Green 4th Study

21
DISTRICT SYSTEMS & GREEN FOURTH CONCEPTS GREEN th PPERRIA SEPTEMBER, 2014

Transcript of Green 4th Study

DISTRICT SYSTEMS & GREEN FOURTH CONCEPTS

GREEN

thPPERRIA

SEPTEMBER, 2014

Cuningham Group Evergreen EnergySRF Consulting Group, Inc.Barr EngineeringKimley Horn and Associates, Inc.

The Mississippi Watershed Management Organization (MWMO)

PPERRIA Neighborhood and Prospect Park 2020

The Cornerstone Group

City of Minneapolis – CPEDCity of Minneapolis – Public WorksUniversity of MinnesotaDesign Center for Sustainable Building ResearchMetropolitan Design CenterTrust for Public LandSaint Paul Water Resources GroupLISC

Green Fourth Study Team: Cuningham Group and the rest of the Green Fourth Study Team would like to thank the following participants:

2522 Marshall Street NE Minneapolis, Minnesota 55418(612) 465-8780 (612) 465 8785 faxwww.mwmo.org

District Systems & Green Fourth Concepts

PPERRIA

FUNDING PARTNERS AND ACTIVE ROLE IN STUDY DIRECTION / CONTENT

COOPERATION AND ASSISTANCE

DISTRICT SYSTEMS & GREEN FOURTH CONCEPTS

A NEW DEFINITION FOR ‘STREET’ AND PUBLIC PLACEMAKING WITHIN THE PROSPECT NORTH DISTRICT

GREEN 4TH

MISSISSIPPI RIVER

PROSPECT PARK NEIGHBORHOOD

CITY OF ST. PAUL

UNIVERSITY OF MINNESOTA

DOWNTOWNMPLS

TO MIDTOWN GREEN WAY

MISSING LINK TO GRAND ROUNDS

29TH LRT STATION

STUDY PURPOSE + APPROACH

Prospect North will be a vibrant, walkable district characterized by an inviting framework of parks, plazas, trails, walkways and other public realm elements that support neighborhood activities and link with the world-renowned Grand Rounds National Scenic Byway and other regional systems.

Fourth Street presents a unique opportunity to convert a neglected, car dominated corridor into a green oasis and pedestrian magnet in the heart of the district. While future parks and the potential to complete the last piece of the Grand Rounds (the ‘missing link’) are included in long range plans, there is heightened interest to promote Fourth Street as the first significant public green space, and new signature residential address, north of University Avenue – with growing urgency to get it built as soon as possible.

▪ Support the City of Minneapolis application for the Metropolitan Council Livable Communities Grant application (TOD Award approved by Met Council 12/11/2013)

▪ Refine the overall vision for Green Fourth, but at the same time provide the quantified basis (math and science) for ongoing discussion and implementation of ‘district systems’ that will support future build-out of the overall Prospect Park 2020 Vision Plan. Evaluation and definition of district systems will include district stormwater management, district utilities, district traffic and parking, and district energy (heating, cooling and some thoughts about energy production).

▪ Help clarify and coordinate preliminary design work needed to support City of Minneapolis Public Works efforts to proceed with the reconstruction of Fourth Street as a priority project.

Toward that end, the primary objectives for the District Systems + Green Fourth Concepts Study include:

A series of stakeholder meetings took place in 2013, resulting in a Joint Agreement between the Mississippi Watershed Management Organization, the Prospect Park Neighborhood and the Cornerstone Group to provide necessary funding and leadership to facilitate the study process. These meetings also provided the forum for presentation of analysis data, review of design alternatives and set the direction for conclusions and recommendation contained in this document.

