GOLDENEYE 021799 Asset Fact Sheets MARKETING · been studied as part of a carbon capture and...

2
Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021570 September 2016 GOLDENEYE GOLDENEYE GOLDENEYE The Goldeneye field ceased production in 2011. The Goldeneye platform and pipeline have been studied as part of a carbon capture and storage project, sourcing CO2 from Peterhead Power Station. In November 2015, the UK Government announced, as part of its Comprehensive Spending Review, all funding for the Carbon Capture and Storage (CCS) Commercialisation Competition was cut. The Goldeneye Operator and owners will consider plans to decommission the facilities in light of the Government's announcement. KEY FACTS Block Approx distance to land Water Depth Hydrocarbons Produced Export Method Operated / Non-Operated 14/29a 130km (81 miles) North East of Aberdeen 396ft (121m) Gas and Condensate Production and Export of wet gas Operated Sector Central North Sea FULMAR GAS LINE FLAGS ST FERGUS ABERDEEN KNEY ISLANDS SHETLAND ISLANDS SULLOM VOE TERMINAL BRENT A BREN GOLDENEYE

Transcript of GOLDENEYE 021799 Asset Fact Sheets MARKETING · been studied as part of a carbon capture and...

Page 1: GOLDENEYE 021799 Asset Fact Sheets MARKETING · been studied as part of a carbon capture and storage project, sourcing CO2 from Peterhead Power Station. In November 2015, the UK Government

Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021570 September 2016

GOLDENEYE

GOLDENEYE

GOLDENEYEThe Goldeneye field ceased production in 2011. The Goldeneye platform and pipeline have been studied as part of a carbon capture and storage project, sourcing CO2 from Peterhead Power Station. In November 2015, the UK Government announced, as part of its Comprehensive Spending Review, all funding for the Carbon Capture and Storage (CCS) Commercialisation Competition was cut. The Goldeneye Operator and owners will consider plans to decommission the facilities in light of the Government's announcement.

KEY FACTS Block

Approx distance to land

Water Depth

Hydrocarbons Produced

Export Method

Operated / Non-Operated

14/29a

130km (81 miles) North East of Aberdeen

396ft (121m)

Gas and Condensate

Production and Export of wet gas

Operated

Sector Central North Sea

FULMAR GAS LINE

FLAG

S

LAN

GEL

ED

ST FERGUS

ABERDEEN

ORKNEY ISLANDS

SHETLAND ISLANDS

SULLOM VOETERMINAL

BRENT A

BRENT BBRENT C

BRENT D

GOLDENEYEGOLDENEYE

Page 2: GOLDENEYE 021799 Asset Fact Sheets MARKETING · been studied as part of a carbon capture and storage project, sourcing CO2 from Peterhead Power Station. In November 2015, the UK Government

GOLDENEYE

INFRASTRUCTURE INFORMATION

HIGH LEVEL CAPACITY INFORMATION

Exit Specification:

Outline details of primary separation processing facilities:

Outline details of gas treatment facilities:

Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

See above

Comment2016 2017 2018 2019 2020

CONTACT INFORMATIONShell For further enquiries regarding the above please contact Matthew Livingston

+44 1224 88 7162 [email protected]

Last update: September 2016

>25% 5% to 25% <5% Unknown

Not applicable.

Description Capacity Ullage as % of system capacity