Green Steel for Better Future

download Green Steel for Better Future

of 39

Transcript of Green Steel for Better Future

  • 8/10/2019 Green Steel for Better Future

    1/39

  • 8/10/2019 Green Steel for Better Future

    2/39

    We do not have a crystal ballto predict the future.But visions, hopes andmotivation, determination, hawork, make things happen

  • 8/10/2019 Green Steel for Better Future

    3/39

    500

    1000

    1500

    2000

    2500

    3000

    2103

    2504

    21492309

    2192

    2007/08 2009/10 2011/120

    50

    100

    150

    200

    250

    300

    350

    172

    299

    246

    273

    201

    2007/08 2009/10 2011/120

    60

    120

    180

    240

    300

    94116

    209

    172

    138

    2007/08 2009/10 2011/12

    Revenue EBITDA Net prot

    4689

    2007/08

    Or

  • 8/10/2019 Green Steel for Better Future

    4/39

    Personale Plantmaking - sintesi ultimi 7 anni

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    2398 2512 2744 2856 2873 2962 315

    346 535800 890 925

    1072124

    38

    27

    3058 60

    7285

    192

    956

    2187

    31133791

    4198436

    2006 2007 2008 2009 2010 2011 201

    29744030

    57616917

    76498304

    884

  • 8/10/2019 Green Steel for Better Future

    5/39

    +=

    + +

  • 8/10/2019 Green Steel for Better Future

    6/39

    QUALITY is not expensive

    QUALITY is priceless !!!

  • 8/10/2019 Green Steel for Better Future

    7/39

    EFFICIENCYDo more with less

  • 8/10/2019 Green Steel for Better Future

    8/39

    COST OPTIMIZATIHeavy or soft ...

    but sustainable?

  • 8/10/2019 Green Steel for Better Future

    9/39

    TEAM UP4 in 1 or 1 in 4?

  • 8/10/2019 Green Steel for Better Future

    10/39

    SERVICEService for the Company

    or

    Company for the Service

  • 8/10/2019 Green Steel for Better Future

    11/39

    0

    25

    50

    75

    100

    125

    150

    175

    200

    05/0606/07 07/08

    08/09 09/1010/

    R&D InvestmentsNew product develo

    70

    120

    154135

    150 13

  • 8/10/2019 Green Steel for Better Future

    12/39

    Recent acquisitionsand new product lines

    1999 Danieli CENTRO MET1999 Danieli FRHLING2000 Danieli DAVY DISTIN2001 Danieli CENTRO TUB2007 Danieli W + K2007 Danieli PROCOME IBE2010 Danieli ALU2010 Danieli LYNXS2010 Danieli DCM SWISS2011 Danieli SPECIAL CRA2011 Danieli LINZ TECHNO2012 Danieli HENSCHEL2012 Danieli INNOVAL2012 Danieli OLIVOTTO FE2013What's next ??

  • 8/10/2019 Green Steel for Better Future

    13/39

  • 8/10/2019 Green Steel for Better Future

    14/39

    Commissioning - Rahji Steel rolling m(KSA)The 1,000,000 t/y high-speed combined Bar & RodMill has been started the operations at the beginning ofMay 2012. Will produce quality straight bars and wirerod for a wide range of customers in local area, Arabgulf and neighbourhood countries.

  • 8/10/2019 Green Steel for Better Future

    15/39

    Commissioning - Steel meltshopPosco Specialty Steel Group (Korea)On March 2012 Danieli started-up the meltshop plant inChangwon and in April 2012 proudly delivered its rstbloom in new two-strand vertical caster.Meltshop capacity: 450,000 t/y

    Vertical caster capacity: 227,300 t/y (high alloy blooms

  • 8/10/2019 Green Steel for Better Future

    16/39

    Commissioning - Baosteel Meishan (

    Baosteel Meishans 4 Mtpy new hot-strip mill willproduce top-quality coils max weight 33 t stripthicknesses ranging from 1.2 to 19 mm, and widthsfrom 900 to 1,630 mm, in HS complex-phase, HScold-forming, antiatmospheric corrosion, and ULCsteels for a wide variety of applications (including theautomotive industry).

