GOVERNMENT OF ODISHA DEPARTMENT OF WATER RESOURCES ANNUAL ACTION PLAN 2017-18 NIMAPARA IRRIGATION DIVISION

Transcript of GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER...

Page 1: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

1

GOVERNMENT OF ODISHA DEPARTMENT OF WATER RESOURCES

ANNUAL ACTION PLAN 2017-18 NIMAPARA IRRIGATION DIVISION

Page 2: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

2

Preface Department of Water Resources is mandated to administer over the water resources in the

state for the end uses of its citizens in an optimal manner so as to ensure equitable availability and use of water resources. As enshrined in the National Water Policy as well as State Water Policy, a clear cut prioritization on the end use of the scanty water resources has been put in place for the guidance of the water planners and the executioners. As is an accepted fact, the nation and the state have a lot to achieve, even though a lot of progress has been made to harness the water resources which are known for their spatial and temporal variation. To address this uncertainty, interventions are planned and executed in the form of major, medium, minor, lift irrigation schemes. As is with every organization, Department of Water Resources, Govt. of Odisha does have a vision statement. The vision is to ensure efficient, optimal and equitable utilization of water resources in Odisha. In order to realize this vision, the Department under the dynamic leadership of Hon’ble Chief Minister of Odisha, Shri Navin Patnaik ji and Principal Secretary, Sri P. K. Jena , IAS, the department has prepared a mission statement to provide atleast 35% of irrigation to each of the 314 blocks of the state. Over the years, water resources sector in Odisha has extended its scope from harnessing its resources for equitable distribution in spatial and temporal scale to (i) fighting with flood hazards, (ii) saline inundation, (iii) ground water recharge and more importantly its social responsibility through people’s participation. The entire department through its constituent field divisions thrives for success every year and in every front ensuring maximum achievement.

Nimapara Irrigation Division is one such constituent division enjoys an important position in coastal Odisha and catering to various needs in the field of irrigation, flood management, saline inundation. The division has undertaken various development works utilizing financial assistance from different sources such as ADB, NCRMP, and NABARD etc. The present report speaks about different activities undertaken by this division during the year 2016-17. Notable achievements have been achieved in flood protection and saline sector.

We sincerely thank our funding agencies, principal motivator Sri P. K. Jena, IAS, and the people of this area for the achieving our goal during the year.

Dr. M. K. Bhuyan, EE (C) Nimapara Irrigation Division

Page 3: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

3

CONTENTS

Section Title Page No.

1 Introduction 4

2 Irrigation Management 6

3 Flood Management 9

3.1 River Embankment 9

3.2 Saline Embankment 11

4 Prachi Barrage 13

5 Participatory Irrigation Management (PIM) 14

6 35% Irrigation Potential 15

Appendix I List of officers under Nimapara Irrigation Division 18

Appendix II Irrigation Potential 20

Appendix III Work wise expenditure statement for the year 2016-17

22

Appendix IV Details of Embankment 44

Appendix V Details of NCRMP Work 46

Appendix VI Details of ADB Work 50

Appendix VII Detail Information of Pani Panchayat / WUA 52

Page 4: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

4

1. Introduction

Nimapara Irrigation Division created in the year 1962 is an important division in coastal

Odisha catering to various needs in the field of irrigation, flood management, saline inundation.

It is under the administrative control of the Superintending Engineer, Central Irrigation Circle,

Bhubaneswar and Chief Engineer, Flood Control & Basin Manager, Lower Mahanadi Basin,

Bhubaneswar. It covers a geographical area of 108.240 Sq. Km in the districts of Puri, Khorda,

Cuttack and Jagatsinghpur of Odisha.

The division is headed by Executive Engineer and manned by two Deputy Executive

Engineers and four Assistant Executive Engineers as Sub-divisional Officers/ Estimator with

twenty five Junior/Assistant Engineers as their field level subordinates posted as sectional

officers. The total human resources in position during 2016-17 of the division are provided in

Appendix I.

The jurisdiction of the division starts from River Bhargavi in the south to River Debi in

north and River Kuakhai in the west to Bay of Bengal in the east (Fig.1). The division provides

kharif irrigation to a vast area of deltaic plane measuring 55268.734 ha (Appendix II) in the

above districts through a gigantic canal system constructed under Delta Stage-2 consisting of

Puri Main Canal Reach III (PMC III) and its off-taking canals. PMC III receives canal water near

Bhubanpur in the right bank of River Kushabhadra and the supply within the reach is totally

controlled by a CR-cum HR (Fig. 2). The canal network mainly consists of (i) Nimapara Branch

Canal and its offtaking canals, (ii) Chandanpur Branch and its offtaking canals, (iii) Kakatpur

Branch canal and its offtaking canals, (iv) Gop Branch Canal and its offtaking canals and

Kundhei Distributary and its offtaking canals. The details of the canal systems are provided in

the Section 2.

This division also ensures safety to the inhabitants in the flood plain against flood hazards

by supervising 328.62 km long flood embankments consisting of 168.30 km capital

embankment, 91.04 km saline embankment, 43 km OA embankment and 26.28 km TR

embankment. The details of the flood embankments are given in Section 3. In addition to these,

the division also looks after various saline embankments those protect the adjacent areas of Bay

of Bengal from saline inundation.

Page 5: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

5

Figure : 1 Jurisdiction Map

Page 6: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

6

2. Irrigation Management

The canal system of Delta Stage III was constructed during the fifties just after

independence. These are mostly earthen channels. The canal system under Nimapara Irrigation

Division comprises of (i) Kakatpur Branch Canal (KBC), (ii) Kundhei distributary, (iii) Gop

branch canal (GBC), (iv) Nimapara Branch Canal (NBC) and (v) Chandanpur Branch Canal

(CBC). Table 1 provides the total length, design discharge of these canal systems. Excepting

NBC and CBC water is received in the tail portion of the ayacut after Prachi Division extracts its

share in the head reach. So it is routine uphill task on the part of the division to supply water to

the command area during kharif, particularly in the tail reaches.

Figure 2 The Gateway of Puri Main Canal Reach III (PMC III)

C/R cum H/R at RD 29.350Km

Page 7: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

7

Table 1 Canal Systems Canal System Total Length

(KM) Length under the jurisdiction of the

Division (KM)

Design Discharge in

cusecs Kakatpur Branch Canal (KBC) 81.325 23.325 1065.96

Kundhei distributary 37.900 22.000 450.00

Gop branch canal (GBC) 61.950 37.950 981.00

Nimapara Branch Canal (NBC) 52.000 52.000 750.00

Chandanpur Branch Canal (CBC) 34.700 34.700 443.00

It became mandatory to ensure water supply to the tail ends and this was accepted as a challenge. The entire engineering team was motivated, geared up to perform up to expectation. We derived inspiration from our seniors and cooperation from our Principal Secretary. The weak reaches of the canal system were strengthened by constructing guard walls; leakage of water was reduced by repairing the structures using the regular grants available. Ultimately water could reach the tail ends which were deprived of since last many years. We present here few glimpses of kharif water supply of 2016-17 in different canals (Fig.3). It is sure that the goal is not far away if such momentum is suatained in future which will the bridge the gap between the design and achieved command area. The division has executed various works for canal improvement during the current year which are provided in Appendix III .

(a) Balibasta Minor (b) Erbang Minor

(c) Boulang Minor (d) Korul Sub-minor

Figure 3 Kharif Water Supply 2016-17

Page 8: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

8

We have also identified ayacut in the tails of various canal systems which are deprived from irrigation, referred here as lost ayacut, due to various reasons like semi-urbanization factors rampantly prevalent now-a-days in the rural sector; encroachment of canal land for communication developments by other private and other governmental players etc. All out efforts are being taken to revive these ayacuts through system improvement in future.

Fig. 4 Lost ayacut under canal systems

Page 9: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

9

These lost ayacut may be revived if the proposed program under ISBIG is implemented. Government of Odisha has provided funds for irrigation development during the last five years and utilizing these funds we are able to cause tremendous improvement in the canal systems to ensure irrigation to the tail. The year wise allocation is provided below in Fig. 5.

3. Flood Management 3.1 River Embankments

Nimapara Division has undertaken improvement and strengthening of various existing flood

embankments with financial assistance from NABARD, plan and non-plan regular allotments of

state authority with the prime focus on the capital and saline embankments. The capital

embankments include Kushabhadra Right and left, Debi Right, Kuakhai Right embankment and

Bhargavi left. The components of these works are mostly launching with stones in the scoured

toe of the embankments, packing the slopes and raising the embankment tops. These

embankments have been inspected by not only by our departmental authorities but also by the

district administration under various ranks. The local people feel secure against a probable

maximum flood discharge of 16 lacs cusec in the River Mahanadi at Munduli. Here we present

the photographs of Kushabhadra Right Embankment executed in the year 2016-17.

The list of flood embankments under the control of this division is given in the Table 1

below and further breakups in Appendix IV. By executing works for improvement of flood

embankments, the ferocity of damage has been reduced drastically. We have received sufficient

fund from NABARD in addition to our state plan allotment and bar chart of fund allocation

during the last five years starting from 2012-13 to 2016-17 are given below.

Page 10: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

10

Table1 River Embankments

The works pertaining to embankments are being inspected by higher authorities periodically at all levels and also by SQM team. The figure. below shows Chief Engineer & Basin Manager, LMB inspecting Kushabhadra Right embankment work executed through NABARD.

Name of Embankment District wise length in Km TOTAL (Km)

Khordha Puri Cuttack Jagatsinghpur

Capital Embankment: Kuakhai Left 11.00 0 0 0 11.00

Kushabhadra Left R.D. 38.50 Km to 73.50 Km 0 35.00 0 0 35.00

Kushabhadra Right from R.D. 00 to 67.50 Km 30.00 37.50 0 0 67.50

Bhargavi Left from R.D. 00 to 37.80 Km 14.00 23.80 0 0 37.80

Devi Right from R.D. 68.00Km to 85.00 Km 0 12.00 4.00 1.00 17.00

Total 55.00 108.30 4.00 1.00 168.30

O. A. Embankment (5 Nos.) 7.00 36.00 0 0 43.00

T. R. Embankment (3 Nos.) 0 26.28 0 0 26.28

Saline Embankment (14 Nos.) 0 91.04 0 0 91.04

Grand Total 62.00 261.62 4.00 1.00 328.62

Page 11: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

11

3.2 Saline Embankments

Saline inundation is a common phenomenon in coastal Odisha during high tide

periods. This is mostly experienced at the time of New Moon and Full Moon of every

lunar month. The most critical situations occur when both rivers and Bay of Bengal are at

spate during flood in these two situations. Such conditions have been experienced during

Phylin in the year 2012 and HudHud in 2015. The entire area below RL less than 5 m of

Astaranga and Kakatpur Blocks come under complete submergence during such periods.

The kharif crops, source of drinking water, public communications etc. are affected under

such situation. Saline inundation has greater adverse impact than the river flood

submergence. So it has also become an area to focus on where this division has an

important role to play. Thanks to OSDMA and ADB who have provided financial

assistance in constructing vast saline embankments promising complete shield against

saline ingression from the sea side. Table 2 provides information of the saline

embankments constructed and proposed source of funding. We believe in presenting our

achievements in the saline sectors for information of all the stake holders. Few

photographs are presented in fig.8 & 9. The details of saline embankments executed

under National Cyclone Rehabilitation Management Program (NCRMP) and ADB are

given in Appendix V & VI respectively.

Figure 7 Kushabhadra Right Embankment near Jogisahi

Page 12: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

12

Figure 9 Chhotipada Saline Embankment

Figure 8 Keutajanga Saline Embankment

Page 13: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

13

Table 2 Saline Embankments Saline Embankments Total

Length (KM)

Source of Funding Amount in Cr. Block

Embankments constructed

Nagar 6.66 OSDMA 13.83 Astaranga Keutajanga 3.6 OSDMA 12.57 Astaranga Chhotipada 3.66 OSDMA 11.45 Astaranga Tandahar 1.98 OSDMA 8.25 Astaranga Jharling Belanga 7.1 ADB 13.21 Astaranga Serai Bandal 3.5 ADB 9.54 Astaranga Embankments to be constructed Nagar 3.32 Funding is awaited Astaranga Astaranga-Biluamundali 2.5 do Astaranga Daluakhai 1.5 do Astaranga Sahan-Balabhadrapur 11.58 do Astaranga Kuhudi-Poichandia 5.5 do Astaranga Ukulai-Astaranga 2.4 do Astaranga Tandahar 2.7 do Astaranga Jharling Belang 22.0 do Astaranga

4. Prachi Barrage

We have undertaken few notable works for stabilizing the tail command area of Kakatpur

Distributary and Kundei Distributary. A barrage over River Prachi at village Bajapur of Kakatpur

Block is being constructed with financial assistance from NABARD and it is most likely that the

benefits will be derived from 2017-18 onwards. The salient features of Prachi Barrage are

provided in Table 3.

Table 3 Salient Features Prachi Barrage over River Prachi Location Bajapur Length of Barrage 60 m Financial Assistance NABARD Cost 21.05 cr Benefits New Command Area- 325 ha

Stabilization- 2091 ha Drinking water – Kakatpur and Astaranga

Recently Sri Surendra Kumar Nayak, Ex. Minister of Odisha who was brain behind this project

visited the project and has expressed his satisfaction on seeing its completion.

Page 14: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

14

5. Participatory Irrigation Management (PIM) We believe in involvement of all stakeholders in irrigation and flood management which

includes all the farmers, local public representatives, NGOs, state authorities in the department of water resources, revenue and disaster mitigation, agriculture and others. Total 115 nos. water user associations (WUA) have been formed for efficient water management and their active participation is a regular practice in both irrigation and flood management. Regular walkthroughs, meetings, cropping pattern planning and other issues are taken up as and when desired. The details of water user association are given in Appendix VII. It is programmed that fresh elections will be held for those WUAs who have already completed their tenure.

Sri Surendra Nayak, Ex Minister visits Prachi Barrage

Figure 10 Prachi Barrage at Bajapur

Page 15: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

15

6. 35% Irrigation Potential

Government of Odisha have undertaken a program to create minimum 35% irrigation

potential in each block of the State through major, medium, minor and lift irrigation

system and also through creating water bodies. We have also an important role to play in

this respect. The jurisdiction of this division is spread over 9 (nine) administrative Blocks

and the existing irrigation potential of the Blocks as on 30.9.2016 is presented in Table 4.

