Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and...

8
Grief Support Service Grief Support Service The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe Victoria, offer grief support services for family members who have experienced a workplace death. Please call: Partnerships in Grieving Program Industrial Deaths Support and Advocacy Inc. (B/H) 03 9827 8322 (B/H) 03 9309 4453 (A/H) 0409 788 883 Email: [email protected] Email: [email protected] WorkSafe Victoria Regional Offices: WorkSafe Victoria Head Office: Ballarat 5337 1400 Level 24, 222 Exhibition Street Bendigo 5443 8866 Melbourne, VIC 3000. Dandenong 8792 9000 Tel: 9641 1555 Fax: 9641 1222 Geelong 5226 1200 www.workcover.vic.gov.au Melbourne 9628 8115 Email: [email protected] Mildura 5021 4001 Mulgrave 9565 9444 Preston 9485 4555 Shepparton 5831 8260 Traralgon 5173 8900 Wangaratta 5721 8588 Warrnambool 5562 5600 VWA501/01/01.02 18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 8

Transcript of Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and...

Page 1: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

Grief Support ServiceGrief Support ServiceThe Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA),

with support of WorkSafe Victoria, offer grief support services for family members who have experienced

a workplace death.

Please call:

Partnerships in Grieving Program Industrial Deaths Support and Advocacy Inc.

(B/H) 03 9827 8322 (B/H) 03 9309 4453

(A/H) 0409 788 883 Email: [email protected]

Email: [email protected]

WorkSafe Victoria Regional Offices: WorkSafe Victoria Head Office:

Ballarat 5337 1400 Level 24, 222 Exhibition Street

Bendigo 5443 8866 Melbourne, VIC 3000.

Dandenong 8792 9000 Tel: 96411555 Fax: 96411222

Geelong 5226 1200 www.workcover.vic.gov.au

Melbourne 9628 8115 Email: [email protected]

Mildura 5021 4001

Mulgrave 9565 9444

Preston 9485 4555

Shepparton 5831 8260

Traralgon 5173 8900

Wangaratta 5721 8588

Warrnambool 5562 5600

VW

A50

1/01

/01.

02

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 8

Page 2: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

Ho

w t

o p

reve

nt

fata

liti

es i

n t

he

con

stru

ctio

nin

du

stry

.

No-one should dieat work.

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 1

Page 3: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

“Jason was my only son. When he got

his apprenticeship he was over the moon.

He had a lot of plans, even at nineteen.

On the day that Jason died, on his way

out to work he gave me a hug and said

‘Bye mum, love ya.’ I lost Jason and now

I’ve lost the family he might have had

as well.”

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 2

Page 4: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

Why should I read it?

In Victoria, a worker dies on average every

week. The impact is felt by everyone around

them. Families, loved ones, work colleagues,

employers and mates. The reality is that

almost every one of these deaths could have

been prevented if proper safety procedures

like those outlined in this book were followed.

No-one should die at work.

Who should read it?

If you’re in the construction industry you

should read this book. As you read it, take

a walk around your workplace to look for

potential hazards. Then find ways to fix the

problem in the short term while you work

on long term solutions.

About WorkSafe Victoria

Our primary aim is to prevent accidents

by offering practical information and advice

to help you manage your occupational health

and safety (OHS) requirements. Small

businesses can take advantage of a free,

3 hour consultation with an independent

OHS professional.

For more information

Call, 1800 136 089 or visit our

website’s construction page

www.workcover.vic.gov.au/construction

for industry regulatory requirements.

About this booklet

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 3

Page 5: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

Cause: Falls from heights

SCAFFOLDS • Set up scaffolds on solid, stable ground with loads distributed through base plates and soleplates.

• Platforms to be fully decked and planks secure against uplift.

• Place guardrails, midrails & toeboards on the open sides and ends of all platforms greater than 2m.

• All platforms to have safe access.

• Don’t overload platforms.

• Ensure scaffold is properly braced and tied.

