The Future of Tailings Disposal in South
Africa
Mine Tailings Africa Conference 6-7 March 2012
-
8/19/2019 Golder 2012
2/142
-
8/19/2019 Golder 2012
3/142
Kimberley – the beginning
Tailings disposal really kicked off in Kimberley diamond fields
Weathered rock washed to release diamonds –Yellow ground Hard rock left to weather before washing – Blue ground
Tailings & grits stored in dumps –source of diamonds today!
Slimes not controlled – discharged into streams
In diamond mining generally Tailings -10 mm to 1 mm
Grits 1 mm to 150 µm
Slimes - 150 µm
March 8, 2012 3
-
8/19/2019 Golder 2012
4/142
Mining legacy
TSFs are some of the largest man-made structures
March 8, 2012 4
-
8/19/2019 Golder 2012
5/142
Bafokeng No 4
March 8, 2012 5
7 km
-
8/19/2019 Golder 2012
6/142
Mining legacy
TSFs are some of the largest man-made structures
They are a lasting legacy of mining operations – there for EVER
March 8, 2012 6
-
8/19/2019 Golder 2012
7/142
What the mining companies wish
March 8, 2012 7
-
8/19/2019 Golder 2012
8/142
Mining legacy
TSFs are some of the largest man-made structures
They are a lasting legacy of mining operations – there for EVER No quite true on the Witwatersrand, but
Cannot destroy matter, so retreated tailings retain their volume
Tailings storages fail, killing people and causing environmental harm
There is a demand by society for TSF designs to
Limit risk to the environment
Limit risk to people
Be stable “for ever”!
March 8, 2012 8
-
8/19/2019 Golder 2012
9/142
Outline today
Tell you something about my journey
Relate some history about tailings disposal in South Africa Look at the development of TSF design in SA
Consider the SA and African TSF market today
Look at trends in tailings disposal
March 8, 2012 9
-
8/19/2019 Golder 2012
10/142
-
8/19/2019 Golder 2012
11/142
My history
“Pre-ordained” to work in the mining industry
Great grandfather a Cornish tin miner Came to Johannesburg in mid 1890’s
Brought family out soon after 2nd Boer War
March 8, 2012 11
-
8/19/2019 Golder 2012
12/142
Early mining scenes – mid 1890’s
March 8, 2012 12
-
8/19/2019 Golder 2012
13/142
My history
“Pre-ordained” to work in the mining industry
Great grandfather a Cornish tin miner Came to Johannesburg in mid 1890’s
Brought family out after 2nd Boer War
My earliest mining recollections are yellow mine dust in my gran’s house
March 8, 2012 13
-
8/19/2019 Golder 2012
14/142
Josie’s old dumps and slimes dams
March 8, 2012 14
-
8/19/2019 Golder 2012
15/142
My history with tailings
Earliest recollections are of yellow mine dust in my gran’s house
Then playing on the slimes dams at Wemmer Pan on weekends (1959) Being petrified of climbing the steep sides
The fun of exploring the many erosion caves on top
Learning corners much flatter and easier to climb
Never courageous enough to use corrugated iron to surf the sand dumps
March 8, 2012 15
-
8/19/2019 Golder 2012
16/142
A steep slimes dam - Norseman
March 8, 2012 16
-
8/19/2019 Golder 2012
17/142
Surface erosion gullies
March 8, 2012 17
-
8/19/2019 Golder 2012
18/142
My history with tailings
Earliest recollections are of yellow mine dust in my gran’s house
Then playing on the slimes dams at Wemmer Pan on weekends (1959) Being petrified of climbing the steep sides
The fun of exploring the many erosion caves on top
Learning that the corners had mush flatter and easier slopes
Never courageous enough to use corrugated iron to ride the sand dumps
Taken to Sachs dam at Premier Diamond Mine (1960) Slimes dam built using loosely dumped tailings
Dam was sliding down the slope
Profs Jennings and Casagrande called in to find solution!