It is noticed that Astarang Block lags behind the target at 28.37%. So a master plan is

conceived after joint discussion with the other contributor i.e Odisha Lift Irrigation

Corporation (OLIC) and the projected year target are given in Table 5. It may be noticed

that OLIC has an important role to play and they should gear up to tap all the creeks

available in Astarang Block as mentioned in Table 5 by end of 2018-19.

Figure 8 Walkthrough with farmers by AE over Janra Minor of Khandasahi

Page 16: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

16

Table 4 BLOCK WISE IRRIGATION POTENTIAL UNDER NIMAPARA IRRIGATION DIVISION, NIMAPARA

District Block Cultivable area (in ha)

Canal ayacut (in ha.) % of area irrigated

Design ayacut

Potential / Irrigated ayacut

Lost ayacut

2 3 4 5 6 7 8 Khordha Balianta 10167 5824.06 5631.090 192.97 55.39%

Balipatna 10566 6440.89 6381.59 59.30 60.40%

Total: 20733 12264.95 12012.68 252.27 57.94%

Puri Nimapara 26133 16601.713 16551.711 50.00 63.34%

Gop 25251 13582.689 13301.419 281.27 52.68%

Kakatpur 10002 4730.100 4730.100 0.00 47.29%

Astaranga 10435 2719.040 2719.040 0.00 26.06%

Satyabadi (Part) 13420 2637.540 2637.540 0.00 19.65%

Puri Sadar (Part) 16376 2007.170 2007.170 0.00 12.26%

Pipili (part) 19407 82.530 82.530 0.00 0.43%

Total 121024 42360.782 42029.510 331.27 34.73%

Cuttack Niali 14000 635.000 635.000 0.00 4.54%

Jagatsinghpur Naugaon 9075 8.000 8.000 0.00 0.09%

Grand Total 164832 55268.732 54685.190 583.54 33.18%

Page 17: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

17

Table 5 ACTION PLAN FOR ACHIEVING 35% IRRIGATION POTENTIAL FOR ASTARANGA BLOCK, PURI

(A)

Name of Block

Total Cultivable

area in Ha.

Existing Irrigation Potential as on 30.09.2016 (In Ha.) Percentage(%)

Agency Area Total

Astaranga 10435.00 Major 2155

2960.00 28.37% Lift 720 Others 85 (B)

Name of

Block

Total Cultivable

area in Ha.

Programme for creating additional potential area for the year (In Ha.) Remarks

Agency 2017-18 2018-19 Total

Astaranga 10435.00

Major 165 - 165 Lift Kopajore Slucie 40 60 100 Barada Slucie 40 60 100

Sribantapur Slucie 40 60 100

Dhobanali Slucie 40 60 100 Bhaunria Slucie 40 60 100 Badajore Slucie 80 120 200 Total:- 280 420 700

Total 865

Gross Total(A+B) 3825

% Projected potential 36.65%

Page 18: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

0

Appendix – I

List of Officers under Nimapara Irrigation Division

Sl.

No.

Name of Employee Designation Mobile No.

1 Mahendra Kumar Bhuyan Executive Engineer 9937693345

2 Trilochan Nayak A.E.E. (Estimator) 9438621636

3 Ramendranath Senapati A.E. (Estimator) 9437594737

4 Mrs. Kelpana Ray J.E. (Estimator) 9438505589

5 Hemamalini Pati J.E. (Estimator) 8763108977

Nimapara Canal Sub-

Division

1 Laxmidhar Biswal A.E.E. Nimapara 9437280879

2 P. Satya Narayan Patro A.E. Head Qrs. Section 9438041818

3 Shyam Sundar Patra J.E. Olikana Seciton 9437561758

4 Lambodhar Padhy J.E. Ottarsasan Section 8895752907

5 Rabinarayan Sethy A.E. Abnhayamukhi Section 9437142899

Kakatpur Irrigation Sub-Division

1 Pratap Chandra Biswal Dy.E.E., Kakatpur 9937139907

2 Sunil Kumar Tosh A.E. Hqr Section I/C 9777533833

3 Tapan Kumar Nayak A.E.. Pacnihhitra Section 8018185013

4 Pranabandhu Behera A.E., Bauriakana Section 9437133415

5 Sunil Kumar Tosh A.E. Astaranga Canal Section 9777533833

6 Pranabandhu Behera A.E., Astaranga Saline Section 9437133415

Gop Irrigation Sub-Division

1 Narayan Chandra Nayak A.E.E., Gop 9938053888

2 Rajendra Prasad Mallick A.E. Hqr. Section 9861357050

3 Baishnab Ch. Mallick A.E. Madaranga Section 9437918503

4 Krishna Chandra Munduri J.E. Ganeswarpur Section 7873791038

5 Baishnab Ch. Mallick A.E. Nagapur Section I/C 9437918503

18

Page 19: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

1

Balanga Irrigation Sub-Division

1 Biswanath Khatua A.E.E., Balanga 9437185200

2 Pravat Kumar Das A.E., Hqr. Section 9438081321

3 Suryamani Rout A.E. Sainso Section 9437887709

4 Suryamani Rout A.E., Ketakipatna Section I/C 9437887709

Balipatna Canal Sub-Division

1 Pradipta Kumar Swain A.E.E., Balipatna 7853905243

2 Rupendra Kanhar A.E. HQr. Section 8763667032

3 Prakash Ch. Muduli A.E., Bentapur Section 9437190246

4 Khirod Ku. Mohapatra A.E., Bhubanpur Section 9437107825

5 Sanjay Ku. Gan J.E. Basantamala section 9437211147

6 Manoranjan Sahoo J.E., Achyutpur Section 9437142247

19

Page 20: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

2

Appendix - II

Irrigation Potential Sl. No.

Name of Project District Name

Block Name

Design ayacut (in

ha)

Potential Ayacut

created (in ha)

Remarks

1 2 3 4 5 6 7 1 Kakatpur Branch Canal

(with offtaking minors & sub-minors)

Cuttack Niali 635.000 635.000 J.S. pur Naugaon 8.000 8.000 Puri Kakatpur 2332.100 2332.100

Astaranga 2717.040 2719.040 5694.140 5994.140

2 Gop Branch Canal (with offtaking minors & sub-minors)

Puri Nimapara 1184.000 1184.000 Gop 6739.100 6572.120 166.98 ha of GBC is

being irrigated by lift point and this canal can be retrieved.

7923.100 7756.120 3 Kundhei distributary &

system Puri Nimapara 1510.905 1510.905

Gop 1888.115 1838.605 49.51 ha of Raiso S/M is not irrigated due to defunct of canal and converted into road and houses by the adjacent land owners. Thic canal can not be retrieved.

Kakatpur 2398.00 2398.00 5797.020 5747.510

4 Puri Main Canal Reach-III and system (with off taking minors and sub-minors)

Khordha Balianta 1198.000 1142.000 56.00 ha of Rathijema Minor converted into the homestead land and can not be retrieved.

1198.000 1142.000 5 Nimapara Branch Canal

and system (with offtaking minors & sub-minors)

Khordha Balianta 3358.247 3344.247 14.00 ha of Dahijanga Disty converted into to homestead land and can no tb eretrieved.

Balipatna 4924.351 4924.351 Puri Nimapara 7770.280 7720.280 50 ha of Dahijanga Disty

converted into to homestead land and can not be retrieved.

Gop 4504.114 4469.564 12.60 ha of Chhaitana Disty & 21.95 ha of Siaro Mr in total 34.55 ha is irrigated by lift point and can be retrieved.

20556.992 20458.442

20

Page 21: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

3

Sl. No.

Name of Project District Name

Block Name

Design ayacut (in

ha)

Potential Ayacut

created (in ha)

Remarks

6 Chandanpur Branch Canal (with off taking minors & sub-minors)

Khordha Balianta 1267.813 1144.843 107.58 ha of Barijanga Disty., 9.52 ha of Barijanga Rt. Minor and 5.87 ha of Nuapada mr in total 122.97 ha is irrigated by lift point and can be retrieved.

Balipatna 1516.539 1457.239 17.95 ha of Barijanga Disty.and 41.35 ha of Nuapada mr in total 59.30 ha is irrigated by lift point and can be retrieved.

Puri Pipili 82.533 82.533 Nimapara 6136.526 6136.526 Satyabadi 2637.540 2637.540 Gop 451.360 421.130 30.23 ha of Balibasta Mr

is irrigated by lift point and can be retrieved.

Puri Sadar 2007.170 2007.170 14099.481 13886.981

Grand Total Canal Ayacut 55268.733 54685.193

21

Page 22: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

4

Appendix - III Work wise Expenditure Statement for the year 2016-17

( Rs. In lakhs) Sl. No. of

App. List

Name of Work Approved Cost

Expenditure during 2016-

17

Ramarks

1 2 3 4 5 Plan Scheme

(Flood Control - River Embankment)-FC -RE

1 Slope Protection to Devi Right Embankment near village Benipur (working RD 81.478 KM to 81.552 KM) for the year 2016-17

37.67 37.62

2 Raising and strengthening to Kushabhadra Right Embankment from RD 48.00 KM to 52.00 KM (working RD 50.900 KM to RD 51.500 KM) for 2016-17

31.06 28.18

3 Slope Protection to Bhargavi left embankment from RD 33.400 KM to RD 33.550 KM (working RD 33.515 KM to RD 33.895 KM) for 2016-17

25.50 25.50

4 Protection to Dhanua Left Embankment from RD 00 KM to 0.210 Km near Tinimuhani for 2016-17 29.80 17.51

5 Raising and strengthening to Bhargavi Left Embankment from RD 1.200 KM to 2.200 Km for 2016-17 29.51 29.56

6 Raising and strengthening to TRE Davar to Santrash from RD 3.550 KM to 4.200 KM (Itakuda to Sankhachira) for 2016-17

28.90 28.87

7 Raising and strengthening to Bhargavi left embankment from RD 11.000 KM to 12.000 KM for 2016-17 17.00 16.92

8 Protection to Kushabhadra Left Embankment near village Jagannathpur for 2016-17 12.76 12.72

9 Raising and strengthening to Dhanua left embankment from RD 0.300 KM to 2.00 KM for 2016-17 31.15 31.12

10 Slope protection to Devi Right Embankment from RD

82.00 KM to 82.100 KM (working RD 83.537 KM to 83.587 KM) for the year 2016-17

43.12 62.53

11 Raising and strengthening to Devi Right Embankment from RD 69.300 KM to RD 74.500 KM) for the year 2016-17

34.48 34.43

12 Slope Protection to Kushabhadra Right Embankment near village Majhihara for 2016-17 25.50 25.49

13 Slope Protection to Kushabhadra right embankment at RD 36.030 KM near village Denuabasta for 2016-17 29.26 23.18

14 Raising and strengthening to Bhargavi left embankment from RD 35.500 KM to RD 37.300 KM (working RD 34.400 KM to 34.910 KM) for 2016-17

23.80 23.76

22

Page 23: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

5

15 Slope Protection to Kushabhadra right embankment near RD 38.900 KM (Village Amuniapatna) & RD 39.400 KM ( Praharajsahi) for 2016-17

23.77 23.77

16 Raising and strengthening to Devi Right Embankment from RD 76.00 KM to RD 77.400 KM (working RD 76.400 KM to 77.800 KM & 78.530 KM to 78.680 KM) for the year 2016-17

33.32 33.32

17 Raising and Strengthening to left embankment of River Prachi near village Kundeswar for the year 2016-17 22.82 21.82

18 Improvement to Devi Right Embankment from R.D. 78.500 KM to 80.500 KM (working R.D. 79.012 KM to 79.052 KM) for the year 2016-17

36.72 42.75

19 Protection to Dhanua Right Embankment near RD 5.200 KM for 2016-17 34.00 31.14

20 Protection to Kushabhadra Left Embankment near Liakhia Bridge for 2016-17 29.75 29.77

21 Raising and strengthening to Kushabahdra Right Embankment from RD 43.00 KM to 45.00 KM (working RD 44.00 KM to 44.50 KM) for 2016-17

16.31 16.32

22 Raising and strengthening to Bhargavi Left Embankment from RD 19.00 KM to RD 20.750 KM (working RD 19.970 KM to RD 20.360 KM) for 2016-17

23.80 23.72

620.00 620.00 F.C. RE (Incomplete Project )

2 Improvement to Kushabahdra Right Embankment near RD 34.100 km. (Construction of low level spur Dumping & packing)

18.28 18.28

18.28 18.28 (Flood Control - Saline Embankment)-FC -SE

1 Protection to Scoured Bank on Jharling-Belanga Saline Embankment from R.D. 4.360 KM to R.D. 4.430 KM near village Nuagarh for the year 2016-17

39.48 39.48

2 Protection to Sahan-Balabhadrapur Saline Embankment from RD 11.100 KM to RD 11.300 KM near village Papira for the year 2016-17

35.81 35.81

3 Protection to Scoured Bank of Jharling-Belanga Saline Embankment from R.D. 4.890 KM to R.D. 4.950 KM near village Nuagarh for the year 2016-17

37.71 37.71

4 Protection to Scoured Bank of Jharling-Belanga Saline Embankment from R.D. 7.500 KM to R.D. 8.000 KM near village Gilikiani for the year 2016-17

11.79 11.79

5 Protection to Left side Saline Embankment near Tikarapada Creek Irrigation Project for the year 2016-17 14.88 14.88

6 Restoration and protection to Ukulei Saline Embankment from RD 00 KM to 5.00 KM (working RD 1.020 KM to 2.00 KM) for 2016-17

1.83 1.83

141.50 141.50

23

Page 24: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

6

FLOOD CONTROL -RESTORATION

1

Design, drawing, supplying, fabrication, transportation, errection, commissioning & testing of M.S. Gates alongwith hoisting arrangements for Drainage Sluice at (1) RD 390m, 920m, 1530m, 2300m, & 3150m of Chhotipada –Badaraula, (2) RD 765m, 1290m, 2040m & 3270m of Keutajanga, (3) RD 200m, 3900m, 4850m, 5255m & 6467m of Nagar and (4) RD 579m & 1120m of Tandahara Saline Embankment under Nimapara Irrigation Divn, Nimapara

20.71 13.48

2 Supplying, fabrication, transportation, errection, commissioning and testing of M.S. Gates alongwith hoisting arrangements for Balibasta sluice

