GRACEPOINT CHURCH…Mar 17, 2019 · Insuring a Common Understanding. Advisory Team Process....
Transcript of GRACEPOINT CHURCH…Mar 17, 2019 · Insuring a Common Understanding. Advisory Team Process....
17 March 2019
GP Advisory Teamwith Station 19 Architects
1
© 2
018
GRACEPOINTCHURCHNew Brighton, MN
Facilities Vision Project Town Hall Presentation
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
2
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
3
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
• Constitution’s Affirmation of Faith Sections• Vision, Values, and Mission Markers• Interviews with Staff & Lay Leaders• Wisdom from Previous Planning Projects• Feedback from Congregation• Emphasis on Prayer
4
The Advisory Team Process(What Guides the Facilities Vision Project?)
© 2
018
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
5
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
WORSHIP ATTENDANCE (2018)8:30am (44%) 190 people - 48% Full
*11:00am (56%) 241 people - 61% Full431 people - Total Sunday
6
© 2
018
NOTE: 50% full min. comfort80% full max. comfort
GRACEPOINT’S RECENT ATTENDANCECurrent Sanctuary Seating – Approximately 400
7
© 2
018
SUNDAY EDUCATION @ 9:45am:Children 0-5th 183Students 6th - 12th 44Adults 190TOTAL 417 People
GP SUNDAY EDUCATION SUMMARYPeople Served – Education Attendance @ 9:45AM Largest Facility Use
NEED “QUALITY EDUCATION SPACE”
97% OF WORSHIP++
EXISTING TOTAL SITE ANALYSIS
8
© 2
018
177 TOTAL EXISTINGPARKING STALLS
N
0.51 ACRESEACH RES. SITE
3.88 ACRESMAIN SITE
SHAREDPKG SHARED
PKG
9
© 2
018
EXISTING TOTAL SITE UTILIZATION
10
© 2
018
EXISTING FACILITY ANALYSISLower Level
N
*AVG. AGE IS 40 YRS OLD
11
© 2
018
EXISTING FACILITY ANALYSISMain Level
N
*AVG. AGE IS 40 YRS OLD
12
© 2
018
EXISTING FACILITY ANALYSISMezzanine & Balcony
N
*AVG. AGE IS 40 YRS OLD
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
13
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
Sharing the Vision – Finally!Remembering:
Preliminary Concept Master Plan
GRACEPOINT’S FACILITIES VISION:Transformed Sanctuary – A More Contemporary Sacred Space
Platform Function & Accessibility : Flooring & Finishes : Lighting : Audio Visual
Secure, Adequate Education SpacesSecure : Unified : Improved Function & Finishes
Strengthen Hospitality “Focus on Others”Sufficient Parking : Unified : Community Gathering Spaces :
Wayfinding & Finishes
Address Deferred Maintenance in Project AreasParking Lot : Roof : HVAC : Exterior Repairs
15
© 2
018
1.
2.
3.
4.
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
16
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
17
© 2
018
FACILITIES VISION MASTER SITE PLANMAXIMUM SITE USE
FACILITIES VISION MASTER SITE PLANSITE CONCEPT
18
© 2
018N
200 STALLS TOTAL
Note the change of orientation fromprevious site-map slides!
19
© 2
018N
LL Gross Area 21,175 Sq. Ft.LL Bldg Addition 1,665 Sq. Ft.TOTAL LL GROSS AREA 22,840 Sq. Ft.
FACILITIES VISION MASTER PLANLOWER LEVEL CONCEPT
20
© 2
018N
ML Gross Area 21,175 Sq. Ft.ML Bldg Addition 2,800 Sq. Ft.TOTAL ML GROSS AREA 23,975 Sq. Ft.
FACILITIES VISION MASTER PLANMAIN LEVEL CONCEPT
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
21
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
22
© 2
018
PRELIMINARY SCOPE / PROGRAM
FACILITIES VISION PHASE 1 SITE PLANSITE CONCEPT
23
© 2
018N
24
© 2
018N
FACILITIES VISION PHASE 1 PLANMAIN LEVEL CONCEPT
25
© 2
018N
FACILITIES VISION PHASING PLANMAIN LEVEL CONCEPT
26
© 2
018N
FACILITIES VISION PHASING PLANLOWER LEVEL CONCEPT
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
27
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
28
© 2
018
CONCEPT BUDGET ALLOWANCES: VARIES BY +/- 20% - CONCEPT ONLY TO BE CONFIRMED W/ CONTRACTOR - THIS IS NOT AN ESTIMATE
29
© 2
018
FINANCIAL CAPABILITY“What Can You Afford?” CONCEPT ONLY…TO BE VERIFIED
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
30
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
31
© 2
018
POSSIBLE SCHEDULE
Insuring a Common UnderstandingAdvisory Team ProcessGracePoint Today
Sharing the VisionFacilities Vision Project ConceptsConcept Phasing, Costs & ScheduleConcept Renderings
32
© 2
018
FACILITIES VISION PROJECTTown Hall Presentation Overview
33
© 2
018
SOUTH ENTRY TODAY…
34
© 2
018
STRENGTHENED IDENTITY
35
© 2
018
SANCTUARY TODAY…
36
© 2
018
TRANSFORMED SANCTUARY
37
© 2
018
KIDS CHECK-IN TODAY…
38
© 2
018
SECURE, ADEQUATE EDUCATION SPACES
39
© 2
018
QUESTIONS…