March 8, 2012 18
-
8/19/2019 Golder 2012
19/142
Cullinan slimes dam
March 8, 2012 19
Sach’s
Dam
-
8/19/2019 Golder 2012
20/142
Getting into tailings
Never planned to work in mining, despite Chamber of Mines bursary
First job with Union Corporation on Verwoerd Dam construction Then when lecturing at Wits
Designed a 13 m ɸ 35 m deep caisson for Harmony headgear
Piled foundations for Unisel headgear and winder house
Rock replacement foundations for new St Helena process plant
Approached by Gary Rae - Fraser F Alexander
Joined FFA as its 1st design engineer
Now been with Golder in Aus for 20 years
So having established my credentials, into tailings disposal
Really just building big mud castles!
March 8, 2012 20
-
8/19/2019 Golder 2012
21/142
-
8/19/2019 Golder 2012
22/142
Mining exposed weathered reef
March 8, 2012 22
-
8/19/2019 Golder 2012
23/142
Stamp mills
Stamp mills introduced 1885
Fresher rock more difficult to break-up by hand Coarse crushing in stamp mills
60 to 65% coarser than150 µm
In 1912 there were 9449 mills processing 25.5 Mt/yr
Last stamp mills in SA1918
Stamp mills still operating in Zimbabwe – Zamas Zamas mine
March 8, 2012 23
-
8/19/2019 Golder 2012
24/142
Stamp mills – note gum log supports
March 8, 2012 24
-
8/19/2019 Golder 2012
25/142
Cyanidation & milling
Cyanidation introduced in 1890 – from Scotland
Started with treatment of sand only Cones (cyclones) used to separate sand and slime
Slimes 16 to 33% of product
Sand washed in vats
Later both sand and slime treated, but separately
Last sand plant in 1918
March 8, 2012 25
-
8/19/2019 Golder 2012
26/142
Sand vats
March 8, 2012 26
-
8/19/2019 Golder 2012
27/142
Cyanidation & milling
Cyanidation introduced in 1890 – from Scotland
Started with treatment of sand only Sand washed in vats
Last sand plant in 1918
Cones (cyclones) used to separate sand and slime
Slimes 16 to 33% of product
Then sand and slime treated separately
Sand dropped out into cocopans
Manhandled to dump
March 8, 2012 27
-
8/19/2019 Golder 2012
28/142
Cocopans moved by hand!
March 8, 2012 28
-
8/19/2019 Golder 2012
29/142
Cyanidation & milling
Cyanidation introduced in 1890 – from Scotland
Sand treatment introduced in 1890 Last sand plant in 1918
Sand and slime treated separately
Cones (cyclones) used to separate sand and slime
Sand washed in vats
Manhandled to dump
Sand batch dropped into cocopans
Manhandled to dump
Hauled by endless rope onto sand dump
Finally by conveyors
March 8, 2012 29
-
8/19/2019 Golder 2012
30/142
An endless rope sand dump
March 8, 2012 30
-
8/19/2019 Golder 2012
31/142
Dumping & hauling
March 8, 2012 31
-
8/19/2019 Golder 2012
32/142
Early gold mining
Cyanidation introduced in 1890 – from Scotland
Sand treatment introduced in 1890 Sand and slime treated separately
Cones (cyclones) used to separate sand and slime
Sand washed in vats
Last sand plant in 1918
Manhandled to dump
Sand batch dropped into cocopans
Hauled by endless rope onto sand dump
Advancing face often failed
Cocopans would end up at the toe Mule teams used to recover them!!
March 8, 2012 32
-
8/19/2019 Golder 2012
33/142
Today reprocessing sand dumps
March 8, 2012 33
-
8/19/2019 Golder 2012
34/142
Early slimes dams
Dumping slimes into veld could not continue
Mines surrounded by good farming land So slimes dams had to be built
Used gravity to get tailings slurry to slimes dam
Needed to be downhill of and close to plant
Slimes wheels used to lift slurries to gain head
Pumps in early development
March 8, 2012 34
-
8/19/2019 Golder 2012
35/142
Tailings wheel – slurry lift “pump”
March 8, 2012 35
-
8/19/2019 Golder 2012
36/142
Early slimes dams
Dumping slimes into veld could not continue
Mines surrounded by good farming land So slimes dams had to be built
Used gravity to get tailings slurry to slimes dam
Needed to be close to and downhill of plant
Slimes wheels used to lift slurries to gain head
Pumps in early development
Few pipes, so used wooden launders or furrows
Dams at toe of sand dumps – cause of dump failure?