0.00 0

3 Protection to Dhanua Right Embankment at RD 3.500 KM to 6.00 KM for 2016-17 26.32 17.88

4 Restoration to Devi Right Embankment from R.D. 83.30KM to 83.50KM near village Gopalpur for 2016-17 64.53 64.53

5 Raising and Strengthening of Kushabhadra Right embankment from RD 65.00 KM to 66.500 KM for 2016-17 24.68 24.64

6 Restoration to Davar-Santrash TRE from RD 6.800 KM to 7.500 KM for 2016-17 25.50 22.33

7 Restoration to Prachi left embankment near Deulimatha for 2016-17 26.51 26.51

8 Restoration to Bhargavi Left Embankment near village Makundaspur (Working RD 11.470 KM to 11.800 KM) 35.69 35.63

9 Protection to Right Embankment of river Prachi near Othaka Pradhan Sahi for 2016-17 30.00 29.00

10 Restoration to Kuakhai left embankment near village Bhubanpur for 2016-17 27.20 27.20

11 Restoration to Left Embankment of river Prachi near village Koilipur for 2016-17 25.50 25.48

12 Restoration to Devi Right Embankment near village Sathiabati for 2016-17 78.96 106.34

13 Restoration to right embankment of Kushabhadra near village Mundahanapatna for 2016-17 25.50 18.17

14 Restoration to Devi Right bank near village Parisikhar for 2016-17 72.36 72.36

15 Protection to Bhargabi left embankment near RD 12.80 Km. at Chitalpur 16.99 16.90

16 Protection to Bhargabi left embankment near RD 26.80 Km. to 26.90 Km. at Nahamanga 18.71 18.71

17 Protection to Kushabhadra right embankment near RD 52.300 Km. at village Khandiakuda

10.05 10.05

18 Protection to Kushabhadra left embankment near RD 58.30 Km. at village Netapur 13.15 13.15

542.36 542.36

24

Page 25: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

7

Work wise Expenditure Statement for the year 2016-17

( Rs. In lakhs) Sl. No. of

App. List

Name of Work Approved Cost

Expenditure during 2016-

17

Ramarks

1 2 3 4 5 Non-plan scheme (Critical - River Embankment)-Lump -RE

1 Protection to Drainage Sluice at RD 25.500 KM of K.V. Right Embankment for 2016-17 18.00 12.91

2 Raising and strengthening to TRE Davar to Santrash from RD 7.500 KM to 8.200 KM near village Santrash for 2016-17

25.00 14.53

3 Restoration to Bhargavi Left Embankment from RD 24.350 KM to RD 24.600 km (Working RD 24.655 KM to 24.845 KM) for 2015-16

34.00 33.90

4 Protection to Kushabhadra Left Embankment near village Paikasahi for 2016-17 34.00 40.00

5 Raising and strengthening to left embankment of river Prachi near village Udaipur for the year 2016-17 24.00 22.79

6 Protection to Bhargavi left embankment near RD 3.500 KM for 2016-17 20.00 18.27

7 Protection to Drainage Sluice at RD 39.690 KM of Kushabhadra Right Embankment near villge Shyamsundarpur for 2016-17

18.00 15.30

8 Restoration to Bhargavi left embankment from RD 25.000 KM to RD 25.200 KM (working RD 25.120 KM to 25.272 KM) for 2016-17

32.00 36.30

9 Improvement to Gabadiha TRE from RD 0.500 KM to 3.200 KM (working RD 2.500 Km to 3.150 KM) 15.00 26.00

220.00 220.00 (Critical - Saline Embankment)-Lump -SE

1 Protection to Right side Saline Embankment near Tikarapada Creek Irrigation Project for the year 2016-17 22.00 17.63

2 Protection to scoured bank of Jharling-Belanga Saline Embankment from RD 3.900 KM to 4.100 KM near Nuagarh for 2016-17

30.00 34.32

25

Page 26: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

8

3 Protection to Sahan-Balabhadrapur Saline Embankment near village Sidhikeswar for the year 2016-17 12.00 15.52

4 Slope Protection to Saline Embankment near Ramachandi for 2016-17 11.00 7.53

75.00 75.00 (Critical - Canal)-Lump -C

1 Improvement to Nimapara Branch Canal from RD 0.070 KM to 3.200 KM for 2016-17 10.00 9.99

2 Renovation of Drainage syphone at RD 4.700 KM of Baharana Minor (RCC retaining wall) for 2016-17 11.00 11.03

3 Improvement to Ankushipur Disty. From RD 5.500 KM to RD 12.00 KM for 2016-17 10.00 10.22

4 Improvement to Khandasahi Disty. From RD 00 to 3.400 KM for 2016-17 25.00 7.22

5 Improvement to Gop Branch Canal from RD 41.550 KM to 42.550 KM and RD 43.00 KM to 43.500 KM and Bayakuda Sub-Minor for 2016-17

12.00 18.78

6 Improvement to Chhaitana Disty. from RD 1.780 KM to 2.580 KM for 2016-17 12.00 15.95

7 Improvement to Begunia Disty. form RD 0.200 KM to 2.00 KM for 2016-17 12.00 12.85

8 Raising and Strengthening of Baharana Minor from RD 00 to 3.500 KM for 2016-17 16.00 15.67

9 Improvement to Kakatpur Disty. from RD 13.750 KM to 14.750 KM, RD 18.00 KM to RD 19.00 KM and RD 21.500 KM to RD 22.800 KM for the year 2016-17

10.00 17.89

10 Improvement of Nagapur Minor from RD 5.00 KM to 6.00 Km and 7.00 KM to 10.00 Km for the year 2016-17 7.00 6.86

11 Improvement to Balibasta Minor from RD 00 KM to 2.50

KM for 2016-17 18.00 17.83

12 Renovation to C.D. at RD 10.840 KM & 18.180 KM of Chandanpur Branch Canal and Head Regulator of Haripur Minor for 2016-17

12.00 10.23

13 Improvement to Kundhei Disty. from RD 18.00 KM to 19.00 KM, 22.400 to 24.00 KM and RD 36.00 KM to 38.00 KM for the year 2016-17

13.00 12.86

14 Improvement to Kakatpur Branch Canal from RD 72.00 KM to 80.00 KM for 2016-17 10.00 9.53

26

Page 27: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

9

15

Improvement to Nimapara Branch Canal from RD 42.00 KM to 44.00 KM, 45.00 KM to 46.00 KM & 51.00KM to 51.700 KM (working RD 42.500 KM to 43.600 KM & 45.500 KM to 46.700 KM) for 2016-17

14.00 14.50

16 Improvement to Gop Branch Canal from RD 44.600 KM to 45.150 KM and RD 47.650 KM to 48.700 KM for 2016-17

15.00 12.97

17 Improvement to Balibasta Minor from RD 3.00 KM to 5.300 KM and Sairi Sub-Minor for 2016-17 22.00 21.67

18 Improvement to Khandasahi Disty. from RD 4.00 KM to 5.20 KM and 14.00KM to 19.00 KM for 2016-17 24.00 23.98

19 Improvement to Bamanal Minor from RD 7.00 KM to 13.700 KM and its 4 Minor and Sub-Minors for 2016-17 8.00 8.37

20 Improvement to NImapara Branch Canal from RD 51.00 KM to 51.700 KM for 2016-17 7.00 6.75

21 Improvement to Ankushipur Disty. from RD 12.360 KM to 24.700 KM for 2016-17 22.00 21.13

22 Improvement to Nuharkiri Minor and Kiakanta Sub-Minor for 2016-17 15.00 13.90

23 Protection to C/R at RD 29.150 KM of PMC Reach-III & left bank at RD 29.300 KM for 2016-17 8.00 23.06

24 Construction of escape on left bank of NBC near village Khandiakuda for 2016-17 14.00 15.34

25 Construction of escape on left bank of GBC near Mallick Sahi for 2016-17 14.00 8.83

26 Improvement to Kakatpur Distributary from RD 2.500 KM to 4.500 KM for 2016-17 8.00 20.91

27 Improvement to Naiguaon Distributary, Naiguaon Minor No.I and Naiguaon Minor No.2 for 2016-17 14.00 13.88

28 Improvement to Barijanga Distributary including repairing to C.D. at RD 4.800 KM and its system for 2016-17

10.00 9.35

29 Improvement to Sunugoradi Disty. from RD 0.500 KM to RD 5.900 KM for 2016-17 8.00 7.65

30 Improvement to Nuagaon Disty. from RD 17.840 KM to 26.150 KM for 2016-17 16.00 16.95

27

Page 28: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

10

31

Improvement to NBC from RD 3.600 KM to RD 3.800 KM, RD 8.700KM to 8.900 KM and 12.000 to 12.500 KM, Kajipur Minor from RD 2.500 to 4.300 KM, Kaijanga Minor & Budhipada Minor from RD 1.500 KM to 4.000 KM for 2016-17

9.00 8.17

32 Improvement to Gandilo Disty. from RD 2.500 KM to RD 4.500 KM, Panchalo Disty. from RD 2.500 to 3.900 KM, Bhailo Minor and Sathilo Minor for 2016-17

9.00 8.38

33 Improvement to Bhuyan Distributary from RD 0.450 KM to 6.500 KM for 2016-17 10.00 9.62

34 Improvement to Kanti Distributary and its system for 2016-17 20.00 19.98

35 Improvement to Bayabar F.C. from RD 00 to 1.100 KM & renovation to Drainage Syphone at RD 0.750 KM. for 2016-17

10.00 9.94

36 Improvement to NBC from RD 32.00 KM to RD 32.820 KM & 34.500 KM to 35.300 KM including repair of escape at RD 30.865 KM for 2016-17

10.00 8.850

37 Improvement to Dahijanga Disty. From RD 0.500 KM to 4.00 KM & 6.00 KM to 7.200 KM & its system for 2016-17

10.00 9.80

38

Improvement to Astaranga Minor from RD 6.00 KM to RD 7.00 KM and 15.00 KM to 19.00 KM (working RD 11.200 KM D/S, 11.900 KM D/S, 13.300 KM Guard wall and 14.800 KM D/S and bed cutting from RD 10.200 KM to 10.700 KM) for 2016-17

7.00 6.89

39 Improvement to Erabanga Minor from RD 5.00 KM to 7.240 Km & Patelia Sub-Minor for 2016-17 8.00 7.89

40 Improvement to Bisharpur Distributary, Odamba Minor, Bhadisha Minor & its system for 2016-17 12.00 12.00

41 Improvement to Begunia Disty. from RD 8.600 KM to RD 9.600 KM & Ambiligaon Minor for 2016-17 8.00 8.00

42 Improvement to Baulanga Sub-Minor, Simuli Sub-Minor, Sohana Sub-Minor & Korual Sub-Minor for 2016-17 8.00 8.00

43 Improvement to Sorava Sub-Minor, Tiruna Sub-Minor and Rayas Sub-Minor for 2016-17 7.00 6.56

44 Improvement to GBC from RD 37.200 KM to 39.800 KM for 2016-17 7.00 6.99

28

Page 29: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

11

45 Raising and Strengthening of NBC from RD 12.00 KM to 16.00 KM & 21.00 KM to 24.00 KM for 2016-17 10.00 8.59

46 Improvement to Janara Minor , Amaranga Minor and Satakalia Minor for 2016-17 12.00 5.75

47 Improvement to Danapada Disty. from RD3.70Km to 13.20Km & its system for 2016-17 9.00 8.20

48 Improvement to Balanga F.C. from RD 00 to 1.470 KM and renovation to canal syphone at RD 0.950 KM for 2016-17

12.00 11.46

49

Restoration to 6 Nos. outlet within RD 24.00 KM to 27.250 KM & Construction of Wing wall and Return wall of V.R.B. at RD 27.00 KM of Chandanpur Branch Canal for 2016-17

10.00 8.90

50 Improvement to Nagapur Minor from RD 00 KM to 3.00 KM including construction of CD at RD 2.150 KM & Basudeipur Minor for 2016-17

10.00 9.90

51

Improvement to Gotalgram Disty. From RD 3.00 KM to 5.00KM including construction of CD at RD 3.350 KM & Gotalgram Minor including construction of CD at RD 2.00 KM for 2016-17

10.00 9.70

52 Improvement to Puransasan Minor from RD 0.200 KM to 0.500 KM & RD 3.500 KM to 5.600 KM for 2016-17 7.00 6.95

53 Improvement to Gop Minor from RD 0.900 KM to 4.00 KM and 5.00 KM to 6.00 KM and Tarangira Sub-Minor for 2016-17

10.00 11.37

54

Improvement to Chhaitana Disty. from RD 8.700 KM to 9.800 KM, Kabirajpur Sub-Minor, Tarana Sub-Minor, Itibhuyan Sub-Minor & Chhaitana Sub-Minor for 2016-17

