Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... ·...

29
0 Prefeasibility report Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P), 511/2 and 557/2(P) At Erathu Village, Adoor Taluk, Pathanamthitta District, Kerala Of Mr. P.Thomas No.57, Sankarathil Thomas Villa, Kurampala, Pandalam-Post, Adoor Taluk, Pathanamthitta district, Kerala State. Mobile.: 09847651337 Email: [email protected] Prepared by Aadhi Boomi Mining And Enviro Tech (P) Ltd., No.3/216, K.S.V.Nagar, Narasothipatti, Salem-4. Phone (0427) 2440446, Cell: 09842729655 [email protected], www.abmenvirotech.com

Transcript of Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... ·...

Page 1: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

0

Prefeasibility report

Granite Building Stone (Khondalite) Quarry

Over 0.98.80 Ha

In S.Y.No: 511/1(P), 511/2 and 557/2(P) At Erathu Village, Adoor Taluk, Pathanamthitta District, Kerala

Of

Mr. P.Thomas

No.57, Sankarathil Thomas Villa,

Kurampala, Pandalam-Post,

Adoor Taluk, Pathanamthitta district,

Kerala State.

Mobile.: 09847651337

Email: [email protected]

Prepared by

Aadhi Boomi Mining And Enviro Tech (P) Ltd.,

No.3/216, K.S.V.Nagar, Narasothipatti, Salem-4.

Phone (0427) 2440446, Cell: 09842729655

[email protected], www.abmenvirotech.com

Page 2: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

1

Chapter

No.

Chapter name Page

No.

1 Executive summary 2

2 Introduction 4

3 Project description 6

4 Site analysis 11

5 Planning brief 21

6 Proposed infrastructure 24

7 Rehabilitation and resettlement (R&R) plan 26

8 Project schedule and cost estimates 27

9 Analysis of proposal 28

Page 3: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

2

Chapter 1: Executive Summary

The Applicant, Shri. P.Thomas residing at No.57, Sankarathil Thomas Villa, Kurampala,

Pandalam-Post, Adoor Taluk, Pathanamthitta district, Kerala State has been applied quarry

lease for granite building stone located in S.Y.No: 511/1(P), 511/2 and 557/2(P), over an area

of 0.98.80 hectares, Erathu Village, Adoor Taluk, Pathanamthitta District, Kerala.

Mining Plan is prepared under Rule 66 of Kerala Minor Minerals Concession Rules,

(Amended 2015) and Minor Mineral conservation and Development Rule, 2010 (Draft) and

approved vide Letter No: 1000/DOPTA/M/17 dated 20.09.2017. As per the EIA

(Environmental Impact Assessment) notification, 2006 and its subsequent amendment

notification S.O 141 (E) dated 15.01.2016, the project area lesser than 5 Hectares are

classified under B2 category for the purpose of Environmental Clearance. This B2 category

projects required environment clearance from DEAC/DEIAA, Pathanamthitta District.

Salient features of the project are as follows:

Table 1.1: Salient Features

S.No. FEATURES DETAILS

1 Proponent details Shri. P.Thomas,

No.57, Sankarathil Thomas Villa,

Kurampala, Pandalam-Post,

Adoor Taluk, Pathanamthitta District,

Kerala state.

Pin code -689 501.

Mob.: 09847651337

Email: [email protected]

2 Type of land Patta land

3 Survey number 511/1(P), 511/2 and 557/2(P)

4 Geographical features Latitude: 9°6'26.0"N to 9°6'29.92”N

Longitude: 76°44'07.22"E to 76°44’11.61"E

Altitude of the area is 95m above MSL

(Toposheet No. 58 C/7)

5 Type of Project Building Stone Granite (Khondalite)

6 Mining lease area 0.98.90 Hectares

7 Production 28670 MT per annum

8 Depth of Mining 35 m

9 Method of Mining Open cast, semi mechanized mining

10 Category B2

11 Letter of Intent Letter No: 1000/DOPTA/M/17 dated 20.09.2017.

12 Period of Lease 5 years

13 General conditions of

EIA notification, 2006

Not applicable

14 Man Power 36 persons

15 Water requirement Total water requirement –3.0 KLD

Drinking -1 KLD

Dust suppression and Green belt - 2KLD

Source: Mineral water supply and water tank

Page 4: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

3

16 EMP Cost Rs. 4.40 lakhs

17 Project Cost Rs. 66.50 lakhs

18 Nearest habitation Enathu – 2.6 km (N)

19 Nearest Town Adoor – 5 km (W)

20 Nearest Railway station Kottarakara – 12 km (S)

21 Nearest Airport Trivandrum International Airport – 71 km (S)

22 Nearest Hospital Adoor – 5 km (W)

23 Land use pattern S.

No. Description

Area (Ha)

Present Proposed

1 Area under

mining 0.28.47 0.77.41

2 Roads 0.01.50 0.02.50

3 Green belt &

Safety area 0.18.99 0.18.99

4 Labour shed 0.00.90 0.00.90

5 Virgin 0.48.9 ---

Total 0.98.80 0.98.80

24 Nearby lake / river/ odai/

channel etc.

