Greenpoint Ave Traffic Flow Improvements
Transcript of Greenpoint Ave Traffic Flow Improvements
![Page 1: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/1.jpg)
New York City Department of Transportation Presented to Brooklyn CB 1 on March 17, 2015
2015
Greenpoint Avenue Traffic Flow Improvements
![Page 2: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/2.jpg)
Project Route 2015 Project Existing On-Street Bicycle Facility Bicycle Path Potential Route
CB 1
QN CB 2
Project Map
2
![Page 3: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/3.jpg)
• March 2011 DOT proposed traffic flow changes on Greenpoint Ave as part of bridge component rehabilitation, which included
• buffered curbside bike lanes
• implementation was delayed due to construction and utility work
• Existing Greenpoint Ave markings are faded
• DOT has received numerous complaints over the years about the faded markings
• Community Board requested evaluation to improve traffic flow
• Congestion between McGuinness Blvd to Kingsland Ave partially due to left-turning vehicles
• Left turning traffic forces westbound traffic into bike lane
Background
3
![Page 4: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/4.jpg)
March 2011: CB1 Transportation Committee Meeting
• Reviewed community comments and recommended changes to existing Greenpoint Avenue
• Proposed changes on bridge – on hold until Greenpoint Avenue changes made
May 2011: Business & community outreach workshop
• Met with businesses/community to obtain additional comments and understanding of issues with the existing design on Greenpoint Avenue
• Conducted walk-through of the corridor to discuss issues
Community Outreach
4
![Page 5: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/5.jpg)
Original Draft Design
5
Greenpoint Ave
![Page 6: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/6.jpg)
January 2015: Business outreach
• Met with businesses to discuss proposed changes on Greenpoint Ave and hear concerns
March 2015: Business outreach
• Met with businesses to review updated design on Greenpoint Ave
Community Outreach
6
![Page 7: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/7.jpg)
• Sudden merge from two to one travel lane off of bridge
• Underutilized parking between Humboldt Street and Kingsland Ave
• High volume of vehicles traveling in bike lane
Greenpoint Avenue
• Southbound left turns block traffic
• Monitor St • N. Henry St • Humboldt St
Existing Conditions Left Turning Vehicle
Vehicles in Bike Lane/Bus Stop
Left Turning Vehicle
Vehicles in Bike Lane
7
![Page 8: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/8.jpg)
Existing Conditions – Typical Street Design
*Weekday mid-day peak hour taken 4/4/11 from 12:30pm to 1:30pm
Greenpoint Avenue McGuinness Blvd to Kingsland Ave
• 50ft roadway • One travel lane in each direction (11ft)
• Bike lanes adjacent to parking (5ft) • Underutilized curbside parking lanes
(9ft *Mid-Day Peak Hour Westbound to Southbound Turn Movements
Intersection Turn
Volume % of WB
Traffic
Monitor Street 409 32%
N Henry Street 88 18%
Humboldt Street 166 23% 8
![Page 9: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/9.jpg)
Peak Hour Vehicle Volumes:
AM/PM Nov 2014
Prov
ost S
t
593/841
776/739 528/706
792/754
750/900
850/850
Peak-Hour Vehicle Volumes
![Page 10: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/10.jpg)
Parking Utilization Study: 2010 - 2015 Kingsland Ave to Humboldt St
*Vehicles parked is the average of five weekdays (11/4/2010, 5/21/2014, 11/12/2014, 12/3/2014 & 2/26/2015) between 7:45am – 10:30am One vehicle in five site visits was observed parked on the north side resulting in 0.2 but was rounded down to zero
Greenpoint Ave looking east at N. Henry St
Existing Conditions – Parking Study
Side of Street Average Vehicles Parking
North 0
South 12
10
Underutilized Parking
![Page 11: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/11.jpg)
Parking Study: 2010 – 2015 Kingsland Ave to Humboldt St
Side of Street Average Vehicles Parked
North 0
South 12
*Vehicles parked is the average of five weekdays (11/4/2010, 5/21/2014, 11/12/2014, 12/3/2014 & 2/26/2015) between 7:45am – 10:30am 11
X Average Vehicles Parked Fire Hydrants
![Page 12: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/12.jpg)
