Grid'5000 - DAS-3 workshop 104/12/06
Grid’5000
Grid’5000Grid’5000*
DAS-3 – Grid'5000 workshopDecember 4th, 2006
www.grid5000.frwww.grid5000.fr
*5000 CPUs
Pierre NEYRON - INRIAPierre NEYRON - INRIAHead of Grid’5000Head of Grid’5000 Technical Committee Technical Committee
mailto:mailto: [email protected]@imag.fr
Grid'5000 - DAS-3 workshop 204/12/06
Grid’5000
Grid'5000 hardwareOverviewHardware summary
Grid'5000 NetworkBackbone networkSecurity architectureRouting tables
Grid'5000 Software stackAccounts managementGrid tools
Grid'5000 PeopleCommitteesTechnical staffCollaborative work
OutlineOutline
Grid'5000 - DAS-3 workshop 304/12/06
Grid’5000
Grid’5000 platform overviewGrid’5000 platform overview
1000 (684)518 (518)
500 (198)
500 (116)
500 (252)
500 (270)
500 (322)
500 (146)
500 (94)
Nation wide Grid:9 sites, 500 CPUs/site(1000 for Orsay)
Currently:2600 CPUs
Interlink network:10GB/s dark fibre
Grid'5000 - DAS-3 workshop 504/12/06
Grid’5000
Grid’5000 platform hardwareGrid’5000 platform hardwareGrid'5000 hardware summary
see: https://www.grid5000.fr/mediawiki/index.php/Special:HardwareAbstract
Manufacturers:• HP• Dell• IBM• Sun• AppleCPU types:• AMD Opteron [80%]• Intel Xeon64• Intel Itanium2• Intel Xeon32• PowerPC G5Network:• Gigabit Ethernet• Myrinet• Infiniband
Grid'5000 - DAS-3 workshop 604/12/06
Grid’5000
Grid'5000 hardwareOverviewHardware summary
Grid'5000 NetworkBackbone networkSecurity architectureRouting tables
Grid'5000 Software stacksAccounts managementGrid tools
Grid'5000 PeopleCommitteesTechnical staffCollaborative work
OutlineOutline
Grid'5000 - DAS-3 workshop 704/12/06
Grid’5000
Grid’5000 backbone networkGrid’5000 backbone network
Grid'5000 dedicated backbone networkRenater4: Sites connected to a single layer-2 VLAN
RENATER
Rennes
RENATER
Lille
RENATER
Nancy
RENATER
BordeauxParis Lyon
RENATER
RENATER
Grenoble
Lyon
RENATER
Sophia
RENATER
Toulouse
Black fibreDedicated LambdaFully isolated traffic!
10 Gbps
10 Gbps
10 Gbps
10 Gbps
10 Gbps
10 G
bps
10 Gbps
10 Gbps
10 Gbps
1Gb throughRenater3
(MPLS)Renater4 VLAN 550
192.168.4.0/24
RENATER
Orsay
DAS-3 via Geant and Surfnet
Grid'5000 - DAS-3 workshop 804/12/06
Grid’5000
Grid'5000 router
Site's Grid'5000access machineSecure access
Grid'5000 site
Grid’5000 security architectureGrid’5000 security architecture
2 fibers:1 dedicated to Grid’5000
Grid'5000site
Grid'5000site
Grid'5000 network is isolated from Renater general purpose network.Access is granted thru secure gateways
Lab
Reginal Node
Regional node
Regional Node
Cluster
Lab's router
SSH
Regional Node
Internet
Renater general purposenational
network backboneGrid'5000 dedicated
isolatednetwork backbone
Lab network
Grid'5000 site
Site servers(DNS, LDAP,
NFS, DHCP/PXE,Console, Reboot)
Cluster nodesworkstation
Renater
ds
Grid'5000 - DAS-3 workshop 904/12/06
Grid’5000
Grid’5000 routing tablesGrid’5000 routing tablesSite-to-Site routing tablesBordeaux 192.168.133.0 /24 (255.255.255.0)
Grenoble (idpot ) 129.88.70.0 /24 (255.255.255.0)
(icluster2) 129.88.98.0 /24 (255.255.255.0)
(icare ) 192.168.11.0 /24 (255.255.255.0)
Lille 192.168.159.0 /24 (255.255.255.0)
Lyon 10.69.0.0 /17 (255.255.128.0)
Nancy 172.28.52.0 /22 (255.255.252.0)
Orsay 172.24.0.0 /16 (255.255.0.0 )
Rennes 131.254.202.0 /23 (255.255.254.0)
Sophia 138.96.20.0 /22 (255.255.252.0)
Toulouse 192.168.22.0 /24 (255.255.255.0)
On site, not routed local networksSeveral private networks are used but not routed from site to site: admin network, IPMA/RSA network, Myrinet/Infiniband network...