No major river is found within 1kms radius.

Kallada river – 2.5 km South

25 Interstate boundary Kerala -Tamil Nadu interstate boundary is about 45

km on East

Page 5: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

4

Chapter 2: Introduction

2.1. PROJECT PROPONENT

Name : Shri. P.Thomas,

Address : No.57, Sankarathil Thomas Villa,

Kurampala, Pandalam-Post,

Adoor Taluk, Pathanamthitta District,

Kerala state.

Pin code -689 501.

Contact : 09847651337

[email protected]

2.2. LEASE AREA

Survey No. : 511/1(P), 511/2 and 557/2(P)

Village : Erathu

Taluk : Adoor

District : Pathanamthitta

State : Kerala

2.3. NATURE OF PROJECT

Open cast semi mechanized quarrying mining with 5m vertical bench for block dimensional

cutting and over all pit slope of bench not exceeding 60° from horizontal during extraction of

blocks will be followed by using Line drilling, smooth blasting, block lifting using cranes and

waste and rejects removal using Hydraulic excavators and tippers combination will be

adopted to recover the dimensional blocks of granite of market required size. The economical

depth of mining is taken as 35m safety having considered several field phenomenons.

2.4. NEED / IMPORTANCE

Building stones play a vital role in roads, concrete and building products & Aesthetic Works.

They are used in walls and paving slabs as it is weather resistant and for its aesthetic appeal.

The aggregates of the stone is crushed and sorted into various sizes for use in concrete,

coated with bitumen to make asphalt or used dry as bulk fill in construction because of its

strong physical properties. Thus mining of Building stones supports the country in improving

the infrastructure as well as the economy. It also supports the day to day life by comforting

the living environment.

2.5. DEMAND

As Building stone is a significant raw material in the construction sector, the demand exists in

the market throughout the year. Thus quarrying of the mineral finds consumer easily in the

local market.

Page 6: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

5

2.6. IMPORT VS INDIGENOUS PRODUCTION

Building stone exists in the proposed site and does not require any raw material to be

imported for the production process. The extracted blocks are broken into required size for

selling.

2.7. EXPORT POSSIBILITY

Not applicable since the project meets local demand only.

2.8. EMPLOYMENT

For the purpose of Mines safety under the provisions of MMR, 1961 under the Mines Act,

1952.The Mining Engineer so appointed should have First\ Second class Mine Manager

certificate to act as a Manager of the Mine as per the Mining laws. To supervise daily, of all

workings and the persons employed therein the First\second class Manager so appointed must

be assisted by a Foreman certificate holder. Wherever the workers are employed more than

10, it is preferred to have a qualified Mining Mate to keep all the production workers directly

under his control and supervision.

A mines clerk shall also be appointed to keep the registers and record of the mine and make

necessary entries for the persons employed in the mines.

a) Mining Engineer/ Mines Manager : 1 Person

(First/ Second Class Mines Manager Competency certificate holder)

b) Mines Foreman : 1 person

(Foreman competency Certificate holder)

c) Mining Mate : 1 person

(Mine mate competency certificate holder)

d) Register keeper : 1 Person

LABOUR SKILLED - SEMI SKILLED AND UNSKILLED

i) Skilled

Operator : 01 Person

ii) Semi-skilled

Driver : 09 Persons

iii) Unskilled

Musdoors/ Labours : 17 Persons

Cleaners : 07 Persons

Register keeper : 02 Person

---------------

Total Labours = 36 Persons

---------------

Page 7: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

6

Chapter 3: Project Description

3.1. TYPE OF PROJECT

The project involves quarrying of granite building stones from the proposed area by adopting

eco-friendly and safer techniques. The stones are broken into required sizes and being sent to

the market.

3.2. LOCATION

The area is represented by Survey of India Toposheet No. 58C/7, the location map is given in

Plate 1 and figure 3.1.

Figure 3.1.: Location of the existing quarry

The area lies in the northern latitude of 9° 6' 26.0 N” to 9° 6' 29.92" N and eastern longitude

of 76° 44' 07.22" E to 76° 44' 11.61" E. It is elevated to 95m above MSL. All the pillar co-

ordinates are given in table 3.1 and shown on Google Earth Image with lease boundary in

figure 3.2.

Page 8: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

7

Table 3.1.: Co-ordinates of Pillars

Figure 3.2.: Lease boundary and pillars on Google Earth image

3.3. ALTERNATIVE SITE

Since the project is site specific due to the availability of the minerals, no alternative sites

proposed for this project.