7.00 7.69

55 Improvement to Saripur Minor, Bantilo Minor, Nasikeswar Minor and Ratanpur Minor for the year 2016-17

12.00 11.64

56 Improvement to Patapur Minor, Chheliberuhan Sub-Minor, Pateligaon Sub-Minor and Akhuria Sub-Minor for 2016-17

7.00 1.55

57 Improvement to Chakrapada Disty. from RD 00 to 0.945 km. & its system for 2016-17 7.00 7.71

58 Improvement to Dipideuli Minor for 2016-17 7.00 6.80

29

Page 30: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

12

59 Improvement to Kunarpur Disty. from RD 0.500 KM to 2.80 KM and renovation of 6 Nos. of outlets for 2016-17 10.00 8.90

60 Improvement to Hantasara Minor & Khagipur Sub-Minor for 2016-17 7.00 6.98

61 Improvement to Gopinathpur Distributary from RD 00 to 0.700 KM for 2016-17 7.00 5.95

62 Improvement to Baku Minor from RD 600 M to 1800 M & Uchhupur Minor for 2016-17 10.00 10.00

63 Improvement to Bhainchua Minor from RD 00 KM to 1.350KM for 2016-17 7.00 6.10

64 Improvement to Alisibindha Distributary its system for 2016-17 8.00 7.65

65 Improvement to Bangurigaon Minor , Bania Minor, Taroto Minor and its system for 2016-17 7.00 6.20

66 Improvement to Karanjipur Minor from RD 1.300 KM to 2.200 KM for 2016-17 8.00 7.68

67 Improvement to Tarana Minor and Uchhupur Sub-Minor and Dagarapada Sub-Minor for 2016-17 7.00 6.53

68 Improvement to Arisandha Minor & Benipur Minor for 2016-17 6.00 6.00

69 Improvement to Hansapada Minor, Pubagarh Minor & Badamachhapur Minor for 2016-17 6.00 4.63

70 Improvement to Manijanga Minor, Juanlo Minor, Badagaon Minor and Baisibati Minor for 2016-17 7.00 2.72

71 Improvement to Badalasasan Disty., Aloi Minor, Chhenua Minor and Bhatabandha Sub-Minor for 2016-17 8.00 8.57

72 Improvement to Patapur Minor and Bhubanpur Minor for 2016-17 7.00 6.12

73 Improvement to Runkei Minor, Adhena Minor, Davar Minor and Gunia Minor for 2016-17 7.00 3.38

74 Improvement to Badalasasan Sub-Minor, Chanarapada Minor, Kolipokhari Sub-Minor and Dihabari Minor for 2016-17

7.00 1.71

75 Improvement to Dangura Minor, Parisagana Minor, Gadavingura Minor & Barana Sub-Minor for 2016-17 7.00 6.62

76 Improvement to Nimapara Branch canal from RD.18.50 to 19.00 Km. 7.00

21.17

30

Page 31: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

13

77 Renovation to C.D. across NBC near village Patrasahi 6.00 2.51

78 Improvement to left bank of Runkei Minor from RD 00 to 0.900 Km. ( Working RD 00 to 0.950 Km.) 7.00 8.16

79 Construction of aquaduct on Kanapur Minor at RD 0.136 km. 7.00

12.99

80 Improvement to kakatpur Disty. From RD.9.60 to 9.97 Km. 20.00

21.00 835.00 835.00 3054-ROAD

1 Improvement to service road on Bisharpur Disty. from RD 2.300 KM to 2.900 KM for 2016-17 8.00 6.45

2 Improvement to service road on right embankment of Kushabhadra near village Majhihara for 2016-17 12.00 10.50

3 Construction of Bridge across C.B.C. near the village Mukundaspur & Samarei Sasan for 2016-17 24.00 21.50

4 Construction of Foot Bridge at RD 8.40 KM of Khandasahi Distributary for 2016-17 8.00 6.79

5 Construction of V.R.Bridge over NBC at RD 37.500 KM near village Banjhati for 2016-17 15.00 12.75

6 Construction of Foot Bridge across CBC near the village

Adalabad for 2016-17 8.00 10.09

7 Construction of Bridge across G.B.C. near village Sarbapada for 2016-17 15.00 14.41

8 Construction of V.R.Bridge across NBC at RD 34.900 KM for 2016-17 15.00 22.05

9 Construction of V .R. Bridge across Tarana Minor near RD 1.200 KM for 2016-17 6.00 5.88

10 Construction of Foot Bridge across Ankushipur Distributary near the village Sagada for 2016-17 7.00 7.58

118.00 118.00 2059-Non Residential Building

1 Renovation to office building of Nimapara Irrigation Division & Sub-division office at Nimapara for 2016-17 9.00 9.00

9.00 9.00 CANAL ROAD

1 Improvement to service road on Left bank of Nuagaon Distributary from RD 11.750 KM to 15.000 KM for 2016-17

20.00 21.24

2 Improvement to Service Road on left bank of Kundhei Disty. from RD 20.400 to 22.00 KM (working RD 20.480 to 21.640 KM) for the year 2016-17

24.00 19.24

31

Page 32: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

14

3 Improvement to Service Road on left bank of Rench Sasan 2L Minor for 2016-17 9.00 12.61

4 Improvement to service road on left bank of Hantasara Minor from RD 3.00 KM to 4.00 KM and Bhairipur Minor from RD 4.500 KM to 6.00 KM for 2016-17

9.00 9.36

5 Improvement to Service Road of Nagapur Minor from Balipatna to Namahara 8.00 7.55

70.00 70.00

EXPENDITURE FOR THE YEAR-2017-18

Sl. No. Name of Work Approved

Allotment Agreement

No.-

Agree-ment

Amount

Name of Agency

Date of Commencement

of work

Stipulated Date of

Completion of work

1 2 3 4 5 6 7 8 (Flood Control - River Embankment)-FC -RE 1

Slope Protection to Devi right Embankment near Bauriakana 16.00 115 P1/16-17 15.61 Shantilata Khuntia 20.12.16 18.6.17

2 Construction of 2Nos low level spur near RD 80.400Km & 80.500Km of Devi right embankment.

84.00 159 P1/16-17 84.25 Sangram Kesheri Nayak 20.12.16 18.6.17

3 Raising & strengthening to Bhargavi left Embankment from Chilapatana to Gabakunda.

34.00 108 P1/16-17 34.00 Basanta Pradhan 20.12.16 18.6.17

4 Protection to Kushabhadra Right Embankment near village Sujanagar. 34.50 43 P1/16-17 34.45 Sanjaya Kumar

Behera 20.12.16 18.6.17

5 Restoration to Devi right bank near Sikhar Sluice. 75.00 156 P1/16-17 74.980 Abhaya Kumar

Swain 20.12.16 18.6.17

6 Protection to Kuakhai Left Embankment near Tankapani bridge. 34.00 144 P1/16-17 34.00 Alekha Prasad

Sahoo 20.12.16 18.6.17

7 Raising & strengthening to Bhargavi left Embankment near Khirikhia. 26.00 134 P1/16-17 25.98 Nillam Kumar

Parida 20.12.16 18.6.17

8 Slope Protection to Kushabhadra Right Embankment from RD 25.500 to 25.800 KM

34.50 138 P1/16-17 34.26 Chandan Patra 20.12.16 18.6.17

9 Protection to Devi right Embankment near Gopalpur. 16.00 53 P1/16-17 15.55 Raj Kishore Sahoo 20.12.16 18.6.17

10 Raising & strengthening to Bhargavi left Embankment near Sahadapada. 21.00 54 P1/16-17 21.18 Subhransu Mohanty 20.12.16 18.6.17

11 Protection to Kushabhadra Right Embankment near Denuabasta. 26.00

162 P1/16-17 26.19 Rushi Prasad

Mishra 20.12.16 18.6.17

12 Protection to Kushabhadra Left Embankment from RD 38.500 to 41.500Km

35.00 60 P1/16-17 34.81 Pravakar Sahoo 20.12.16 18.6.17

32

Page 33: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

15

13 Protection to Devi right Embankment near Asan. 42.00 59 P1/16-17 42.07 Chakradhar Parida 20.12.16 18.6.17

14 Raising & strengthening to Bhargavi left Embankment from R.D 15.100 km to 16.100 km

17.00 112 P1/16-17 17.05 Basanta Pradhan 20.12.16 18.6.17

15 Raising and strengthening to Kushabhadra left Embankment from RD 55.230 KM to 57.00 KM

22.00 61 P1/16-17 22.02 Kabita Sahoo 20.12.16 18.6.17

16 Protection to Devi Right Embkt. Near Sathiabati 50.00

17 Slope protection to Devi Right Embankment from RD 82.00 KM to 82.100 KM (working RD 83.537 KM to 83.587 KM)

10.00 188 P1/15-16 3.06 Abhilash Biswal

18 Raising and strengthening to Kushabhadra Right Embankment from RD 48.00 KM to 52.00 KM (working RD 50.900 KM to RD 51.500 KM)

5.00 249 P1/15-16 2.85 Smrutiranjan Senapati

19 Protection to Dhanua Left Embankment from RD 00 KM to 0.210 Km near Tinimuhani

12.00 244 P1/15-16 12.27 Miniti Sahoo

20 Protection to Dhanua Right Embankment near RD 5.200 KM 10.00 250 P1/15-16 2.87 Maghalal Rout

21 Raising and strengthening to Kushabahdra Right Embankment from RD 43.00 KM to 45.00 KM (working RD 44.00 KM to 44.50 KM)

16.00 243 P1/15-16 16.31 Miniti Sahoo

22 Slope Protection to Kushabhadra right embankment at RD 36.030 KM near village Denuabasta

10.00 245 P1/15-16 6.07 Dillip Ranjan Mishra

630.00 516.40 (Flood Control - Saline Embankment)-FC -SE

1 Protection to scoured bank of Jharling belang saline embankment near 5.00km

37.00 110 P1/16-17 40.40 Rajib Lochan Patra 20.12.16 18.6.17

2 Raising and strengthening to sahan Balabhadrapur saline embankment from RD 00 to 1.00km.

35.00 84 P1/16-17 37.80 Prabodha Kumar Swain 20.12.16 18.6.17

3 Protection to Tikarpada saline embankment near Ganipur. 36.00 29 P1/16-17 39.63 Bijaya Kumar

Swain

23.11.16 19.5.17

4 Raising and strengthening to Ukulai-Astarang S/E (Ukulai to Bhanuria bridge).

31.00 30 P1/16-17 33.90 Harekrushna Swain 23.11.16 19.5.17

5 Protection to scoured bank of Prachi left embankment near Haladigadia. 27.00 164 P1/16-17 29.66 Premananda

Mallick 20.12.16 18.6.17

6 Protection to sahana-Balabhadrapur Saline Embankment near RD 11.200 Km.

8.00

33

Page 34: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

16

7 Restoration and protection to Ukulei Saline Embankment from RD 00 KM to 5.00 KM (working RD 1.020 KM to 2.00 KM)

6.00 219 P1/15-16 5.95 Bhagirathi Behera

180.00 181.39

D- STATE PLAN COMPLETION OF NCOMPLETE PROJECTS 1 Restoration to Devi right embankment

near village Sathiabati. 7.00

2 Restoration to Devi right embankment

near village Benipur. 7.00

3 Restoration to Bhargavi left

Embankment from RD 24.680 to 24.720 Km.

7.00

4 Restoration to Bhargavi left

Embankment from RD 28.700 to 28.750 Km.

7.00

5 Restoration to TRE from Davar to

Santrash & Bamanal from RD 1.50 Km to 2.40 Km.

8.00

6 Restoration to TRE from Davar to

Santrash & Bamanal from RD 8.90 Km to 9.20 Km.

7.00

Total: 43.00 (Critical - River Embankment)-Lump -RE 1

Slope Protection to Kushabhadra Left embankment near Maliatutha. 16.00 34 P1/16-17 15.81 Bibekananda Sitha 23.11.16 19.5.17

2

Improvement to TRE from Davar to Santrash & Bamanal from RD 0.0 KM to 3.20 KM including 1 No. drainage sluice.

53.50 160 P1/16-17 53.64 Shantilata Khuntia 20.12.16 20.9.17

3 Raising & strengthening to Bhargavi left Embankment from R.D 11.000 km to 11.200 km & 11.500 km to 11.800 km

9.50 150 P1/16-17 9.56 Kedar Chandra Mohanty 20.12.16 18.6.17

4 Raising and strengthening to Kushabhadra Right Embankment from RD 61.90 KM to 62.5 KM 22.00 69 P1/16-17 21.91 Jayanta Kumar

Nayak 20.12.16 18.6.17

5 Restoration to Dhanua left embankment near Sana-Bhoinchua. 17.00 136 P1/16-17 16.99 Purna Chandra

Dash 20.12.16 18.6.17

6 Raising and strengthening to left Embankment of siarocut from RD 6.00 KM to 12.00 KM 24.00 105 P1/16-17 24.63 Purna Chandra

Pradhan 20.12.16 18.6.17

7

Improvement to TRE from Davar to Santrash & Bamanal from RD 4.200 KM to 4.450 KM, RD 6.500 to 6.700 KM & RD 8.655 KM to 9.00 KM

