GOVERNMENT OF KHYBER PAKHTUNKHWA … › images › news › 2016968.pdfConstruction of Technically...
Transcript of GOVERNMENT OF KHYBER PAKHTUNKHWA … › images › news › 2016968.pdfConstruction of Technically...
-
GOVERNMENT OF KHYBER PAKHTUNKHWA COMMUNICATION & WORKS DEPARTMENT
NOTICE INVITING E-BIDDING
(Single Stage Two Envelop E-Bidding System)
C&W Highway Division Peshawar, Government of Khyber Pakhtunkhwa invites Electronic Bids
from eligible firms/ bidders in accordance with KPPRA procurement rules 2014 on single stage Two
envelop procedure for the following works.
Work No
Name of Work Required Category of PEC
& Codes
Bid Security
Period of
Compl etion
Last date & Time
of submissi
on E- Bids
Date & Time of
Technical Bids
Construction of Technically & Economically Feasible 198 KM Roads in District Peshawar
ADP No.1702/200247 (2020-21).
1 SH: Construction & M & R of Roads in UC C4-& 2% of As per 22-01- 22-01-
Maryamzai Badaber Badaber Hurizai, Surizai Above E/Cost work 2021 2021
Bala, Surizai Payan, Surizai Maira / Payan order At 12:00 At 12:30
Urmar Bala, UrmarMaina and Maryamzai PM PM
District Peshawar.
Sub work:-
1. Const: of road (From Bachiano Koroona (Kandaywala) MohallaHaroom Khel to Bazargai District Peshawar.
2. Constn: of Bin Ghazi Road (from Masjid Kandi Bin Ghazi through Aurangzeb Market) District Peshawar.
3. Constn: of Telaband Road (TorsamKoroona from Telaband Road to Khuwarchnear Ifitkharnazim house) District Peshawar.
2 SH: Construction, &M&R of roads in UC C4-& 2% of As per 22-01- 22-01- Mashogagar, Mashokhel, Suleiman Khel,Sheikh Muhammadi UC Mattani UC Aza Khel Adezai Above E/Cost work 2021 2021
Sherkera Yousaf Khel and Passani on need basis order At 12:00 At 12:30 District Peshawar . PM PM Sub work:-
1. Constn: of Mashogagar road (from Mashogagar main road to telephone exchange).
2. Const: of Sarwarabad road (from canal road to doctor Saeed bhati near Zangali).
3. Constn: of jan said koroona road (ladhawar to dagai) Peshawar.
4. Const: of Zaman khan koroona road (Pasani
main road to Ghulam Hassan koroona).
-
3 SH:- Construction ,Improvement and Black
Topping of Roads, Sidewalls, Shoulders along
C4-&
Above
2% of
E/Cost
As per
work
22-01-
2021
22-01-
2021
with drains etc. in various UCs, UC-35 order At 12:00 At 12:30
pawaka,UC-36 Arbab Road,UC-37 Shaheen PM PM
Town, Uc-38 Tekhal Payan-1,UC-39 Tehkal
Payan-2,UC-40 Tehkal Bala,UC-41
Palosi&BabuGhari District Peshawar.
1. Const:/Rehabilitation of road from Doctor
Kifayat clinic to Momen house Palosai
atozai (L-1-KM).
2. Const: of Madina town road perano palosai
(L-1KM).
3. Constn: kachkol kababi road I/C link road
peranu palosai (L-0.9KM).
4. Constn:/Rehabilitation of Rahatabad Raod
(L-0.5KM)
5. Const:/Rehabilitation of musali ghari road
from majid taciwa to janazgh tekhal bala (L-
1.5-KM).
6. Const:/Rehabilitation of mohallah Mansoor
khel to warsak canal (L-1.5KM).
7. Const:/Rehabilitation of musali ghari road
No.1 (L-0.7-KM)
4 SH: Construction of Road and drain at C-5 & 2% of As per 22-01- 22-01- UCNo.14,15,16,17,18,19,20,21,22,23,24,25 District Peshawar. Above E/Cost work 2021 2021
Sub work:- order At 12:00 At 12:30
1. Rehabilitation/Improvement of road & street
with Drain from Lahori kadmal Balochian
PM
PM
Mohalla Pir Sado Mohalla Sarbana, Molvie
Abdul Hakeem Korona sabaz pir road, and its
surrounding link roads (L=0.7 KM)
2. Rehabilitation/Improvement of road & street
with Drain from Shah Mashoom, Kareem Pura
,Ghantaghar and its surrounding link roads. (L=
0.7KM).
