Greater Peoria Mass Transit District
FY 2020 Budget(July 1 ,2019 – June 30, 2020)
June 10, 20191
Greater Peoria Mass Transit District (CityLink)
Transmittal Letter
Date: June 10, 2019
TO: Board of Trustees of Greater Peoria Mass Transit District (GPMTD)
Please accept the proposed FY2020 budget for your consideration and approval. This budget issubmitted in accordance with the adopted financial policies of GPMTD. This proposed document isintended to provide you with a comprehensive framework for decision-making on expenses,revenues, and fund balances, resulting in a final approved spending plan for fiscal year 2020.
The overall appropriation of $41,475,000 for the FY 2020 budget includes the operating budget,capital budget, and is an increase of 4.2% from the FY 2019 budget. The operational budgetexpenses for 2020, which exclude capital expenditures, total $31,800,000, an increase of 2.9%compared to the FY 2019 operational budget total of $30,898,000.
FY2020 Proposed Budget
2
Greater Peoria Mass Transit District (CityLink)
Transmittal Letter
Each year, the budget establishes the plan to address new challenges as well as take advantage ofunforeseen opportunities.
As always, GPMTD will continue to work with other governments (FTA, IDOT, Peoria County,City) duringthe upcoming year.
The District Board has contributed its full support to the development and maintenance of the financialoperations of District. Without this leadership, together with the strong commitment from the District’smanagement team, the presentation of this budget and other financial reports would not occur.
Respectfully submitted,
Doug Roelfs Christine Feng, CPA, MBA, CGMA
General Manager Chief Financial Officer
FY2020 Proposed Budget
3
CityLink’s Board of Trustees
CityLink provides an environmentally friendly and customer-focused transportation servicethat connects people to places in an efficient and safe manner.
Our Mission
Arthur BellChair
Jennifer LeeVice Chair
Maxine WorthamTreasurer
Sharon McBrideSecretary
Joan KrupaTrustee
RepresentingPeoria
RepresentingPeoria
RepresentingPeoria
RepresentingWest Peoria
RepresentingPeoria Heights
4
5
VISION
GPMTD is a regional leader in the movement of people focused on providing a safeenvironment and reliable transportation. We are proactive leaders in providing creativesolutions by a dedicated, committed, highly motivated team, who produces delightedcustomers.
1. Excellence :We believe excellence is a never-ending journey to exceed the expectationsplaced upon us as individuals and as an organization.
2. Innovation : We are open to implementing new concepts and sharing what we havelearned from our diverse experiences and, in the process, evolving. Embracing growthwithin the District’s mission.
3. Respect : Respect is measured by how we treat each other, by the contributions that flowfrom our diversity, by the productivity of our relationships, and by a job well done, nomatter what the job. To meet our goals, we depend on the integrity, knowledge, skill,diversity, and teamwork of our employees.
4. Safety: We are dedicated to safeguarding our greatest assets – our employees – togetherwith the environment and our communities.
5. Accountability: As public service employees, we bring a high degree of integrity,professionalism, quality, and caring to our work. We have a commitment to ourcommunities to provide service with the highest level of integrity, transparency, andaccountability.
6
GPMTD PLANS
• Maximize value provided to riders/customers and
taxpayers.
• Ensure funding for ongoing operations remains stable.
• Identify new funding (aggressively apply competitive
grants ) to continue delivering enhancements and
improvements.
• Establishes a new path that will ensure long-term stability.
• Ensures that riders continue to enjoy clean, reliable buses.
• Identifies opportunities for new / improved services orService expansion.
Organizational Financial Goals
7
** To budget revenues and expenses annually as accurately as possible in an effortto maximize the utility of every GPMTD taxpayer’s dollar.
** The financial goals of GPMTD are to:--Operate under a balanced budget.--Safeguard and maximize resources.
** Main Capital Projects Plans for coming years--Maintenance Garage--Electric bus and bus charging system--Technology Improvement /upgrade
8
Current Situation
Financial Strengths
The District has many strengths as an organization. In many ways, these strengthsare reflections of the dedication and passion for the community displayed by staffand Board members. Key financial strengths include:
• No indebtedness; and
• No evidence of fraud or mismanagement.