March 8, 2012 36
-
8/19/2019 Golder 2012
37/142
Tailings slurry launders
March 8, 2012 37
-
8/19/2019 Golder 2012
38/142
-
8/19/2019 Golder 2012
39/142
Early slimes dams
March 8, 2012 39
-
8/19/2019 Golder 2012
40/142
Rotating mills – total slimes
Air agitation and filtration allowed efficient cyanidation of slimes
Introduction of rotating mills in 1904 lead to ALL tailings treatment Total slimes - 75% (
-
8/19/2019 Golder 2012
41/142
Rod Mills
March 8, 2012 41 MINE TAILNGS, JOHANNESBURG 2012
-
8/19/2019 Golder 2012
42/142
Vacuum filters to remove cyanide solution
March 8, 2012 42
-
8/19/2019 Golder 2012
43/142
Rotating mills – total slimes
Air agitation and filtration allowed efficient cyanidation of slimes
Introduction of rotating mills in 1904 lead to all tailings treatment Total slimes - 75% (
-
8/19/2019 Golder 2012
44/142
-
8/19/2019 Golder 2012
45/142
Scientific method criteria
1917 Chemical, Metallurgical and Mining Society
Still mainly daylight operations Emphasised choosing flat land for slimes dam
Ideal slimes dam
22 ha for 50 000 tpm (1 ha / 1 000 tpm = 1 m/yr)
Equivalent to 337 claims – Crown Deep and Langlaagte Deep mines
Gang 1 intelligent foreman (white)
8 to 10 able bodied labourers
Problems
Wooden penstocks – easily crushed
Cracks & leaks in walls – frequent wash-outs
March 8, 2012 45
-
8/19/2019 Golder 2012
46/142
Awareness – from 1917
Toe trench 900 wide by 500 deep - slimes trench and key
Excavated earth used to form toe wall Looked to use dry ground away from water
March 8, 2012 46
-
8/19/2019 Golder 2012
47/142
Toe trench and toe wall
March 8, 2012 47
-
8/19/2019 Golder 2012
48/142
Awareness – from 1917
Toe trench 900 wide by 500 deep - slimes trench and key
Excavated earth used to form toe wall Looked to use dry ground away from water
When soggy ground
French drains installed in toe drain
March 8, 2012 48
-
8/19/2019 Golder 2012
49/142
Toe drain and toe wall
March 8, 2012 49
-
8/19/2019 Golder 2012
50/142
Day wall system
Irrigation (day wall) system developed by Fraser Alexander
Started at Ferreira Deep in 1904 Allowed
Development of freeboard
Control of supernatant
March 8, 2012 50
-
8/19/2019 Golder 2012
51/142
2 cell system
March 8, 2012 51
-
8/19/2019 Golder 2012
52/142
Day wall system
Irrigation (day wall) system developed by Fraser Alexander
Started at Ferreira Deep in 1904 Allowed
Development of freeboard
Control of supernatant
Build walls with shovels – special shovels
500 mm wide by 100 mm high Sloped inwards
Maximum height 20 m
Single point delivery - puts limit on cycle time
Rate of rise reduced to 150 mm/mnth
Developed “rule of thumb” method to size a new slimes dam
March 8, 2012 52
-
8/19/2019 Golder 2012
53/142
Night wall system
Night wall developed when 24 hours sliming introduced
Night wall ~ 3 times Day wall width Allowed controlled supervision free night (16 hpd) deposition
March 8, 2012 53
-
8/19/2019 Golder 2012
54/142
Early night trench system
March 8, 2012 54
Wooden penstock
-
8/19/2019 Golder 2012
55/142
Idealised Day wall/Night wall system
March 8, 2012 55
Day wall Night wall
-
8/19/2019 Golder 2012
56/142
Pool wall system
Single slimes delivery point difficult to manage at night
Pool at far side of slimes dam Difficult to control location of pool
Introduction of pool wall by FA changed operations
Allowed:
Pool location to be held around penstock
Development of adequate freeboard
No need for night wall – reduction in work load!
