Gooding 2014 MPA MCZ England.pdf
-
Upload
coastal-futures -
Category
Documents
-
view
226 -
download
0
Transcript of Gooding 2014 MPA MCZ England.pdf
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 1/10
Marine Conservation Zones
Nigel GoodingMarine Programme
Defra
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 2/10
Outline
• Update on designating Marine ConservationZones in England
• Progress to date
• The first tranche of MCZs
• MCZs as part of a network of Marine
Protected Areas
• Next steps
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 3/10
Where have we come from?
•Four Regional MCZ Projectsmaking 127 siterecommendations
• Extensive advice from
Natural England and JNCC• Impact Assessment
• Formal consultationgenerating 40,000+responses
• All responses and newevidence carefully analysedand evaluated
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 4/10
First tranche of 27 MCZs
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 5/10
MCZs complement the existing
components of the network: SSSIs
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 6/10
SSSIs and SACs
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 7/10
SSSIs, SACs and SPAs
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 8/10
And with the first tranche of MCZs
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 9/10
What next?•
Committed to completing our contribution to anecologically coherent network of MPAs
• Two further tranches of MCZs over the next threeyears, one by the end of 2015 and the second by theend of 2016
• Sites selected to complete the contribution to anecologically coherent network
• Not repeating the Regional MCZ Projects butengaging stakeholders throughout the process
• Full consultation on all proposals before designation
• More detailed plans will be provided shortly
• Review of reference areas to start soon
•Management measures
8/10/2019 Gooding 2014 MPA MCZ England.pdf
http://slidepdf.com/reader/full/gooding-2014-mpa-mcz-englandpdf 10/10