In addition, the agency has a track record of clean audit results. Preserving and building on
these strengths will be important going forward.
FY2020 GREATER PEORIA MASS TRANSIT DISTRICT ORGANIZATIONAL CHART
* General ManagerDoug Roelfs
Board of TrusteesArthur Bell, Chair
Jennifer Lee, Vice ChairMaxine Wortham, TreasurerSharon McBride, Secretary
Joan Krupa, Trustee
HumanResourcesShannonWilliams
Chief Financial OfficerChristine Feng
Paratransit &CustomerService
Andrew Dwyer
Safety &Security
Steve Green
CustomerServiceFT CSRPT CSR
MaintenanceMike
Brockway
MaintenanceShift Foremen
Inventory ClerkMechanic
UtilityJanitors
Accounting& Payroll
MattBrannan
ProcurementLynne
Safford
Federal Grant& Finance
MarthaHowarter
Supervisors
2 Scheduling8 Supervisors
GeneralForeman
Steve Risch
AdministrativeAssistantVenessaDixson
PlanningJoe
Alexander
AP&Inventory
BethanyPotter
* Assistant GM - MaintenanceNick Standefer(EEOC officer)
* 3 First Transit Management Team** Outsourced Attorney
ExecutiveAssistantDesireeCarlson
Operators
FT &PT
Operators
ParatransitSpecialist
Carla Jackson
MarketingEmily Watson
OperationsKen Boddie
* Assistant GM – OperationsAngel Marinich(DBE officer)
ARWendy Kelley
FA & OthersOpen
** Legal couselBill Wombacher
10
112019 Estimate
2,917,5943,014,014
3,386,163 3,408,2323,329,917
3,420,7053,301,372
2,711,720 2,686,550
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
3,500,000
4,000,000
2011 2012 2013 2014 2015 2016 2017 2018 2019
Fiscal Year Ridership Report
12
Performance Trends for Fixed Route Service
PrecedingYears (FY 2013 through FY2018)
153.62 157.42151.59
166.03170.15 168.8
140
150
160
170
180
2013 2014 2015 2016 2017 2018
Cost per hour
Cost per hour
6.46 6.93 6.78
8.419.7 9.68
10.83 11.1410.47
11.49 11.83 11.73
0
2
4
6
8
10
12
14
2013 2014 2015 2016 2017 2018
Cost per passenger Cost per mile
13
Farebox Revenue ComparisonFY 2018 vs. FY 2019
Percentage Difference * FY2019Estimate
July Aug Sep Oct Nov Dec Jan Feb March April May June
6.65% 4.03% -3.47% 1.32% -5.09% -4.07% -10.08% -3.37% -9.73% -1.91% -1.55%* 1.60%*
July AugustSeptembe
rOctober November December January February March April May June
FY 2018 Fare Box Revenue 76,451 88,263 84,743 89,605 83,323 81,149 80,446 74,929 83,960 74,658 85,611 82,962
FY 2019 Fare Box Revenue 81,538 91,821 81,801 90,787 79,083 77,844 72,340 72,405 75,787 73,233 84,286 84,286
-
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
14
6.93%
6.58%
6.23%
6.68%
6.01% 5.98%
5.40%
5.60%
5.80%
6.00%
6.20%
6.40%
6.60%
6.80%
7.00%
7.20%
2013 2014 2015 2016 2017 2018
Revenue Recovery Ratio
Passenger Fare Revenue Recovery RatioPreceding 5Years (FY2013 – FY2018)