P. 4 District Systems & Green Fourth Concepts

PROCESS

PO

LIC

Y

SC

HE

DU

LE

BU

DG

ET

CO

ST

S

TRAFFIC AND PARKING STORM WATER

MANAGEMENT

PUBLIC UTILITIES DISTRICT ENERGYDISTRICT SYSTEMS

FINDINGS & DIAGRAMS

DISTRICT FRAMEWORK

CONTEXT & INFORMANTS

PROSPECT PARK

2020 VISION

METROPOLITAN DESIGN

CENTER STUDY

CITY OF MINNEAPOLIS

DESIGN CRITERIA

BOESER PHASE I

CONCEPT DESIGN

ADDITIONAL INPUTS

CONCEPTS & IMPLEMENTATION

BACKED UP WITH MATH AND SCIENCE

GREEN FOURTH / DESIGN CONCEPT IMPLEMENTATION / RECOMENDATIONS

MWMO

BARR

SRFSRF KIMLEY HORN EVERGREEN

PUBLIC REALM

PR

OG

RA

M

CGA

+

=INFORMS

▪ MPLS CPED

▪ MPLS

DISTRICT FRAMEWORK CONTEXT & INFORMANTS

PROSPECT PARK 2020THE CORNERSTONE GROUP

CITY OF MINNEAPOLIS

Representatives from both CPED and Public Works have provided ongoing meeting participation and helpful context related to existing city policy, zoning code, subdivision regulation, street/utility design standards and other regulatory criteria. As the Lead Agency for the 2013 Metropolitan Council LCDA grant application and the project lead for future Fourth Street improvements, their input is critical to the success of these major components in support of Prospect North redevelopment.

Cuningham Group Landscape Architects, Urban Designers and Architects worked with Cornerstone Group to explore conceptual design ideas for the Boeser Property, Harris Site and Green Fourth Street. These preliminary studies included both building and site program elements. Plan diagrams, 3-D drawings and photo-precedents illustrated various scenarios for building massing, unit count/phasing, site layout, public realm framework and bicycle/pedestrian connections.

Cornerstone Group has provided more recent design concepts and other studies provided by CLOSE Associates, Cermak Rhoades and Coen and Partners.

Central Corridor light rail line Minneapolis

2020 developMent FraMework (MarCh 2012)

METROPOLITAN DESIGN CENTER

“The Urban Design Framework encompassed an in depth environmental inventory of the University District and a detailed inventory of the critical ‘Contested Territories’ found within the district . . . using a series of public meetings and workshops, the Metropolitan Design Center developed a vision for the District outlining specific proposals for reflection and action. Using known design and research methods in the fields of landscape and urban ecology, the proposals should serve as a regenerative force to re-establish a new outlook . . . based on urban greenways, green infrastructure and low-impact design approaches.” (excerpt from the Urban Design Framework)

• In depth environmental inventory• Public meetings and workshops• Specific proposals for urban greenways,

green infrastructure and low impact design approaches

Contextual background, design concepts, research data and other background information.

• Development concept• District zoning recommendation• Market analysis and suggested land use mix• Public realm diagram

• Existing city policy, code and regulations• CPED and Public Works Staff participation• Leadership for specific public projects within

the district

• Property owner within the district• Conceptual development studies test district

principles• Advocates for district systems approach

University distriCt allianCe

Urban design FraMework (greenways and green inFrastrUCtUre – aUgUst 2012)

There is a library of relevant information that provides both overall context and valuable detailed information in the form of reports, inventories, assessments, master plans, site designs, cost spreadsheets and many others to numerous to list here.

“The purpose of the project is to craft a pre-development Framework through the hands-on involvement of businesses, landowners and the community . . . The Framework is intended to maximize the potential of the station area in alignment with the community vision for a diverse, vibrant, accessible, affordable, sustainable, walkable and connected mixed-use transit-oriented urban neighborhood.” (excerpt from the SRF Consulting Group 2020 Framework)

MWMO

CITY OF MINNEAPOLIS CITY OF MINNEAPOLIS

UNIVERSITY OF MINNESOTA BIOMEDICAL DISCOVERY ZONE UNIVERSITY OF MINNESOTA

CITY OF MINNEAPOLIS

Extensive library of additional information including studies related to Bridal Veil Creek, the Granary Corridor, U of M Campus Plan, University District Alliance studies, Stadium Village studies and much more.

This background information was critical in providing a solid platform for further study and conceptual design at both a district and project/site development scale. This report focuses on the relationship between potential district systems (parking, stormwater management, heating/cooling etc.) and future improvements within the 4th Street corridor.

