I. BASIC INFORMATIONS
SL.NO ITEM DETAILS
1. Name of the Project Jilson Joseph Quarry
2. S. No. in the schedule 1 (a)
3. Proposed capacity/ area/ length/ tonnage to be handled / command area/ lease area / number of wells to be drilled.
Lease area : 8.0804 Ha
Production Capacity : 4,10,000 MTA
4. New/Expansion/Modernization Expansion
5. Existing Capacity/Area etc. 2,00,000 MTA
6. Category of Project i .e. , ‘A’ or ‘B’ B 2
7. Does i t attract general condition? If yes, please specify.
No
8. Does i t attract specific condition? If Yes, please specify.
No
9. Location
Plot/Survey/Khasra No. Re-Survey No. 28
Village Nediyenga
Tehsil Taluk: Taliparamba
District Kannur
State Kerala
10. Nearest Railway Station/Airport along with distance in kms.
Kannur Railway Station , 45 km Airport: Calicut International Airport , 160km
11. Nearest Town, City, District Headquarters along with distance in kms.
Town: Sreekandapuram, 7 km
District Headquarter : Kannur, 45 km
12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given)
Sreekandapuram Muncipality,
Taliparamba – 670 631,Kannur.
Phone. No: 0460 2230261
13. Name of Applicant Mr. Jilson Joseph
14. Registered Address Veliyathil House, Naduvil Via, Pulikurumba P.O, Kannur District – 670 582, Kerala .
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
15
SL.NO ITEM DETAILS
15. Address for correspondence: Veliyathil House, Naduvil Via, Pulikurumba P.O, Kannur District – 670 582, Kerala
Name Mr. Jilson Joseph
Designation (Owner/Partner/CEO) Owner
Address Veliyathil House, Naduvil Via, Pulikurumba P.O, Kannur District , Kerala
Pin Code 670 582
E – mail [email protected]
Telephone No. 9447 733 285
Fax. No.
16. Details of Alternate Sites examined, if any. Location of these sites should be shown on a topo sheet
Nil, as mining is a site specific activity. Granite Building stone is occurring in lease area which applicant intends to mine.
17. Interlinked Projects No
18. Whether separate application of
interlinked project has been
submitted?
Not Applicable
19. If yes, date of submission Not Applicable
20. If no, reason Not Applicable
21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given.
(a) The Forest (Conservation)
Act, 1980?
(b) The Wildlife (Protection) Act,
1972?
(c) The C.R.Z. Notification,
1991?
Not Applicable
22. Whether there is any Government Order/Policy relevant/relating to the site?
23. Forest Land involved (hectares) Nil
24. Whether there is any litigation pending against the product and/or land in which the project is propose
Nil
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
16
SL.NO ITEM DETAILS
to set up? (a) Name of the Court
(b) Case. No.
(c) Orders/Directions of the court ,
if any and its relevance with the
proposed project.
II. Activity
1. Construction, operation or decommissioning of the Project
involving actions, which will cause physical changes in the
locality (topography, land use, changes in water bodies, etc.)
Sl.
No.
Information/Checklist Confirmation
Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)
Yes Part of the proposed land which is having an area of 8.0804 Ha is already under mining and there is no vegetation in that area. The remaining land in the proposed land is mostly covered with native trees, shrubs, herbs, grass, climbers, bushes etc. The highest elevation of the lease area is 635m MSL and lowest is 535m MSL. As the proposed area is hil l rock, the drainage of the lease area is towards N & E. No habitants are located in the lease area. The present land is a dry land. The land use certif icate is enclosed as Annexure – 5. There will be permanent change in the topography and land use since the rock will be mined out.
1.2 Clearance of existing land, vegetation and building?
Yes There are no trees in the mine lease area. The area is a hill where by minor shrubs shall be removed as the mining proceeds. .
1.3 Creation of new land uses
No The mined out area will be restored by following the mine closure guidelines
1.4 Pre-construction investigations e.g. bore houses, soil testing?
No Not required as the quarry is already under operation
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
17
Sl.
No.