March 8, 2012 56
D l f h P l W ll
-
8/19/2019 Golder 2012
57/142
Development of the Pool Wall system
March 8, 2012 57
SA ld li d l ll
-
8/19/2019 Golder 2012
58/142
SA gold slimes dam pool wall
March 8, 2012 58
P l ll i K l li i t d d 1993
-
8/19/2019 Golder 2012
59/142
Pool wall in Kalgoorlie – introduced 1993
March 8, 2012 59
D l t
-
8/19/2019 Golder 2012
60/142
Developments
Developments to manage slimes dams
Slurry pumps and steel piping Day wall, night wall and pool wall to manage pool
Concrete penstock boxes – raised periodically
Newer developments include:
Penstock rings - eliminates raising of concrete towers
Safe handling system for rings – reduces risk of death! Penstock towers - ERGO
Mechanisation – reduces day wall blowouts/ratholes
In-wall delivery stations – minimises pipe lifting
Multiple discharge locations
Reduces cycle time More uniform product in wall
March 8, 2012 60
“R i f d” t k
-
8/19/2019 Golder 2012
61/142
“Reinforced” penstock
March 8, 2012 61
Wooden slat controlled
Steel pipe riser
-
8/19/2019 Golder 2012
62/142
Th lti t ERGO t k t
-
8/19/2019 Golder 2012
63/142
The ultimate - ERGO penstock tower
March 8, 2012 63
Design criteria 1949 1
-
8/19/2019 Golder 2012
64/142
Design criteria 1949 - 1
Gold slimes now 85 to 95%
-
8/19/2019 Golder 2012
65/142
Design criteria 1949 - 2
1 m by 600 mm toe trench – stops bulging failures!
Excavated material forms toe wall Introduced concept of step-ins to prevent wall failures
Return water 15 to 20% of slurry water
Secrets of operating
Maintain walls in good condition
Ensure supernatant runs off daywalls to pool
Have sufficient penstock capacity to remove rainfall runoff
Operating cost 0.5 c/t
March 8, 2012 65
-
8/19/2019 Golder 2012
66/142
Typical wet toe failure Millsite
-
8/19/2019 Golder 2012
67/142
Typical wet toe failure - Millsite
March 8, 2012 67
Saaiplaas foundation failure & liquefaction
-
8/19/2019 Golder 2012
68/142
Saaiplaas foundation failure & liquefaction
March 8, 2012 68
-
8/19/2019 Golder 2012
69/142
George Donaldson NBRI
-
8/19/2019 Golder 2012
70/142
George Donaldson - NBRI
In 1953 George investigated seepage problems on East Rand
First technical study of slimes dams in SA (maybe globally?) Looked at seepage, underdrainage design and stability
Winkelhaak had extensive French drains
1959 published book on geotechnical aspects of slimes dam design
March 8, 2012 70
The problem!
-
8/19/2019 Golder 2012
71/142
The problem!
March 8, 2012 71
The seepage analysis
-
8/19/2019 Golder 2012
72/142
The seepage analysis
March 8, 2012 72
-
8/19/2019 Golder 2012
73/142
George Donaldson - NBRI
-
8/19/2019 Golder 2012
74/142
George Donaldson - NBRI
In 1953 George looked at seepage problems on East Rand
Winkelhaak had extensive French drains
First technical study of slimes dams in SA (maybe globally?)
Looked at seepage, underdrainage design and stability
1959 published book on geotechnical aspects of slimes dam design
Main innovation was
Introduction of planned underdrainage Suggested drains around toe the logical location
St Helena first slimes dam to incorporate new drain concepts
Concluded
Can build to 40 m at 3 m/yr
Outer slope of 18º
Eliminates foundation failure risk
Helps rehabilitation
March 8, 2012 74
New slimes dams - Seepage control
-
8/19/2019 Golder 2012
75/142
New slimes dams - Seepage control
March 8, 2012 75
Remember
-
8/19/2019 Golder 2012
76/142
Remember
All done without a computer
Mostly long multiplication and division
No slope stability program
No seepage program
Slide rule at best
No CAD or plotters
Flow nets developed and drawn by hand
March 8, 2012 76
And so
-
8/19/2019 Golder 2012
77/142
And so
SA remans uniquely suited for upstream raising
Semi-arid climate – higher evaporation than rainfall
Relatively flat ground – mainly ring-dyke construction
Low seismic risk (but remember Welkom’s earthquakes?)
