Green, Affordable,Sustainable, Inovative Method of Construction

download Green, Affordable,Sustainable, Inovative  Method of Construction

If you can't read please download the document

description

By Load Bearing,Precast,R.C.B.Method of Construction save up to 30% construction Cost.& get up to 10 more Carpet area. 300 Building Design by R.C.B.Method For details see www.AffordableConstruction.in Ganesh Kamat +919820867755 [email protected]

Transcript of Green, Affordable,Sustainable, Inovative Method of Construction

  • 1.GreenAffordable Housing

2. Green Affordable Houses Must Be Attractive Economical Eco Friendly Proven Simple Speedy Sturdy Sustainable 3. While Designing The Building it isMore Appropriate To Work OutWhich is The Most SuitableConstruction Method i.e.,R.C.C.,STEEL,PRECAST,BRICK / MIVAN / R.C.B. 4. Affordable Due To Optimum Planning Detailed Designing Detailing of each Joint Appropriate Technology 5. PLANNING More common walls Least number of notches Least wall area / Floor area ratio Complete detailing for each member Minimum number of staircase Least common passages Least foot print & loading 6. LESS OFFSET, MORE COMMON WALLS10% More Carpet Area. So Most Affordable 7. 1.5 BHK in 3 Lacks Beauty with Economy 8. TOTAL COST WITH FINISHINGFor R.C.C. .. Rs. 1000/- per Sqft.For R.C.B . Rs. 700/- per Sqft. 9. 1) R.C.C. type of construction was taught byBritish & we are following Beam & Columntype of construction for the last hundredyears or so in India.2) R. C. C. building needs repairs within 15years of construction.Not that anything is wrong with R. C. C. butthere is more scope to use inferior material &workmanship in R.C.C.& hence need forearly repair. 10. 3) Our Forts, Old buildings, V. T.Station, Municipal Bldg., Palaces, Towers aregenerally constructed by Stone Masonry loadbearing method & have stood since hundredsof years without any major repair work.4) The same load bearing technology has beenfurther developed in U.S.A. which isSpeedy, Sturdy, Simple, Durable, Eco-Friendly which also saves 30% inconstruction cost & is called R.C.B./Reinforced Masonry/ C.M.U. 11. Presentation on Green Affordable Housing by.Reinforced Concrete Block Masonry (R.C.B) Method of Construction Green Affordable Structures Advantages (Economy, Speed & Simplicity) Architectural Features Earthquake, Wind & Fire resistance Conclusion 12. Method Of Construction 13. Concrete block 8 X 8 X 16Ultimate strength = 40,000 Kg/block 14. As Air is freely availableand Hollow ConcreteBlock is 50% hollow, if astructure is built byR.C.B.the cost of constructionis slashed down. 15. Staggered Joints In Block Masonry 16. R.C.B. Work Under Progress 17. 13 Block Layer + Slab=15 Days. 18. R.C.B. Pointing From Outside 19. In India 300 buildings have been designed by R.C.B. method in the past 30 years by us.In the world millions of buildings have been built by this established & proven American technology in the past 90 years. 20. R.C.B. Users BMCBhojwani Const. MHADAUnity Const. P.W.D. Vipassana Govt. of Gujarat Lodha Kamat Hotel (i) Ltd. Excon Royal HotelArch. Bhatnagar Ganaka Hotel Arch. Kudalkar Poddar Developer Arch. Premnath. Panoramic UniversalAfrican Countries 21. R.C.B. Structures 22. Architect Bhatnagars Bungalow, Malad, 23. No Beam, Column & Offset in Bungalow 24. 6 Storey Building At Mahim For Unity Construction 25. Budget Motel at Igatpuri Under Construction 26. RCB Column 27. InteriorPointing 28. Method Of Pointing 29. BMC School At Goregaon, Mumbai 30. No Beam, No Column only RCB 31. Vertical Reinforcement At Corner 32. Door-Window Frame before casting Slab 33. AdvantagesSpeed, SimplicityEconomy 34. Eco - Friendly As itSAVES,100% Bricks,50% Steel & Shuttering,40% Concrete,25% Utility Bill. 35. 96 Houses For Policemen, Jogeshwari 36. R.C.B. Pointing From Outside 37. Vipasanna Meditation Hall, Igatpuri 38. Plan ForMeditation Hall 39. R.C.B. WALL & SLAB 40. 150 Earthquake Proof Homes, Gujrat 41. Foundation Work 42. Foundation For R.C.B. Work 43. Vertical Steel.Runner BeamHorizontal Steel.Wall Footing 44. HOUSING & SLUM PROJECTS 6 Bldg. Quarters for Policemen of SRPF,Goregaon, Mumbai For P.W.D. 16 Bldg at Vinoba Bhave Nagar transit camp,kurla, Mumbai For MHADA. 5 Bldg. For Pancharatna Soc. Complex at Neral,Maharashtra. Transit Bldg. For Unity Construction atSitaladevi Temple Rd. Mahim Mumbai. 