Information/Checklist Confirmation
Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data
1.5 Construction works? No There is no construction work .
1.6 Demolition Works? No No demolition works will be carried out
1.7 Temporary sites used for construction works or housing of construction workers?
No Outside the lease (mine) area sufficient area will be provided for accommodation facility is provided for the required employees as per requirements.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations
Yes Existing infrastructure facilities are sufficient to operate the present existing quarry
1.9 Underground works including mining or tunneling?
Yes Mining will be done to extract the rocks. It is an open cast mining.
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing Process?
No T The mining will be done open cast Semi
mechanized. The working will be done by
forming benches of 5.0m (Average) height. The
proposals of mining for the next five year
workings are given in the table. The Stone
production will be started from the first year the
systematic working of open cast mines, the main
development work will be the forming of
systematic benching. The height of bench will not
be kept more than 5.0m at a time and the width
of the benches will be always kept safe according
to provisions. The highest elevation of the lease
area is 635m. MSL and lowest is 535m MSL. As
the proposed area is hill rock, the drainage of the
lease area is towards N & E. No habitants are
located in the lease area. Old pits lies in the lease
area are marked on surface plan.
The excavated material will be transported to the consumers for building construction, roads and
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
18
T infrastructure development or to the crusher plant.
1.14 Facilities for storage of goods or materials?
Yes The ROM from quarry will be transported directly to the crusher unit/to the client.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents?
No Solid waste
The mine waste and other are proposed to be stacked in the dump area specially provided for the purpose. Care has been taken in selecting the site for the stacking yards for the stacking purpose. It is located in a secure place and having solid base and on a non-used zone. These dump yards have been protected by toe walls. The toe walls will be constructed during first year period. The height of these dumps will also be restricted and benched. A retaining wall 0.5 m x 1.0 m will be made on the low altitude side of the dump.
Liquid Waste
No appreciable quantity of Liquid waste is excepting during monsoon months, no water shall be discharged from mine. A garland drain shall be made all around the quarry to divert the water away from the pit through silt settling tank. The rain water shall be diverted to its natural course.
1.16 Facilities for long term housing of operational workers?
Yes Statutorily qualified personnel will be made available for mining to supervise the operation as per provision of MCDR under metalliferrous Mines Regulations. Around 14 persons will have direct employment in the quarry and indirectly, more than 20 people get employed in various allied services like logistics, green belt creation and other miscellaneous services. The numbers will be flexible as per the requirements.
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
19
1.17 New road, rail or sea
traffic during construction of operation?
No Loading of mineral will be done by excavator and will be sent to the crushing units nearby and from there to required clients . Trucks / Tippers of 15T will be used for transportation of mineral from mine site. It is expected that 15 -20 trips will be required to transport on daily basis. Thus, the impact due to movement of trucks from the mine will be marginal and well within the capacity of the roads. There will not be any new road network is expected to meet the demands. Sufficient width around 7 meters will be provided for those approach roads as per the norms that a Fire engine and Ambulance have to cross without any traffic congestion.
1.18 New road, rail , air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.?
No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?
No Not Envisaged
1.20 New or diverted transmission lines or pipelines?
No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?
No Nil
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
20
1.22 Stream crossings? No No stream crossing within the site.
1.23 Abstraction or transfers of water from ground or surface waters?
No No ground water extraction.
1.24 Changes in water bodies or the land surface affecting drainage or run-off
No No changes
1.25 Transport of personnel or materials for construction, operation or decommissioning?
Yes Loading of mineral will be done by excavator and will be sent to the crushing units nearby. Trucks / Tippers of 15T will be used for transportation of mineral from mine site. It is expected that 15-20 trips will be required to transport on daily basis. Thus, the impact due to movement of trucks from the mine will be marginal and well within the capacity of the roads.
1.26 Long-term dismantling or decommissioning or restoration works?
No Not Envisaged
1.27 Ongoing activity during decommissioning which could have an impact on the environment?
No Not Envisaged
1.28 Influx of people to an area in either temporarily or permanently?
Yes Around 14 persons will have direct employment in the quarry and indirectly, more than 20 people get employed in various allied services like logistics, green belt creation and other miscellaneous services. The temporary influx of the people will be only expected during the construction phase. During the operational phase only the permanent workers are allowed to stay back.