To prevent failure design must control
Rate of rise
Pool water location and size Freeboard to meet Design Storm requirement
March 8, 2012 77
So is Australia - Kalgoorlie
-
8/19/2019 Golder 2012
78/142
So is Australia Kalgoorlie
March 8, 2012 78
Upstream raising above rock dam - China
-
8/19/2019 Golder 2012
79/142
Upstream raising above rock dam China
March 8, 2012 79
Rock dam
Upstream tailings raise
And so
-
8/19/2019 Golder 2012
80/142
And so
But not all SA is suitable for ring-dyke construction
A few usable valleys - Barberton and Steelport areas
High rainfall areas – Lowveld, KwaZuluNatal
March 8, 2012 80
Not everywhere is flat! Barberton area
-
8/19/2019 Golder 2012
81/142
Not everywhere is flat! Barberton area
March 8, 2012 81
1st CIP plant
And so
-
8/19/2019 Golder 2012
82/142
d so
But not all SA (or Africa) is suitable for ring-dyke construction
A few usable valleys - Barberton and Steelport areas
High rainfall areas – lowveld, KwaZuluNatal
Much of African is
Hillier
Wetter
Has significant seismicity Lesotho is a good example
SA engineers must look to the world for design methodologies
March 8, 2012 82
High rainfall & seismicity – Solomon Islands
-
8/19/2019 Golder 2012
83/142
g y
March 8, 2012 83
Other deposition systems
-
8/19/2019 Golder 2012
84/142
p y
Spigots
Cyclones
Earth or rock valley dams
In pit
Underground
In river or ocean
March 8, 2012 84
Spigots
-
8/19/2019 Golder 2012
85/142
p g
Used to split coarse material from slimes for outer perimeter beach
Already in use at RPM in 1947
Tailings 55% -75 µm
Slurry at 30% solids
150 mm delivery pipe
Supported on wooden trestles
75 mm spigots at 2 m intervals Outer walls built by hand
Used in SA mainly for
Diamonds
Iron ore
Coal
March 8, 2012 85
-
8/19/2019 Golder 2012
86/142
Full pipe spigot – coal combined rejects
-
8/19/2019 Golder 2012
87/142
p p p g j
March 8, 2012 87
Cyclones
-
8/19/2019 Golder 2012
88/142
y
Used extensively in South America
Steep valleys
High seismicity
Very few cycloned dams in SA
Finer tailings
Low seismicity
Plenty of real estate (still true??) Used very successfully at Ergo and Daggafontein
Modified centreline construction
Used for Sheba gold mine TSF in early 1980’s
Valley dam
High rates of rise Upstream raised
Limited other uses for gold, platinum and diamonds
March 8, 2012 88
Multiple cyclones – Ergo early days
-
8/19/2019 Golder 2012
89/142
y g y y
March 8, 2012 89
-
8/19/2019 Golder 2012
90/142
Daggafontein cyclone operation
-
8/19/2019 Golder 2012
91/142
March 8, 2012 91
Diamonds - Botswana
-
8/19/2019 Golder 2012
92/142
March 8, 2012 92
Cyclone station - Chile
-
8/19/2019 Golder 2012
93/142
March 8, 2012 93
Compacted cyclone underflow dam - Chile
-
8/19/2019 Golder 2012
94/142
March 8, 2012 94
-
8/19/2019 Golder 2012
95/142
Other Containments
March 8, 2012 95
Concrete faced waste rock dam - Peru
-
8/19/2019 Golder 2012
96/142
March 8, 2012 96
Coarse coal rejects to contain fines
-
8/19/2019 Golder 2012
97/142
March 8, 2012 97
-
8/19/2019 Golder 2012
98/142
-
8/19/2019 Golder 2012
99/142
In river (Indonesia) – not acceptable
-
8/19/2019 Golder 2012
100/142
March 8, 2012 100
Deep sea tailings disposal – limited locations
-
8/19/2019 Golder 2012
101/142
March 8, 2012 101
TAILINGS HEAD TANK
-
8/19/2019 Golder 2012
102/142
Foundation failures
-
8/19/2019 Golder 2012
103/142
March 8, 2012 103
Los Frailes
Merriespruit
Wall failure
-
8/19/2019 Golder 2012
104/142
Most wall failures are really foundation failures
Poor foundations
Seismic action
So need to carry out comprehensive site investigations under wall
Drilling depth at least as high as dam
TSFs in China and USA planned to >300 m high