Sl.No. Latitude Longitude

1 09° 6' 28.53" N 76° 44' 11.61" E

2 09° 6' 29.12" N 76° 44' 10.17" E

3 09° 6' 29.26" N 76° 44' 8.93" E

4 09° 6' 29.92" N 76° 44' 7.49" E

5 09° 6' 29.04" N 76° 44' 7.52" E

6 09° 6' 28.32" N 76° 44' 7.22" E

7 09° 6' 27.64" N 76° 44' 7.31" E

8 09° 6' 27.41" N 76° 44' 7.34" E

9 09° 6' 26.52" N 76° 44' 9.14" E

10 09° 6' 26.00" N 76° 44'10.19" E

11 09° 6' 26.06" N 76° 44'10.71" E

Page 9: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

8

3.4. PRODUCTION (SIZE OF OPERATION)

Table 3.2: Production proposed

YEARWISE PRODUCTION AND DEVELOPMENT

YEAR L(m) W(m) D(m) B.D Quantity (MT) PRODUCTION

@95% (MT)

Reject @5%

(MT)

I

24 10 7 2.5 4200 3990 210

33 29 4 2.5 9570 9092 479

35 17 1 2.5 1488 1413 74

47 32 4 2.5 15040 14288 752

II

6 32 4 2.5 1920 1824 96

53 50 4 2.5 26500 25175 1325

4 42 5 2.5 2100 1995 105

III 44 42 5 2.5 23100 21945 1155

27 21 5 2.5 7088 6733 354

7 21 5 2.5 1838 1746 92

IV 40 14 5 2.5 7000 6650 350

43 32 5 2.5 17200 16340 860

19 43 2 2.5 4085 3881 204

22 43 2 2.5 4730 4494 237

V 37 33 5 2.5 15263 14499 763

34 23 5 2.5 9775 9286 489

TOTAL 150895 143350 7545

Total production for the five years = 143350MT

Total rejects (7545MT+9360MT) =33955MT

Ore waste ratio = 33955/143350 =1: 0.23

3.5. PROJECT DESCRIPTION

The economical depth of mining is taken as 35m having considered existing bore holes and

outcrops such as limit of lease boundary. Topsoil shall be removed; one benches of

weathered rock and four benches are designed to exploit the granite blocks by conventional

methods. The benches each of 5m height and width not less than the height are designed to

win the blocks.

Top soil shall be removed and stacked separately along lease boundary as earth bund which

will be used for afforestation purposes in phases. A bench height of 5m and a width not less

than the height and three working benches, each with a height of 5m as equal to the height of

the excavator boom and the width more than 5m is proposed to be maintained for safe

movement of machinery. The bench slope is maintained not more than 60° from horizontal.

S1 fencing shall be constructed at the top of high benches in order to safe guard the

Page 10: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

9

unauthorized entry of men and machinery. In the case of entry, G1 fencing as a parapet

should be made to control trespassers.

3.5.1. Drilling and Blasting

Drilling of shot-holes will be carried out using compressor and Jack hammer combination.

Depth of holes shall be 1-2m. The spacing shall be 0.75m and burden shall be 0.60m from the

preface depends upon the size of block. To achieve a correct blasting geometry, certain

amount of trial blast is pre-requisite to effect a perfect pre-determined fragmentation and fly

rock control. In case of heavy blasting, a qualified Mines manager has to be appointed for

proper calculation of powder factor, control blasting, sequencing and arrangements of

explosives.

The massive formation shall be broken into pieces of portable size by jack hammer drilling

and shot hole blasting. Powder factor of explosives for breaking such hard rock shall be in the

order of 6-7 tonnes per Kg of explosives.

A controlled Blasting technique is adopted to open a pre-determined crack of the block from

the parent body. Shot-hole with 32-40mm dia. which are drilled by line drilling and Jack

hammers at a close spaced interval of 30cms will be initiated suitably with any one or more

of the following methods,

a) Pre-splitting

b) Cushing blasting with low strength and very low dia. Cartridges axial priming or

standard dia. cartridge with intermittent stemming materials.

c) Water impulsion with Detonating cords of sufficient power, preferably 10gms per

meter to develop cracks along the line of drilling.

3.6. RESOURCES

Total Geological resources (A) = 172823MT

Mineral reserves blocked under Mine benches (B) = 16247 MT

Mineral reserves blocked in safety zone (C) = 13226 MT

Then,

Total Mineable/Recoverable reserves = A-(B+C)

=172832-(16247+13226)

=172832-29473

Mineable reserves calculated as =143350 MT

3.7. WATER SOURCE AND REQUIREMENT

Whole some drinking water shall be provided as per the Mines Rules, 1955. Quantity for

drinking and utilities is 1.0KLD. Dust suppression and green belt of water is

Page 11: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

10

2.0KLD.Minimum quantity of 3.0KLD has to be maintained as per the Rule. Drinking water

is obtained by Mineral water industries by water canes. Dust suppression and green belt is

obtained from water tank.

3.8. POWER SOURCE AND REQUIREMENT

Electricity is not required as the mine will be working during day time only which does not

demand artificial light. Fuel is required only for operating the machineries.

3.9. WASTE GENERATION

The waste to be generated shall be debris of portable size hard rock without any clay soil and

connate water and therefore collapse of dumps is not possible for this mine.