Routing for experiments using virtualization10.<site>.0.0 address space used for virtual nodes (work in progress)
=> DAS-3 connection: Need to avoid IP conflicts
Grid'5000 - DAS-3 workshop 1004/12/06
Grid’5000
Grid'5000 hardwareOverviewHardware summary
Grid'5000 NetworkBackbone networkRouting tablesSecurity
Grid'5000 Software stacksAccounts managementGrid tools
Grid'5000 PeopleCommitteesTechnical staffCollaborative work
OutlineOutline
Grid'5000 - DAS-3 workshop 1104/12/06
Grid’5000
Cluster
A single account for every user on every sites:•Every site runs a LDAP server•Every site manages its LDAP branch of user accounts•Every site replicates the LDAP branches of the other sites•Home directories structure automatically createdAll sites share the same global Grid'5000 account directory
Grid'5000 account managementGrid'5000 account management
Grid'5000site
SSH
Home directories/home/<site>/<user>
LDAP accountssite local branch +replicated remote branches
Grid'5000 site
SSH
Grid'5000site
remote accounts replication+
home directory creation & on demand synchronization
Unique user accounts on Grid'5000
Grid'5000 - DAS-3 workshop 1204/12/06
Grid’5000
Cluster
Grid'5000 grid toolsGrid'5000 grid tools
Grid'5000site
SSH
Grid'5000 siteSSH
Resource management & deployment
homesLDAP
Grid'5000site
OAR
KadeployOAR
Kadeploy
OARGrid
•Every cluster is managed by a OAR server•On user's demand, every cluster can be redeployed with the user's provided environment•OAR grid allows grid submission over the whole grid
Grid'5000 - DAS-3 workshop 1304/12/06
Grid’5000
Grid'5000 hardwareOverviewHardware summary
Grid'5000 NetworkBackbone networkRouting tablesSecurity
Grid'5000 Software stacksAccounts managementGrid tools
Grid'5000 PeopleCommitteesTechnical staffCollaborative work
OutlineOutline
Grid'5000 - DAS-3 workshop 1404/12/06
Grid’5000
Grid’5000 committeesGrid’5000 committees
• Steering Committee (CP): Pr. Franck Cappello, Pr. Thierry Priol, Pr. Brigitte Plateau & al
• Technical Committee (CT): 20 engineers + researchers, about 50 persons
• Users: more than 200 active users, located on Grid'5000 sites/nearby/in foreign countries (Netherlands, Brazil, Africa, Japan...)
Grid'5000 - DAS-3 workshop 1504/12/06
Grid’5000
Grid’5000 technical staffGrid’5000 technical staff
Grid'5000 technical staff is dispatched on all 9 sites, France wild.National: coordination + development (2 engineers)Sites: 1 or 2 engineers per sites for the administrationPeople hosted in INRIAresearch labs or universities. Bordeaux – Grenoble – Lille – Lyon –
Nancy - Orsay (Paris) – Rennes – Sophia-Antipolis (Nice) - Toulouse
Grid'5000 as acomputer grid, andas a grid of People
Grid'5000 - DAS-3 workshop 1604/12/06
Grid’5000
Grid’5000 collaborative workGrid’5000 collaborative work
Communication means:• Mailing lists (CP, CT, users, site-users, site-
staff, network-staff)• Instant messaging (Grid'5000 dedicated
Jabber server)• Phone + audio-conf (monthly CT audio-
meeting + task dedicated meeting... )• Physical meeting every 4 months Tools aiding collaborative work:• Wiki: public web site + user's portal +
committees portal• Bugzilla: ticket tracking, task assignment• SVN repository / GForge• incident tracking tools/cross admin
logs/monitoring