Remove poor soils and, were appropriate, weak rock Ensure good contact between foundation and wall
Provide an adequate cut-off to limit seepage forces under wall
Monitor the wall
Piezometers
Inclinometers and survey beacons
Settlement gauges/rings
March 8, 2012 104
Preparing clay core – rock abutment contact
-
8/19/2019 Golder 2012
105/142
March 8, 2012 105
Fully instrumented earth/rock dam lined TSF
-
8/19/2019 Golder 2012
106/142
March 8, 2012 106
Overtopping
-
8/19/2019 Golder 2012
107/142
Need to provide and operate with adequate freeboard
EU regulations require PMF freeboard storage
SA 1:50 yr requirement inadequate in most of Africa
Need to meet IFC or World Bank criteria
Provide emergency spillways at all stages of operation
EU regulations require PMF spillways
Queensland - capacity dependent on Hazard category of TSF
1:100 to 1:10 000
Size decant/penstock/pumps appropriately
Operate pool correctly!!!!
March 8, 2012 107
Start of 70 m wide stepped chute spillway
-
8/19/2019 Golder 2012
108/142
March 8, 2012 108
Uncontrolled release of water
-
8/19/2019 Golder 2012
109/142
Carry out daily time step stochastic water balance
Vital in tropical regions
Estimate supernatant volume correctly
Use settling tests – not in situ density measurements
Size return water dam appropriately
Queensland – 2 to 4 month wet period 1:20 year AEP for RWD and TSF
Size return water pumps appropriately
March 8, 2012 109
Coal rejects codisposal return water pumps
-
8/19/2019 Golder 2012
110/142
March 8, 2012 110
Seepage into groundwater
-
8/19/2019 Golder 2012
111/142
This is essentially an uncontrolled release
Very difficult and expensive to control once started
Has become more of a focus by EPAs
EU regulations demand at least a single liner
Australia moving to liners for all TSFs
SA lining requirement for TSFs now hazard related
Goes to mining companies maintaining a social permit to operate
March 8, 2012 111
1st HDPE liner for residue (??) - gypsum
-
8/19/2019 Golder 2012
112/142
March 8, 2012 112
120 ha Nickel residue storage (LDPE)
-
8/19/2019 Golder 2012
113/142
March 8, 2012 113
Spillway & abutment
Earth/rock dam
Oman – HDPE cover to prevent seepage
-
8/19/2019 Golder 2012
114/142
March 8, 2012 114
Dust
-
8/19/2019 Golder 2012
115/142
Remember my early recollections of mining in Johannesburg?
Dust off dry surfaces can be a real issue
Difficult and can be costly to manage
Keep surfaces wet by rotating deposition
Spray dry surfaces with dust palliatives
Cover surfaces with larger material
Use fences and vegetation
March 8, 2012 115
Bauxite tailings adjacent to a town
-
8/19/2019 Golder 2012
116/142
March 8, 2012 116
Erosion
-
8/19/2019 Golder 2012
117/142
All tailings surfaces erode
Loose, granular, weakly cemented, unstable particles
Surface water management probably greatest challenge
During operations and especially post closure
Rigid engineered structures rarely work
Tailings continues to settle and move
March 8, 2012 117
-
8/19/2019 Golder 2012
118/142
Wind and water erosion - Kalgoorlie
-
8/19/2019 Golder 2012
119/142
March 8, 2012 119
Design team to minimise risk
-
8/19/2019 Golder 2012
120/142
Need a competent & experienced team, including:
Tailings engineer
Geotechnical engineer
Hydrologist
Hydrogeologist
Metallurgist
Geochemist
Seismologist
Geomorphologist
Landscape architect
Botanist
Design drafter
Project manager
March 8, 2012 120
“New” technologies
-
8/19/2019 Golder 2012
121/142
Paste and thickened tailings
In-line flocculation
Filtration
Codisposal
March 8, 2012 121
Paste and thickened tailings
-
8/19/2019 Golder 2012
122/142
Slurry needs secondary thickening after process
Possible with advent of deep tank thickeners
May need positive displacement pumps – lots of power!