• Scaffolds greater than 4m to be erected, altered and dismantled by certificated scaffolders only.

LADDERS • Do not use ladders where safe alternatives can be used.

• Use step-platforms in preference to ladders.

• Ensure ladders are industrial grade, not domestic grade.

• Do not use 2-handed tools on ladders.

• On step ladders, do not stand higher than second tread from the top.

• Do not stand higher than 900mm from the top of a single or extension ladder.

• Pitch ladder at a slope of 4 (vertical) to 1 (horizontal).

• Ensure ladders are secure.

INCOMPLETE FLOORS • Guardrail open sides, voids and lift shafts.

• Cover penetrations.

ROOFS • Fix safety mesh to metal-deck roofs before roof-laying is started.

• Ensure perimeter protection for all roof work is provided.

• Use roof ladders on very steep-pitched roofs.

Problem: Solution:

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 4

Page 6: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

Cause: Electrocution

OVERHEAD POWER LINES • Ensure "no go zones" are observed for scaffolds, cranes, EWPs, concrete

booms and earthmoving equipment.

• Use trained spotters where work needs to be done within the "yellow zones."

UNDERGROUND CABLES • Dial before you dig. (1100)

POWERBOARDS • All fuses to be locked.

• RCD to be fitted and tested.

• Ensure powerboards are protected from mechanical damage.

EXTENSION LEADS • Test and tag every 3 months.

• Only use heavy duty leads.

• Protect leads from damage and keep them clear of the ground.

• Do not use piggy-backs or portable domestic power boards.

POWER TOOLS • Use battery-powered tools where possible.

• Test and tag every 3 months.

• Always follow the manufacturer's instructions.

Problem: Solution:

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 5

Page 7: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

Cause: Structural Collapse

TRENCHES • Shore trenches.

• Use trench shields.

• Batter back the trench sides.

• Keep spoil well clear.

• Keep heavy machinery well clear.

• Ensure a trained person is in charge.

STEEL STRUCTURES • Follow the documented erection sequence strictly.

• Check that weather conditions are safe for erection.

• Maintain structural stability at all stages by using temporary guys, props, braces, etc.

• Only certified riggers to be in charge of trained crews.

BULK EXCAVATIONS • Use physical barriers to separate people from earth walls.

• Only underpin to an engineered plan.

• Ensure a trained person is in charge.

SHORING & FALSEWORK • Do not erect without an engineer’s drawing.

• Do not exceed manufacturer's Working Load Limits.

• Inspect structure against plan prior to loading.

• Load in strict accordance with any instructions specified on the drawing.

TILT-UP & PRE-CAST PANELS • Follow the shop drawings and documented erection sequence strictly.

• Check that weather conditions are safe for erection.

• Do not remove temporary braces without written authority.

• Only certified riggers to be in charge of trained crews.

Problem: Solution:

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 6

Page 8: Grief Support Service - prod.wsvdigital.com.au · The Partnerships in Grieving Program (PIGP) and the Industrial Deaths Support and Advocacy Inc. (IDSA), with support of WorkSafe

Cause: Powered Plant

MOBILE PLANT • Use physical barriers to isolate people from operating plant.

• Fit plant with warning devices and reversing beepers.

• Workers who need to be near plant to wear high visibility reflective vests.

MOVING PARTS • Ensure guards are fitted.

OPERATION • All operators to be trained and where appropriate, certificated or qualified.

• Use the right machine for the right task.

• Ensure operator's manual is used.

• Schedule work to avoid operator fatigue.

MAINTENANCE • Test and service as per manufacturer's advice.

• Maintain a logbook.

OVERTURNING • Ensure ground is stable and strong enough for imposed loads.

• Keep clear of excavations and steep inclines.

• Never exceed load charts.

• Check weather conditions are safe for operation.

Problem: Solution:

18365_SF60P_Work Constrution 17/1/02 2:02 PM Page 7