GREEN SHORELINE PROJECTS ON LONG ISLAND
Presented By: Laura Schwanof, RLA
Presented To: May 15, 2013
110 Walt Whitman Road, Suite 204 Huntington Station, NY 11746
www.geiconsultants.com
Geotechnical, Water Resources,
Environmental and Ecology
Planning, Design and Construction Solutions
![Page 2: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/2.jpg)
WHAT IS A LIVING SHORELINE?
“A shoreline management practice that provides erosion control benefits; protects, restores or enhances natural shoreline habitat; and maintains coastal processes through the strategic placement of plants, stone, sand fill, and other structural organic materials (e.g., biologs, oyster reefs, etc.).”
- NOAA Shoreline Glossary
![Page 3: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/3.jpg)
“PROTECTS, RESTORES & ENHANCES NATURAL HABITATS & COASTAL PROCESSES…”
BEFORE:
Mid 1900’s method of
stabilizing shorelines using
various forms of construction
debris…
AFTER:
Replacing rubble with clean
backfill, controlling toe
erosion and restoring
ecological function & value
![Page 4: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/4.jpg)
HOW? … ONE OF MANY HANDY REFERENCES
![Page 5: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/5.jpg)
WHY? … CONSIDER COST BENEFITS:
Treatment Relative Complexity Relative Cost
Conventional vegetation Simple to Moderate Low
Live Stake Simple Low
Joint Planting Simple Low
Live Fascines Moderate Moderate
Brushmattress Moderate to complex Moderate
Live Cribwall Complex High
Branchpacking Moderate to complex Moderate
Conventional bank armoring Moderate to complex Moderate to High
Table based on “Streambank Erosion Protection Treatment Relative Costs and Complexity”
(Fischenich and Allen 1999)
![Page 6: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/6.jpg)
CONVENTIONAL SHORELINE STABILIZATION TECHNIQUES
Concrete Bulkheads
Source: NRCS 1996
![Page 7: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/7.jpg)
CONVENTIONAL SHORELINE STABILIZATION TECHNIQUES
Timber or Sheet Pile Bulkheads
Source: NRCS 1996
![Page 8: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/8.jpg)
CONVENTIONAL SHORELINE STABILIZATION TECHNIQUES
Rock Gabions
Source: NRCS 1996
Stone Riprap Revetment
![Page 9: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/9.jpg)
BIO ENGINEERING FOR SHORELINE STABILIZATION
1. Soil & Salinity
2. Slope
3. Climate
4. Use Intensity
5. Level of Exposure
6. Typical and Anticipated Flow of Water
Key Design Considerations for Treatment Selection:
![Page 10: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/10.jpg)
Treatment Selection Process
Soil Analysis
Slope & Wave Analysis
Vegetative Treatment Potential Rating Sheet
Climatic Regions
![Page 11: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/11.jpg)
What works…what
doesn’t? ~
Vegetative Treatment
Potential Rating Sheet
![Page 12: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/12.jpg)
4 Guiding Principals
• Consider the Length of Open Water or Fetch
• Control Drainage
• Determine the Natural Angle of Repose
• Protect the Base of the Slope or Toe
![Page 13: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/13.jpg)
#1 - Consider Length of Fetch
When vegetation alone just won’t do…
![Page 14: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/14.jpg)
#2 – Control Drainage
Both Overland Flow…
…and Subsurface Seeps
![Page 15: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/15.jpg)
#3 –Natural Angle of Repose Defined as the maximum slope at which loose solid material will remain in
place without sliding and the slope remains stable…
Modifying that angle will require some
form of structural support.
…and the critical slope where vegetation used
alone will provide long-term stabilization.