GPMTD Operating Expenses Budgetas a
Percentage of Consolidated FY2020 Budget
Labor Cost
Fringe Benefits
Service Cost
Materials & Supplies
Miscellaneous
Casualty & Liability
Contingencies
Expense$9,377,475
$10,495,096
$6,530,743
$3,914,226
$584,060
$580,400
$318,000
Percent29.5%
33.0%
20.5%
12.3%
1.8%
1.8%
1.0%
15
FY 2019 FY 2020 %
Labor Cost $9,270,433 $9,377,475 1.2%
Fringe Benefits $10,486,530 $10,495,096 0.1%
Service Cost $6,124,954 $6,530,743 6.6%
Materials & Supplies $3,734,300 $3,914,226 4.8%
Miscellaneous $416,533 $584,060 40.2%
Casualty & Liability $557,250 $580,400 4.2%
Contingencies $308,000 $318,000 3.2%
PROJECTED OPERATING EXPENSES
16
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
2019
2020
Operating Expenses Comparison
17
18
Factors Affecting Operating Expenses
Salaries and Benefits
** Pay rate increase from $37.00 to $38.00 per hour for Security officers in Safety Department .
** Have a better control in overtime spending from Operations and maintenance departments .
** The effect of Retiree insurance plan change will not be reflected immediately.
Professional Services
** Remain unchanged.
Materials and supplies
** The trend of Fuel cost-- increase
Purchased Transportation
** Purchased transportation costs increased primarily as a result of annualized costs of the Paratransit Service.Additional increases are related to contractual rates for service with existing provider.
Miscellanies
** Add a Special Budget line item for District’s 50th Anniversary in FY 2020
19
FY 2020 Operating Budget
**The Key points in FY 2020 Budget proposal **
• There is no deficit foreseen in FY 2020.
• No fare increase is planned in the FY 2020; however,
a fare increase could be implemented after further
analysis.
• No significant service changes are planned.
$25,000,000
$26,000,000
$27,000,000
$28,000,000
$29,000,000
$30,000,000
$31,000,000
$32,000,000
$28,443,060 $30,033,720 $27,562,795 $29,775,000 $29,635,000 $30,898,000 $31,800,000
2016
2017
2018
2020
2014
2015
OPERATING EXPENSES 2014 - 2020
20
2019
21
Historical Fuel Price
FY 2014 – FY 2019
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
$35,000,000
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Salaries Fringe Benefits Material Services Casualty Miscellaneous
22
Benefit Growth Driving Expense Growth Expense By TypeFY2011 - FY2020
23
Capital & Work Plan Descriptions
• Maintenance Facility Phase 1
• Maintenance Facility A&E - Prebuild
• Bus Wash Renovation – Phase 1 Requirement
• Transit Center Upgrade/Remodel
• Collision Avoidance System
• Electric Buses (2)
• Electric bus Charging System (1)
Capital Development Project
Project Name: Maintenance Facility Phase 1 Expenditure Budget FY2020 Plan
Department: Maintenance Maintenance Facility 4,500,000
ProjectType: New Facility construction Total Outlay $4,500,000
Project Description: Maintenance Garage upgrade
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from State
Project Number:2020-01 80% FTA 3,600,000
Line Item:00-1630000000 20% State 900,000
Grant Number: 5339(b) Total Funding $4,500,000
24
Capital Development Project
Project Name: Maintenance Facility A&E - Prebuild Expenditure Budget FY2020 Plan
Department: Maintenance Maintenance Facility 750,000
ProjectType: New Facility construction Total Outlay $750,000
Project Description: Maintenance Garage upgrade
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from Local
Project Number: 2020-02 80% FTA 600,000
Line Item: Line Item:00-1630000000 20% Local 150,000
Grant Number: Proposed Total Funding $750,000
25
Capital Development Project
Project Name: Bus Wash Renovation(Phase 1 requirement)
Expenditure Budget FY2020 Plan
Department: Maintenance Maintenance Facility 800,000
ProjectType: New Facility construction Total Outlay $800,000
Project Description: Maintenance Garage upgrade
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from State
Project Number:2020-03 80% FTA 640,000
