Alamo Wash Basin Management Study Government Sector Stakeholder Meeting February 10, 2017

Transcript of Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project...

Page 1: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Alamo WashBasin Management Study GovernmentSectorStakeholderMeetingFebruary10,2017

Page 2: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Welcome

• AgendaIntroductionsandOpeningCommentsProjectCharacteristicsProjectScopeofWorkProjectScheduleStakeholderInvolvementandInputAdjourntoCommentonMaps

Page 3: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Fred Felix, P.E.

• City/Countycollaboration• Studywillidentifybestwaytomanagethisbasin• Developratingsystemforallaspects• Shareknowledgeofstudyarea– Commentforms

Page 4: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Introductions

• ProjectTeamPimaCountyRegionalFloodControlDistrictCityofTucsonCMGDrainageEngineeringInc.JEFullerHydrology&GeomorphologyInc.AshbySurveyingWheatDesignGroupKaneenCommunications

• Stakeholders

Page 5: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Project Characteristics

Page 6: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project
Page 7: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project
Page 8: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project
Page 9: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project
Page 10: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project
Page 11: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project
Page 12: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project
Page 13: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Project Scope of Work

• ExistingConditionsDataCollectionandReview• FloodplainDelineation• FEMALetterofMapRevision(LOMR)ifJustified• AlternativesAnalysisandRemediationRecommendations• PublicandStakeholderInvolvement

Page 14: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Existing Conditions• DataCollectionDrainageComplaintsOperationSplashAs‐BuiltPlansReviewPreviousStudies

• HistoricalPeakFlowDataTucsonStormwaterMgtStudyUSGSStreamGage

• FieldInspections SurveyExistingCulverts,etc.

Page 15: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Floodplain Delineation• 2dimensionalmodeling(FLO‐2D)• NewTechnology(notavailable20yearsago)• Moredetail– breaksdownwatershedtoover1millionpieces

• Usescurrenttopographicandlanduse data(2015)

• Abletoreflectbridges,culverts,stormdrains,etc.

• Betterforalternativesevaluation• MajorWash&localizedflowsaredetermined• Draftmapforillustrationonly

Page 16: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Alternatives Analysis

• Developacomprehensivelistofproblemareas

• Topratedlocationstoadvance

• ListentoStakeholdersaboutpotentialAlternatives

Page 17: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Alternatives Analysis

• Proposemixofalternatives• Structural(newculvert,bankprotection,detentionbasin,etc.)• Policybased(developmentstandard)• Operational(frequencyofvegetationmaintenance)

Page 18: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Project Schedule

Page 19: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Stakeholder Involvement and Input

• Periodicstakeholdersmeetings• FloodControlProjectwebsite

• Gotowww.pima.gov andenterAlamoWashBasinManagementinthesearchfield

• Projectupdates• FirstofthreeOpenHouseswillbe6‐7:30p.m.Tuesday,March21,2017,atMurphy‐WilmotLibrary,530N.WilmotRoad

Page 20: Government Sector Stakeholder Meeting February 10, 2017 · 2/10/2017  · • Flood Control Project website • Go to enter Alamo Wash Basin Management in the search field • Project

Thank You! Please Visit Our Maps!