Bridal Veil Creek: Urban Subwatershed Stormwater Retrofit Assessment MWMO Watershed Bulletin: 2011-6. Prepared for the MWMO by: Ramsey Conservation District, with assistance from The Metro Conservation Districts

Granary Corridor Study

SEMI Access with Extended Greenway

2-Lane

3-Lane

SEMI Access Roadway

25th Avenue SE (constructed 2011)

Extended Greenway

Bike Path

Light Rail (existing and future)

Central Corridor light rail transit

hiawatha light rail transit

NOVEMBER 5 , 2012

MINNEAPOLIS | MINNESOTA

Prospec t Park

Gre

en S

tree

tLi

ving

Str

eet

Act

ive

Stre

etN

eigh

borh

ood

Stre

et

- tree lined street - on-street parking - access to properties - streetscape amenities

- stormwater collection and treatment - urban agriculture - energy production

- bike and pedestrian first - “car is a guest” - flexible spaces - linear park-like character - intentional and spontaneous uses

- context with each block - defined by buildings - residential amenities - public - semipublic - private

Green FourthBuilding a Great Neighborhood Street

+

+

+

image from Prospect Park 2020 Plan

image from Metropolitain Design Center

This diagram illustrates the opportunity to integrate multiple (stacked) systems within GREEN FOURTH.

District Systems & Green Fourth Concepts P. 7

PUBLIC REALM

P

PUBLIC REALM FRAMEWORK

Great placemaking pays for itself in many ways – financial (rents/sales prices, property values/taxes, stable tenancies), environmental (recycle land/infrastructure, more efficient, lower carbon footprint), and social (more housing options, services, gathering places, community identity).

1. GREEN FOURTH 2. SIGNATURE PARK 3. GRAND ROUNDS

Apendix

DISTRICT PUBLIC REALM FRAMEWORK

P

District Systems & Green Fourth Concepts P. 9

The Prospect Park 2020 Framework and other planning documents created a vision and guiding principles that promote authenticity and vitality resulting from a mix of land uses, variety of architecture, location of parks and squares, and orientation and scale of streets that, together, form a whole fabric and create valued, memorable places.

To become a highly successful local and regional amenity, the Prospect North District must evolve into a place that gives primacy to the pedestrian. Development of a high-quality public realm is paramount, and in the short term will focus on these three projects:

Although we remain an auto-centric culture, there is a dramatic increase in the development of more balanced places that offer safe, vital and engaging pedestrian environments and vastly improved bicycle systems. In many instances, spaces that had once been given over to the car are now being reclaimed for redevelopment with the creation of “complete streets” and ‘car as guest’ approaches for a much more cohesive urban setting. The Prospect North District vision promotes these outcomes as foundational thinking for ongoing projects at both district and site development scale.

LRT Station

Park

Park

Granary corridor

29th LRT station

TCF Bank Stadium

University Ave.

Green Fourth

27th Ave.

27th Ave.

1. GREEN 4TH

3. REGIONAL PARK

2. SIGNATURE PARK

1. GREEN FOURTH

2. SIGNATURE PARK IN THE HEART OF THE

DISTRICT

3. LINKS TO THE GRAND ROUNDS

2. CENTRALLY LOCATED PUBLIC PARK/PLAZA BECOMES THE SIGNATURE FOR THE DISTRICT

1. GREEN FOURTH MIGHT LOOK SOMETHING LIKE THIS

3. CONNECT TO REGIONAL PARK, TRAIL AND OPEN SPACE SYSTEMS SUCH AS THE GRAND ROUNDS

Public Realm Framework

Green 4th

University Avenue

Distric Icon

Granary CorridorBridal Veil Creek Partial Daylighting

Park

Pedestrian network

Pedestrian network

Pedestrian Node

Pedestrian Node

Pedestrian Node

Surly site

Park

Pedestrian Node

Pedestrian Node

Pedestrian Node

Pedestrian Node

Pedestrian Node

Blue & Green Connection to Mississippi River

IconicBuilding

27th. Avenue

GREEN 4TH CONCEPT

P

CELEBRATION OF SEASONS

HYDRAULIC PERFORMANCE

Cherry blossom avenue, Bonn, Alemania

Raingarden Tree Trench

Cornerstone Site Stormwater Analysis - Treatment System Precedent Illustra onsMississippi Watershed Management Organiza onMinneapolis, MinnesotaPrepared by Barr Engineering - 04/03/2013

