Green Dot Criteria

3
Green Dot Criteria No Criteria Bad Good 1. Groove line   smooth / blowholes repaired 2. Chamfer edge   grind/smooth 3. Repair   done and satisfied as specs

Transcript of Green Dot Criteria

Page 1: Green Dot Criteria

7/24/2019 Green Dot Criteria

http://slidepdf.com/reader/full/green-dot-criteria 1/3

Green Dot Criteria

No Criteria Bad Good

1. Groove line –  smooth / blowholes

repaired

2. Chamfer edge –  

grind/smooth

3. Repair –  done and

satisfied as specs

Page 2: Green Dot Criteria

7/24/2019 Green Dot Criteria

http://slidepdf.com/reader/full/green-dot-criteria 2/3

4. Bolt Socket- freefrom slurry

5. Plastic Sheath –  

clean

6. Coating –  touch up

7. Stamping –  

markings are

correct and clear.

Page 3: Green Dot Criteria

7/24/2019 Green Dot Criteria

http://slidepdf.com/reader/full/green-dot-criteria 3/3

8 Bagging –  smoothsurface / no visible

 blowholes

9. Grout Socket -

clean

10. Stacking –  

Segments are

stacked in a

complete ring