Maximises
Water recovery
Initial settled density
May eliminate need to line base Allows early rehabilitation access
March 8, 2012 122
-
8/19/2019 Golder 2012
123/142
Paste TSF - Bulyanhulu
-
8/19/2019 Golder 2012
124/142
March 8, 2012 124
-
8/19/2019 Golder 2012
125/142
In-line flocculation
-
8/19/2019 Golder 2012
126/142
Addition of flocculants just before discharge
Rapid dewatering
TSFs
Steeper beaches
Higher settled density
Higher water recoveries
March 8, 2012 126
Beach and density improvement -China
-
8/19/2019 Golder 2012
127/142
March 8, 2012 127
Prior to flocculation
After flocculation
In-line flocculation
-
8/19/2019 Golder 2012
128/142
Addition of flocculants just before discharge
Rapid dewatering
TSFs
Steeper beaches
Higher settled density
Higher water recoveries
Coal tailings Use recyclable pits
Excavation for disposal within days
Dumped with mine waste - codisposal
March 8, 2012 128
Coal tailings
-
8/19/2019 Golder 2012
129/142
March 8, 2012 129
Coal tailings removal after 3 days
-
8/19/2019 Golder 2012
130/142
March 8, 2012 130
Filtration
-
8/19/2019 Golder 2012
131/142
Range of filters to match tailings and tonnage
Recovers maximum volume of water
Transport by conveyors & trucks
Co-dispose with mine waste rock
Build an engineered dump
No new coal TSFs in Queensland
Coal - mix coarse and fine rejects Dry stacking may reduce seepage issues
March 8, 2012 131
-
8/19/2019 Golder 2012
132/142
Compacted filtered tailings dump
-
8/19/2019 Golder 2012
133/142
March 8, 2012 133
Filtered – risk of static liquefaction
-
8/19/2019 Golder 2012
134/142
March 8, 2012 134
Flow of filtered tailings
-
8/19/2019 Golder 2012
135/142
March 8, 2012 135
Trends in South Africa
f
-
8/19/2019 Golder 2012
136/142
Increased concern about failure to contain
Surface water releases
Groundwater contamination
Dust
Visual pollution
Pressure on land availability
Settlements around TSFs in Rustenburg
Crown slimes dams and SOWETO
Water supplies are nearing their limit
Need to maximise water recovery
March 8, 2012 136
-
8/19/2019 Golder 2012
137/142
TSF closure
N l ti
-
8/19/2019 Golder 2012
138/142
No easy solutions
SA Chamber of Mines tried grassing slimes dams for over 20 years
“Old man” Cook
Rand mines took over the mantle (Brian Cook)
Where Digby Wells got started!
Reasons
Very erodible material – very little clay to “bind” particles
Salts, pH and metals are a problem
Steep sides – well above agricultural slopes
Mines required to flatten to 1:7 in Queensland
Return to grazing
Cost in excess of $40 000 /ha (R300 000)
March 8, 2012 138
Closure - PasteRock ®
C t ll d l f thi k d filt d t ili dd d t t k
-
8/19/2019 Golder 2012
139/142
Controlled volume of thickened or filtered tailings added to waste rock
Mixed and then placed in a “thin” cover layer
Has use in providing low permeability covers – control of AMD
Scale of use limited by waste size and mixing equipment
Could be used to dispose of tailings with mine waste (codisposal)
Used for coal rejects - Bulga, Mt Thorley
Planned for Namibian copper mine Daggafontein example
A dry PasteRock cover
An erosion resistant matrix of rock & soil
March 8, 2012 139
-
8/19/2019 Golder 2012
140/142
In closure
N l ti
-
8/19/2019 Golder 2012
141/142
No easy solutions
Tailings disposal will become more costly
Engineering input will increase
SA has an urgent need to train more tailings design and operationalengineers
This means more geotechnical engineers!!
March 8, 2012 141
-
8/19/2019 Golder 2012
142/142
The end – thanks