  • 8/10/2019 Green Steel for Better Future

    17/39

    Commissioning - Vallourec Star (USA

    The production line will consist of a bar cutting area,billet rotary hearth furnace, piercing mill, FQM mill,reheating furnace, stretch reducing mill, cooling bedand nal cut-to-length area. The size range will be OD2 3/8- 7. Nominal capacity will be 500,000 t/y.

  • 8/10/2019 Green Steel for Better Future

    18/39

    Commissioning - Nikkei SiamAluminium Ltd (Thailand)The rst cold rolling mill for aluminium in Thailand buaccording to Danieli Frhlings design and assuredquality standards, and the most advanced mill of itstype in the region in operation.

  • 8/10/2019 Green Steel for Better Future

    19/39

    Commissioning - ESI 1 Mtpy 2BMinimill (UAE)According to schedule, after the positive results of hottrials carried out during December 2011, the rstofcial beams was rolled and packed, declaring thestart of hot test at Emirates Steel Phase-2 HSM, part ofthe minimill complex expansion currently in operationin the Mussaffah Industrial Area, Abu Dhabi.

  • 8/10/2019 Green Steel for Better Future

    20/39

    Commissioning - Hi-speed rebar millat Dongkuk Steel (Korea)On June 2012 Danieli Morgrdshammar stared up the1,0 Mt/y high-speed rolling mill for production of 10 t57-mm-dia deformed bars.

  • 8/10/2019 Green Steel for Better Future

    21/39

    Commissioning - Interpipe NTZ(Ukraine)1.32 Mt/y specialty steel meltshop supplied on aturnkey basis, is made up of a 160-t FastArc AC EAF, a twin-station ladle furnacea double-tank VD unit, and two FastCastconticasters, to cover from 150 to 470 mm roundbillets and blooms for producing pipes and rail wheels.

  • 8/10/2019 Green Steel for Better Future

    22/39

    New order - Angola Steel Co. (AngoNanomill technology in Africa - ASC-Angola SteelCorp., a privately owned company based in Luanda,has awarded to Danieli the contract for a newcomplex made up of a 150,000 t/y meltshop and a200,000 t/y rebar rolling mill.

  • 8/10/2019 Green Steel for Better Future

    23/39

    New order - Posco SS minimill (KoreThis order, placed in November 2011, represents the79th minimill plant for Long Products built by DanieliGroup since 1964, and again strengthens Danielisindisputable leadership in this eld.1,0 Mt/y capacity for bars, medium sections and rails

  • 8/10/2019 Green Steel for Better Future

    24/39

  • 8/10/2019 Green Steel for Better Future

    25/39

    New order - Minimill Deacero (ColomThe 5 th Minimill for Deacero group: the 450,000 t/yminimill for bars and wire rod. The plant will producebars from 8 to 32 mm dia and wire rod from 5.5 to 16mm for commercial steel grades. Start-up will becompleted for the 1 stQ of 2014

  • 8/10/2019 Green Steel for Better Future

    26/39

    New order - Metec (Ethiopia)March 6, 2011, Metal & Engineering Corporation(METEC) signed a contract for the supply of a new,complete minimill to be installed in the FederalDemocratic Republic of Ethiopia at Addis AbabaIndustrial Area, to produce about 300,000 t/y ofbillets and feed the downstream rolling mill, to

    produce rebars and small proles.

  • 8/10/2019 Green Steel for Better Future

    27/39

    New orders - Bhushan P&S (India)Two meltshops units MSH1 and 2 of more than1,1Mt/y of liquid steel for specialty and stainlesssteel products , one 570,000 t/y Heavy Bar Milland auxiliaries for existing facilities.