Table 3.3.: Year wise waste generation

Year Topsoil (MT)

Overburden

/Waste

(MT)

Building stone

Rejects (MT) Total

First 26410 - 1515 27925

Second - - 1526 1526

Third - - 1509 1509

Fourth - - 1506 1506

Fifth - - 1488 1488

Total 26410 - 7545 33954

Page 12: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

11

Chapter 4: Site Analysis

4.1. CONNECTIVITY

The area is accessible from Erathu village by 6.5km on northern side. SH-road is situated

above 1.5km away on the eastern side connecting Adoor-Erathu. There is no railway line is

found around 5km radius. There is a village road located nearby the site on the western side

for transport of materials. Features in the 300 m and 500 m buffer zone of the lease area is

shown in figure 4.2.

Figure 4.1. Route

Figure 4.2. Geo-referenced Google Earth image around 300m and 500 m radius

4.2. LAND DETAILS

Table 4.1. shows the list of survey numbers and its extent. The lease area is Patta land.

Existing land use pattern of the lease area is given in table 4.2.

Page 13: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

12

Table 4.1.: Land Particulars

State and

District Taluk Village S.Y No.

Area in

Position

(Ha)

Permissible

for

quarrying

(Ha)

Ownership

Occupancy

Kerala

Pathanamthitta Adoor Erathu

511/1(P) 1.20.51 0.41.82

Patta land 511/2 0.20.23 0.20.23

557/2(P) 2.19.40 0.36.75

TOTAL 3.60.14 0.98.80

Table 4.2.: Existing Land use

S.

No. Description

Area (Ha)

Present Proposed

1 Area under

mining 0.28.47 0.77.41

2 Roads 0.01.50 0.02.50

3 Green belt &

Safety area 0.18.99 0.18.99

4 Labour shed 0.00.90 0.00.90

5 Virgin 0.48.9 ---

Total 0.98.80 0.98.80

4.3. TOPOGRAPHY

The area (Figure 4.3.) applied for Environmental Clearance. The area is almost hilly terrain

and its elevation ranges from 90-65m above mean level. Some part of lease area is disturbed

by quarrying .The other part of the area covered by the native plants and trees. There is no

water source found around the lease boundary. The Pathanamthitta district received the rain

under the influence of both southwest and northwest monsoons. The southwest monsoon

chiefly contributes to the rainfall in the district. Most of the precipitation occurs in the form

of cyclonic storms caused due to the depressions in Arabian Sea. The normal annual rainfall

over the district varies from about 2850mm.It is the minimum around Pathanamthitta in the

southeastern part of the district. The highest humidity is generally recorded in May with the

value of 87%. Throughout the month of August daytime temperatures will generally reach

highs of around 28°C that's about 83°F. At night the average minimum temperature drops

down to around 22°C, that's 72°F.

Page 14: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

13

Figure 4.3.: Photograph showing general view of the quarry

4.4. ENVIRONMENTAL FEATURES

4.1. Air Environment

Air samples are collected from the mine and Air sampling was done in this mine and little

amount of dust rise is observed. Dust fall data may be taken from the district observation for

threshold values. Results are as given in table 4.3.

Table 4.3.: Air sample analysis report

Sl.

No

PARAMETERS PROTOCOL UNIT RESULT NAAQ

S

1 Particulate Matter (PM 2.5) Envirotech Manual μg / m3 39.90 60

2 Respirable Particulate Matter ( PM10)

IS 5182 Part 23-2006

μg / m3 79.80 100

3 Sulphur Dioxide (SO2) IS 5182 Part 2 -

2001

μg / m3 7.35 80

4 Nitrogen Dioxide ( NO2) IS 5182 Part 6-2006

μg / m3 14.10 80

5 Ozone (O3) IS 5182 Part 9-

2009

μg / m3

36.10 180

6 Lead (Pb) IS 5182 Part 22-2004

μg / m3 BDL

(DL=0.1) 1

7 Carbon Monoxide (CO) (1 Hour

)

IS 5182 Part 10-

2003

mg/m3 BDL

(DL=1.15)

4

8 Ammonia (NH3) Indophenol Method μg / m3 17.15 400

9 Arsenic (As) IS 5182 Part 22:2004 R.2009

ng / m3 BDL

(DL=1.0) 6

10 Nickel (Ni) IS 5182 Part

22:2004 R.2009

ng / m3 BDL

(DL=0.1)

20

11 Benzene (C6H6) IS 5182 Part 11-

2006

μg / m3 BDL

(DL=0.1)

5

12 Benzo (a) Pyrene IS 5182 Part 12-

2004

ng / m3 BDL

(DL=0.1)

1

BDL – Below Detectable Limit ; DL – Detection Limit

Page 15: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

14

4.4.2. Water Environment

Water table is located at a depth of 11mbgl from the tube wells. No adverse health hazardous

was reported due to quality of water like flurosis. TDS, COD, BOD, Salinity, hardness etc

have to be tested by the applicant within one year for consumption of water by the mine

workers one sample each from open and tube wells. Results as per the test report is given in

table 4.4.