20.00 51 P1/16-17 20.13 Parikhita Swain 20.12.16 18.6.17

8 Improvement to approch road 4 Nos.to Bhargavi left embankment within RD 25.00 to 30.00km. 11.00

62 P1/16-17 11.06 Kabita Sahoo 20.12.16 18.6.17

9 Restoration to Gabadiha T.R.E from R.D 1.700 km to 2.500 km 4.00

28 P1/16-17 3.56 Ashok Kumar Pani 23.11.16 19.5.17

10 Protection to Bhargabi left embankment near RD 29.800km 26.00

34

Page 35: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

17

11 Raising and strengthening to TRE Davar to Santrash from RD 7.500 KM to 8.200 KM near village Santrash

17.00

21 P1/16-17 18.21 Pradipta

Ku.Acharya

220.00 195.50

(Critical - Saline Embankment)-Lump -SE

1 Improvement to Khalkipatna Saline Embankment.

17.50 48 P1/16-17 17.51 Prasad Pattanayak 20.12.16 18.6.17

2 Improvement to Saline Embankment near Ramchandi temple.

34.50 113 P1/16-17 34.35 Susobhan Samantaray 20.12.16 18.6.17

3 Improvement to Talasuan creek Irrgation. 13.00 55 P1/16-17 13.13 Samira Kumar

Mohanty 20.12.16 18.6.17

4 Protection to K.V. left embankment near village Khalakatapatna

10.00 0

75.00 64.99

(Critical - Canal)-Lump -C

1 Improvement to NBC from RD 12.300 to 12.500 km 13.00 118 P1/16-

17 13.43 Mohan Charan Mukhi 20.12.16 18.6.17

2 Improvement to CBC from RD 0.900 to 1.200 km 15.00 140 P1/16-

17 15.24 Pradeep Kumar Sundararay 20.12.16 18.6.17

3 Improvement to Barijanga Distributary from RD 3.00 to tail

9.00 130 P1/16-17 8.78 Laxmipriya

Parida 20.12.16 18.6.17

4 Raising and strengthening to NBC from RD 12.900 to 13.600 km

15.00 119 P1/16-17 15.30 Subash Chandra

Swain 20.12.16 18.6.17

5 Improvement to Bhuyan Distributary RD 4.00 km to tail 10.00 122 P1/16-

17 10.28 Basanta Kumar Bhoi 20.12.16 18.6.17

6 Improvement to Ankushipur distributary and its system RD 10.00 to 12.00 km.

15.00 142 P1/16-17 15.34 Annada Prasad

Prusti 20.12.16 18.6.17

7 Raising and strengthening to NBC from RD 20.600 to 21.800 km.

15.00 125 P1/16-17 15.34 Nrusingha

Charana Jena 20.12.16 18.6.17

8 Improvement to Narada Distributary &RD 4.00 km to tail

7.00 47 P1/16-17 7.68 Aswini Kumar Dash 20.12.16 18.6.17

9 Protection to left bank of PMC Reach III near RD 38.60 km. 6.00 49 P1/16-17 3.60 Dillip Kumar

Mishra 20.12.16 18.6.17

10 Improvement to Danapada Distributary RD 3.500 to tail 8.00

58 P1/16-17 8.50 Prasanta Kumar

Mallick 20.12.16 18.6.17

35

Page 36: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

18

11 Raising and strengthening to NBC from RD 22.600 to 23.500 km.

12.00 124 P1/16-17 12.77 Nrusingha

Charana Jena 20.12.16 18.6.17

12 Improvement to Gotalgram disty & it's system. 8.00 141 P1/16-

17 7.81 Ajaya rout 20.12.16 18.6.17

13 Improvement to Biswanathpur minor.

8.00

14 Improvement to Balibasta Minor R.D 2.60 km to 5.60 km 26.00 126 P1/16-

17 26.52 Rama Chandra Samantasinghar 20.12.16 18.6.17

15 Improvement to Nuagaon disty from R.D 00 km to 6.00 km 26.00 79 P1/16-17 26.41 Bhaskar Sahoo 20.12.16 18.6.17

16 Improvement to Uchhupur disty from R.D 300 m to 1200 m

9.00 66 P1/16-17 8.99 Patitapaban Pati 20.12.16 18.6.17

17 Improvement to Chakrapada disty. from R.D 200 m to 600 m & its minor

7.00 74 P1/16-17 7.19 Pradyumna Rath 20.12.16 18.6.17

18 Improvement to Gadavingura Minor & its system 8.00 117 P1/16-

17 8.72 Kalendi Charana Jena 20.12.16 18.6.17

19 Improvement to Balanga F.C from R.D 500 m to tail 7.00 147 P1/16-

17 6.96 M/s Liku Traders 20.12.16 18.6.17

20 Improvement to Godimal disty from R.D 200 m to 1200 m 6.00 65 P1/16-17 6.47 Laxmidhar

Nayak 20.12.16 18.6.17

21 Improvement to Kuanarpur disty. & its minor from R.D 6.00 km to tail

7.00 104 P1/16-17 7.26 Arundhati Pal 20.12.16 18.6.17

22 Improvement to Bhanapur disty from R.D 00 to 180 mtr 6.00 120 P1/16-

17 6.22 Rajat Kumar Nayak 20.12.16 18.6.17

23 Improvement to Jamarsuan disty from R.D 900 m to 1800 mtr

8.00 56 P1/16-17 8.59 laxmipriya Behera 20.12.16 18.6.17

24 Improvement to Nuagaon disty from R.D 12.88 km to 24.00 km

14.00 123 P1/16-17 14.48 Pradipta Kumar

Acharya 20.12.16 18.6.17

25 Improvement to Sairi Minor from R.D 00 to 1.00 km

6.00 71 P1/16-17 4.14 Purna Chandra

Pradhan 20.12.16 18.6.17

26 Improvement to Gadatorihan Minor from R.D 400 m to 2500 mtr

7.00 121 P1/16-17 7.19 Rajat Kumar

Nayak 20.12.16 18.6.17

27 Improvement to Gop Branch Canal near HR of Begunia disty.

6.00 171 P1/16-

17 6.22 Padmanav Routray 20.12.16 18.6.17

36

Page 37: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

19

28

Improvement to Gop Branch Canal from RD 50.00 KM to 51.20 KM and RD 53.500 KM to 53.600 KM.

12.00 139 P1/16-17 12.17 Jitendra Kumar

Nayak 20.12.16 18.6.17

29 Improvement to Chhaitana Disty. from RD 00 Km to 1.50 km.

10.00 67 P1/16-17 10.08 Jaganath Sahoo 20.12.16 18.6.17

30 Improvement to Siaro minor & Tarana minor. 6.00 33P1/16-17 4.85 Anapurna Dash 23.11.16 19.5.17

31 Raising and Strengthening of Putupada Minor 9.00 68 P1/16-17 8.78 Jayanta Kumar

Nayak 20.12.16 18.6.17

32

Improvement to Begunia Disty. form RD 2.00 KM to 3.50 KM & 7.5km. to 8.50 km.

8.00 80 P1/16-17 8.74 Debasis Harichandan 20.12.16 18.6.17

33 Improvement to Bhairipur minor & Mahalapada sub minor.

9.00 145 P1/16-17 8.81 Sibendra Kandi 20.12.16 18.6.17

34 Renovation to Khadiso minor from RD.2.0 km to 3.0km. & Bayakuda Sub-Minor

6.00 169 P1/16-17 2.50 Jyoti Ranjan

Mohanty 20.12.16 18.6.17

35 Renovation to Erabanga minor from RD 1.0 km to 2.50km. 5.00 32P1/16-17 5.04 Sanjaya Kumar

Dethi 23.11.16 19.5.17

36 Improvement to Gop Minor from RD 0.90 KM to 2.00 KM and RD 4.00 KM to 5.500 KM.

8.00 50 P1/16-17 12.42 Madhusudan Behera 20.12.16 18.6.17

37 Improvement to Bisharapur Distributary & Bhadish minor and it's system.

12.00 177 P1/16-17 17.41 Bijaya Kumar

Pradhan 20.12.16 18.6.17

38 Renovation to A.I. Distry. & Benipur Minor. 8.00 167 P1/16-

17 8.04 Bijaya Kumar Swain 20.12.16 18.6.17

39 Improvement to N.B.C. from RD 46.00 to 47.00km 10.00 46 P1/16-17 10.26 Gagan Bihari

Patra 20.12.16 18.6.17

40 Improvement to Right bank of N.B.C. from RD 38.00Km to 39.00Km.

10.00 158 P1/16-17 10.38 Ashok Kumar

Senapati 20.12.16 18.6.17

41 Improvement to Nimapara Branch Canal from RD 31.200 KM to RD 32.00 KM.

6.00 106 P1/16-17 6.54 Basanta

Pradhan 20.12.16 18.6.17

42 Improvement to Andhia minor-II, Nuharkiri Minor and Bhubanpur Minor

20.00 129 P1/16-17 19.85 Subhransu

Mohanty 20.12.16 18.6.17

43 Improvement to Khandasahi Disty.from RD 5.200 KM to 14.000 KM

17.00 175 P1/16-

17 14.97 Himanshu Bhusan Patra 20.12.16 18.6.17

37

Page 38: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

20

44 Improvement to Janara Minor and its system 12.00 57 P1/16-17 17.65 Suhobhan

Samantray 20.12.16 18.6.17

45 Improvement to Baharana Minor from RD 00 KM to 4.500 KM

13.00 44 P1/16-17 12.75 Madhusudan Behera 20.12.16 18.6.17

46 Improvement to Durgeswar Sub-Minor from RD 0.200 to 0.500 KM.

8.00 128 P1/16-17 8.53 Sanjukta

Sarangi 20.12.16 18.6.17

47 Improvement to Srimukha minor from RD 00 to tail. 9.00 179 P1/16-

17 9.15 Brahmananda Rout 20.12.16 18.6.17

48 Improvement to Ashapuran Minor from RD 00 to 3.500 KM.

9.00 111 P1/16-17 9.09 Benudhar Pani 20.12.16 18.6.17

49

Improvement to Ankushipur Distributary from RD 13.00 KM to RD 17.00 KM and its system

17.00 107 P1/16-17 17.33 Basanta

Pradhan 20.12.16 18.6.17

50 Improvement to Bamanal Minor from RD 00 to 7.00 KM and its system

12.00 52 P1/16-17 11.92 Subhransu Mohanty 20.12.16 18.6.17

51

Improvement to Nimapara Branch Canal from RD 26.500 KM to RD 30.500 KM & its system

13.00 174 P1/16-17 12.90 Ashok Kumar

Senapati 20.12.16 18.6.17

52 Improvement to Kanti Disty.from RD 00 to 1.30km and 7.00 KM to 11.000 KM

13.00 83 P1/16-17 13.44 Sanjukta Sarangi 20.12.16 18.6.17

53 Improvement to Kendrapati Minor and Kakatpur Sub-Minor.

6.00 81 P1/16-17 1.28 Pramod Kumar Senapati 20.12.16 18.6.17

54 Improvement to Kakatpur Distributary from RD 3.00km to 9.00km.

11.00 137 P1/16-17 11.43 Ramesh

Chandra Dalai 20.12.16 18.6.17

55 Improvement to Kakatpur distributary from RD 19.00 Km to RD 21.500 Km.

13.00 76 P1/16-17 12.94 Pramod Kumar Senapati 20.12.16 18.6.17

56 Improvement to Nagpur minor from RD 00 to 5.00km & 7.00 to 10.00km

13.00 82 P1/16-17 13.03 Pramod Kumar Senapati 20.12.16 18.6.17

57 Improvement to Kakatpur Distributary from RD 10.00 Km to 19.00 Km.

13.00 102 P1/16-17 12.81 Kailash

Chandra Sahoo 20.12.16 18.6.17

58

Improvement to right bank of Kakatpur Branch Canal from RD 66.600 KM to RD 69.600 kM

14.00 75 P1/16-17 14.13 Harekrushna Swain 20.12.16 18.6.17

59 Improvement to Astaranga Minor from RD 7.00 KM to 12.00 KM.

15.00 176 P1/16-

17 21.53 Smruti Ranjan Pradhan 20.12.16 18.6.17

38

Page 39: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

21

60 Improvement to Nilakanthapur Minor, Kuhudi Minor, Lataharana Minor

6.00 86 P1/16-17 0.84 Pramod Kumar Senapati 20.12.16 18.6.17

61

Improvement to Beguniabasta Minor near Khandasahi and Karanjipur Minor from RD 60.00 m to 160.00 m and Naiguaon Disty. from RD 00 to 500 m.

14.00 149 P1/16-17 14.30 Prasanta Kandi 20.12.16 18.6.17

62 Improvement to Kundhei disty from 16.00 to 20.00km including it's system

12.00 103 P1/16-17 12.74 Kailash

Chandra Sahoo 20.12.16 18.6.17

63 Improvement to Patapur minor from 1.50 to 3.00km. 12.00 127 P1/16-

17 11.95 Jitendriy Nayak 20.12.16 18.6.17

64 Renovation to Gop Branch Canal from RD 59.50 km. to 61.900km.

15.00

65 Improvement to Chhaitana Disty. from RD 12.00 km. to 15.00 km.

10.00

66 Improvement to Khandashi Disty. from RD 17.00 to 17.90km

25.00

67 Improvement to Barijanga Disty. from RD 0.20 km. to 1.00 km.

12.00

68 Improvement to Rajas Disty. from RD 00 to 2.50km. 10.00

69 Impprovement to Purohitpur Disty. from RD 00 to 2.00 km. 8.00

70 Improvement to Badalasasan Sub-Minor, Chanarapada Minor, Kolipokhari Sub-Minor and Dihabari Minor

6.00 135 P1/15-16 4.41 Manjaraj Barik

71 Improvement to Khandasahi Disty. From RD 00 to 3.400 KM

22.00 229 P1/15-16 22.18 Pulak Mohanty

Const.

72 Improvement to Janara Minor , Amaranga Minor and Satakalia Minor

6.00 257 P1/15-16 5.65 Jaganath Parida

73 Improvement to Manijanga Minor, Juanlo Minor, Badagaon Minor and Baisibati Minor

6.00 160 P1/15-16 3.55 Baburam Nayak

74 Improvement to Runkei Minor, Adhena Minor, Davar Minor and Gunia Minor

6.00 195 P1/15-

16 3.20 Madhusudan Behera

39

Page 40: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

22

75 Renovation to C.D. across NBC near village Patrasahi 7.00 69-P1- 15-16 6.44 Pitabash Swain

76 Improvement to Gop Branch Canal from RD 44.600 KM to 45.150 KM and RD 47.650 KM to 48.700 KM

6.00 239 P1/15-16 5.07 Truptiranjan

Swain

77 Construction of escape on left bank of GBC near Mallick Sahi

6.00 236 P1/15-16 6.24 Nrusingh Ch.

Bastia

78 Improvement to Patapur Minor, Chheliberuhan Sub-Minor, Pateligaon Sub-Minor and Akhuria Sub-Minor

6.00 190 P1/15-16 5.42 Kailash Ch.

Khuntia

79 Improvement to kakatpur Disty. From RD.9.60 to 9.97 Km.

9.00 06-P1- 15-16 8.71 Bhinmasen Khuntia

835.00 750.88

3054-ROAD

1 Construction of V.R.Bridge across Chhaitana Distributary near village Dalanai. 9.00 116 P1/16-17 8.74 Santosh Kumar

Baral 20.12.16 18.6.17

2 Construction of V.R.Bridge across GBC near village Sabar sahi & renovation to VRB near Golapur. 12.00 173 P1/16-17 12.24 Susanta Kumar

Biswal 20.12.16 18.6.17

3 Construction of Foot Bridge across NBC near 11.50 Km. 8.00 178 P1/16-17 7.92 Sanjaya Kumar

Dethi 20.12.16 18.6.17

4 Construction of Bridge across GBC near village Kushapur. 13.00 146 P1/16-17 13.31 Prakash Chandra

Rout 20.12.16 18.6.17

5 Construction of Bridge across C.B.C near village Madhayasahi 7.00 165 P1/16-17 5.15 Rajat Kumar Nayak 20.12.16 18.6.17

6 Construction of Foot Bridge over Khandasahi Distributary near village Magunichhanda. 8.00 148 P1/16-17 7.40 Ramakanta Behera 20.12.16 18.6.17

7 Improvement to Service road of Khandasahi Distributary from RD 00 to 1.64km and 4.20 to 5.20km. 7.00 157 P1/16-17 7.48 Nirupama Swain 20.12.16 18.6.17

8

Improvement to service road of Ankushpur distributary from 17.85km to 18.35Km. (W/RD 17.60km to 18.35km)

7.00 170 P1/16-17 7.15 Renubala Dutta 20.12.16 18.6.17

9 Construction of culvert across Malada Minor near Kantapada High school. 7.00 85 P1/16-17 7.29 Pramod Kumar

Senapati 20.12.16 18.6.17

10

Costruction of 2 Nos. bridges near RD 4.00km & 5.70km including strengthening both banks of Durujanga of Astaranga Minor

9.00 77 P1/16-17 9.15 Pramod Kumar Senapati 20.12.16 18.6.17

11 Construction of V.R.Bridge across Kakatpur Branch Canal near village Patharapaka Bhoi sahi. 8.00

87 P1/16-17 8.25 Pramod Kumar

Senapati 20.12.16 18.6.17

40

Page 41: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

23

12

Construction of V.R.Bridgte near Kantapada including approach slab at RD 9.20 & 9.60km over RCC trough of Astaranga Minor.