1.29 Introduction of alien species?
No Not Envisaged
1.30 Loss of native species or
genetic diversity?
No Not Envisaged
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
21
Sl.
No.
Information/Checklist Confirmation
Yes/No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data
genetic diversity?
1.31 Any other actions? No Not Envisaged
2. Use of Natural resources for construction or operation of Project
(such as land, water, materials or energy, especially any resources
which are non-renewable or in short supply).
Sl.
No.
Information/Checklist
Confirmation
Yes/
No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
2.1 Land specially undeveloped or agricultural land (ha)
Yes The core zone covers the mining area of 8.0804 Ha is Private Patta Dry land and in most part of the quarry lease area, rocks are exposed and remaining part with very small amount of top soil and local vegetation. The quantity of topsoil will be estimated and the overburden will be stored within the premise of the quarry site without any leaching problem. The stock pile will be restricted within the stipulated height of 5 meter.
2.2 Water (expected source & competing users) unit KLD
Yes The entire water for industrial activities such as Dust suppression, greenbelt plantations and etc will be met from Rain water harvesting in the unused pits outside the quarry lease area. For domestic use water will be availed from Tube well / open well.
Domestic consumption : 1 KLD
Dust suppression : 4 KLD
Plantation : 1 KLD
TOTAL : 6 KLD
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, and/soil (expected source-MT)
No Required infrastructure already exists
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
22
2.5 Forests and timber
(source-MT) No Nil
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)
Yes No electricity is needed since only diesel operated mining machineries are used for quarrying operations. A small unit of power requirement for the administrative and staff quarters buildings are needed and will be met from the state electricity grid. Electrical line is passing through the nearby place of the quarry lease area.
2.7 Any other natural resources (use appropriate standard units)
No Nil
3. Use, storage, transport, handling or production of substances or
materials, which could be harmful to human health or the environment
or raise concerns about actual or perceived risks to human health
Sl.
No
Information/Checklist
Confirmation
Yes/
No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)
Yes Explosives will be procured, stored, transported, handled and used in accordance with Indian Explosive Act 1884, MSIHC rules 1989, Mines Act 1952 and regulations there under.
Only class 2 and class 6 explosive is
proposed for use as given below: -
SL.N
O
NAME AND
DESCRIPTION
CLASS
&
DIVISI
ON
SUB-
DIVISI
ON
(IF
ANY)
1 Nitrate Mixture 2 ,0 0
2 Safety Fuse 6,1 0
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
23
Sl.
No
Information/Checklist
Confirmation
Yes/
No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
3
Electr ic and/ or
Ordinary
Detonators
6 ,3 0
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)
No Not applicable
3.3 Affect the welfare of people e.g. by changing living conditions?
Yes The living condition will be transformed due to the influx of the innovative developmental procedures connected with the mining operations. The project will support for improving local socio -economic conditions of the people in the surrounding region by providing direct and indirect employment opportunities.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,
No Not Applicable.
3.5 Any other causes No Not envisaged from the project.
4. Production of solid wastes during construction or operation or
decommissioning (MT/month)
Sl.
No.
Information/Checklist
Confirmation Yes/No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
4.1 Spoil , overburden or
mine wastes
Yes A total quantity of 1, 04,864 cu. m. of topsoil is proposed to be removed during the mining operations. The
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
24
Sl.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
mine wastes topsoil excavated from the quarry will be dumped separately at pre-determined place and subsequently will be utilized in spreading over reclaimed areas for plantation. Precautions will be taken to limit the height of the topsoil dump to 5 to 6 meters in order to preserve its fertility and shelf life. It will be suitably protected from soil erosion and infertility by planting fodder grass and leguminous plants during temporary storage . About 41946 cu. m. of overburden will be generated throughout the mine life. This waste will be utilized within the pit for lying of haul roads. At the end use, OB can be reutilized as soil base for plantation.
4.2 Municipal waste (domestic and or commercial wastes)
No No commercial waste due to the production of product material will be produced. Only food waste will be generated in negligible quantity. The same will be stored in a drum and taken to municipality authorized areas on daily basis.