Table 4.4.: Water sample analysis report

Sl.

No

PA

RA

ME

TE

RS

UN

ITS

RE

SU

LT

S

As Per IS 10500:2012

PROTOCOL:

APHA 22nd

Edition 2012

Req

uir

emen

t

(Acc

epta

ble

lim

it)

Per

mis

sib

le l

imit

in

the

ab

sen

ce o

f

alt

ern

ate

sou

rce

1 pH value at

25oC

- 7.96 6.5 – 8.5 6.5 – 8.5 4500 H+ B

2 Turbidity NTU <1.0

1 5 2130 B

3 Color Hazen Unit <1.0 5 15 2120 B

4 Odor - Agreeable Agreeable Agreeable IS 3025 P 5 1983

R.2012

5

Electrical

conductivity

at 25oC

Micromhos/

cm

377 - - 2510 B

6

Total

Suspended

Solids

mg/l <1.0 - -

IS:3025:

P.17:1984:R.2012

7

Total

Dissolved

Solids

mg/l 200 500 2000

IS

3025:P.16:1984:R

.2012

8

Total

Hardness as

CaCO3

mg/l 144 200 600 2340 C

9

Calcium

Hardness as

CaCO3

mg/l 136 - - 3500 - Ca B

10

Magnesium

Hardness as

CaCO3

mg/l 8.0 - - 3500 – Mg B

11 Calcium as

Ca mg/l 54.0 75 200 3500-Ca B

12 Magnesium

as Mg mg/l 1.92 3 100 2340 C

Page 16: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

15

13

Phenolpthalei

n Alkalinity

as CaCO3

mg/l Nil - - 2320 B

14

Total

Alkalinity as

CaCO3

mg/l 50.0 200 600 2320 B

15 Chlorides as

Cl mg/l 11.0 250 1000 4500 Cl

- B

16 Sulfates as

SO4 mg/l 86.0 200 400 4500 SO4 E

17 Total Iron as

Fe mg/l BDL 0.3 0.3 3500 Fe B

18

Silica

(Reactive) as

SiO2

mg/l 1.68 - - 4500 SiO2 C

19

Carbonate

Hardness as

CaCO3

mg/l 50.0 - - 2340 A

20

Non-

Carbonate

Hardness as

CaCO3

mg/l 94.0 - - 2340 A

21 Free Residual

Chlorine mg/l <0.2 0.2 1 4500 CL

- B

MICROBIOLOGICAL EXAMINATION

Sl.

No Parameters Units Results

Requirement as per IS

10500: 2012 Second

revision (Acceptable

Limit)

Protocol

1 Total

Coliforms

MPN/

100ml Absent

Shall not be detectable

in any 100ml

IS 1622-1981

Amd.4 RA 2009

2 E.Coli MPN/

100ml Absent

Shall not be detectable

in any 100ml

IS 1622-1981

Amd.4 RA 2009

4.4.3. Acoustic and Seismic environment

Sound measurement in the core and buffer area is done. Threshold sound level is reported as

55dB. Detailed measurement is given in table 4.5. No activity to test vibration of longitudinal

waves and its peak particle velocity.

Table 4.5.: Sound measurement readings

Sampling

Location

Noise Value

dB (A)

Average Noise Value

dB (A)

Limits as per KSPCB

dB (A) (Day Time)

Core Zone 50.6

50.72 55 51.2

50.2

50.9

Page 17: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

16

4.4.4. Soil

Soil sample is collected and analysed for its physical and chemical characteristics as in table

4.6. from the lease. Dust is suppressed by water spraying at the time of transporting material

from mine. Dust fall data collected from the district office for observing threshold values.

Table 4.6.: Soil analysis results

S.No PARAMETERS RESULTS

1 pH value (10% Solution) 5.58

2 EC@ 25oC (Micromhos/cm) (10%

solution)

8.0

3 Moisture 21.12% w/w

4 Density 1.09 g/cc

5 Texture Clay=39.30% :Sand & Silt =20.90:

Gravel =39.80%

Gravel Soil

6 Consistency Soft

7 Structure Structureless

8 Texture Clay=39.30%

Sand & Silt =20.90

Gravel = 39.80 % Gravel Soil

9 Color Blackish

10 Loss On Ignition 25.85 %w/w

11 Lime Status (Lime Requirement) Nil

Chemical Parameters

S. No PARAMETERS RESULTS

1 Alkalinity 0.0250%w/w

2 Sodium Absorption Ratio 8.57 meq/Kg

3 Cation Exchange Ratio 10.0 meq/100g

4 Oil & Grease <10.0 ppm

5 Chlorides 0.0099% w/w

6 Sulphates 0.0037 % w/w

7 Nitrates 0.0142% w/w

8 Total Nitrogen 0.149% w/w

9 Total Phosphorous 0.006% w/w

10 Calcium 0.269% w/w

11 Magnesium 0.111% w/w

12 Sodium 0.210% w/w

13 Potassium 0.034% w/w

14 Iron 1.18% w/w

15 Organic matter 0.95% w/w

16 Water holding capacity 1.23% w/w

17 Copper 0.031% w/w

18 Nickel 0.00089% w/w

Page 18: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

17

19 Chromium 0.0014% w/w

20 Lead 0.0021% w/w

21 Zinc 0.018% w/w

4.4.5. Flora and Fauna

The applied area and the surrounded area is mostly covered with rubber, coconut trees. The

photo of identified flora is given below in Table 4.7 and Fig no.4.4. Identified fauna is given

in table 4.8.

