Great makers ship
-
Upload
haxl-r8r -
Category
Technology
-
view
5.494 -
download
0
description
Transcript of Great makers ship
GREAT MAKERS SHIP���BUILDING LEAN HARDWARE STARTUPS
#LeanHW
@BENJAMINJOFFE
• 13 years in Asia (CJK) • Founder of web/mobile
strategy consultancy +8* • Speaker @ 150+ events • MobileMonday Beijing
founder (35 events) • 11 angel investments • Now in hardware with
HAXLR8R
2014���YEAR OF HARDWARE
2014: Year of Hardware
HARDWARE RENAISSANCE PROTOTYPING IS SOLVED Arduino / Pi / 3D printing / Sensors / BLE / Smartphones / Cloud
SUPPLY CHAIN IS BETTER THAN EVER – China (Shenzhen) has the whole chain – Fast, Affordable, Scalable
MORE FUNDING – KickStarter (200,000 HW backers!), IndieGoGo – More VC & Angel money
LIFE OF A HARDWARE STARTUP
FROM CONCEPT TO RETAIL
1. Concept 2. Minimum Functional prototype (MFP) 3. Complete Functional Prototype (CFP) 4. Design-for-Manufacture (DFM) 5. First factory run (FFR) 6. Retail
LEAN HARDWARE RULES “No hardware plan survives contact with a factory”
Cyril Ebersweiler, Founder of HAXLR8R
1. Design with the right components 2. A prototype is ready when it can be manufactured 3. Your factory is your most important partner 4. Be memorable 5. Pick the right business model
HARDWARE’S DEATH TRAPS
What is your NVU plan?
THE NVU CURVE
Founders Friends Family Fools
PROTOTYPING
PRODUCTION
SCALING
TIME
$$
Crowdfunding
Accelerators Angels
Sales POs Banks VCs
Bridge of Death
Pre-orders
N V U
If you survive it, others will envy you!
GOLDEN RULE OF LEAN HARDWARE
GREAT MAKERS SHIP
BUILDING WITH CHINA
THE APPLE CASE
BEFORE Asia was cheaper TODAY Factories in Asia can scale (up and down) faster
Asian supply chains have surpassed what’s in the U.S. (Labor cost is a minimal factor)
RESULT “Made in the U.S.A.” is no longer a viable option for most Apple products.
• In Shenzhen (hardware capital of the world) – Cash + Mentoring – Components all around to iterate faster – Source suppliers – Get ready to manufacture (and crowdfund)
• 29 startups
• 16 crowdfunding campaigns (avg. $250,000)
FROM PROTOTYPE TO PRODUCTION
PROTOTYPING
PRODUCTION
SCALING
TIME
$$
Bridge of Death
Founders Friends Family Fools
Crowdfunding
Accelerators Angels
Sales POs Banks VCs
Pre-orders
Accelerator program
HARDWARE IS NOT THE KEY
• Pure hardware is commoditized quickly
• A better way – Combination HW+ SW – Strong Positioning (‘a better way to catch mice’) – High quality, high margins (rather than low cost) – Lead Mindshare (media + marketing + reviews) – Timely Financing and Distribution
SUMMARY
IT’S STILL CALLED HARDWARE FOR A REASON…
• LONGER CYCLES than software
• NO “MVP” (bad ratings will kill you)
• BROADER SKILLSET needed���(electrical + mechanical + software / design / manufacturing / financing / distribution)
• MORE BARRIERS to reach customers
ON THE BRIGHT SIDE
• LEGO was fun, hardware is fun too
• Better ecosystem than ever before
• Less competitive than software
• People pay for things