Proposed Design Greenpoint Avenue Kingsland Ave to Humboldt St
• Two westbound travel lanes (11ft)
• One eastbound travel lane (11ft)
12
• Curbside buffered bike lanes (6ft) bike lane + (2.5ft) buffer
![Page 13: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/13.jpg)
Proposed Design Greenpoint Avenue Kingsland Ave to Humboldt St
Prop
osed
E
xist
ing
13
![Page 14: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/14.jpg)
Proposed Design Greenpoint Avenue At Kingsland Ave and Greenpoint Ave Bridge Approach
Prop
osed
E
xist
ing
14
![Page 15: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/15.jpg)
Parking Utilization Study: 2010 - 2015 Humboldt St to Provost St
Underutilized Parking
Side of Street Average Vehicles Parked
North 19
South 10
*Vehicles parked is the average of five weekdays (11/4/2010, 5/21/2014, 11/12/2014, 12/3/2014 & 2/26/2015) between 7:45am – 10:30am 15
Greenpoint Ave looking east at Russell St
Existing Conditions – Parking Study
![Page 16: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/16.jpg)
Parking Study: 2010 – 2015 Provost St to Humboldt St
7 spaces available on the south side between Jewel St and Humboldt St *Vehicles parked is the average of five weekdays (11/4/2010, 5/21/2014, 11/12/2014, 12/3/2014 & 2/26/2015) between 7:45am – 10:30am
Side of Street Average Vehicles Parked
North 19
South 10
16
X Average Vehicles Parked Fire Hydrants
![Page 17: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/17.jpg)
Proposed Design Greenpoint Avenue: Humboldt St to Provost St
• Two westbound travel lanes (10.5ft)
• Westbound curbside bike lane (5ft)
Greenpoint Ave
*Vehicles parked is the average of five weekdays (11/4/2010, 5/21/2014, 11/12/2014, 12/3/2014 & 2/26/2015) between 7:45am – 10:30am 17
• Eastbound bike lane (5ft) • South side parking lane (8ft)
![Page 18: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/18.jpg)
Proposed Design Greenpoint Avenue Humboldt St to Provost St
Prop
osed
E
xist
ing
18
![Page 19: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/19.jpg)
N Henry St One-Way Conversion
Underutilized Parking
19
![Page 20: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/20.jpg)
Monitor Street – Side Street Parking
Underutilized Parking
20
![Page 21: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/21.jpg)
Side Street Parking Regulations
No Standing Anytime No Standing Anytime
21
X Average Vehicles Parked Fire Hydrants
![Page 22: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/22.jpg)
Existing Conditions McGuinness Boulevard
• Frequent traffic backups past Provost St
• One travel lane approaching McGuinness Blvd
Left Turning Vehicle
Vehicle Maneuvering
Around Vehicle in Bike Lane
View From Provost St
22
One Travel Lane
![Page 23: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/23.jpg)
Existing Conditions
*Weekday PM peak hour average taken 5/14/2014 & 5/15/2014 from 5pm to 6pm
McGuiness Blvd: Intersection of Greenpoint Ave and McGuinness Blvd
• One travel lane approaching McGuinness
• Bike lanes adjacent to parking
• Curbside parking
*Mid-Day Peak Hour Westbound to Southbound Turn Movements
Intersection Turn
Volume % of WB
Traffic
McGuinness Boulevard 181 42%
Greenpoint Ave
23
![Page 24: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/24.jpg)
Proposed Design McGuiness Blvd: Intersection of Greenpoint Ave and McGuinness Blvd
• Two travel lanes approaching McGuinness Blvd
• Protected west bound left turn phase
• Shared lane markings
• Mid-block part-time loading zone
Greenpoint Ave
New Loading Zone
24
![Page 25: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/25.jpg)
• Greenpoint Avenue (Kingsland Ave to Provost St)
• Two travel lanes for westbound traffic
• Repurpose parking lane for travel lane
• Curbside bike lanes
• Eliminate unorganized merge at Kingsland intersection
• McGuinness Blvd Intersection
• Two travel lanes approaching McGuinness Blvd on Greenpoint Ave
• Lane assignment markings
• Protected west bound left turn phase
• Shared lane bike markings in each direction on Greenpoint Ave (Provost St to McGuinness Blvd)
Overview
25
![Page 26: Greenpoint Ave Traffic Flow Improvements](https://reader031.fdocuments.net/reader031/viewer/2022020119/58a2ed941a28abf8698b91e2/html5/thumbnails/26.jpg)
Questions? Thank You