3. Rehabilitation/Improvement of road & street
with Drain from Chowk Nasir khan,ander sehar
Dheri Nalbandi and its surrounding link roads
(L=0.7KM)
4. Rehabilitation/Improvement of road & street
-
.
with Drain from Asia 1,Asia 2,Asia 3and its
surrounding link roads (L=0.6 KM)
5. Rehabilitation/Improvement of road & street
with Drain from Gut Bacha G,Shah Qaboul,
Jahanger pura,Mehrvi and its surrounding link
roads L=0.6 Km).
6. Rehabilitation/Improvement of road & street
with Drain from Ghor ghari,Ghanj,Baqir shah
and its surrounding link roads (L=0.7KM).
7. Rehabilitation/Improvement of road & street
with Drain from Sharifabad, Shahbazz town,
Yakkatot 1, and its surrounding link road
(L=0.9KM).
5 SH: Constn:/Rehab:/Widening/Impvt:/BT Roads C-5 & 2% of As per 22-01- 22-01-
and Bridges UCs Nazar Khwani 1&2,Dehbahar, Above E/Cost work 2021 2021
Bazid Khel, Kagawala, Musazai and Akhun order At 12:00 At 12:30
Abad District Peshawar. PM PM
Sub work:-
1. Const: Rehabilitation of road from bazid khel
to kagawala towards Akhoon salag Baba Distt:
Peshawar.
2. Const: of road from mashal CNG Pump to
Doziyan Khel Dist: Peshawar.
3. Const: /Rehabilitation of road at Gulshan
Town Deh Bahadur Dist: Peshawar.
4. Const:/Rehabilitation of road from Jabbar
ustad Masjid to Ghulam Ali ustad House.
5. Const:/Rehabilitation of road from choorkhel
to Qabristan road Dist: Peshawar.
6. Const: of road at kagawal (from M. Road to
saadullah House) Distt: Peshawar
7. Const: of shaheed stop (Mohalla Abu Bakar
from Kohat road to Mohalla Dodhiyan Khel).
8. Const: of Road at Wazeer Ghari road (Abbas
khan house to Hazrat Ameen Masjid).
9. Const:/Rehabilitation of road at Shaheed stop
Bachi Laar (from Kohat Road to syed wall
house) Dist: Peshawar.
10. Constn/Rehabilitation of road at Ahmad khel
(from haji gulab sher hujra to canal).
-
,
11. Const:/Rehabilitation of road at Durrani Ghari
(from Babu Mama chowk to Canal road)
12. . Const:/Rehabilitation of Naray Laar Road
Hazar Khwani).
13. Const: of Umar Khel Road (from jaba canal
to mohalla umar khel near molana
Abdussalam House).
6 SH:- Construction of 02 No's of Bridges Dheri C-5 & 2% of As per 22-01- 22-01- kallay & Wazir Qilla alongwith Approach roads Above E/Cost work 2021 2021
in Kabul River at UC juggani Peshawar. order At 12:00 At 12:30
(including Design & Supervision Charges @ PM PM
3%).
7 SH:-Construction /Rehabilitation of roads at UC C-5 & 2% of As per 22-01- 22-01- Wadpaga ,kankola, PakhaGulam, Nagai Above E/Cost work 2021 2021
Gulbela, Takhtabad, Khazana and Haryana order At 12:00 At 12:30
District Peshawar. PM PM
1. Const:/Rehabilitation of roads at Wadpaga &
Muhammad Zia linked approaches
surrounding Areas.
2. Rehabilitation/Improvement of roads at village
Kukker internal roads & kankola linked
approaches surrounding Areas.
3. Rehabilition/ Improvement roads in village
chugulpura, Doranpura, siddque Akbar and
Muhammadia internal road with surrounding
Areas.
8 SH:- Construction of Roads at Mahal Tarai, C-5 & 2% of As per 22-01- 22-01-
Charsadda Road, Dalazak Road, Ring Road and Above E/Cost work 2021 2021
surrounding areas District Peshawar. order At 12:00 At 12:30
1. Constn: of Roads at Mahal Tarai Charsadda
road Dalazak road ring road and its
surrounding Areas.