Raingarden Tree Trench

Cornerstone Site Stormwater Analysis - Treatment System Precedent Illustra onsMississippi Watershed Management Organiza onMinneapolis, MinnesotaPrepared by Barr Engineering - 04/03/2013

Illustration by Barr Engineering

HISTORY, ART & CULTURE

SIT & MINGLE

EAT & DRINK

Brighton, UKPhoto by Gehl Architects

The Park in Prague, Czech Republicby Cigler Marani

Mill City Museum Photo by John Schroeder

LIGHTS TO DEFINE SPACE

ENERGY GENERATION

The Digital Aurora Borealis (The Place in China) by Trey Ratcliff

Pavegen

Stationsstraat / Sint-Niklaas by Grontmij Belgium

The Marquette and 2nd StreetMinneapolis

Thriving authentic communities invariably contain significant civic components that celebrate and enrich the “publicness” of place . . . and Green Fourth, as the first significant public green space north of University Avenue, has the potential to define what that means for Prospect North. The overall concept for Green Fourth is based on the following two ideas:First – What’s in a name?And second – District systems and corridor design components.

What’s in a Name?It’s important to note that in the early stages of discussion (and planning study), the difference between calling this ‘4th Street’ or ‘Green Fourth’ had interesting connotations. Staying with the typical ‘street’ designation suggested more of a conventional approach, perhaps emphasizing the car in terms of dimensional elements (lane widths and rights-of-way) . . . with the pedestrian getting what’s left over.

On the other hand, the ‘Green Fourth’ designation suggests a more contemporary approach that includes the entire space (building face to building face), primacy of the pedestrian realm, integration

of public and semi-public spaces (extension of the ‘living room’) and interesting discussion about a variety of potential uses (“when is a street, not a street?”). Which led to the second idea:

District Systems and Corridor Design ComponentsOne of the primary objectives for this study was to explore the relationship between design concepts for Green Fourth and their potential integration with district infrastructure systems. Traffic, parking, heating and cooling, typical utilities (sanitary sewer and water supply) and other components were discussed. But the collection, treatment and use of storm water, particularly within the Green Fourth right-of-way, became a central issue for debate and further resolution.

Initial concept diagrams and images in this study suggest the unique opportunity this location presents, but also recognizes the complexities of the issue and realization that multiple approaches/solutions apply (not ‘one size fits all’). Yet the pervasive view is to take advantage where possible (and feasible) to improve water quality and reduce direct pipe-to-river conveyance within the Prospect North District and along Green Fourth.

Parking &Infiltration

BikewayBikeway 2 waythru-lane

Green SpaceSidewalk

Public R.O.W

Public R.O.W

Private

Private

Green 4th

P. 10 District Systems & Green Fourth Concepts

Public Realm Framework

Infiltration Garden

Residential and Office Mix

Commercial &Office Residential

Water Recirculation

Playground

U of M Stadium

PavegenEnergy Generation

Permeable Paver

Parking

Overflow

P

CHARACTER STUDY OF POTENTIAL GREEN FOURTH COMPONENTS

EXISTING 4TH STREET

District Systems & Green Fourth Concepts P. 11

Public Realm Framework

P

SIGNATURE PARK IN THE HEART

Green 4thUniversity Avenue

Distric Icon

Granary Corridor

Bridal Veil Creek Partial Daylighting

Park

29th LRT StationPlaza

Pedestrian network

Pedestrian network

Pedestrian Node

Pedestrian Node

Pedestrian Node

Surly site

Pedestrian Node

Pedestrian Node

Pedestrian Node

Pedestrian Node

Pedestrian Node

IconicBuilding

27th. Avenue

PUBLIC REALM CONCEPT DIAGRAM

SIGNATURE PARK

From the earliest settlements to our largest cities, we have recognized the importance of public places. The village green, town square and a rich variety of urban parks and plazas have all contributed to our understanding of city form and human scale. These unique places express history, define district identity and invite civic interaction as an important mediator between buildings (types/uses) and the spaces in between.

However, the opportunity to create a signature public park in the heart of the Prospect North District goes well beyond a conventional definition of placemaking. Contemporary thinking, and extensive research, confirms that a high quality public realm can be transformative and has the potential to become a major influence in terms of land value, district infrastructure design (stacked systems), local/regional destination uses and many others layers of modern city-building.