4.3 Hazardous wastes (as per hazardous waste management rules)
Yes Used oil from maintenance of Excavators will be handled as per Hazardous Waste (Management Handling & Transboundary Movement) Rules,2008.
4.4 Other industrial process wastes
No Nil
4.5 Surplus product No None
4.6 Sewage sludge or other sludge from effluent treatment
No Sewage will be treated through soak pit and septic tank with an assurance of not interacting with any of the existing water bodies in the Nediyenga Village.
4.7 Construction or demolition wastes
No Not applicable
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
25
4.8 Redundant machinery or equipment
Yes Machinery with sufficient life will be utilized for other projects and others will be phased out or sold to reprocessing agency.
4.9 Contaminated soils or other materials
No Not envisaged
4.10 Agricultural wastes No Nil
4.11 Other solid wastes No Nil
5. Release of pollutants or any hazardous, toxic or noxious substances to
air (kg/hr)
Sr.
No.
Information/Checklist
Confirmation
Yes/
No
Details thereof (with
approximate quantities/ rates,
wherever possible) with
source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources
Yes For the proposed quarrying operations three jack hammer can meet the requirement of drilling, two rock breakers for sizing the material and two excavators will be used to meet the requirements of excavation and loading of material, six tippers are required for transportation of material to the consuming centers, one lorry with water tanker with spraying arrangements for dust suppression & afforestation and one Jeep for the transport of workers & staff. Vehicles will be monitored frequently for PUC certificate.
5.2 Emission from production processes
Yes Quarry operations like drilling and blasting, transportation etc will generate emissions.
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
26
Sr.
No.
Information/Checklist
Confirmation
Yes/
No
Details thereof (with
approximate quantities/ rates,
wherever possible) with
source of information data
Monitoring has been carried out in the project si te for air quality and noise and the report is enclosed.
5.3 Emissions from materials handling including storage or transport
Yes Air pollutants are generated from transportation. There will be fugitive emissions generated during material handling, transportation, loading and unloading etc. Regular water sprinkling on haul road will suppress the dust particles and prevent them from getting air -borne.
5.4 Emissions from construction activities including plant and equipment
No Not Envisaged
5.5 Dust or odours from handling of materials including construction materials, sewage and waste
Yes Fugitive dust will be generated during Excavation, Transportation and Loading operations. This will be taken care of by water sprinkling at regular intervals on haul roads, quarry benches and internal roads. No odor is generated from handling the materials including construction materials, sewage and waste.
5.6 Emissions from incineration of waste
No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)
No Not applicable
5.8 Emissions from any other sources
No Not applicable
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
27
6. Generation of Noise and vibration, and emissions of Light and
heat
Sl.
No
Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever
possible) with source of
information data
6.1 From operation of
equipment e.g. engines,
ventilation plant,
crushers
Yes The noise generating equipments in the lease area are as under: -
Sl.
No.
List of equipments Nos.
1. Back hoe 2
2. Rock Breaker 2
3. Trucks and Lorries 6
4 Jack Hammer 3
5 Compressor 3
6. DG Set 1
Mitigation measures : -
Effective maintenance of
machineries and vehicles at
regular and frequent intervals.
Plantation of green belt around
the haul roads and lease
periphery.
PPE‟s will be provided.
6.2 From industrial or similar processes
No Not applicable
6.3 From construction or demolition
No Not applicable
6.4 From blasting or piling Yes Drilling and blasting do generate noise and vibration. Required precautions will be taken to maintain the noise levels to maintain within the acceptable norms.
6.5 From construction or operational traffic
Yes Noise do generate due to movement of loaded and unloaded trucks of tippers. There will not be traffic congestion to the local public .
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
28
Sl.
No
Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever
possible) with source of
information data
6.6 From lighting or cooling systems
No None
6.7 From any other sources No None
7. Risks of contamination of land or water from releases of
pollutants into the ground or into sewers, surface waters,
groundwater, coastal wasters or the sea
Sl.