Table 4.7: Flora

A) TREES

Sl.no. Local Name Botanical Name Number of Trees

1 Rubber Hevea Brasiliensis 663

2 Kasumavu Anacardium orcidentale 91

B) Climbers

Sl.no. Local Name Species Name Number

1 kattupayar Centrosema molle 34

2 Menthoni Gloriosa superba Linn.

C) SHRUBS

Sl.no. Local

Name Botanical Name Number of species

1 - -

-

D) HERBS

Sl.no. Local Name Botanical Name

-- --- ---

Page 19: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

18

a) Rubber b) Kasumavu

c) Naikorana d) Kattupayar

Figure 4.4: Flora found in the site

Table 4.8.a: Fauna- Mammals

Sl.no. Local Name Zoological Name

1 Indian palm squirrel Funambulus palmarum

2 Wild Boar Sus scrofa

3 Rabbits Lepus curpaeums

Table 4.8.b: Fauna – Avian Fauna

Sl.no. Local Name Zoological Name

1 House crow Corvus splendens

2 Black drogue Dicrurus macrocercus

Table 4.8.c: Fauna – Butterfly

Sl.no. Local Name Zoological Name

1 Scorpion Scorpiones

2 Millipedes Diplopoda

Page 20: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

19

4.4.5. Eco sensitive area

There is no major water body, seasonal odai or Nallah found within 500 m radius of the lease

boundary. Archaeological monuments, bridges, Theme parks, are also not located in the area.

No reserve forest, wild life sanctuaries found within the 10 km radius.

4.5. CLIMATIC CONDITION

The Pathanamthitta district received the rain under the influence of both southwest and

northwest monsoons. The southwest monsoon chiefly contributes to the rainfall in the district.

Most of the precipitation occurs in the form of cyclonic storms caused due to the depressions

in Arabian Sea. The normal annual rainfall over the district varies from about 2850mm.It is

the minimum around Pathanamthitta in the southeastern part of the district. The highest

humidity is generally recorded in May with the value of 87%.

4.6. INFRASTRUCTURE

4.6.1. Road

The mode of transport of the building stone granite produced and marketed is by road to

various consumer destinations. Approach road is available from the lease area for

transportation.

4.6.2. Power Supply

Since simple methods are adopted and the limited scale of activities involved in the

quarrying, high tension electric power supply or huge workshop facility is not required.

4.6.3. Sanitary Facilities

Surface latrines and urinals shall be constructed at convenient place for usage of male and

female labours separately.

4.6.4. First Aid Facility

Being a small mine First aid station as per provisions under Rule (44) of the Mines Rules

1955 will be provided with facilities as per the third schedule as prescribed. Qualified First

Aid personnel should be appointed or nominated to attend emergency first aid treatment.

4.7. SOCIAL INFRASTRUCTURE

Table 4.9. shows the existing infrastructures nearby the area.

Page 21: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

20

Table 4.9.: Infrastructure nearby the lease area

S.No. Particulars Location Approximate

Distance in

Km

Direction

(Avg)

1. Post office Choorakode 1 North

2. Town (Taluk Head) Adoor 8 North

3. Police Station Enathu 4 SE

4. Municipality Adoor 8 North

5. Fire Station Adoor 8 North

6. Govt. Hospital Choorakode 1 North

7. School Choorakode 1 North

8. DSP Office Adoor 8 North

9. Railway Station Chengannur 27 North

10. Nearest Airport Trivandrum 85 South

11. Sea port Neendakara 26 NW

12. Villages

i) Adoor 6 North

ii) Enathu 2.5 South

iii) Kadambanadu 1.5 West

iv) Enadimangalam 8 East

Page 22: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

21

Chapter 5: Planning Brief

5.1. PLANNING CONCEPT

Excavation of building stone granite is planned and described in section 3.4 and 3.6.

Proposed land is a Patta land which does not come under Residential, Forest or any other

sensitive land classification. As a small project, it is not demanding any town or country

planning. However, approach roads and haul roads will be laid for the transportation of

excavated materials to the market and to the dump.

5.2. POPULATION PROJECTION

The proposed project will not affect the village population, and hence population projection is

not significant. However, it provides occupation to about 36 persons of which 80% of them

will be from the local villages. Other than mine employment, workshops, spare parts, tyres

and tubes and related several self-employment opportunities.