PM PM
2. Rehabilitation /Improvement of road from
Pajjagi road & its surrounding Area such as
Hassan Ghari ,WAPDA House ,Bashir abad,
Link street,1-3Samdo Ghari, Madina Colony.
-
9 SH:-Improvement of Nasir Bagh Road Peshawar
from DHA to Sakhi pull District Peshawar
(L-2.525Km).
Construction of Roads at UCs Mamukhatki,
Tukhtabad, Jugni, Chaghar Matti, Haryana,
Kaniza, Pajjagi & Larama District Peshawar.
Sub Work:
1. Const:/Rehabilitation of mathra khazana road
from charpareza to Haryana Bala (L-3.6KM).
2. Const:/Rehabilitation of road from Khadra khel
to Mandra khel (L-1.7KM).
3. Const:/Rehabilitation of road from Chuli payan
to Mandra khel (1.30-KM).
C-4 &
Above
2% of
E/Cost
As per
work
order PM
22-01-
2021
At 12:00 PM
22-01-
2021
At 12:30
10 Construction / Rehabilitation of Road at UC- C-4 & 2% of As per 22-01- 22-01- 36,42,43,44,48,65,66,68,69,70,71,80,92 District Above E/Cost work 2021 2021
Peshawar. order At 12:00 At 12:30 Sub work:- PM PM
1. Rehabilitation /Improvement of road zaka
Khail/Ghazi asad road and (1km).
2. Rehabilitation /Improvement of road at
Lakkarai javeed hamayon road (1km).
3. Rehabilitation /Improvement of road faisal
town road (400m).
4. Rehabilitation /Improvement of road at kochi
abad to Kismet councilor, road (500m).
5. Rehabilitation /Improvement of road at
Nasirabad road and its (500m).
6. Rehabilitation /Improvement of road at atitehad
lalazar road (1km).
7. Rehabilitation /Improvement of road at main
khan ghari road (500m).
8. Rehabilitation /Improvement of road at parrang
area roads and (1km).
9. Rehabilitation /Improvement of road Regi
Mulazai road and (1km).
10. Rehabilitation /Improvement of road at Jogo
Jehgra(lkm).
11. Rehabilitation /Improvement of road at Faqeer
Gul House road (1km).
12. Rehabilitation /Improvement of road at Danish
-
Abad road (500m).
11 Construction of Roads at Roads at UC Deh C-4 & 2% of As per 22-01- 22-01- Bahadar, Lala, Marozai, Urmar Miana, Above E/Cost work 2021 2021
Urmarbala, pandu ,Musazai ,Nazar Khwani- order At 12:00 At 12:30
1,Hazar Khwani-II, Surizai Payan & Chamkani PM PM
District Peshawar.
Sub work:-
1. Constn: of road at Urmar Miana (from Yousaf
khel Janazgah to Shpano garhi.
2. Const: of mama khel surizai payan road (from
Mohib house to Inc°lab road.
3. Rehabilitation /Improvement of road and street
with drain from Chamkani road and
surrounding link roads.
4. Rehabilitation /Improvement of road and street
with drain from Lala kaly road and
surrounding link roads.
5. Rehabilitation /Improvement of road and street
with drain from Phandu Mandi road and its
surrounding link roads
• Bid documents including instruction to Bidders can be downloaded up to one day
prior then, the opening date from C&W web site www.cwd.gkp.pk.
• A copy of Technical Proposal in the required format is mandatory and to be uploaded
as a part of E-bidding before submitting financial bids.
• Scanned copy of bid security shall be submitted electronically alongwith Technical
bid on E-bidding system.
• All the bidders are required to be registered with Khyber Pakhtunkhwa Revenue
Authority, Established under the Khyber Pakhtunkhwa Finance Act, 2013 (Khyber
Pakhtunkhwa Act No. XXI of 2013), for works consulting and non-consulting service
as listed in schedule-II of Act ibid.
• In case of bid/ rate quoted by the bidder more than 10% below Engineer Estimate, the
additional bid security shall be sought from the successful bidder only to the exten: of
bid more than 10% below Engineer Estimate in the form of percentage. The amount
-
of additional bid security shall be equal to impact of financial difference occurring in
the quoted rates beyond 10% below Engineer Estimate.
Executive Engineer 1 144 Highway Division Peshawar
Ph # 091-9211371
Page 1Page 2Page 3Page 4Page 5Page 6Page 7