![Page 16: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/16.jpg)
#4 – Toe Protection is Critical
![Page 17: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/17.jpg)
Choice of Treatment
1. Plants as Primary Support (5:1 and flat)
2. Plants with Erosion Control (5:1 to 3:1)
3. Plants as Structural Support (3:1 to 2:1)
4. Plants with Additional Structural Support
(2:1 and steeper)
![Page 18: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/18.jpg)
Plants as Primary Support • 5:1 (horizontal: vertical) or flat ground • Not seeded • Low energy environment • No concentrated surface flows (sheet flow only)
![Page 19: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/19.jpg)
Planting Plugs
2 Years Later…
Before
Installation
![Page 20: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/20.jpg)
Plants With Erosion Control • 5:1 to 3:1 (horizontal: vertical) • Seeded • Low energy environment • Sheet flow only
Erosion Control Blankets & Mats
Hydro Mulching
Coir Logs
Coir Pallets
Source: NRCS 1996
Source: Google web images
![Page 21: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/21.jpg)
Erosion Control Mats
• Jute Netting • Prefabricated Blankets • Turf Reinforcement Mats (TRM) • Biodegradable Vs. Permanent
3 Years Later… Installation
![Page 22: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/22.jpg)
Fresh Kills Wetlands COIR LOG Installation Coir Pallets Steep Sided Channel & Fresh to Saline Conditions
3 Years Later…
Installation
![Page 23: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/23.jpg)
Coir Logs Tidal and Streambank Application for Toe Protection and Benched Plantings
![Page 24: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/24.jpg)
Plants as Structural Support • 3:1 to 2:1 horizontal/ vertical • Low to moderate energy environment • Seeding may be included
Live Stakes
Brushmattress Installation
![Page 25: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/25.jpg)
Live Stakes & Fascines
4 Months later
Installation
![Page 26: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/26.jpg)
Brushmattress
• Live Stakes • Dead Stakes • Fascine Bundles • Galvanized Wire Webbing • Seeds
Before
After
Installation
![Page 27: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/27.jpg)
Plants With Additional Structural Support
• 2:1 < Approaching Natural Angle of Repose • Low to Moderate Energy Environments
(On steeper slopes & high energy environments structural stabilization MUST predominate)
Vegetated Rip Rap
Live Crib Walls Source: Terra Erosion Control Ltd.
![Page 28: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/28.jpg)
Live Crib Wall
Installation of Structure
![Page 29: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/29.jpg)
Live Crib Wall
Monitoring Growth
Post Construction
![Page 30: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/30.jpg)
QUALITY CONTROL & QUALITY ASSURANCE
Build Into Contract: • Professional Design Team • Construction Observation • Long Term Monitoring
Design Phase: • Consider Long Term
Performance Standards (85%-90% - If You Can’t Meet
It – Don’t Propose It…) Remember:
• Post Construction Monitoring Spans 2 to 5 Years (1 Year Guarantees May Not Be Adequate)
![Page 31: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/31.jpg)
Case Study 1: Northern Captree Island
April 2012 August 2012
• Coir Logs
• Jute Netting
• Live Stakes
• Plug Plantings
• Seeding
![Page 32: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/32.jpg)
April 2012 August 2012
Early Vegetative Success
![Page 33: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/33.jpg)
Post SANDY & Winter Storms
![Page 34: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/34.jpg)
NEW SOLUTION?
Potential Composite Treatment
With Toe & Slope Reinforcement
![Page 35: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/35.jpg)
Case Study 2: Shoreline Stabilization Udall’s Mill Cove, Great Neck, NY
![Page 36: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/36.jpg)
• Live Stakes
• Fascines
• Brushmattress
![Page 37: GREEN SHORELINE PROJECTS ON LONG ISLAND · Huntington Station, NY 11746 Geotechnical, Water Resources, ... Conventional bank armoring Moderate to complex Moderate to High ... Case](https://reader036.fdocuments.net/reader036/viewer/2022081402/604d4b432c88f27554019a47/html5/thumbnails/37.jpg)
CONCLUSION 1. Key Design Considerations 2. 4 Guiding Principals 3. Approach Site Feasibility Analysis from Less to More 4. Integrate Plant Materials as Structural Elements & Permanent Cover 5. Monitoring is Essential to Success
Living Shorelines offer Sustainable Solutions, have Built-in Flexibility for Permanence and Support Biodiversity
…ANY QUESTIONS?
O: 631-759-2969
C: 631-513-1604