12.00

161 P1/16-17 12.51 Jitendriy Nayak 20.12.16 18.6.17

13 Improvement to Service Road on right bank of NBC from RD 4.00 to 6.00 km.

11.00 0

118.00 106.59 2059-Non Residential Building 1

Renovation to Non-Res Building of Madaranga Irrigation section 9.00

88 P1/16-17 7.80 Madhusudan

Behera 20.12.16 18.6.17

9.00 7.80 CANAL ROAD

1 Improvement to right bank of PMC Reach-III from RD 29.650Km to 30.200Km. 13.00 143 P1/16-17 14.60 Ajaya Rout 20.12.16 18.6.17

2 Improvement to Service Road on right bank of NBC from RD 7.50 to 12.00 km. 11.00 131 P1/16-17 11.35 Pratap Kumar

Swain 20.12.16 18.6.17

3

Improvement to Service road of Khandasahi Distributary from RD 7.85 to 8.50km and 10.50 to 13.20km. 12.00 132 P1/16-17 12.39 Debendra Nath

Mahari 20.12.16 18.6.17

4 Improvement to service road on Astaranga Minor from RD 11.400 Km to 13.300 Km. 8.00 109 P1/16-17 8.51 Jitendriy Nayak 20.12.16 18.6.17

5 Improvement to service bank of Bamnal minor from RD 7.80km to 8.47Km. 12.00 168 P1/16-17 12.19 Ashok Kumar Pani 20.12.16 18.6.17

6 Improvement to Right bank service Road on Benipur Minor from RD 0.00 to 1.10Km. 8.00 133 P1/16-17 8.30 Jitendra Kumar

Nayak 20.12.16 18.6.17

7 Improvement to Service Road on right bank of Baibara F.C.

6.00 0

70.00 67.34 FLOOD CONTROL -RESTORATION

1 Restoration to Bhargavi left Embankment near Suando. 30.00 63 P1/16-17 29.77 Ganesh Biswal 20.12.16 18.6.17

2 Restoration to Devi right scoured bank near RD 80.600Km. 70.00 155 P1/16-17 71.91

Shantilata Khuntia

15.12.16 14.9.17

3 Restoration to Kushabhadra right embankment near village Nakadiha.

33.00 135 P1/16-17 33.16 Prakash Chandra Jena 20.12.16 18.6.17

4 Protection to Bhargavi left Embankment near Parbatipur. 26.00 166 P1/16-17 26.00 Apex Pvt. Ltd. 20.12.16 18.6.17

5 Restoration to Kushabhadra Left Embankment near village Nagapur 34.00 45P1/16-17 34.19 Sanjaya Kumar

Behera 20.12.16 18.6.17

6 Protection to Bhargavi left Embankment near Nahamanga. 26.00

64 P1/16-17 26.40 Ajit Chand Das 20.12.16 18.6.17

41

Page 42: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

24

7 Restoration to Devi right scoured bank near RD 80.700Km. 65.00 163 P1/16-17 66.27 Abhaya Kumar

Swain 20.12.16 20

8 Restoration to Bhargabi left embankment near village Seulakunda.

36.00 72 P1/16-17 35.93 Bhagaban Mishra 20.12.16 20.9.17

9 Restoration to Devi right Embankment near Benipur. 9.00 31P1/16-17 9.03 Abhaya Kumar

Swain 23.11.16 19.5.17

10 Restoration to Bhargavi left Embankment near Totasahi. 21.00 89 P1/16-17 21.32 Rushi Prasad

Mishra 20.12.16 18.6.17

11 Restoration to Bhargabi left embankment near village Chadheibara.

34.00 114 P1/16-17 34.07 Santosh Nayak 20.12.16 18.6.17

12 Restoration to Bhargabi left embankment near RD 11.800km. 25.00

13 Improvement to Kushabahdra Right Embankment near RD 34.100 km. (Construction of low level spur Dumping & packing)

9.00 102 P1/15-16 9.28

Mitalipriyankini Swain

14 Design, drawing, supplying, fabrication, transportation, errection, commissioning & testing of M.S. Gates alongwith hoisting arrangements for Drainage Sluice at (1) RD 390m, 920m, 1530m, 2300m, & 3150m of Chhotipada –Badaraula, (2) RD 765m, 1290m, 2040m & 3270m of Keutajanga, (3) RD 200m, 3900m, 4850m, 5255m & 6467m of Nagar and (4) RD 579m & 1120m of Tandahara Saline Embankment under Nimapara Irrigation Divn, Nimapara

7.00 105F2 of 2015-16 7.23

OCC Ltd.

15 Protection to Dhanua Right Embankment at RD 3.500 KM to 6.00 KM

8.00 147 P1/15-16 8.44

Rushi Pr. Mishrsa

16 Restoration to Davar-Santrash TRE from RD 6.800 KM to 7.500 KM

5.00 149 P1/15-16 3.48

Bismayakanta Sahoo

17 Restoration to right embankment of Kushabhadra near village Mundahanapatna

7.00 226 P1/15-16 7.34

Pulak Mohanty Const.

445.00 423.82

NP(SE)

1

Improvement to left side Saline Embankment of Tikarapada Creek Irrigation Project from RD 0.300 KM to 1.050 KM

113 P1/ 15-16 587,268

Gagan Bihari Patra

27.1.16 30.3.16

42

Page 43: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

25

NP(RE)

1

Protection to Dhanua Right Embkt from RD 3.00km to 3.210km

78 P1/16-17 1,248,413 Niranjan Pradhan 20.12.16 18.3.17

2 Imp. To K.V. Right Embkt. 36.350 to 41.00km 17P1/16-17 1,637,037 Jyoti Ranjan

Mohanty 24.10.16 20.2.17

3

Imp. To Devi Right Embkt. From RD 76.50km to 77.50km

18P1/16-17

1,540,682 Samir Kumar Mohanty 1.11.16

28.2.17

S/R (Canal)

1

Construction of Bridge across Tarana Minor near village Bijipur for 2016-17 03P1/2016-17 Bijaya Kumar

Pradhan 27.5.16 25.7.16

2

Const. of Pile Bridge across Nuagaon Disty Near Village Podapalli for 2016-17 172P1/2016-

17 Basanta Kumar Kandi 20.12.16 18.2.17

Lump(RE) Savings

1

R/s to TRE Davar to Santrash from RD 7.50km to 8.20km near village Santrash 21P1/2016-17 Pradipta Kumar

Acharya 15.11.16 13.3.17

Non-Res Building

1

Imp. To Ganeswarpur Section office Copoundwall at Subarnapur

23P1/2016-17 Gagan Bihari Patra 1.11.16 28.2.17

2 Imp. To Rest shed at Balanga Irrigation Colony 153P1/2016-

17 100719 Ajit Chand Das 5.12.16 4.1.17

Res-Building

1

Repair to Res Building(2RA,Etype-3&4 & C-typeQrs)in Delta Colony at Nimapara

24P1/2016-17 Tuna Behera 1.11.16 28.3.17

2

Repair to Res Building(2RB-I,4th Grade Qr-6,G-type qr No-6&7,Clerk Qr no-1,F-type qr no-9 to 12 & E type- 1 & 2)in Delta Colony at Nimapara

27P1/2016-17

Mangaraj Barik 15.11.16 13.3.17

3 Renovation to Qr No-2RA-II at Delta Colony Nimapara 152P1/2016-

17 Santilata Sahoo 5.12.16 4.1.17

43

Page 44: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

26

Appendix - IV

DETAILS OF EMBANKMENT A) CAPITAL EMBANKMENT

Sl. No.

Name of the embkt with RD

Jurisdiction (RD in km)

Length in km

Block Constituency Total length

Sub-Divn

Section

1 Kushabhadra left embkt RD 38.50 to 73.50 km

38.50 to 57.50 19.000 Gop Nimapara 35.00 Gop Gop 57.500 to 60.00

2.500 Gop Nimapara Gop Nagapur

60.00 to 73.50 13.500 Gop Kakatpue Gop Nagapur 2 Kushabhadra right

embkt RD 30.00 to 67.50 km

30.00 to 41.00 11.000 Nimapara Nimapara 37.50 Nimapara Nimapara 41.00 to 45.00 4.000 Nimapara Nimapara Gop Ganeswarpur

45.00 to 56.00 11.000 Gop Nimapara Gop Ganeswarpur

56.00 to 64.00 8.000 Gop Nimapara Gop Madaranga

64.00 to 67.50 3.500 Gop Kakatpur Gop Madaranga

3 Bhargavi left embkt from RD 14.00 to 37.800 km

14.00 to 26.00 12.000 Nimapara Nimapara 23.800 Balanga Embkt Section

26.00 to 28.00 2.000 Pipili Pipili Balanga Embkt Section

28.00 to 31.00 3.000 Nimapara Nimapara Balanga Embkt Section

31.00 to 37.80 6.800 Satyabadi Satyabadi Balanga Embkt Section

4 Devi right embkt from RD 73.00 to 85.00 km

73.00 to 80.50 7.500 Kakatpur Kakatpur 12.000 Kakatpur Bauriakana

80.50 to 85.00 4.500 Astaranga Kakatpur Kakatpur Bauriakana TOTAL 108.300

B) O.A. EMBANKMENT

Sl. No.

Name of the embkt with RD

Jurisdiction (RD in km)

Length in km

Block Constituency Total length

Sub-Divn

Section

1 Siaro cut left embkt from RD 00 to 12.00 km

00 to 5.00 5.00 Gop Nimapara 12.00 Gop Madaranga

5.00 to 12.00 7.00 Gop Puri Sadar Gop Madaranga

2 Siaro cut right embkt from RD 00 to 12.00 km

00 to 12.00 12.00 Puri Sadar

Puri Sadar 12.00 Balanga Ketakipatna

3 Dhanua right embkt from RD 00 to 6.200 km

00 to 6.20 6.200 Puri Sadar

Puri Sadar 6.200 Gop Madaranga

4 Dhanua left embkt from RD 00 to 5.800 km

00 to 5.80 5.800 Gop Nimapara 5.800 Gop Ganeswarpur

TOTAL 36.000 36.000

44

Page 45: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

27

C) O.A. EMBANKMENT

Sl. No.

Name of the embkt. with RD

Jurisdiction (RD in km)

Length in km

Block Constituency Total length

Sub-Divn

Section

1 Davar to Santrash from RD 00 to 14.00 km

00 to 14.00 14.000 Gop Nimapara 14.000 Nimapara Nimapara

2 Gabadiha TRE from RD 00 to 9.08 km

00 to 9.080 9.080 Gop Nimapara 9.080 Balanga Ketakipatna

3 Siula T.R. embkt. 00 to 3.20 km 3.200 Puri Sadar

Puri Sadar 3.200 Balanga Ketakipatna

TOTAL 26.280 26.280

D) SALINE EMBANKMENT

Sl. No.

Name of the embkt. with RD

Jurisdiction (RD in km)

Length in km

Block Constituency Total length

Sub-Divn

Section

1 Tikina Saline embkt 00 to 6.00 km 6.000 Gop Kakatpur 6.000 Gop Nagapur

2 Khalakatapatna S/E 00 to 4.00 4.000 Gop Kakatpur 4.000 Gop Nagapur

3 Astaranga Biluamundali S/E

00 to 2.50 2.500 Astaranga Kakatpur 2.500 Kakatpur Astaranga (Saline)

4 Jharling Belanga S/E

00 to 29.10 29.100 Astaranga Kakatpur 29.100 Kakatpur Astaranga (Saline)

5 Sahana Balabhadrapur S/E

00 to 11.58 11.580 Astaranga Kakatpur 11.58 Kakatpur Astaranga (Saline)

6 Tandahar – Singiripali S/E

00 to 4.80 4.800 Astaranga Kakatpur 4.800 Kakatpur Astaranga(Saline)

7 Keutajanga Saline Gherry

00 to 3.60 3.600 Astaranga Kakatpur 3.600 Kakatpur Astaranga(Saline)

8 Daluakani Saline Embankment

00 to 1.50 1.500 Astaranga Kakatpur 1.500 Kakatpur Astaranga(Saline)

9 Kuhudi Poichandia Saline Embankment

00 to 5.50 5.500 Astaranga Kakatpur 5.500 Kakatpur Bauriakana

10 Nagar Saline Gherry

00 to 9.60 9.600 Astaranga Kakatpur 9.600 Kakatpur Bauriakana

11 Serei Bandala Saline Embankment

00 to 4.00 4.000 Astaranga Kakatpur 4.000 Kakatpur Bauriakana

12 Chhotipada Badaraula Saline Embankment

00 to 3.600 3.660 Kakatpur Kakatpur 3.660 Kakatpur Panichhatra

13 Uklei Astaranga Saline Embankment

00 to 2.70 2.700 Astaranga Kakatpur 2.700 Kakatpur Astaranga (Canal)

14 Tentulia Saline Embankment

00 to 2.50 2.500 Kakatpur Kakatpur 2.500 Kakatpur Panichhatra

Total 91.040 91.040

Total Puri District:-

261.620

45

Page 46: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

28

Details of NCRMP Work Appendix – V

Name of the Saline Embankment : Raising & Strengthening of Keutajanga Saline Embankment

Package No. : NCRMP – (OR)- NMPD-02 Agreement No. N.C.B – 03/2013-14 Agreement Amount Original / Revised / Amount as per final deviation (Approx.)

Rs. 1257.59 lakhs / Rs. 1275.28 lakhs / Rs. 1154.66

Date of commencement / completion / EOT granted upto 16.12.13 / 15.06.15 / 30.09.2016

Work Details :

Sl. No

Item Unit Agrt Qnty Executed Qnty

Balance Qnty. to be executed

Remarks

1 Earth work Cum 183162.00.

182591.00 Nil Work completed

2 Stone work a) Launching Cum 14483.00 14786.00 Nil Work completed b) Packing with

gabion box Cum 14117.00 10423.72 Nil Work completed

3 Concrete Cum 830.00 736.00 Nil Work completed 4 ‘Z’ sheet pile Sqm 788.00 737.40 Nil Work completed 5 Turfing Sqm 27891.00 25000.00 Nil Work completed 6 Sand &

moorum Cum 2553.00 2553.00 Nil Work completed

Agreement Amount Rs. 1257.59 lakhs Total amount as per final bill Rs. 1105.92 lakhs (87.94%) (100% as per actual requirement) Balance amount to be paid by OSDMA Rs. 62.53 lakhs Agency / Contractor M/S Gangadhar Jena, Super Class Contractor, 9937097236 Executive Engineer Sri Mahendra Kumar Bhuyan, Mobile No. - 9937693345

Length of embankment = 3.600 km

Sluice = 4 Nos.