Line Item:00-1630000000 20% Local 160,000
Grant Number: IL-90-X734 Total Funding $800,000
26
Capital Development Project
Project Name: Transit Center Upgrade/Remodel Expenditure Budget FY2020 Plan
Department: Maintenance Upgrades to Transit Center 700,000
ProjectType: Improvement to Land Total Outlay $700,000
Project Description: Improve customer servicearea
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from Local Funding
Project Number: 2020-04 80% FTA 560,000
Line Item: 00-163000000 20% Local 140,000
Grant Number: IL-90-X734 Total Funding $700,000
27
Capital Development Project
Project Name: Collision Avoidance System Expenditure Budget FY2020 Plan
Department: Safety Department Project Name: CollisionAvoidance System
500,000
ProjectType: Communication software and equipment Total Outlay $500,000
Project Description: Safety related system
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from State
Project Number:2020-05 80% FTA 400,000
Line Item:00-166110000 20% State (TDC) 100,000
Grant Number: Proposed Total Funding $500,000
28
Capital Development Project
Project Name: Voice Paging – Emergency Systems Expenditure Budget FY2020 Plan
Department: Safety Voice Paging – EmergencySystems
60,000
ProjectType: Communication software and equipment Total Outlay $60,000
Project Description: purchase emergency system toenhance safety implementation in District
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from State
Project Number:2020-06 80% FTA 48,000
Line Item:00-1661100000 20% State (TDC) 12,000
Grant Number: Proposed Total Funding $60,000
29
Capital Development Project
Project Name: Paratransit Software Expenditure Budget FY2020 Plan
Department: Paratransit Department Paratransit Software 165,000
ProjectType: communication software Total Outlay $165,000
Project Description: Purchase software to assist dailyoperation in paratransit service area.
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from State
Project Number:2020-07 80% FTA 132,000
Line Item:00-1661100000 20% State (TDC) 33,000
Grant Number: Proposed Total Funding $165,000
30
Capital Development Project
Project Name: Electric Bus (2)Electric Bus Charging System (1)
Expenditure Budget FY2020 Plan
Department: Operations Purchase Electric Bus (2)Charging System (1)
1,500,000700,000
ProjectType: Revenue Vehicles Total Outlay $2,200,000
Project Description: Purchase electric bus and charging
Funding Sources FY2020 PlanJustification: 80% from FTA
20% from State
Project Number:2020-08 80% FTA 1,760,000
Line Item:00-1650000000 20% State (TDC) 440,000
Grant Number: Proposed Total Funding $2,200,000
31
32
Proposed Tax Levy -Operations 2,816,528$
Proposed Working Cash Account Levy $10,000
Proposed Capital Budget Appropriation $253,540
Total Funds Levied against MIL 3,080,068$
Equalized Assessed Valuation for This
Period 2,252,756,150$
Proposed MIL Rate 13.67
Or
13.67 Cents Per $100 Assessed Valuation
Maximum Allowable Rate is 15 Cents
Comparison : FY 2019 FY 2020
Portion of Levy Affected by Cap 2,655,870$ 3,080,068$
Equalized Assessed Valuation 2,309,833,112$ 2,252,756,150$
MIL Rate 11.5 13.67
Calculation of MIL Rate
13YEARPROGRESSION OF MIL
RATE
BASED ONLOCAL
PROPERTYEAV
33
12.99%12.39%12.35%
10.05%
8.37% 8.32%
9.13% 8.85% 8.80%
9.…9.97%
11.50%
13.67%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Local Tax Levy
Summary of Sources and Uses of Funds
34
Sources FY2020
Local Operating Revenues
Passenger Fares 1,595,500$
Paratransit & Special 310,000$
EP/Pekin/JARC/IGA 562,915$
Replacement Taxes 175,000$
Advertising 375,000$
Miscellaneous 370,968$
Total Local Operating Revenues: 3,389,383$
Federal Transit Administration:
Capital Maintenance Grant 1,498,029$
Federal assistance( capital cost of contracting) 560,000$
Tire lease 45,500.00$
Total Federal Funds 2,103,529$
Local Tax:
Property Tax 2,816,528$
Audit Mass Transit 33,000$
IMRF Tax 1,080,000$
Social Security Tax 785,000$
Tort Mass Transit 500,000$