Currently there is little, or no, publicly held property (outside of street rights-of-way), that could potentially be reserved for public park designation. But, with support from property owners and through future development team design proposals, the concept for a signature park (perhaps near the LRT station) could become reality.

P. 12 District Systems & Green Fourth Concepts

DISTRICT SYSTEMS

P

Roofdeck Event center

Public art

Solar Panel roof

Kiosk

Harvested water from roof

Anchor building

Hotel

Rock climbing wall

Screen Projection & Mural

Rooftop yard

Cafe

Residential

29th LRT Station

Restaurant

Connection to park

EXISTING 29TH AND UNIVERSITY AVENUE

District Systems & Green Fourth Concepts P. 13

Public Realm Framework

The potential to connect Prospect North District public spaces and other amenities with City/Regional systems is not a new idea. Completing the ‘Missing Link’ of the Grand Rounds, while providing access to other facilities within the world-renowned Minneapolis park system, has been discussed for several decades.

More recent studies have explored both conceptual design and potential projects for implementation related to the Granary Road Corridor, Bridal Veil Creek and other initiatives within and adjacent to the District.

While we recognize that some of these concepts have a much longer time horizon (in terms of process, design, funding, permits and construction), there are a variety of implications and tangible impacts/influences that will help inform short-term design decisions for Green Fourth and the Signature Park.

REGIONAL PUBLIC REALM

P. 14 District Systems & Green Fourth Concepts

GREEN 4TH

Public Realm Framework

GRANARY CORRIDOR BRIDAL VEIL CREEK MISSING LINK

Image credit: Metropolitan Design Center

Image credit: Metropolitan Design Center

Image credit: Metropolitan Design Center

Image credit: Dinkytown Greenway

Photo credit: Landschaftspark Duisburg Nord by Latz + Partner

Photo credit: 1911 Civic Celebration postcard

Saw Mill River in downtown Yonkers Photo credit: Zach YoungermanPhoto credit: Parco Dora by Latz + Partner

There is a wealth of existing information and precedent research that promotes a thoughtful integration of local and regional systems including park/trail/open space networks, stormwater management/ surface drainage patterns, natural habitat corridors, energy production, waste handling, urban agriculture and many more.

District Systems & Green Fourth Concepts P. 15

P

DISTRICT SYSTEMS

PPP

PSTORMWATERHEATING & COOLINGTRAFFIC & PARKING PUBLIC UTILITIES

DISTRICT SYSTEMS

DISTRICT BUILD-OUT PLAN

Prospect Park June 13, 2013

MINNEAPOLIS MINNESOTA

Minneapolis st. Paul

scale: 1” = 400’

surly destination brewer y-brewer y

- events center- restaurant

-bar-b eer garden

mixed use25,000sq. f t . - gro cer y125,000 sq. f t . - retai l

100,000 sq. f t . - educ ation supp or t125 key hotel

1,150 units - M ixed / multi family

mixed use300 residential units

mixed use50,000 sq. f t . - c l inic

200,000 sq. f t . - off ice200,000 sq. f t . - medic al supp or t

125 key hotel1,100 units - M ixed / multi family

UofMBio discover y

D istr ic t

MN I nnovation park700,000 sq. f t . - research

MN I nnovation park100,000 sq. f t . - research

MN I nnovation park200,000 sq. f t .

Univers i t y Enterpr ise

Laborator ies

UofMTCF

Stadium

UofMAmbulator yCare Center

Glendaleto be

re - imagined

P

P

P

P

P

P

legend

ProsPeCt ParK 2020distriCt BUild-oUt Chart

Mixed use with emphasis on commercial, retail, & office

Mixed use with emphasis on housing

Mixed use with emphasis on enterprise innovation uses

structured parking

residential ------------------------grocery ----------------------------other retail ------------------------hotels ------------------------------Clinic -------------------------------Office ------------------------------Mn innovation Park ------------

2,550 units 25,000 sq. ft 125,000 sq. ft 250 rooms 50,000 sq. ft 200,000 sq. ft1,000,000 sq.ft

