Good Practices of Septage Management in ThailandFacilities Public facilities Individual Household...
Transcript of Good Practices of Septage Management in ThailandFacilities Public facilities Individual Household...
Jiranun Hempoonsert
Pollution Control DepartmentMinistry of Natural Resources and Environment
Good Practices of SeptageManagement in Thailand
Background of Administration in Thailand
Central Government
Ministry of Natural Resources and Environment
Ministry of Public Health Ministry of Interior
Public Health Acts B.E.2535 (1992)
National Environmental Quality Acts
B.E.2535 (1992)
Establishment of Municipality
Acts B.E.2535 (1992)
Local Governments
Building Control Acts
B.E.2522 (1979)
Local Administration Responsibility
Public Health Acts B.E.2535 (1992)
Establishment of Municipality Acts B.E.2535 (1992)
National Environmental Quality Acts
B.E.2535 (1992)
Local
Governments
Budget‐Build‐Operation of ‐ Wastewater,‐ Solid Waste, and ‐ SeptageTreatment
Provide SeptageTreatment
Provide Public Facilities
Public facilities
Individual Household
Public Facilities
Building Control Acts B.E.2522 (1979) Control Building
Construction All Buildings
Background of Surface Water Quality Situation 1996 - 2012
Excellence Good Fair Deteriorated High deteriorated
Source: State of Thailand Pollution, 2013
Background of Coastal Marine Water Quality Situation 1997 - 2012Excellence Good Fair Deteriorated High deteriorated
Wastewater Management Model in Thailand• Central Treatment Plant
• Cluster (Community) Treatment Plant
• On-site Treatment
7
Central Wastewater Treatment plants in Thailand
Figure of Wastewater Treatment Plants in Thailand (as of 2016)
28 plants operating subtotal 1,384,600 m3/D 1 plant under construction1. จ.สมุทรปราการ (วว.)(AS) 525,000 m3/D
Total 1,909,900 m3/D
Central
Sum. :
Operating 96 plants
Under construction 4 plants Suspended 1 Plant Total 101 Plants
North
Northeast
East
South
16 plants operating subtotal 255,809 m3/D1 plant under construction 1. ทม.อุทยัธานี (ปค.+วว.)(SP)
9,000 m3/DTotal 264,809 m3/D
18 plants operating subtotal 353,466 m3/D1 plant under construction 1. ทม.นครพนม(ทส.)(SP) 8,600 m3/DTotal 362,066 m3/D
16 plants operatingTotal 297,400 m3/D
16 plants operating subtotal 346,750 m3/D3 plants under
construction 1. ทม.ชุมพร (ยธ.)(SP) 12,000 m3/D
2. ทม.ปัตตานี (ยธ.)(SP) 27,000m3/D
Total 375,750 m3/D
Central or Cluster Treatment Service Area
Septic Tank
Effluent to WWTP
SeptageWWTP
Septage Central Treatment Plant
Rural Area
Septic Tank
Land Application
Septage
Cesspool
Public sewer or
Land Application
Septage Central Treatment Plant
Central Septage Treatment : Nonthaburi Plant
Facilities in Treatment Plant
1. Office
2. Pond
3. Digestion Tank
4. Sand Drying Beds
5. Heavy Mechanical
Equipment Store
6. Soil Improvement
Material Store
7. Equipment Store
8. Parking Lots
http://www.behn.go.th/upload/detail_dirt.pdf
Septage Treatment Process (Nonthaburi Plant)
Transportation
Anaerobic Digestion 28 days
Soil Improvement Material
Transportation & Pumping
Anaerobic Digestion
Sludge Drying & Soil Improvement Material
• Concrete tank 13 cu.m
• Slope 3%
• PVC Ǿ 6” piping distribution
Soil Improvement Material
Liquid Fertilizer
Drainage from Sand Drying Bed
Storage Pond for Liquid Fertilizer
Process
Thank you for
your attention