Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013...
Transcript of Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013...
![Page 1: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/1.jpg)
Greenways and Cycle Tracks 2013 Mid-Year Report
Seattle City Council Transportation Committee
May 31, 2013
![Page 2: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/2.jpg)
Statement of Legislative Intent
2013 Adopted Budget included a Statement of Legislative Intent (SLI) prioritizing the following projects in the 2013-2014 Biennium:
• Ballard neighborhood greenway
• Delridge neighborhood greenway
• Downtown cycle track development
• West Seattle lower bridge trail access
• Design work on the following additional neighborhood greenways:
o Rainier Valley
o Central District
o Lake City
o University District
![Page 3: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/3.jpg)
What are Neighborhood Greenways?
• Family friendly routes
• Neighborhood networks that link community destinations such as parks, schools, libraries, and shopping areas
• Provide connections to regional trails such as the Burke-Gilman Trail
• Facilities that are parallel to higher volume arterials that allow bicyclists to make connections between neighborhoods on lower speed, lower volume streets
![Page 4: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/4.jpg)
• Low speeds (< 25 mph)
• Low volumes (< 1,000 vehicles per day)
• Gradual Inclines
• Destinations
• Community input
Route Selection
![Page 5: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/5.jpg)
Define the Route
![Page 6: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/6.jpg)
Improve Arterial Crossings
Traffic signals Crosswalk/crossbikes/ADA
![Page 7: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/7.jpg)
Walk-Bike Priority and Traffic Calming
![Page 8: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/8.jpg)
Why Invest in Neighborhood Greenways
• Increase walking and bicycling
• Improve transportation options
• Environmental benefits
• Safer streets for everyone
• Health benefits
• Equity
No Way, No How
Willing but Wary
Strong and
Fearless
Enthused and Confident
![Page 9: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/9.jpg)
Neighborhood Greenways Outreach
Data Collection
• Speeds, volumes, collisions
•Community greenway or other planning efforts
Outreach Meeting #1
• Define greenways and describe tool box
• Discuss goals and objectives
• Hear local ideas and concerns
• Share traffic data and general route possibilities
Conceptual Design
• Identify route(s)
• Define improvements
Outreach Meeting #2
• Review goals and objectives
• Share conceptual routes and treatments
• Be open to input and change
• Describe next steps
Design and Build Greenway
• Design
• Construction
• Opening event
Evaluate and Adjust
• Stakeholder feedback
• Data
• Make changes if needed
![Page 10: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/10.jpg)
Neighborhood Greenway Work Plan
2012 Completed Greenways: Wallingford 39th Avenue NE 2013 Greenway Construction: • Ballard • Delridge • Beacon Hill • Fremont Avenue N Planning Underway: • Delridge Loop • Ballard Box • Rainier Valley • Central District • Lake City • University District
![Page 11: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/11.jpg)
Delridge Neighborhood Greenway
![Page 12: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/12.jpg)
Delridge Neighborhood Greenway Project Elements Include: • Raised crosswalk at SW Andover St • New corners with curbs on the south side of SW Brandon St • ADA ramps, speed humps, crosswalks and crossbikes • Radar speed feedback and 20mph signs on SW Genesee •Sidewalk and pavement repair • Wayfinding signs and markings • 20 mph speed limit along the greenway; stop signs for intersecting non-arterial streets
Before
After
![Page 13: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/13.jpg)
Ballard Neighborhood Greenway
Existing half-signal
![Page 14: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/14.jpg)
Ballard Neighborhood Greenway
Before
After
Sidewalk Repair Widened sidewalk at Seaview
![Page 15: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/15.jpg)
Additional Neighborhood Greenways
Planning underway for:
•Delridge Loop
•Ballard Box
•Rainier Valley
•Central District
•Lake City
•University District
![Page 16: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/16.jpg)
Downtown Cycle Track
Next Steps: • Bicycle Master Plan adoption • 30% design for approximately 2 miles downtown
• Final design of an initial .25 miles for 2014 construction
![Page 17: Greenways and Cycle Tracks - Seattleclerk.seattle.gov/~public/meetingrecords/2013/... · 31-05-2013 · Neighborhood Greenways Outreach Data Collection •Speeds, volumes, collisions](https://reader034.fdocuments.net/reader034/viewer/2022052101/603b5ae3c5dbfa13102875e4/html5/thumbnails/17.jpg)
West Seattle Bridge Trail Access
• Site evaluation and data collection underway • Consultant selection starting • Goal is charrette in Summer 2013