The Prospect North District Build-Out Plan highlighted on these two pages provided a rough estimate of various land use types (square footage, unit count, general location), from which the Green Fourth Study Team could base their district systems analysis and conclusions. The Jim McComb Market Study, included in the 2020 Framework Plan prepared by the SRF Consulting Group Team, offers a much more detailed look at potential uses within the district, but for the purposes of this report, we have made the following assumptions:

Prospect Park June 13, 2013

MINNEAPOLIS MINNESOTA

Minneapolis st. Paul

scale: 1” = 400’

surly destination brewer y-brewer y

- events center- restaurant

-bar-b eer garden

mixed use25,000sq. f t . - gro cer y125,000 sq. f t . - retai l

100,000 sq. f t . - educ ation supp or t125 key hotel

1,150 units - M ixed / multi family

mixed use300 residential units

mixed use50,000 sq. f t . - c l inic

200,000 sq. f t . - off ice200,000 sq. f t . - medic al supp or t

125 key hotel1,100 units - M ixed / multi family

UofMBio discover y

D istr ic t

MN I nnovation park700,000 sq. f t . - research

MN I nnovation park100,000 sq. f t . - research

MN I nnovation park200,000 sq. f t .

Univers i t y Enterpr ise

Laborator ies

UofMTCF

Stadium

UofMAmbulator yCare Center

Glendaleto be

re - imagined

P

P

P

P

P

P

legend

ProsPeCt ParK 2020distriCt BUild-oUt Chart

Mixed use with emphasis on commercial, retail, & office

Mixed use with emphasis on housing

Mixed use with emphasis on enterprise innovation uses

structured parking

residential ------------------------grocery ----------------------------other retail ------------------------hotels ------------------------------Clinic -------------------------------Office ------------------------------Mn innovation Park ------------

2,550 units 25,000 sq. ft 125,000 sq. ft 250 rooms 50,000 sq. ft 200,000 sq. ft1,000,000 sq.ft

Mixed use with emphasis on commercial, retail, and office

Mixed use with emphasis on housing Mixed use with emphasis on enterprise innovation users

Source: Eco Boulvard Ecosystema urbanoSource: Via Verde, Bronx NY Photo: David SundbergSource: 222 Hennepin, Minneapolis MN Excelsior Group

District Systems & Green Fourth Concepts P. 17

DISTRICT SYSTEMS

riVer rd e

UniVersitY aVe se

oaK

st s

e

27th

aV

e se

interCaMPUs transitwaY

onta

rio s

t se

erie

st s

e

esseX st se

orlin aVe se

eMer

ald

st

FUlton st se

arthUr aVe se

4th st se

delaware st se

Yale aVeMalColM aVe se

seY

MoU

r aV

e se

25th

aV

e se

MelBoUrne aVe se

29th

aV

e se

Barton aV

e se

ClarenC

e aVe se

sain

t Mar

Ys

aVe

26th

aV

e se

Bed

For

d st

se

23rd

aV

e se

sidneY Pl

thor

nton

st s

e

30th

aV

e se

Mal

Col

M a

Ve

se

BeaCon st se

dartMoUth Pl

ProsPeCt ter

Brid

al V

eil C

ir

saint MarYs Pl

arthUr P

l se

4th st se

5th st se

27th

aV

e se

27th

aV

e se

delaware st se

Mal

Col

M a

Ve

se

Bed

For

d st

se

LRT

LRT

PHASE 1: 7-10 YEARS

P

*All data related to traffic has not been approved by City of Minneapolis Public Works. Before moving forward this will need formalization, validation, and approval.