Work Comp. 500,000$
Unemployment Tax 21,495$
Total Local Tax Revenue for Operating 5,736,023$
State Operating Assistance:
Eligible Expenses 31,647,792$
65% Cap 20,571,065$
Maximum
Total State Operating 20,571,065$
Total Operating Revenues--Funding Sources 31,800,000$
Capital development Fund Reserves & Levy for Capital
reserve $450,000.00
FTA- Capital Grants 7,740,000.00$
State Assistance 1,485,000.00$
Total Capital Revenues--Funding Sources 9,675,000$
Grand Total ---- Sources 41,475,000$
Uses FY 2020
Wages/salaries 9,377,475$
Benefits 10,495,096$
Services 6,530,743$
Material/supplies 3,914,226$
Causality and Liability 584,060$
Misc. 580,400$
contingencies 318,000$
Total Operating Expenses: 31,800,000$
Maintenance Facility Phase 1 4,500,000$
Maintenance Facility A&E - Prebuild 750,000$
Bus Wash Renovation - Phase 1 requirement 800,000$
Transit Center Upgrade/remodel 700,000$
Collision Avoidance System 500,000$Voice Paging - Emergency Systems 60,000$
Paratransit Software 165,000$
Electric Bus (2) 1,500,000$
Electric Bus Charging System (1) 700,000$
Total Capital Expenditures 9,675,000$
Grand Total ---- Uses 41,475,000$
35
49Years of public transportation service to the community
Incorporated May 4, 1970
www.ridecitylink.org
BUDGET AND APPROPRIATION ORDINANCEFOR THE TWELVE MONTH FISCAL YEAR WHICH ENDS
JUNE 30, 2020
BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE GREATER PEORIA MASS TRANSIT DISTRICT:
SECTION ONE:
That the following sums of money, or as much thereof as may be authorized by law, as may be needed or deemednecessary to defray all expenses and liabilities of the Greater Peoria Mass Transit District, Peoria County, Illinois, be andthe same hereby appropriated and budgeted for the corporate and specific purposes and obligations of said District ashereinafter specified, for the fiscal year commencing on the 1st day of July, 2019 and ending on the 30th day of June, 2020.
Continued on Next Page
Projected Operating Expenses FY2020 % of Total Operating Budget
Labor Cost $9,377,475 29.5%Fringe Benefit $10,495,096 33.0%Services cost $6,530,743 20.5%Materials and Supplies $3,914,226 12.3%Miscellaneous $584,060 1.8%Casualty and Liability $580,400 1.8%Contingencies $318,000 1.0%
Total Appropriated Amount - Operating $31,800,000 100.00%
36
Projected Capital Expenditures
Projected Capital Expenditures FY 2020
Maintenance Facility Phase 1 $4,500,000
Maintenance Facility A&E - Prebuild $750,000
Bus Wash Renovation - Phase 1 requirement $800,000
Transit Center Upgrade/remodel $700,000
Collision Avoidance System $500,000
Voice Paging - Emergency Systems $60,000
Paratransit Software $165,000
Electric Bus (2) $1,500,000
Electric Bus Charging System (1) $700,000
Total Appropriated Amount - Capital $9,675,000
Grand Total - Operating & Capital $41,475,000
37
Total appropriated for the foregoing expenses from general operating revenue of the Transit District to June 30, 2020 $2,651,468
Total appropriated for the foregoing expenses from contract revenues from EPMTD/Pekin $562,915
Total appropriated for the foregoing purposes from the tax for general corporate purposes provided for in sub-section (10) ofSection 5 of an act entitled “Local Mass Transit District Act” (Chapter 70, Illinois Compiled Statutes, Section 3610/5)
$2,816,528
Total appropriated for the payment of Self Insurance Expenses from the tax for workers compensation claims expense, insurancepremiums, liability claims expense, claims services and other related matters provided for in Chapter 745, Illinois CompiledStatutes, Section 10/9-101 et. seq., Section 10/9-103, Section 10/9-107
$1,000,000
Total appropriated for the foregoing purposes from the tax for (IMRF) employer pension provided for in Chapter 40, IllinoisCompiled Statutes, Section 5/7-171
$1,080,000
Total appropriated for the foregoing purposes from the tax for Medicare and Social Security Contributions provided for in Chapter40, Illinois Compiled Statutes, Section 5/21-110, and Section 5/21-110.1