Gate work completed

Agreement amount 1257.59 lakhs Bill paid 1043.39 lakhs Balance amount to be paid 62.53 lakhs Total executed amount 1105.92 lakhs

46

Page 47: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

29

Length of embankment = 6.66 km Sluice = 5 Nos. Gate work completed

Agreement amount 1383.01 lakhs Bill paid 1212.94 lakhs Balance amount to be paid 111.95 lakhs Total executed amount 1324.90 lakhs

Name of the Saline Embankment : Raising & Strengthening of Nagar Saline Embankment from RD 00 to 6660 mtr Package No. : NCRMP – (OR)- NMPD-01 Agreement No. N.C.B – 02/2013-14 Agreement Amount (Original / Revised / Amount as per final deviation (Approx.)

Rs. 1383.01 lakhs / Rs. 1574.61 lakhs / Rs. 1384.06 lakhs

Date of commencement / completion / EOT granted upto 16.12.13 / 15.06.15 / 30.09.2016 Work Details :

S N Item Unit Agrt Qnty Executed Qnty

Balance Qnty. to be executed

Remarks

1 Earth work Cum 194524.00 164973.00 Nil Work completed 2 Stone work a) Launching Cum 24014.00 15951.00 Nil Work completed b) Packing

(gabion box)

Cum 16745.00 14593.00 Nil Work completed

3 Concrete Cum 1379.00 1243.00 Nil Work completed 4 ‘Z’ sheet

pile Sqm 1259.00 1259.00 Nil Work completed

5 Turfing Sqm 40512.00 34365.00 Nil Work completed 6 Sand &

moorum Cum 4140.00 4066.00 Nil Work completed

Agreement amount Rs. 1383.01 lakhs Total amount as per final bill Rs. 1324.90 lakhs (95.80%) (100% as per actual requirement) Balance amount to be paid by OSDMA Rs. 111.95 lakhs Agency / Contractor M/S Gangadhar Jena, Super Class Contractor, 9937097236 Executive Engineer Sri Mahendra Kumar Bhuyan, Mobile No. - 9937693345

47

Page 48: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

30

Name of the Saline Embankment :

Raising & Strengthening of Chhotipada Badaraula Saline Embankment

Package No. : NCRMP – (OR)- NMPD-04 Agreement No. N.C.B- 04/2013-14 Agreement Amount (Original / Revised)

Rs. 1145.11 lakhz / 1259.28 lakhs

Date of commencement / completion / E.O.T. granted upto 16.12.13 / 15.06.15 / 31.10.16

Work Details :

Sl. No

Item Unit Agrt Qnty Executed Qnty upto 31.10.2016

Balance Qnty. to be executed

Remarks

1 Earth work Cum 187821.00 184500.00 Nil Work completed 2 Stone work a) Launching Cum 12683.00 12450.00 Nil Work completed b) Packing

(gabion box) Cum 12524.00 12100.00 Nil Work completed

3 Concrete Cum 1060.00 860.00 Nil Work completed 4 ‘Z’ sheet pile Sqm 961.45 943.79 Nil Work completed 5 Turfing Sqm 36494.00 34000.00 Nil Work completed 6 Sand &

moorum Cum 2325.00 2000.00 Nil Work completed

Agreement amount Rs. 1145.11 lakhs Total amount as per final bill (Approximately) Rs. 1121.19 lakhs Balance amount to be paid by OSDMA Rs. 152.40 lakhs (97.91%) (100% as per actual requirement) Agency / Contractor M/S Gangadhar Jena, Super Class Contractor, 9937097236 Executive Engineer Sri Mahendra Kumar Bhuyan, Mobile No. - 9937693345 Length of embankment = 3.660 km Sluice = 5 Nos. Gate work completed

Agreement amount 1145.11 lakhs Bill paid by OSDMA 968.79 lakhs Balance amount to be paid 152.40 lakhs Total executed amount 1121.19 lakhs

Name of the Saline Embankment : Raising & Strengthening of Tandahara –Singiripala Saline Embankment

48

Page 49: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

31

Name of the Saline Embankment : Raising & Strengthening of Tandahara –Singiripala Saline Embankment Package No. : NCRMP – (OR)- NMPD-08 Agreement No. N.C.B- 01/2013-14 Agreement Amount Original / Revised / Amount as per final deviation

Rs. 719.85 lakhs / Rs. 851.24 lakhs / Rs. 825.47 lakhs

ate of commencement / completion 16.12.13 / 15.06.15 Work Details : Sl.

No Item Unit Agrt

Qnty Qnty as per final deviation

Executed Qnty

Balance Qnty.

Remarks

1 Earth work Cum 110934 110947.62 110947.62 Nil Work Completed

2 Stone work a) Launching Cum 6803.48 7422.86 7422.86 Nil Work

Completed b) Packing with

gabion box Cum 7816 6549.25 6549.25 Nil Work

Completed 3 Concrete Cum 390 377.169 377.169 Nil Work

Completed 4 ‘Z’ sheet

pile Sqm 420 398.72 398.72 Nil Work

Completed

Amount paid Rs. 784.60 lakhs Amount as per final bill Rs. 825.47 lakhs (96.97%) / 100% as per actual requirement Amount paid by OSDMA Rs. 825.47 lakhs Balance amount to be paid Nil

Agency / Contractor M/S Sarathi Engineering & Construction, Special Class Contractor, Prop. Bijaya Kumar Rout, 9437060600

Executive Engineer Sri Mahendra Kumar Bhuyan, Mobile No. - 9937693345

49

Page 50: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

32

Details of ADB Work Appendix - VI

* Total amount work done (Approval of deviation awaited) = Rs. 526.30 lakhs

Name of the Saline Embankment Raising & strengthening of Serai-Bandalo Saline embankment from RD 0.00 to 3.50 Km. in Astaranga Block of Puri District.

Package No. CW-NCB-NID-02 Agt. No. ADB-06-NCVB of 2015-16 Agreement Amountt Original / Revised

Rs.954.21 lakhs / Rs. 1130.82 lakhs

Date of commencement 24.02.2016 Stipulated date of completion 23.08.2017

Work Details Sl. No.

Item Unit Agrt. Quantity Interim Deviation Quantity

Quantity executed up to

28.02.2017

Balance quantity to be

executed

Remaraks

1 Earthwork Cum 143246 149932 69642 82290 Work in progress

2 Stone work

a) Launching Cum 26153 22091 12695 9396 Work in progress

b) Packing cum 5872 9369 Nil 9369 Work in progress

3 Concrete cum 540 756 278 327 Work completed

4 Turfing sqm 49749 26055 Nil 26055 Work not startted

5 Z' sheet pile

sqm 248 1058 260 258 Work in progress

Amount paid up to 28.02.2017 Rs.426.30 lakhs (44.67%) Balance amount work to be done Rs. 527.91 / 704.52 lakhs Agency / Contractor Sri Mohan Kumar Senapati (Super Class) Mob - 9439150110 Executive Engineer Sri Mahendra Kumar Bhuyan, Mobile No. 9937693345

50

Page 51: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

33

Name of the Saline Embankment

Raising & strengthening with slope protection work by providing launching and packing of Jharling Belenga Saline embankment from RD 22.00 to 29.10 Km.

Package No. CW-NCB-NID-03

Agt. No. ADB-01-NCVB of 2015-16 Agreement Amountt Original / Revised Rs.1321.54 lakhs

Date of commencement 01.11.2015 Stipulated date of completion 30.04.2017

Work Details Sl. No. Item Unit Agrt. Quantity Quantity executed up to 28.02.2017

Balance quantity to be executed

Remaraks

1 Earthwork Cum 193191 169798 23393 Work in progress

2 Stone work

a) Launching Cum 21610 18693 2917 Work in progress

b) Packing Cum 22083 13159 8924 Work in progress

3 Concrete Cum 513 513 Nil Work completed

4 Turfing Sqm 59376 Nil 59376 Work not started

5 Z' sheet pile Sqm 186 186 Nil Work completed

Amount paid up to 28.02.2017 Rs.1030.58 lakhs (77.98%)

Balance amount work to be done Rs. 290.96 lakhs

Agency / Contractor M/s ABS Engineering& Developers (Super Class) Mob - 9777520691

Executive Engineer Sri Mahendra Kumar Bhuyan, Mobile No. 9937693345

51

Page 52: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

34

APPENDIX - VII DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (NIMAPARA SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed

on-2008

No of Beneficiary

No. of Beneficiary

enrolled

No. of Outlet

Area in Ha

Date of Election

6year complited Re Election Remarks

1 2 3 4 5 6 7 8 9 10 11 12

1 Sri Sri Somanath Dev 1 MAH-NIM-29 2687 38 431.008 27.10.2008 27.10.2014 Election to

be done

2 Maa Pingalakhi 2 MAH-NIM-30 2767 37 514.598 29.10.2008 29.10.2014 Election to be done

3 Sri Basudev 3 MAH-NIM-36 45 497.168 Election to be done

4 Sri Basudev 4 MAH-NIM-31 31 522.037 Election to be done

5 Maa Subarnachandi 5 MAH-NIM-32 2582 33 487.021 10.06.2008 10.06.2014 Election to

be done

6 Baba Bakreswar Dev 6 MAH-NIM-33 2132 32 525.481 13.10.2008 13.10.2014 Election to

be done

7 Maa Sarala 7 MAH-NIM-34 1322 28 399.092 17.09.2008 17.10.2014 Election to be done

8 Nilakantheswar Dev 8 MAH-NIM-35 800 23 336.013 06.08.2008 06.08.2014 Election to

be done

9 Sri Jateswar Dev 9 MAH-NIM-16 2601 43 509.206 29.07.2008 29.07.2014 Election to be done

10 Maa Jayadurga 10 MAH-NIM-17 2051 40 383.145 12.06.2008 12.06.2014 Election to be done

11 Maa Jhadamallei 11 MAH-NIM-18 2261 50 410.255 13.06.2008 13.06.2014 Election to be done

12 Sri Sri Kepileswar Dev 12 MAH-NIM-19 2325 37 449.711 09.10.2007 09.05.2013 Election to

be done

13 Maa Dwarika 13 MAH-NIM-21 2432 43 405.684 29.05.2008 09.10.2013 Election to be done

14 Maa Jageswari 14 MAH-NIM-20 2140

36 312.995 14.02.2008 14.02.2014 Election to be done

52

Page 53: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

35

15 Maa Jageswari (Torabanga) 15 MAH-NIM-22 1227 35 388.813 03.11.2008 03.11.2014 Election to

be done

16 Saptamatruka 13 MAH-GOP-13 1934 22 340.546 29.10.2007 29.10.2013 Election to be done

17 Artatrana 14 MAH-GOP-14 2084 16 320.659 10.10.2008 10.10.2014 Election to be done

18 Ananta Basudev 15 MAH-GOP-15 2975 44 458.072 02.06.2008 02.06.2014 Election to be done

19 Satyanarayan 16 MAH-GOP-16 2553 24 524.566 16.05.2008 16.05.2014 Election to be done

20 Grameswar Dev 17 MAH-GOP-17 3282 27 497.429 26.11.2008 26.11.2014 Election to be done

21 Sri Ayisaneswar 42 MAH-KUN-42 MAH-KUN-9 3714 37 597.99 16.10.09 16.010.2015 Election to

be done

22 Patitapaban 43 MAH-KUN-43 MAH-KUN-10 1605 55 418.009 12.12.2008 12.12.2014 Election to

be done

23 Sri Hara Ganesh 44 MAH-KUN-44 2202 41 460.327 21.07.2009 21.07.2015. Election to be done

24 Sri Budheswari 45 MAH-KUN-45 1673 32 468.951 21.08.2009 21.08.2015 Election to be done

53

Page 54: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

36

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (GOP SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed on-

2008

No of Beneficiary

No. of Beneficiary

enrolled

No. of Outlet

Area in Ha

Date of Election 6year complited Re Election Remarks

1 2 3 4 5 6 7 8 9 10 11 12 1 Gadibrahma 16 MAH-NIM-37 1164 1164 23 321.57 27.7.2013 27.07.2019 2 Baba Balunkeswar 17 MAH-NIM-38 1055 1055 24 326.76 27.7.2013 27.07.2019 3 Maa Dasamalli 18 MAH-NIM-39 2629 2629 31 595 27.7.2013 27.07.2019

4 Sri Sri Nilakantheswar dev 19 MAH-NIM-41 1733 1733 33 484.471 27.7.2013 27.07.2019

5 Baba ManchaNath 20 MAH-NIM-40 2434 2434 51 601.00 27.07.2013 27.07.2019 21

6 Sri Sri Nilakantheswar 22 MAH-NIM-42 2458 1600 44 594.84 26.07.2013 26.07.2019 7 Sidha Mahaveer 23 MAH-NIM-43 1655 1440 20 341.85 26.07.2013 26.07.2019 8 Sri Sri Bakreswar Dev 24 MAH-NIM-44 1487 1170 18 414.77 26.07.2013 26.07.2019

9 25

MAH-NIM-45 29 346.91 Election to be

done 26

10 Nilakantheswar 18 MAH-GOP-18 2703 2100 21 396.349 13.6.2013 13.06.2019 11 Gopal Jew 19 MAH-GOP-19 2223 1700 43 587.55 25.07.2013 25.07.2019 12 Maa Gangeswari 20 MAH-GOP-20 1344 800 28 268.53 25.07.2013 25.07.2019

13 Maa Jagulai 21 MAH-GOP-21 2407 1850 22 590.517 10.07.2010 10.07.2016 Election to be done

14 Balaram Jew 22 MAH-GOP-22 2448 2000 18 237.23 10.07.2010 10.07.2016 Election to be done

15 Mahaveer 23 MAH-GOP-23 2289 1800 32 590.72 10.07.2010 10.07.2016 Election to be done

16 Maa Kanteswari 24 MAH-GOP-24 1786 1339 23 417.71 10.07.2010 10.07.2016 Election to be done

17 Baba Dhabaleswar 25 MAH-GOP-25 657 570 29 333.056 26.07.2013 26.07.2019 18 Maa Tarini 26 MAH-GOP-26 1047 650 26 407.882 26.07.2013 26.07.2019 19 Maa Patarani 27 MAH-GOP-27 1575 1200 44 638.06 26.07.2013 26.07.2019 20 Maa Khadgeswari 28 MAH-GOP-28 1453 1453 28 277.811 26.07.2013 26.07.2019

