Graphic1 - MKE - Mining Contractor India | Mining … Projects Scope of work Organization Estimated...

6
MALA KUMAR ENGINEERS PVT. LTD. MINING EARTHWORK | | ENGINEERS Since 1984

Transcript of Graphic1 - MKE - Mining Contractor India | Mining … Projects Scope of work Organization Estimated...

MALA KUMAR ENGINEERS PVT. LTD.

MINING EARTHWORK | | ENGINEERS

Since 1984

Mala Kumar Engineers was established in 1984 with a vision to emerge as Began its mining operations with Silicia sand mining in Haryana state

a leading supplier of contract mining services to clients in the in 1996.

infrastructure development sector in India. Its founder, Mr. Sanjiv Kumar, Achieved its first Aggregate Quarrying contract for roads and

a commerce graduate, with significant achievements in the industry, has a highways from BSC RBM PTC (JV) in 1998.

long standing reputation for creating excellence, and has driven the

growth of the organization since its inception. His, son, Mr. Abhishek Began providing contract mining services for Bharat Coking Coal Ltd.

Kumar, assumed responsibility as Director in 1997, and has been in year 2003.

instrumental in the development of the company's people, processes, Awarded the cut & cover contract in the prestigious Delhi Metro Rail

capabilities to deliver tangible value to its stakeholders through long term project by the Japanese Consortium KSHI (JV) in 2003.

mutually beneficial relationships.

Expanded its operations in coal and rock phosphates mines in 2004.The significant milestones of the company are as follows:

In 2007, the company was awarded the largest quarrying operations Pioneered the introduction of wheel loaders for Bharat Coking Coal

from Jaiprakash Associated Ltd. for the Yamuna Expressway project. Limited (a subsidiary of Coal India Ltd.)

The company produces 500,000 tonnes of aggregate per month with

Established the reputation of reliable and efficient wagon loading by a total production target of 16.5 million tonnes in three years.

1990 with increasing capacity delivered from 36 company owned

wheel loaders within a span of few years.

»

»

»

»

»

»»

»

History

Mala Kumar Engineers is a New Delhi, India, We have 12 Drill machines of Atlas Copco and Today, Mala Kumar Engineers supports 650

based provider of contract mining services to have Fleet of over 50 Dumpers of Volvo , Terex, employees across several simultaneous projects

some of the largest public and private sector Man and Amw. Further we own 25 wheel and continues its dedication toward exceeding

enterprises in the infrastructure sector in the loaders , 2 dozers and various ancillary mining customer expectations across all its operations.

country. Over the last two decades, the equipment. Our fleet enables us to commence The company is committed to the highest

company has continually diversified its projects on schedule and we have the ability to standards of quality in services, coupled with a

capabilities and scope of operations offering add additional equipment at short notice due to determination to ensure the occupational

turnkey solutions to organizations across India our excellent relation with financial institutions health, safety and welfare of all its employees

to emerge as a leader in its business domain. and equipment manufactures. Our teams while sustaining harmony with the environment

consist of the highest calibre of professionals in We at Mala Kumar Engineers own a range and its wider community.

engineers, auditors, and managers to ensure Heavy Earth Moving Equipments. Our Current

that client projects are effectively managed from Fleets consists of 15 Komatsu Excavators ranging

proposal to completion.from 20 ton to 40 ton.

Profile

»

»

»

»

»

»

»

Mining, Overburden removal, quarrying, drilling

and blasting and allied services.

Earthwork, Excavation for large infrastructure

project such as Expressways, Dams, Railways etc.

Feasibility Audits, Requirements Assessments, &

Quarry Evaluations.

Mine Planning & Project Implementation.

Material Handling, Logistics, haulage & supply.

Loading of coal into rakes/railway wagons.

Rental of new and used heavy mining and ancillary

equipment.

Expertise

»

»

»

»

»

»

and management of mining and extraction projects for industry

leaders.

A demonstrated ability to continually invest in machinery &

equipment, technology & systems, processes & human capital.

Continued training, development, and implementation of best

global industry practices.

Decentralized organizational structure allowing quick decision

support and project management efficiencies.

Financially robust organization with excellent long term

associations with banks and financial institutions.

Mala Kumar Engineers has a large fleet of Heavy Earthmoving

Equipment which includes a range of Excavators, Dumpers,

Wheel Loaders, Dozers and Drilling equipment.

More than 20 years of experience in the planning, execution

Key Strengths

Mine Planning Models Designed for Jaiprakash Associates

MALA KUMAR ENGINEERS PVT. LTD.