$785,000
Total appropriated for the foregoing purposes from the tax for unemployment insurance provided for in Chapter 745, IllinoisCompiled Statutes, Section 10/9-107
$21,495
Total appropriated for the foregoing purposes from the tax for audit services to be performed by an independent public accountingfirm as provided for in Chapter 50, Illinois Compiled Statutes, Section 310/9
$33,000
Total appropriated for operating subsidy from the State of Illinois Downstate Public Transportation Act- Chapter 30, IllinoisCompiled Statutes, Section 740/1-1
$20,571,065
Total appropriated for the foregoing purposes from the Federal Transit Administration under its Capital/Preventative Maintenanceand Operating Assistance
$2,103,529
Total appropriated for the foregoing purposes from the Personal Property Tax Replacement Fund, (Chapter 30, Illinois CompiledStatutes, Section 115/12)
$175,000
TOTAL ANTICIPATED REVENUES - Operating
Total appropriated for the foregoing Capital Expenses from capital grant agreement with FTA , State and the Capital DevelopmentReserve Revenues of the Greater Peoria Mass Transit District
TOTAL ANTICIPATED REVENUES - Capital Projects
$31,800,000
$9,675.000
$9,675,000
ACCOUNT A:SELF INSURANCE RESERVE FUNDReserve for the payment of insurance premiums, workers compensation claims services and other related mattersprovided for in Chapter 745, Illinois compiled Statutes, Section 10/9-101 et. seq., Section 10/9-103, Section 10/9-107
AMOUNT APPROPRIATED
Legal Fees $30,000
Workers Compensation Service Fees/Premiums $51,500
Workers Compensation Claims Expense $500,000
Illinois Public Transit Risk Management Association Risk Pool:
Loss Fund Share $150,000
Premium Share for Excess Coverage $350,000
Claim Program Administrative Expense $58,500
TOTAL $1,140,000
ANTICIPATED REVENUE:
Total appropriated for the foregoing Self Insurance Expenses from a transfer of reserve funds to theIllinois Public Transit Risk Management Association
$40,000
Total appropriated for the foregoing for the workers compensation claims expenses, liability claimsexpenses, claims services and other related matters provided from a reserve of funds provided for inChapter 745, Illinois Compiled Statutes, Section 10/9-101et. seq., Section 10/9-103, Section 10/9-107
$88,500
Total appropriated for the payment of Self Insurance Expenses from the tax for workers compensationclaims expense, insurance premiums, liability claims expense, claims services and other related mattersprovided for in for in Chapter 745, Illinois Compiled Statutes, Section 10/9-101 et. seq., Section 10/9-103,Section 10/9-107
$1,000,000
Total appropriated for the foregoing Self Insurance Expenses from interest earnings on the Self InsuranceReserve Fund
$11,5000
TOTAL$1,140,00039
ACCOUNT B:CAPITAL DEVELOPMENT FUNDCurrent Reserve for the payment of locally funded capital development projects:
AMOUNT APPROPRIATEDMaintenance Facility A&E - Prebuild $150,000Bus Wash Renovation - Phase 1 requirement $160,000Transit Center Upgrade/Remodel $140,000
TOTAL $450,000
ANTICIPATED REVENUE:
Total appropriated for the payment of locally funded Capital Projects from the tax for general corporatepurposes provided for in sub-section (10) of Section 5 of an act entitled “Local Mass Transit District Act”(Chapter 70, Illinois Compiled Statutes, Section 3610/5)
$253,540
Lease Payment $45,000
Total appropriated for the foregoing Capital Development Fund from interest earnings on the CapitalDevelopment Fund
$8,000
Total appropriated for the foregoing Capital Expenses from the Capital Development Reserve of theGreater Peoria Mass Transit District
$143,460
TOTAL $450,000
40
AMOUNT APPROPRIATED
Bus Wash Renovation – Phase 1 requirementTransit Center Upgrade/remodel
$800,000$700,000
TOTAL $1,500,000
ANTICIPATED REVENUE:
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theUnited States of America.