21 Baba Harinath 29 MAH-GOP-29 1287 0 26 422.64 10.07.2010 10.07.2016 Election to be done

22 Kochileswar 30 MAH-GOP-30 18 363.99 Election to be done

23 Maa Narayani 31 MAH-GOP-31 1969 0 28 382.59 25.09.2013 25.09.2019

24 32 MAH-GOP-32 0 166.27 Election to be done

54

Page 55: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

37

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (KAKATPUR SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed

on-2008

No of Beneficiary

No. of Beneficiary

enrolled

No. of Outlet

Area in Ha

Date of Election

6year complited Re Election Remarks

1 2 3 4 5 6 7 8 9 10 11 12 1 Mahaveer 46 MAH-KUN-46 2611 2611 52 498.73 26.11.2013 26.11.2019 2 Rameswar 47 MAH-KUN-47 3014 3014 70 577.90 27.11.2013 27.11.2019

3 Maa Narayani 48 MAH-KUN-48 2984 2984 45 526.23 17.8.2009 17.08.2015 Election to be done

4 Satyanarayan 49 MAH-KUN-49 4114 4114 61 596.07 17.8.2009 17.08.2015 Election to be done

5 Maa Saharai 50 MAH-KUN-50 2076 2076 70 515.11 28.11.2013 28.11.2019

6 Sankareswar 51 MAH-KUN-51 2230 2230 47 447.95 17.8.09 17.08.2015 Election to be done

7 Kasi Biswanath 1 MAH-KAK-1 2149 2149 46 495.39 26.11.2013 26.11.2019 8 Bikash Mangal 2 MAH-KAK-2 2826 2826 55 520.59 27.11.2013 27.11.2019 9 Madhabananda 3 MAH-KAK-3 1505 1505 46 303.92 28.11.2013 28.11.2019 10 Maa Mangala 4 MAH-KAK-4 2000 2000 59 392.44 29.11.2013 29.11.2019 11 Hara Parbati 5 MAH-KAK-5 3107 3107 56 557.39 26.11.2013 26.11.2019 12 Sri Sudarsan 6 MAH-KAK-6 2786 2786 41 501.47 27.11.2013 27.11.2019 13 Sri Sri Nateswar 7 MAH-KAK-7 2421 2421 47 481.17 28.11.2013 28.11.2019 14 Bijayananda 8 MAH-KAK-8 3003 3003 62 588.14 26.11.2013 26.11.2019 15 Sankat Tarini 9 MAH-KAK-9 3206 3206 55 509.89 27.11.2013 27.11.2019 16 Maa Jagulai 10 MAH-KAK-10 2406 2406 33 402.51 28.11.2013 28.11.2019 17 Gyana Devi 11 MAH-KAK-11 2675 2675 35 447.50 26.11.2013 26.11.2019 18 Bighna Nashan 12 MAH-KAK-12 3127 3127 47 436.68 27.11.2013 27.11.2019 19 Gadi Brahma 13 MAH-KAK-13 4081 4081 44 569.99 28.11.2013 28.11.2019

55

Page 56: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

38

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (BALANGA SUB-DIVISION)

Sl. No. Name of Pani Panchayat

W.U.A No.

New WUA/PP No. after

renamed on-2008

No of Beneficiary

No. of Beneficiary

enrolled

No. of Outlet

Area in Ha

Datae of Election

6year completed Re Election Remarks

1 2 3 4 5 6 7 8 9 10 11 12 1 Somana Sasan 1 MAH-CHA-7 1796 1796 20 347.7 17.06.2014 17.06.2020

2 Haripur 2 MAH-CHA-10 2029 2029 40 456.08 11.11.2014 11.11.2020 3 Rench Sasan 3 MAH-CHA-8 2439 2439 45 474.11 17.06.2014 17.06.2020 4 Rench Khelar 4 MAH-CHA-9 1692 1692 46 636.89 18.06.2014 18.06.2020

5 Bhagabatipur 5 MAH-CHA-11 2497 2497 39 741.89 27.03.2007 27.03.2013 Election to be done

6 Beraboi 6 MAH-CHA-12 3163 3163 55 817.21 28.03.2007 28.03.2013 Election to be done

7 Balanga 7 MAH-CHA-22 2319 2319 31 543.58 28.032007 28.03.2013 Election to be done

8 Parbatipur 8 MAH-CHA-23 1960 1960 22 489.13 29.05.2007 29.05.2013 Election to be done

9 Gadachandapur 9 MAH-CHA-13 3328 3328 61 683.27 21.06.2014 21.06.2020 10 Saderia 10 MAH-CHA-14 1468 1468 23 549.84 19.06.2014 19.06.2020

11 Nuabudhakera 11 MAH-CHA-16 1648 1648 29 654.54 23.04.2008 23.04.2014 Election to be done

12 Padmapur 12 MAH-CHA-17 1095 1095 20 348.96 30.05.2007 30.05.2013 Election to be done

13 Nuakholamara 13 MAH-CHA-15 1886 1886 22 512.01 20.06.2014 20.06.2020 14 Ketakipatna 14 MAH-CHA-18 2147 2147 38 747.13 11.11.2014 11.11.2020 15 Suando 15 MAH-CHA-24 2510 2510 45 766.89 20.06.2014 20.06.2020 16 Rayakhandi 16 MAH-CHA-25 1981 1981 30 658.76 19.06.2014 19.06.2020

17 Palli 17 MAH-CHA-19 1243 1243 20 346.25 13.02.2009 13.02.2015 Election to be done

18 Baliput 18 MAH-CHA-20 1892 1892 30 603.04 13.02.2009 13.02.2015 Election to be done

19 Ankupada 19 MAH-CHA-21 3158 3158

31 660.1 27.10.2010 27.10.2016 Election to be done

56

Page 57: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

39

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (BALIPATNA SUB-DIVISION)

Sl. No. Name of Pani Panchayat

W.U.A No.

New WUA/PP No. after

renamed on-2008

No of Beneficiary

No. of Beneficiary

enrolled

No. of Outlet

Area in Ha

Datae of Election

6year complited Re Election Remarks

1 2 3 4 5 6 7 8 9 10 11 12 1 Allarpur 29 MAH-PUR-02 3145 3145 34 613.091 10.02.14 10.02.2020 2 Maa Mahamaya 28 MAH-PUR-03 3238 3238 43 585.012 10.02.2014 10.02.2020 3 Maa Khetramani 1 MAH-NIM-1 2442 2442 27 348.15 7.02.14 07.02.2020

4 Maa Tarini 2 MAH-NIM-2 1778 1778 31 377.15 28.2.2011 28.2.2017 Election to be done

5 Maa Tankapani 3 MAH-NIM-3 36 576.55 Election to be done

6 Budhipada 4 MAH-NIM-4 3606 3606 51 596.33 10.02.2014 10.02.2020

7 Jadamalli 5 MAH-NIM-5 3338 3338 56 609.00 7.02.14 07.02.2020 8 Champeswar 6 MAH-NIM-6 2799 2799 44 573.88 10.02.14 10.02.2020 9 Maa Dakhineswari 7 MAH-NIM-7 1970 1970 27 373.00 28.02.14 28.02.2020

10 Garedipanchan 8 MAH-NIM-8 2424 2424 35 406.409 26.02.14 26.02.2020

11 Sri Gobinda Jew 9 MAH-NIM-9 2253 2253 34 475.04 12.02.2014 12.02.2020

12 Maa Giringeswari 10 MAH-NIM-10 2349 2349 30 397.7 14.02.14 14.02.2020

13 Saratsasan 11 MAH-NIM-11 2500 48 465.629 Election to be done

14 Kulintaragram 12 MAH-NIM-12 2400 30 401.387 Election to be done

15 Mukteswar 13 MAH-NIM-13 1929 1929 36 462.00 05.10.2013 05.10.2019

16 Shree Somanath Dev 14 MAH-NIM-14 1909 1909 37 304.00 12.06.2014 12.06.2020 Election to be done

17 Trinath Dev 15 MAH-NIM-15 1931 1931 36 411.3 10.02.2014 10.02.2020

18 Deshprem 16 MAH-NIM-24 2383 2383

26 371.327 04.5.2015 04.05.2021

19 Maa Narayani 17 MAH-NIM-23 1944 1944 40 331.043 14.02.2014 14.02.2020

57

Page 58: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

40

20 Balunkeswar 18 MAH-NIM-25 1589 1589 35 492.317 27.12.2014 27.12.2020 21 Jogeswar 19 MAH-NIM-26 2851 2851 43 472.602 16.07.2013 16.07.2019

22 Sri Nilakantheswar 20 MAH-NIM-27 1617 1617 40 361.803 04.5.2015 13.5.2021

23 Uttareswar 21 MAH-NIM-28 2504 2504 46 449.00 31.05.2014 31.05.2020

24 Bhubaneswar Dev 22 MAH-CHA-6 4352 4352 63 657.533 07.06.2014 07.06.2020

25 Maa Bhagabati 21 MAH-CHA-5 2992 2992 36 442.67 31.05.2014 31.05.2020

26 Netaji 24 MAH-CHA-4 3119 3119 29 380.18 17.02.14 17.02.2020

27 Trahi Achyuta 23 MAH-CHA-3 5627 5627 53 684.952 23.3.2011 23.03.2017

28 Kapilanath 26 MAH-CHA-2 2014 2014 30 315.57 10.02.14 10.02.2020 29 Maa Duladei 27 MAH-CHA-1 2714 2714 38 534.641 14.02.14 14.02.2020

58

Page 59: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

41

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (BALANGA SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed on-08

Date Of election

Re-Election Remarks

1 2 3 4 6 7 8 1 Bhagabati pur 5 MAH-CHA-11 27.03.2007 Election to be done 2 Beraboi 6 MAH-CHA-12 28.03.2007 Election to be done

3 Balanga 7 MAH-CHA-22 28.03.2007 Election to be done 4 Parbatipur 8 MAH-CHA-23 29.05.2007 Election to be done 5 Nuabudhakera 11 MAH-CHA-16 23.04.2008 Election to be done 6 Padmapur 12 MAH-CHA-17 30.05.2007 Election to be done

7 Palli 17 MAH-CHA-19 13.02.2009 Election to be done 8 Baliput 18 MAH-CHA-20 13.02.2009 Election to be done 9 Ankupada 19 MAH-CHA-21 27.10.2010 Election to be done

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (NIMAPARA CANAL SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed on-2008

Date Of election

Re-Election Remarks

1 2 3 4 6 7 8 1 SriSri Somanath Dev 1 MAH-NIM-29 27.10.2008 Election to be done 2 Maa Pingnalakhi 2 MAH-NIM-30 29.10.2008 Election to be done 3 Sri Basudev 3 MAH-NIM-36 Election to be done 4 Sri Basudev 4 MAH-NIM-31 Election to be done 5 Maa Subarnachandi 5 MAH-NIM-32 10.06.2008 Election to be done 6 Baba Bakreswardev 6 MAH-NIM-33 13.10.2008 Election to be done 7 Maa Sarala 7 MAH-NIM-34 17.09.2008 Election to be done 8 Nilakentheswar dev 8 MAH-NIM-35 06.08.2008 Election to be done

9 SriSri Jaleswar Dev 9 MAH-NIM-16 29.07.2008 Election to be done 10 Maa Jayadurga 10 MAH-NIM-17 12.06.2008 Election to be done 11 Maa Jhadamallei 11 MAH-NIM-18 13.06.2008 Election to be done 12 SriSri Kepileswardev 12 MAH-NIM-19 09.10.2008 Election to be done 13 Maa Dwarika 13 MAH-NIM-21 29.05.2008 Election to be done 14 Maa Jageswari 14 MAH-NIM-20 14.02.2008 Election to be done

15 Maa Jageswari

(Torabanga) 15 MAH-NIM-22 03.11.2008 Election to be done 16 Saptamatruka 13 MAH-GOP-13 29.10.2007 Election to be done 17 Artatrana 14 MAH-GOP-14 10.10.2008 Election to be done 18 Ananta Basudev 15 MAH-GOP-15 02.06.2008 Election to be done 19 Satyanarayan 16 MAH-GOP-16 16.06.2008 Election to be done 20 Grameswar Dev 17 MAH-GOP-17 26.11.2008 Election to be done

21 Sri Aysanswar 42 MAH-KUN-42

16.10.2009 Election to be done MAH-KUN-09

22 Patitapaban 43 MAH-KUN-43 MAH-KUN-10 12.12.2008 Election to be done

23 Hareganesh 44 MAH-KUN-44 21.07.2009 Election to be done

24 Sri Budheswari 45 MAH-KUN-45 21.08.2009 Election to be done

59

Page 60: GOVERNMENT OF ODISHA DEPARTMENT OF WATER · PDF fileGOVERNMENT OF ODISHA . DEPARTMENT OF WATER RESOURCES . ... minor, lift irrigation schemes. As is with ... water recharge and more

42

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (GOP SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed on-2008

Date Of election

Re-Election Remarks

1

25

MAH-NIM-45

26 2 Maa jagulai 21 MAH-GOP-21 10.07.2010 Election to be done 3 Balaram jew 22 MAH-GOP-22 10.07.2010 Election to be done 4 Mahaveer 23 MAH-GOP-23 10.07.2010 Election to be done 5 Maa kanteswari 24 MAH-GOP-24 10.07.2010 Election to be done 6 Bba Harinath 29 MAH-GOP-29 10.07.2010 Election to be done 7

Kochileswar 30 MAH-GOP-30 Not Formed Not

Formed 8

32 MAH-GOP-32 Not Formed Not

Formed

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (KAKATPUR SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed on-2008

Date Of election

Re-Election Remarks

1 2 3 4 6 7 8 1 Maa Narayani P.P 48 MAH-KUN-48 17.08.2009 Election to be done 2 Satya NarayanP.P 49 MAH-KUN-49 17.08.2009 Election to be done 3 Shankareswar P.P 51 MAH-KUN-51 17.08.2009 Election to be done

DETAIL INFORMATION OF PANI PANCHAYAT/WUA OF NIMAPARA IRRIGATION DIVISION (BALIPATNA SUB-DIVISION)

Sl. No.

Name of Pani Panchayat

W.U.A No.

New WUA No. after renamed on-08

Date Of election

Re-Election Remarks

1 2 3 4 6 7 8 1 Maa Tarini 2 MAH-PUR-02 28.02.2011 Election to be done 2 Maa Tankapani 3 MAH-PUR-03 Election to be done 3 Saratsasan 11 MAH-NIM-11 Election to be done 4 Kulintaragram 12 MAH-NIM-12 Election to be done 5 Shree Somanatha dev 14 MAH-NIM-14 12.06.2014 Election to be done 6 Trahi Achuta 23 MAH-NIM-03 23.03.2011 Election to be done