MINING EARTHWORK | | ENGINEERS

We wi l end avour t achie e

l e

o v

lea ership in divers fied

d

icont act ining

rm

services focus d on e

infr structure evelo ment

a

dp

to conti ually deliver

n

value to ur customers

oand all takeholders

sof our o ganiza ion.

rt

umari ee

,

At Mala

K Eng n

rs

ato f f l

ur i i s f l

we im ul i l o v s on a

ol ows:

t f e

di er f

We will aim o o f r a

vsi ied

portfi

ctrac

mi i

ol o of ont

n ng

d g

enon

anag

regate g

erati

er c,

i ln n

l

svi es an

d w l coti ual y

n ovow

ds ci g

i nate

tar

a hiev n

t opeti

the mos cm

tive

sui k

cost , qc er

il

t

mp emen ation and

a c

e

c urate d

livery of

roj ts tol u q

pec ful ni ue

er

enf

r qui emts o

cuto

er

our s

ms.

Mala Kumar Engineers is a value

driven organization that is has focused its

operations on the following guiding principles:

»

»

»

»

»

To be driven by integrity and fairness across

all functions of our organization at all times.

To commit towards the safety and welfare of our

employees, the environment and the

wider community.

To foster transparency and responsibility in all our

activities and operations.

To recruit, train, and retain the highest calibre

of professionals.

To create and sustain an open organizational culture that

provides equal opportunities in a meritocracy

driven environment.

Ongoing Projects

Scope of work Organization Estimated (In Lacs)

Jaiprakash Associates Ltd.

Bhilai Jaypee Cement

Limited

Rajasthan State Mines &

Minerals Ltd.

12,500

13,446

1,800

Mar - 2012

Oct - 14

Mar - 2012

Completion

Drilling, Blasting, Excavating & removal Segregation, Sizing, Stockpiling,

Loading & Unloading / Feeding and Transorting of rock boulders of

maxium size up to 750 mm at Crusher Stockyard or Crushing Plant as

directed with a lead of up to a radius of 2 Kms.

Mining Limestone including drilling, blasting, raising, Loading &

transportation upto 4 km

Mining of Rock Phosphate ore including removal of OB etc of G-Block

& A-Extn at Jhamarkotra, Udaipur under Rajasthan State Mine &

Mineral Ltd.

Completed Projects

Scope of work Organization Amount (In Lacs) Completion

Drilling, Blasting, Segregating, sizing, stockpiling, excavation, Loading of

suitable rock boulders of size 750 mm into Crushing Plant including

overburden removal and rehanding at Quarry and Crushing Plant

Location.

Excavation / Loading / Transporing of Rock Boulding and feeding into

Hopper of intergrated Crudhing System at Silko Quarry.

Cut & Cover Excavation in all kinds of soils and including dressing etc.

& Mucking of soil up to any lead and lift and Disposal of excavated

materials to the designated dumping yard.

Quarring of Rock Boulders and Transporting and Feeding into Crusher

at GAYA

Hiring of HEMM for removal and transportation of OB and extraction

& transportation of coal from Quarry Bed to Railway Siding/Washery

at Murulidih Colliery under Western Jharia Area.

Excavation/Loading/Transporing of Rock Boulders and feeding into

Hopper of intergrated Crushing System.

Mechanical Loading of Coal into Rly. Wagons at Spur Siding Nos. III &

IV of Jagannath Area (2 Years)., Mechanical Loading of Coal into Rly.

Wagons at Spur Siding Nos. V & VI of Jagannath Area ( 1 Year),

Mechanical loading of Coal into Rly. Wagons at Ananta Spur Siding No.

V & VI of Jagannath Area (1 Year).

Oriental Structural Engineers

Pvt. Ltd.

BSC-RBM-PATT (JV)

Hyderabad

KSHI (JV) Delhi Metro Rail

Project, New Delhi

Oriental Structural Engineers

Pvt. Ltd. New Delhi

Bharat Coking Coal Limited,

Western Jharia Area

Moonidih

B. Seenaiha & Co. (Project)

Ltd. Hyderabad

Mahanadi Coalfield Limited,

Orissa

1,867

771

696

709

1,876

450

718

Dec - 2005 to

Dec - 2009

Aug - 1998 to

Mar - 2001

Nov - 2002 to

Aug - 2003

Nov - 2001 to

May - 2005

Jun - 2003 to

Jan - 2005

Jul - 2002 to

Apr - 2004

Aug - 2001 to

Oct - 2005

MALA KUMAR ENGINEERS PVT. LTD. S - 571, Greater Kailash - II, New Delhi.

Tel:+91-11-29220374 / 75

Fax:+91-11-29220377

Email: [email protected]

www.mkeindia.com

Clients

Steel Authority of India Ltd.

National Thermal Power Corporation Limited

National Highway Authority of India

Rajasthan State Mines & Minerals Ltd.

Jaiprakash Associates Ltd.

Bharat Coking Coal Ltd.

Oriental Structural Engineers Ltd.

Mahanadi Coalfield Ltd.

B. Seenaiha & Co. Ltd.

Cre

dit

s: w

ww

.mila

gro

.in