$1,200,000
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theState of Illinois
$0
Total appropriated for the foregoing Capital Expenses from the District's Capital DevelopmentFund Account B
$300,000
TOTAL$1,500,000
ACCOUNT C:CAPITAL ACQUISITION IMPROVEMENT GRANT (IL-90-x734)
41
ACCOUNT D :
CAPITAL ACQUISITION IMPROVEMENT GRANT (5339b)
AMOUNT APPROPRIATED
Maintenance Facility - Phase 1 $4,500,000
TOTAL $4,500,000
ANTICIPATED REVENUE:
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theUnited States of America
$3,600,000
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theState of Illinois
$900,000
Total appropriated for the foregoing Capital Expenses from the District's Capital DevelopmentFund Account B
$0
TOTAL $4,500,000
42
ACCOUNT E:CAPITAL ACQUISITION IMPROVEMENT GRANT (Proposed)
AMOUNT APPROPRIATED
Collision Avoidance SystemVoice Paging - Emergency SystemsParatransit Software
$500,000$60,000
$165,000
TOTAL $725,000
ANTICIPATED REVENUE:
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement withthe United States of America.
$580,000
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement withthe State of Illinois
$145,000
Total appropriated for the foregoing Capital Expenses from the District's CapitalDevelopment Fund Account B
$0
TOTAL $725,000
43
ACCOUNT F :
CAPITAL ACQUISITION IMPROVEMENT GRANT (Proposed)
AMOUNT APPROPRIATED
Electric Bus (2)Electric Bus Charging System (1)
$1,500,000$700,000
TOTAL $2,200,000
ANTICIPATED REVENUE:
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theUnited States of America
$1,760,000
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theState of Illinois
$440,000
Total appropriated for the foregoing Capital Expenses from the District's Capital DevelopmentFund Account B
$0
TOTAL $2,200,000
44
45
ACCOUNT G :
CAPITAL ACQUISITION IMPROVEMENT GRANT (Proposed)
AMOUNT APPROPRIATED
Maintenance Facility A&E - Prebuild $750,000
TOTAL $750,000
ANTICIPATED REVENUE:
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theUnited States of America
$600,000
Total appropriated for the foregoing Capital Expenses from a Capital Grant Agreement with theState of Illinois
$0
Total appropriated for the foregoing Capital Expenses from the District's Capital DevelopmentFund Account B
$150,000
TOTAL $750,000
ACCOUNT H:
WORKING CASH FUND
AMOUNT APPROPRIATED
Addition to the reserve to meet the Working Cash Needs of the Greater PeoriaMass Transit District and reduce its need to borrow in anticipation of receipt oflocal property taxes and state and federal grant funding
$10,000
ANTICIPATED REVENUE:
Total appropriated for the foregoing Working Cash Needs from a tax for generalcorporate purposes as provided in sub-section (10) of section 5 of the "Local MassTransit District Act" (Chapter 70, ILCS 3610/5)
$10,000
SECTION TWO:
In support of said budget and as part thereof, the following statement is made in compliance with the provisions ofSection Three of the “Illinois Municipal Budget Law”, (Chapter 50, Illinois Compiled Statutes, Section 330/1)
46
SUMMARY OF RESOURCESEstimated income from general operating revenue of the District $2,631,968
Estimated income to be received from EPMTD/PEKIN $562,915
Estimated income from Personal Property Tax Replacement Fund $175,000
Estimated income from General Corporate Real Property Taxes $2,816,528
Estimated income from Downstate Public Transportation Operating Expense Grant with the State of Illinois Department ofTransportation
$20,571,065
Estimated income from the Federal Transit Administration’s Capital Maintenance and Operating Assistance $2,103,529
Estimated income from a tax for the payment of audit fees $33,000