5.3. LAND USE PLANNING

The present and proposed land use pattern is given in clause 23 of Table 1.1.

5.4. INFRASTRUCTURE DEMAND

Labour shed, Surface latrines and urinals are required to be constructed for making easy

accessibility from the working area. No other infrastructures required.

5.5. AMENITIES/ FACILITIES

List of equipments and materials required for drilling, loading, transporting is given in table

5.1., 5.2, 5.3 respectively.

Table 5.1.: Drilling equipments

Type Nos. Dia. Of

Hole Size/Capacity Make

Motive

Power

H.P.

Jack Hammer 4 19mm Hand held

Atlas Copco Air 45

Compressor 2 --- Mahindra --- 80

Table 5.2.: Loading Equipments

Type Nos. Size/ Capacity

(m3)

Make Motive

Power

H.P.

Hydraulic

excavator 2 No 1.20 Hitachi Diesel

EX

110

Table 5.3.: Transportation vehicles

Type Nos. Size/ Capacity Make Motive Power H.P.

Tipper 6 10 M.T Swaraj Masta Diesel 180

Page 23: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

22

5.6. HAZARDS AND RISK MANAGEMENT

5.6.1. Explosives

Blasting is done by means of explosives which are hazardous during of handling, storage and

blasting.

5.6.1.1. Storage and Handling

The Applicant is advised to store the explosives as per the Indian Explosives Act, 1958 and

the Explosive Rules, 1983. Necessary permissions should be obtained from the Joint

Controller of Explosives to store and uses of explosives in the quarry in the magazine permit

under Form - 23 or Agreement shall be made with holder of Form - 22 who can supply and

fire explosives as per safety practices. However blasting in the mine or quarry shall be done

as per the MMR, 1961 under the supervision of Mines Blaster certificate holder, appointed

under Reg. 160 of Metalliferous Mines Regulations, 1961.

5.6.1.2. Blasting

Poorly designed shots can result in misfires early ignition and flying rock. Safety can be

ensured by planning for round of shots to ensure face properly surveyed, holes correctly

drilled, direction logged, the weight of explosion for good fragmentation. Blast design,

charge and fire around of explosives should be carried out by a trained person.

5.6.2. Drilling

Slipping and Falling of labours from the edge of a bench during drilling is possible. Part of

training should include instructions to face towards the open edge of the bench so any

inadvertent backward step is away from the edge. Suitable portable rail fencing which can be

erected between the drilling operations and the edge of the mine can be provided.

Attachment of a safety line to the drilling rig and provide harness for the driller to wear can

be done. Newer drill machines are provided with cabin which controls noise level within

cabins. Driller operators should be protected with ear protection.

5.6.3. Loading

Possible risks during loading of mined rocks are falling of rock on the driver, plant toppling

aver due to uneven ground, failure of hydraulic system, fires, fall while gaining access to

operating cabin, electrocution in Draglines, failure of wire ropes in Dragline. In order to

overcome these risks:

Operator cabin should be of suitable strength to protect the driver in event of rock fall.

Electrical supply to dragline should be properly installed with adequate earth

continuity and earth leakage protection.

Wire rope should be suitable for work undertaken and be examined periodically.

Ensure that loaders are positioned sufficiently away from face edges

5.6.4. Transportation

Brake failure, lack of all-around visibility from driver position, vehicle movements

particularly while reversing, rollover, Vibrations, Noise, Dust and improper / no signalling

are some of the factors causing risk. This can be avoided by following measures:

Page 24: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

23

Visibility defects can be eliminated by the use of visibility aids such as closed circuit

television and suitable mirrors.

Edge protection is necessary to prevent inadvertent movement.

Seatbelt to protect driver in event of vehicle rollover.

Good maintenance and regular testing necessary to reduce possibility of brake failure.

Avoid driving at the edge of roadway under construction

Heavy earth moving equipment and vehicle drivers and those giving signals should be

well trained.

5.6.5. Unstable face

Chances of Rock fall or slide exists. Regular examination of face must be done and remedial

measures must be taken to make it safe if there is any doubt that a collapse could take place.

Working should be advanced in a direction taken into account the geology such that face and

quarry side remain stable.

5.6.6. General safety measures

Provisions of the Mines Act, Rules and Regulations orders made there under shall be

complied with, so that the safety of the mine, machinery and persons will be ensured.

Permission, relaxation or exemption wherever required for the safe and scientific mining of

the deposit will be obtained from the Department of Mine Safety.

Safety kits should be located in easily accessible place with major first aid materials

in it.