2,810 TRIP

1,185 TRIP

10,515 TRIP

1,515 TRIP

riVer rd e

UniVersitY aVe se

oaK

st s

e

27th

aV

e se

interCaMPUs transitwaY

onta

rio s

t se

erie

st s

e

esseX st se

orlin aVe se

eMer

ald

st

FUlton st se

arthUr aVe se

4th st se

delaware st se

Yale aVeMalColM aVe se

seY

MoU

r aV

e se

25th

aV

e se

MelBoUrne aVe se

29th

aV

e se

Barton aV

e se

ClarenC

e aVe se

sain

t Mar

Ys

aVe

26th

aV

e se

Bed

For

d st

se

23rd

aV

e se

sidneY Pl

thor

nton

st s

e

30th

aV

e se

Mal

Col

M a

Ve

se

BeaCon st se

dartMoUth Pl

ProsPeCt ter

Brid

al V

eil C

ir

saint MarYs Pl

arthUr P

l se

4th st se

5th st se

27th

aV

e se

27th

aV

e se

delaware st se

Mal

Col

M a

Ve

se

Bed

For

d st

se

LRT

LRT

FULLBUILD OUT: 15 YEARS

11,952 TRIP

475 TRIP

950TRIP

3,320 TRIP

10,830TRIP

1,295 TRIP

INFORMS

The project technical advisory committee developed a land use plan based on anticipateddevelopment in the project area over the next seven to 10 years. The land use assumptions shown in Map 1 are characterized as Phase 1 land use conditions. The land use assumptions forPhase 1 were compared against the land use types/sizes proposed as part of the Prospect ParkMaster Plan, by the Cuningham Group, which represents the Full Build-Out land use plan for thearea. The land use assumptions under Phase 1 and Full Build-Out conditions are shown in Table 1.

PROSPECT PARK NEIGHBORHOOD AND GREEN FOURTH

P

P

P

P

P. 18 District Systems & Green Fourth Concepts

ITE = 435 SPACES CITY = 375

SPACES

250,000 sF oFFiCe & residential

MiXed Use

350 dU apartMent

650 dU apartMent

ITE = 680 SPACES CITY = 585

SPACES

ITE = 1,750 SPACES CITY = 1,270

SPACES

DEVELOPMENT TRIPS

▪ 55% MODAL REDUCTION (RESIDENTIAL)

▪ 35% MODAL REDUCTION (OFFICE/RETAIL)

▪ 10% MULTIUSE REDUCTION

MIXED USE750 DU APARTMENT

125 ROOM HOTEL

150 ROOM HOTEL

150 KSF OFFICE

150 KSF RETAIL

50 KSF ARTS/CULTURAL

ITE = 366 SPACES CITY = 315

SPACES

TRAFFIC & PARKING

ITE = Institute of Transportaion Engineers

City = City of Minneapolis

ITE = 1,860 SPACES CITY = 1,440

SPACES

ITE = 1,220 SPACES CITY = 1,050 SPACES

700,000 s.F. researCh & developMent

oFFiCe

200,000 s.F. researCh & developMent

oFFiCe

350 dU apartMent

MiXed Use

MiXed Use

ITE = 175 SPACES CITY = 150 SPACES

100,00 s.F. researCh & developMent oFFiCe

ITE = 2,235 SPACES CITY = 1,820 SPACES

ITE = 350 SPACES CITY = 300 SPACES

MIXED USE25,000 S.F GROCERY

125,000 S.F. RETAIL

100,000 S.F. EDUCATIONAL SUPPORT

125 KEY HOTEL

1,150 UNITS MIXED/MULTIFAMILY

MIXED USE50,000 S.F. CLINIC

200,000 S.F. OFFICE

200,000 S.F. MEDICAL SUPPORT

125 KEY HOTEL

1,100 UNITS MIXED/MULTIFAMILY

ITE = 366 SPACES CITY = 315

SPACES

P

P

P

P

P

P

DISTRICT SYSTEMS

PARKING ANALYSISTRAFFIC FORECASTS

TRIP GENERATION ESTIMATES ▪ Trip generation estimates on a daily basis were developed using the ITE Trip Generation Manual, 9th Edition and are summarized in Table 2 for each block.

▫ A 35 percent modal reduction was applied to the ITE parking requirements to account for customers arriving via transit services and for those that are walking, biking, or carpooling to the developments.

▫ A 10 percent multi-use reduction was applied to the retail and office land uses to account for customers visiting more than one development with their initial trip.*

AVERAGE DAILY TRAFFIC VOLUMES

▪ Existing average daily traffic (ADT) volumes were reviewed, which are made available by the Minnesota Department of Transportation (MnDOT).

▪ A background growth rate of one-half percent was applied to the existing daily traffic volumes to obtain forecast traffic volumes for the future conditions, which is consistent with historical growth trends in the area.

▪ Trip generation estimates for Phase 1 and Full Build-Out conditions were distributed throughout the study area based on the directional distribution shown in Attachment 4.

▪ The existing and resultant Phase 1 (year 2023) and Full Build-Out (year 2028) condition traffic volumes are shown in Table 3.