150- Earthquake Proof House for Gujarat Govt.at Morvi (World Bank Project.) Transit Bldg. For Bhojwani Builders at Khar,Mumbai. Housing Complex for Lodha at Shirdi 45. BLOCKRIBRIB 46. Concealed Wiring in Slab 47. RIB SLAB BOTTOM RIB BLOCKS 48. SHOPPING MALL AT AFRICA 49. THE GREAT PYRAMID AT EGYPT 50. PROPOSED RCB PYRAMID PRAYER HALL AT AFRICA 51. COMMERCIAL & SCHOOLPROJECT School & Dispensary for B.M.C at Film Cityroad, Goregaon (E) Mumbai. Meditation Hall for Vipassana at Igatpuri, Maharashtra Old man colony at BadlapurFire Station at Illinois, U.S.A. The Eldorado Theatre at Tucson U.S.A. Shopping Centre at Tucson U.S.A. Shopping Centre (100000 Sq.Ft.)at Africa. R.C.B. Pyramid Prayer Hall at Africa. 52. BUNGALOW PROJECT Triplex Bungalow at Malvani Church, Malad (W)Mumbai. Six Bungalow at Kalyanpur Colony, Lonavala. Bungalow for Arch. Bhatnagar at Chickni Murud Bungalow for Mr. Rohidas Koli at Malvani, MaladMumbai. Bungalow for Assi. Teachers forVipassana, Igatpuri Bungalow for Bhatnagar, Bordi. Bunglow for Vipasanna at Titwala Bunglow for architect Premnath at Vasai 500 (4 BHK) Bunglow at Africa. 53. Architectural Features 54. Bungalow At Lonavala 55. Beauty With Simplicity 56. Bungalow at Arizona U.S.A. 57. Slum House At Malad 58. Typical Compound Wall 59. HOTEL PROJECTS Hotel Granada Inn at Tucson Arizona, U.S.A. Hotel Granada Inn at EI Paso, Texas U.S.A. Hotel - The Chaparral at Siera Vista, ArizonaU.S.A Hotel Maharaaja Inn at LonavalaMaharashtra, India. Ganaka Motel - NH3 - Near ManasResort, Igatpuri, India. Kamat Hotel at Nashik Lotus Suit at Chandigarh 4 Star Resort at Durgapur 60. First R.C.B. Hotel Building In India, 1977 61. Arch Masonry Bungalow 62. Royal Hotel Building, Arizona. USA 63. R.C.B. Hotel, Tuscan, Arizona, USA 64. Proposed 3 Star Hotel At Nasik For Kamat Hotel 65. 4 Star Resort At Durgapur 66. Completed Masonry Building 67. Shear Wall Structures AreAlsoEarthquake, Wind & Fire 68. nt Failure in R.C.C. 69. Fire Resistance Due To Horizontal Projection 70. MASONARY JOINTS 71. MASONRY HORIZONTAL REINFORCEMENT 72. Decorative Block Masonry 73. Elevation From Decorative Block Masonry 74. R.C.B. Decorative Blocks 75. DecorativeBlock Masonry 76. Decorative Jali Block 77. Economy (Save up to Rs. 300 / SF of slab area)RCC RCB Savings Reinforcement3.5 Kg / SF X 1.2 Kg / SF XRs 55 / KgRs 55 / KgRs 126.50Rs 192.50 Rs 66 Cement 0.6 Bag/SF X0.25 Bag/SF XRs 310 / BagRs 310 / BagRs 186 Rs 77.50Rs 108.50 Sand , Mettle, Blocks, Rs 300 Rs 235Rs 65Plaster, Labour. Finishing & Fees Rs 321 Rs 321 ---------- TotalRs 1000Rs 700Rs 300Note : By Optimize Plan get 10% more Carpet Area. 78. Advantages of R.C.B. Method. Economy : As steel, cement, formwork, concrete & Laborrequired is almost half & due to simplicity of construction &speed, minimum saving is Rs. 300/- per sq. ft. Also byoptimum planning get up to 10% more carpet Area. Warranty: R.C.B. Method assured warrantee against heavyrain, flood, fire, storm, earth quake & all other naturalcalamities for at least 50 years. Fire Resistant : Due to concrete block & 3.5" cover tosteel, rusting is minimized & such buildings are fire & bomblast resistant. 79. Durable: Concrete blocks are attractive, durable and haveexcellent thermal, acoustic properties. No repair like R.C.C.is needed in every fifteen years. Earthquake: Load bearing concrete blocks can be designedto be wind, earthquake resistant too. Speed: No heavy equipment needed on site, lessformwork, less steel so construction is simple, speedier &hence economical. Architecture: Ancient type of architectural elevation is alsopossible by R.C.B type of construction. 80. R.C.B. is Useful For1) Retaining Wall2) Bridge Abutment3) Bridge Pier4) Highway Culverts 81. REMARKS1) For Affordability one needs to take a lot ofefforts in Planning, Design, Detailing, &technology.2) Every individual is a part of affordability.3) The client or owner must learn aboutaffordability first.4) Affordable structure is always green.5) Affordable does not mean cheap construction.6) By Optimum Plan get 10% more Carpet Area. 82. CONCLUSION 30%Considering Durability, Speed, Simplicity,Saving & 10% more Carpet Area. This EcoFriendly R.C.B. Construction is ParticularlySuited For,Housing,Slum Project,Transit Camp,Schools & Hospital,Hotel & Bungalow,Industrial Projects,Retaining Wall, Culverts etc. 83. Ganesh Kamat B.E. (Civil) M.S. (U.S.A.)Technical Adviser, Structural Engineer.40 Yrs. in Green Affordable BuildingsMobile: [email protected] 84. ThanksAll of You