  • 8/10/2019 Green Steel for Better Future

    28/39

    New order - NMDC fTSR complex (The most modern exible Thin Slab Casting and Rollin(fTSR) Plant in India for production of hot rolled steelcoils. Plant capacity 2.9 Mt/ySlab thickness 90/70/50 mmSlab width 900 1,650 mmSteel grades LC, DD, EDD, MC, HC, HSLA. API, DuaPhase, Automotive applications

  • 8/10/2019 Green Steel for Better Future

    29/39

    New order - KUMZ - Kamensk UralsMetallurgical Works (Russia)On December 1, 2011, Danieli was awarded the contracfor the Kamensk Uralsky Metallurgical Works (KUMZRussia, the widest aluminium cold rolling mill worldwiThe mill to be supplied for KUMZ it will produce coilesheet up to 2,800 mm wide for aerospace applicatiothicknesses ranging from 8 mm to 0.2 mm, thusproducing the worlds widest at-rolled aluminium.

  • 8/10/2019 Green Steel for Better Future

    30/39

    New order - Amag (Austria)In May 2012, AMAG Rolling GmbH, a wholly ownedsubsidiary of AMAG Austria Metall AG, contracted Dato supply a new Twin Coiler Hot-Strip Mill to be installits plant in Ranshofen. The twin coiler rolling mill isdesigned to produce hot rolled coils, heavy and light placlad panels in thicknesses of 3 to 160 mm and widths of

    up to 2,300 mm. Considering the specic product mix oAMAG, the twin-coiler rolling mill will have a rolling cof up to 225,000 t/y of nished products.

  • 8/10/2019 Green Steel for Better Future

    31/39

    New order - Chinalco Shenyang (Chia world giant in the production of alumina and primaaluminum, awarded Danieli an order to supply a newSteckel Mill for special alloys (including Titanium alloyNickel alloys, Copper-Zirconium Alloys) and stainless Initial productivity of 62,000 t/y with 1,560 mm-widand 12,2 t weight

  • 8/10/2019 Green Steel for Better Future

    32/39

    Next challenge - Hadeed minimill (KFinal commissioning of Hadeed Minimill 1,0 Mt/y for the production of bars and wire rod including auxilisystems, services, buildings and steel structures on a turkey basis supply.

  • 8/10/2019 Green Steel for Better Future

    33/39

    Next challenge - Minimill UMMC (R550,000 t/y special steel minimill for long products. greeneld complex, supplied on a turn-key basis built inTiumen (Western Siberia), will process scrap into coldnished products for the automotive industry.

  • 8/10/2019 Green Steel for Better Future

    34/39

    Next challenge - Suez Steel DRP (EgThe new direct reduction, steelmaking and conticastingcomplex will produce up to 1.95 Mt/y of DRI and y of low carbon and alloyed steel billets, blooms and beblanks.

  • 8/10/2019 Green Steel for Better Future

    35/39

    Next challenge - Jindal Shadeed (OmThe new steelmaking and conticasting complex willproduce up to 1.95 Mt/y of low carbon and alloyed sbillets, blooms and beam blanks.

  • 8/10/2019 Green Steel for Better Future

    36/39

    Next challenge - IUD (Ukraine)1 Mt/y rolling mill for bars and wire rod strengthens thcollaboration and good relationship between IUD andDanieli.

  • 8/10/2019 Green Steel for Better Future

    37/39

    Next challenge - Severstal (Russia)1 Mt/y multi-product superexible high-speed rolling mfor bars, sections and wire rod awarded by Severstalextends the list of state-of-the-art, Danieli high-capacitylong product rolling mills in Eastern Europe.

  • 8/10/2019 Green Steel for Better Future

    38/39

    1.1 Mt/y rail and section mill to produce 100-m long, iline hardened rails, and up to 600-mm wide parallelange beams, structural shapes, and sheet piles, hasbeen completed, and now the installation phase is inprogress.

    Next challenge - Mechel Chelyabinsk(Russia)

  • 8/10/2019 Green Steel for Better Future

    39/39