▫ Since future development access along 4th Street is unknown at this time, a daily traffic volume range along 4th Street was provided for future conditions. The lower traffic volume represents a condition with limited access along 4th Street.

▪ Based on planning level corridor capacity thresholds, no future capacity issues are expected within the study area.*

▪ The City of Minneapolis parking code was reviewed to estimate the parking requirements under Phase 1 and Full Build-Out conditions for each block.

▪ The parking demand for each block under Phase 1 and Full Build-Out conditions was calculated based on the ITE Parking Manual.

▫ Since the project site is located in a Pedestrian Oriented (PO) overlay district, a 10 percent reduction was applied to off-street parking requirements for residential land uses and 25 percent reduction was applied to off-street parking requirements for non-residential land uses.

▫ A 35 percent modal reduction was applied to the ITE parking requirements to account for customers arriving via transit services and for those that are walking, biking, or carpooling to the developments.

▫ A 10 percent multi-use reduction was applied to the retail and office land uses to account for

▫ customers visiting more than one development.

▪ Results of the parking analysis are summarized in Table 4 and shown in Attachment 5 and Attachment 6 under Phase 1 and Full Build-Out conditions, respectively.*

*All data related to traffic has not been approved by City of Minneapolis Public Works. Before moving forward this will need formalization, validation, and approval.

District Systems & Green Fourth Concepts P. 19

DISTRICT SYSTEMSGREEN 4TH STREET DESIGN OPTION

E N G I N E E R S

P L A N N E R S

D E S I G N E R SConsulting Group, Inc.September 24, 2013GREEN FOURTH STREET

State Aid Minimum Requirements with Parking Zone

B1 B2

Section View

Plan View

B1 B20 10

Pedestrian ZonePedestrian Zone Thru LaneThru Lane ParkingParking21’21’ 11’11’ 8’8’

80’ Right-of-Way

E N G I N E E R S

P L A N N E R S

D E S I G N E R SConsulting Group, Inc.September 24, 2013GREEN FOURTH STREET

State Aid Minimum Requirements with No Parking Zone

Section View

Plan View

DRAFT

A1 A2

A1 A2

0 10

Pedestrian ZonePedestrian Zone Thru LaneThru Lane27’27’ 13’13’

80’ Right-of-Way

FIGURE 1: STATE AID MINIMUM REQUIREMENTS WITHOUT PARKING BAYS

FIGURE 2:STATE AID MINIMUM REQUIREMENTS WITH PARKING BAYS

Prepared by SRF Consulting Group, Inc.

P

State Aid minimum requirements and Access Minneapolis design guidelines informed the possible scenarios for a typical local street with 80 ft R.O.W. Typical street sections, both with and without a parking bay, still allow adequate sidewalk space, but not enough to maximize occupiable pedestrian space for diverse civic uses and stormwater treatment.

Working with the current standard, the scenario seen in fig. 3 was developed to show how parking, as well as infiltration basins, is accomodated while providing 20 feet of sidewalk width on both sides.Furthermore, the current policy allows asymetric configuration of the street section that can allow different width of the sidewalks.

The next chapter will introduce further exploration of the Green 4th street design scenarios that maximize pedestrian space for multiple programs that enliven the life of the street.

P. 20 District Systems & Green Fourth Concepts

DISTRICT SYSTEMS

State Aid minimum requirements and Access Minneapolis design guidelines informed the possible scenarios for a typical local street with 80 ft R.O.W. Typical street sections, both with and without a parking bay, still allow adequate sidewalk space, but not enough to maximize occupiable pedestrian space for diverse civic uses and stormwater treatment.

Working with the current standard, the scenario seen in fig. 3 was developed to show how parking, as well as infiltration basins, is accomodated while providing 20 feet of sidewalk width on both sides.Furthermore, the current policy allows asymetric configuration of the street section that can allow different width of the sidewalks.

The next chapter will introduce further exploration of the Green 4th street design scenarios that maximize pedestrian space for multiple programs that enliven the life of the street.

FIGURE 3:GREEN 4TH ALTERNATIVE (STILL SITHIN MSA STANDARDS)

Prepared by SRF Consulting Group, Inc.

P

District Systems & Green Fourth Concepts P. 21