No
Information/Checklist
Confirmation
Yes/No Details thereof (with
approximate quantities/
rates, wherever possible)
with source of information
data
7.1 From handling, storage, use or spillage of hazardous materials
No Hazardous materials like spent oil , old batteries are being disposed off as per the existing rules & guidelines of hazardous waste (management handling & Tran boundary movement) rules, 2008 and for disposal through authorized agents.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)
Yes About 1KLD domestic effluent will be generated and the same will be treated though septic and soak pit .
7.3 By deposition of pollutants emitted to air into the land or into water
No Dust will be generated, which is suppressed by regular water sprinkling on haul roads, quarry benches & etc,
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up of pollutants in the environment from these sources?
No Not applicable
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
29
8. Risk of accidents during construction or operation of the project,
which could affect human health or the environment
Sl.
No
Information/Checklist
Confirmation
Yes/No Details thereof (with
approximate quantities/
rates, wherever possible)
with source of information
data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances
No Operations are strictly as per DGMS guidelines for its safety of the mine workers is taken care as per the mines act 1952 and the rules and regulations made under this act . Storage & using explosives as per the guideline by DGMS Indian explosives act 1884, MSIHC Rules 1989.
8.2 From any other causes No Nil
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, could burst etc)?
No Not envisaged
9. Factors which should be considered (such as consequential
development) which could lead to environmental effects or the
potential for cumulative impacts with other existing or planned
activities in the locality.
Sl.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with
approximate quantities/
rates, wherever possible)
with source of
information data
9.1 Lead to development of supporting, utilities, ancillary development or development stimulated by the project which could have impact on
Yes The project will generate direct/ indirect employment to the local people. Hence the activity has also contributed to the
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
30
Sl.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with
approximate quantities/
rates, wherever possible)
with source of
information data
the environment e.g. :
Supporting infrastructure (roads, power supply, waste or waste water treatment, etc)
Housing development
Extractive industries
Supply industries
Other
improvement of income status of the local people.
The quarry project will al so improve by means of many ancillary/ supporting facilities/ infrastructure eventually leading to the overall development of the area and the life style will improve.
9.2 Lead to after use of the site, which could have an impact on the environment
Yes Portion of the pit will be used as water reservoir cum, recharging pit. Portion will be backfilled followed plantation.
9.3 Set a precedent for later developments
No No
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects
Yes Similar types of projects are being operated in the vicinity of the project which will lead to cumulative improvement of region.
III. Environmental Sensitivity
Sl.
No
Areas Name / Identity Aerial distance
(with 15-km)
Proposed
project location
boundary
1 Areas protected under international conventions, national or local legislation for their ecological , landscape, cultural or other
Nil
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
31
Sl.
No
Areas Name / Identity Aerial distance
(with 15-km)
Proposed
project location
boundary
related value
2 Areas which are important or sensitive of ecological reasons – wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests
Sreekandapuram River
7 km
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
Nil
4 Inland, coastal, marine or underground waters
Nil
5 State, national boundaries Karnataka Border 16Km
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas
Payyavoor Shiva Kshetram, Paithal Mala Pala kayam thattu
12km 15km 12km
7 Defense installations No Nil
8 Densely populated or built -up area
Sreekandapuram : 7 km
9 Areas occupied by sensitive man made land uses (hospitals, schools, places of worship, community facilities)
St. Judes Church, Chepparamba – 2km
10 Areas containing important, high quality or scarce resources (ground water
Granite Building Stone Quarry owned by Jilson Joseph at Nediyenga Village, Taliparamba Taluk, Kannur District – Extent 8.0804 Ha
32
Sl.
No
Areas Name / Identity Aerial distance
(with 15-km)
Proposed
project location
boundary
resource, surface resources, forestry, agriculture, fisheries, tourism, minerals)
11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)
Nil No Notified/Recognized polluted area within 15km distance.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)
No This area is generally not prone to any natural disasters.
IV. Proposed Terms of Reference
Not Applicable
V. DECLARATION
I hereby given undertaking that the data and the information given in the
application and enclosures are true to the best of my knowledge and belief
and I am aware that if any part of the data and information submitted is
found to be false or misleading at any stage, the project will be rejected and
clearance give, if any to the project will be revoked at our risk and cost.