October 23 rd , 2013 STRUCTURE PLAN GREAT NORTHERN WAY CAMPUS 1 WELCOME GREAT NORTHERN WAY BNSF RAIL-YARDS FRASER THORNTON Purpose of Open House The purpose of tonight’s open house is to share with the public and to seek input on a revised Structure Plan* for the site. City of Vancouver staff and the Great Northern Way Campus team are here to answer any questions you may have and to hear your thoughts. • Road Network + Circulation • Parks + Open Space • Development Parcels WHAT IS A STRUCTURE PLAN? A structure plan establishes the parameters for: STRUCTURE PLAN ______ _______ ______ ____ ______ ____ ______ ____ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ ______ Please be sure to ll out a comment sheet to provide you input The Structure Plan WILL NOT consider new heights, densities or uses.

Transcript of GREAT NORTHERN WAY - Vancouver...October 23rd, 2013 STRUCTURE PLAN GREAT NORTHERN WAY CAMPUS History...

Page 1: GREAT NORTHERN WAY - Vancouver...October 23rd, 2013 STRUCTURE PLAN GREAT NORTHERN WAY CAMPUS History The 5.8ha (14 acre) Campus Lands were originally created in 1999 as part of CD-1(402)

October 23rd, 2013

STRUCTURE PLANGREAT NORTHERN WAY CAMPUS1 WELCOME

GREAT NORTHERN WAY

BNSF RAIL-YARDS

FRA

SERTH

ORN

TON

Purpose of Open HouseThe purpose of tonight’s open house is to share with the public and to seek input on a revised Structure Plan* for the site.

City of Vancouver staff and the Great Northern Way Campus team are here to answer any questions you may have and to hear your thoughts.

• Road Network + Circulation• Parks + Open Space• Development Parcels

WHAT IS A STRUCTURE PLAN?A structure plan establishes the parameters for:

STRUCTURE PLAN

______ _______ ______

____ ______ ____

______ ____ __________

__________ __________

__________ __________

__________ __________

__________ __________

__________ ______

Please be sure to fi ll out a

comment sheet to provide you input

The Structure Plan WILL NOT

consider new heights, densities

or uses.

Page 2: GREAT NORTHERN WAY - Vancouver...October 23rd, 2013 STRUCTURE PLAN GREAT NORTHERN WAY CAMPUS History The 5.8ha (14 acre) Campus Lands were originally created in 1999 as part of CD-1(402)

October 23rd, 2013

STRUCTURE PLANGREAT NORTHERN WAY CAMPUS

GREAT NORTHERN WAY

PRIOR ST

TERMINAL AVE

MALKIN AVE

GLE

N D

R

PACIFIC CENTRAL STATION

BNSF RAILYARD

INDUSTRIAL AVE

VIA RAILYARD

CN RAILYARD

CLA

RK

DR

MA

IN S

T

QU

EBEC

ST

GREAT NORTHERN WAYORTHERN WWWAYGREAT NO

TERTERMINAL AVEAL AVE

TTERMINA

PACIFICPAC CCENTRAL RASTATIONSSTA

BNSF RANSF RAILYARD

INDUSTRIAL AVE

VIA RAILYARD

CN RAILYARDD

MA

IN S

TMMM

AIN

SSTS

TEB

EC S

TQ

UB

ECE

QU

EQ

UQ

C S

GNW Campus

THO

RN

TON

ST

FRA

SER

ST

FOLE

Y ST

2 CONTEXTBackgroundThe Great Northern Way Campus is situated in the False Creek Flats (the Flats), an area roughly located between False Creek and Clark Drive, north to Prior/Venables street and south to Great Northern Way.

The Great Northern Way site is fl anked to the north by the BNSF railyards and to the south by the Mt. Pleasant neighbourhood.

The Flats are a key employment area and have long been home to port and city-serving activities; they contain a diversity of business and industry that support the City’s economy including food wholesalers, automotive repair, passenger and freight rail and various wholesalers.

Planning for future transportation and land use in the Flats is currently underway through the False Creek Flats Planning Process. Integrating the Great Northern Way Campus Lands into this larger strategy is an important component in the planning of the Campus Lands.

LEGEND

False Creek Flats

CD-1 (402)

Central Valley Greenway

Mt. Pleasant

Page 3: GREAT NORTHERN WAY - Vancouver...October 23rd, 2013 STRUCTURE PLAN GREAT NORTHERN WAY CAMPUS History The 5.8ha (14 acre) Campus Lands were originally created in 1999 as part of CD-1(402)

October 23rd, 2013

STRUCTURE PLANGREAT NORTHERN WAY CAMPUS

HistoryThe 5.8ha (14 acre) Campus Lands were originally created in 1999 as part of CD-1(402) when it was envisioned by the original owners, Finning International, that the area would be redeveloped as a technology park

When the technology park concept did not materialize, Finning gifted 80% of the land to the Great Northern Way Campus Trust, a consortium of four academic institutions: UBC, SFU, Emily Carr University and BCIT. The Trust subsequently acquired the remaining lands.

What is currently on site?Currently on site are a series of low-rise offi ce/warehouse buildings used for a variety of purposes including an accredited graduate program in digital media, commercial space for digital media companies, studio and event space for art and community organizations and two art galleries.

What is the future of the site?1. Creative DistrictThe GNW Trust envisions developing the Campus Lands into a revitalized district that stimulates BC’s creative economy by co-locating educational institutions, including Emily Carr University, with creative industry tenants.

2. SkyTrain ExtensionThe future extension of the Millennium Line SkyTrain is proposed through the site, including a station at the northeast corner of Great Northern Way and Thornton St. The future line is anticipated to extend along the northern edge of the site and enter a bored tunnel before turning south to meet the next proposed station at Main and Broadway.

3. Adjacent DevelopmentsIn addition to the recently completed Centre for Digital Media and the Emily Carr relocation proposal, a number of projects are taking place:

• Lot O: The Onni Group is proceeding with an artist live-work project under the existing IC-3 zoning

• Lot P: The Onni Group is currently proposing a concept for live-work, student rental housing/hotel under the existing zoning.

• 1933 Fraser: The Great Northern Way Trust is proceeding with an offi ce project in the northwest corner of the Campus Lands under the existing CD-1 zoning.

3 THE CAMPUS LANDS

• Up to 236,900 m2 (2.5 million sf) of fl oorspace• Primarily educational, high tech + light industrial

and offi ce• Some live-work and retail (limited to Lot P and the

western portion of Lot Q)• Building heights up to 45.7m (150 ft) on the western

portion of the site and between to 13.7m – 18.2m (45ft – 60ft) on the eastern side

WHAT DOES THE CURRENT ZONING ALLOW?W?

The Structure Plan WILL NOT

consider new heights, densities

or uses.

GREAT NORTHERN WAY

Mt Pleasant

BNSF RAIL-YARDS

THO

RNTO

N

GNW CampusLot Q

Lot P

1933Fraser

Lot O

FRA

SER