Entry of any unauthorized person into mine and plant areas shall be completely

prohibited

Arrangements for fire fighting in the mine’s office complex and mining area

Provision of all the safety appliances such as safety boot, helmets, goggles, ear plugs

etc. shall be made available for the employees

Mining will be undertaken in coexistence with the requirements of the Mining Plan

which shall be updated from time to time

Handling of explosives, charging and blasting shall be undertaken only by a

competent person

Adequate safety equipment shall be provided at the explosive magazine

All the mining equipment shall be maintained as per the guidelines of the

manufacturer

Elevating the awareness of employees, contract workers and public as a whole by celebrating

Annual Safety Week which includes various competitions like posters, essay, slogan, quiz

etc.

Page 25: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

24

Chapter 6: Proposed Infrastructure 6.1. GREEN BELT

Afforestation plan is proposed to develop a green belt around the mining lease as in table 6.1.

About Rs.1,50,000/- is allotted for the afforestation programme.

Table 6.1.: Afforestation Programme

Year Place Types of Trees Number Rate of Survival

I Lease Boundary Rubber, Teak and

other regional trees 50 80 %

II Lease Boundary Rubber, Teak and

other regional trees 50 80 %

III Lease Boundary Rubber, Teak and

other regional trees 50 80 %

IV Lease Boundary Rubber, Teak and

other regional trees 50 80 %

V Lease Boundary Rubber, Teak and

other regional trees 50 80 %

6.2. SOCIAL INFRASTRUCTURE

6.2.1. CSR activities

The proponent is proposed to spend CSR as per the Companies Act. He propose to spent CSR

activities to the Panchayat for maintenance of road, street light, school sanitation etc

6.2.2. Employment potential

The proposed project will enhance the socio-economic activities in the adjoining areas.

Several shops and service providers shall grow in the public adjacent to mines. Schools and

city development shall also be possible owing to the fact of economic growth in the village.

This will result in following benefits

- Improvements in physical infrastructure.

- Improvements in Social Infrastructure.

- Increase in Employment Potential

- Contribution to the Exchequer.

- Prevention of illegal mining.

- During and Post-mining enhancement of green cover.

6.3. CONNECTIVITY

Haul roads are already laid connecting the public roads for transportation of materials

6.4. DRINKING WATER MANAGEMENT

Water requirement and management are as discussed in section 3.7. of chapter 3.

Page 26: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

25

6.5. DRAINAGE PLAN

Rainwater will be properly routed such that not affecting the nearby water source. Garland

drainage around dump shall prevent under wash of dump by hydrostatic pressure to be

developed by surface water and control wash outs and collapse.

6.6. SOLID WASTE MANAGEMENT

Waste generation is as discussed in section 3.9.

6.7. POWER REQUIREMENT AND SOURCE

Details of the power requirement and source are as discussed in section 5.5 of Chapter 5.

Page 27: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

26

Chapter 7: Rehabilitation and Resettlement (R&R) Plan

In the event of closure of mine, the mine worker shall get alternate work or business like

agriculture etc. No serious repercussions envisaged in the event of cessation of mining

activity, as they will be provided employment in other mines belong to the company.

The mining operation was concentrated only in the Granite bearing area over the entire lease

area and some waste removal from these mines and dumped on the southern part of the area.

No reclamation was made over the mined out area since the deposit persist at still at deeper

levels. Being a site specific building stone excavation, the project does not involve

displacement of any residents or public infrastructures. Thus resettlement is not proposed.

Page 28: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

27

Chapter 8: Rehabilitation and Resettlement (R&R) Plan

8.1. PROJECT COST

i. Land cost = Rs. 58,00,000

ii. Machinery = Nil

iii. Refilling/Fencing = Rs. 2,00,000

iv. Labour shed = Rs. 1,50,000

v. Sanitary facility = Rs. 2,00,000

vi. Miscellaneous = Rs. 3,00,000

Total = Rs. 66.50 lakh

8.2. ENVIRONMENTAL MONITORING AND MANAGEMENT COST

i. Drinking water facilities =Rs. 1,00,000

ii. Sanitary Arrangements =Rs. 50,000

iii. Safety Kits =Rs. 80,000

iv. Water sprinkling =Rs. 60,000

v. Afforestation =Rs. 1,50,000

Total =Rs. 4.40 lakh

Page 29: Granite Building Stone (Khondalite) Quarryenvironmentclearance.nic.in/writereaddata/District/... · Granite Building Stone (Khondalite) Quarry Over 0.98.80 Ha In S.Y.No: 511/1(P),

28

Chapter 9: Analysis of Proposal

The mining activities in this belt will benefit to the local people both directly and indirectly.

The direct beneficiaries will be those who get employed in the mines as skilled and un-skilled

workers. This operation doesn’t need relocation of any habitants.

The proponent will plant sufficient number of trees around the lease boundary as well as

along the village roads to keep the environment green.

The Proponent will maintain the infrastructures and provide development fee of 2.5% of the

profit as per the Companies Act 2013 and CSR Rules 2014 to the local Panchayat.

(Mr.P.Thomas)

Project Proponent

Mr.S.Suriyakumar

Signature of EIA coordinator (Mining)

M.Sc., M.Phil, F.C.C. (Min) PGDBA, DIPC

Date: 21-09-2017

Place: Salem