Estimated income from a tax for the payment of Employer Social Security and Medicare Contributions $785,000
Estimated income from a tax for the payment of unemployment Insurance $21,495
Estimated income from a tax for the payment of (IMRF) Employer Pension Contributions $1,080,000
Estimated interest income from Self Insurance Reserve Funds to be applied to Self Insurance Program Costs as set forth in Account A $11,500
Estimated income from a tax for the payment of insurance premiums, Liability Claims Expense, Claims Services and related matters asset forth in Account A
$500,000
Estimated income from a tax for the payment of Workers Compensation Claims Expense as set forth in Account A $500,000
Estimated interest income from Capital Development Funds to be applied to Capital Development program costs as set forth inAccount B
$8,000
Estimated income from the District’s Capital Development Fund as set forth in Account B $450,000
Estimated income from a Capital Grant Agreement with the State of Illinois as set forth in Account D/E/F $1,485,000
Estimated income from a Capital Grant Agreement with the United States of America as set forth in Account C/D/E/F/G $7,740,00
TOTAL ESTIMATED INCOME: $41,475,000
TOTAL ESTIMATED (ELIGIBLE) EXPENSES: $41,475,00047
SUMMARY OF CASH RESERVES ON HAND ATBEGINNING OF FISCALYEAR 2020
STATEMENT OF ESTIMATED CASH EXPECTED TO BE ON HAND AT THEEND OF FISCALYEAR 2020
Estimated Cash on hand for Working Cash Reserve $1,242,485
Estimated Cash Reserves on hand for unpaid Capital Development Expenditures $255,718
Estimated Cash Reserves for Self Insurance, Insurance Premiums, WorkersCompensation Claims, General Liability Claims, Claims Services and related mattersprovided for in Chapter 745, Illinois Compiled Statutes, Section 10/9-101 et.seq., Section10/9-103, Section 10/9-107
$2,335,495
Estimated Cash on hand for Working Cash Reserve$1,279,785
Estimated Cash Reserves on hand for unpaid Capital Development Expenditures$183,197
Estimated Cash Reserves for Self Insurance, Insurance Premiums, WorkersCompensation Claims, Liability Claims, Claims Services and related matters providedfor in Chapter 745, Illinois Compiled Statutes, Section 10/9-101 et.seq., Section 10/9-103, Section 10/9-107
$2,383,015
48
SECTION THREE:That the amounts herein specified shall be deemed to be the limit of the amount to be expended, except bytransfer authorized by the Board of Trustees; but any unexpended balance of any items may be expended inmaking up the deficiencies in any item in the same appropriation and for the same general purpose of in likeappropriations made by this Ordinance.
SECTION FOUR:This Ordinance shall be in full force and effect from and after its passage and approval by the Chairman of theBoard of Trustees of the Greater Peoria Mass Transit District and due publications as required by law.
Adoption Moved: __________
Seconded: ___________
ROLL CALL:
YEAS: NAYS:
Trustee: __________________ Trustee: ________________
Trustee: __________________ Trustee: ________________
Trustee: __________________ Trustee: ________________
Trustee: __________________ Trustee: ________________
49
The foregoing Ordinance was approved by me this 10th day of June 2019.
.Chair of the BoardGreater Peoria Mass Transit District
Attest & Seal:
.Secretary
CERTIFICATION
I, Maxine Wortham, Treasurer of the Board of Trustees of the Greater Peoria Mass Transit District, do hereby certifythat attached hereto is a true and correct copy of the Budget and Appropriation Ordinance, as well as an estimate ofrevenue by source anticipated for Fiscal Year 2018 to be received by the District in its fiscal year.
.TreasurerBoard of TrusteesGreater Peoria Mass Transit District
(SEAL)
50