【 Earthquake record (3) 】

Page 28: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Comparison (1) 】1) “ATF at KEK” Feb. 10, 2004 – Feb. 11, 20042) “D03 P.S.Bldg. at KEK” Dec. 27, 2002 – Dec. 28, 20023) “SPring-8” June 14, 2003 – June 15, 2003

SPring-8SPring-8ATFATF

D3 P.S.Bldg.D3 P.S.Bldg.

Page 29: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Comparison(2) 】Component : X

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Power Spectrum Density and Integrated Spectrum “

Page 30: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Comparison(3) 】Component : Y

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Power Spectrum Density and Integrated Spectrum “

Page 31: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Comparison(4) 】Component : Z

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

Nighttime Nighttime (19:00-03:00)(19:00-03:00)

“ Power Spectrum Density and Integrated Spectrum “

Page 32: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Summary 】

- ATF at KEK -

•The peak around 0.2Hz and 3Hz is observed in allmeasurement points.•Horizontal natural frequency of the trestle in ATFis thought to be around 10 - 12 Hz.•As the peak excited only P1J can’t be observed,vertical natural frequency of the trestle in ATF isnot clear.•In the P1J (the measurement point on the trestle), the vibration is amplified during the earthquake.

Page 33: Ground Motion Measurement in Accelerator Test Facility at KEK

Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd.

【 Summary 】

•The level of ground motion in the KEK is muchhigher than that in the SPring-8.•The amplitude of the peak around 2-3Hz is almost the same between the ATF and the D3 power supplybuilding at the KEK. •There is a difference in the peak around 0.2Hz,because the observed season is different.

- Comparison (KEK, SPring-8) -