Energiforsk GobiGas - Bio-Methane from Forest Residues Jonas Dahl Bröndby 17 November 2015

Transcript of GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files ›...

Page 1: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Energiforsk

GobiGas- Bio-Methane from Forest Residues

Jonas Dahl

Bröndby 17 November 2015

Page 2: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Energiforsk –Swedish Energy Research Centre (new organization since 1 Jan 2015)

Owners : Swedish electric power association (30%) - Svensk Energi AB Swedish Power grid owner (20 %) - Svenska KraftnätSwedish district heating association (20 %) - Svensk Fjärrvärme ABSwedish gas association (15 %) - Energigas SverigeThe Swedish TSO (15 %) - Swedegas AB

Page 3: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Energiforsk in short

• Office in Stockholm and Malmö, Sweden• 21 employees, annual turn-over (2015) 23 MEUR• Core business: To develop new knowledge and financing

opportunities for developing energy R&D that leads to a more sustainable and efficient future energy system

Page 4: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Staten direkt vs. Trippel-helix

4

Staten Akademien

Industrin

Staten Akademien

Page 5: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

The Story of the GoBiGas ProjectFrom Vision to Plant in Operation

Ingemar Gunnarsson Göteborg Energi

Page 6: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

GoBiGas – Pioneering New Technology• The world’s first plant for bio methane from biomass through

gasification • The first Swedish plant to inject bio-methane into the

interregional grid

6IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

Page 7: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Quick history of GobiGas

• 2005 - Project started- Feasibility studies developed - bio-methane production from forest residues –- Comparing different gasfication & methanation technologies

• 2006 - Ambition to build a commercial sized plant, delivering 100 MW biomethane- Decision to split in 2 phases- A demonstration plant (20 MW) to be followed by a commercial plant (100 MW)

• Sept 2009 - Awarded funding from the Swedish Energy Agency sept 2009 for Demo - (220 mil SEK => 25 % of estimated CAPEX at time => current bill 1, 5 bil SEK)

• 2010 (Dec 16) - Board decision to implement after EU approved government support • 2011 – 2012 Engineering & Construction• 2012 - 2013 Construction & Commissioning

- 13/11 2013 First period of gasification• 2014 - 2015 Start-up

- 15/12 2014, 18:40, The first delivery of SNG out on the gas grid• 2015 Production! With troubleshooting and optimization of operation

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

Page 8: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

The GoBiGas Site – Phase 1 & 2

Phase 1

Phase 1 – Demonstration Plant (20 MW, Bio-SNG) Partly financed by the Swedish Energy Agency

15 000 cars400 buses

Phase 2

Phase 2 – Commercial Plant after proof of Phase 1and secured financing (100 MW Bio-SNG)Selected project by the EU-commission in NER 300

~100 000 cars

Page 9: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

SVEBIO17/09/2015 Malin Hedenskog

Process - the Movie

http://goteborgenergi.streamingbolaget.se/video/156153/link

Page 10: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Gasification Sept 30 2015: 5000 hrs(wood pellets)

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

0

1000

2000

3000

4000

5000

6000

0

100

200

300

400

500

600

700

800

900

100020

13-1

120

13-1

220

14-0

120

14-0

220

14-0

320

14-0

420

14-0

520

14-0

620

14-0

720

14-0

820

14-0

920

14-1

020

14-1

120

14-1

220

15-0

120

15-0

220

15-0

320

15-0

420

15-0

520

15-0

620

15-0

720

15-0

820

15-0

920

15-1

0

Accu

mul

ated

ope

rati

ng ti

me

[h]

Ope

rati

ng ti

me

each

per

iod

[h]

Clogging of gas cooler=>

much more tars thandesign

Page 11: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Reference installations - gasification

Senden, Germany• Repotec technology ½ the size

compered to GoBiGas

• Production of electrical power and district heating

• In operation autumn 2012

Güssing, Austria• Repotec technology 1/4 the size

compered to GoBiGas

• Gas-fueled motor 2 MW el and 4,5 MW district heating

• In operation since 2002 (> 60 000 h)

SVEBIO17/09/2015 Malin Hedenskog

Same technology butmuch less or no issues with tars !

Page 12: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

How We Handle Tars

• Activate the Olivine (Mg,Si,Fe)

• What makes the olivine ”active”? How is this activity achieved?

• Addition of K2CO3 activates olivine

Analysis: Dr. Pavleta Knutsson Analysis: Dr. Pavleta Knutsson Analysis: TOP ANALYTIC, BSE-image

Fresh olivine Used olivine Used olivine after K2CO3

Before K After KTotal tar* (g/m3 ) 43,1 13,1Total tar, excl. BTX** (g/m3) 21,8 4,4

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

Page 13: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Gasification Sept 30 2015: 5000 hrs(wood pellets)

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

0

1000

2000

3000

4000

5000

6000

0

100

200

300

400

500

600

700

800

900

100020

13-1

120

13-1

220

14-0

120

14-0

220

14-0

320

14-0

420

14-0

520

14-0

620

14-0

720

14-0

820

14-0

920

14-1

020

14-1

120

14-1

220

15-0

120

15-0

220

15-0

320

15-0

420

15-0

520

15-0

620

15-0

720

15-0

820

15-0

920

15-1

0

Accu

mul

ated

ope

rati

ng ti

me

[h]

Ope

rati

ng ti

me

each

per

iod

[h]

Optimisation and test of fuel feeding

Page 14: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Fuel feeding system

(pressure differences, backflow of hotgas in feedingsystem, …)

Picture by Dr. Claes Breitholtz at Valmet Power AB

Carbonisation in the feedings screw

SVEBIO17/09/2015 Malin Hedenskog

Page 15: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Bio-Methane to grid until September 2015

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

0

2000

4000

6000

8000

10000

12000

14000O

kt 1

4

Nov

14

Dec

14

Jan

15

Feb

15

Mar

s 15

April

15

Maj

15

Juni

15

Juli

15

Aug

15

Sep

15

Accu

mul

ated

pro

duct

ion

[MW

h]

Production of biomethane

CH4 96.5- 97.5%N2 0.6-0.8%H2 2%CO2 0-0.5%

Page 16: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Rest products

SVEBIO17/09/2015 Malin Hedenskog

- RME and activated carbon, separated tar from raw gas cleaning arecombusted in the combustion part of the gasifier

- Currently, no bottom ash due to low ash content of wood pellets . All ash is removed as filter fly ash which is partly reintrodued due to content of activated bed material

- Fly ash is send to deposit due to Cr6 in the olivine sand => other bed materials in the future would omite this

Page 17: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

ProductionBio-methane 160 GWh/ yr

2200 Nm3/hrDistrict Heating 50 GWh/yrConsumptionFuel 32 MWElectricity 3 MWRME (bio-oil) 0,5 MW

Overall performance goals• Biomass to bio-methane > 65 %• Energy efficiency > 90%• Operation 8000 h/year

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

Production and performance Goals

Page 18: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Efficiency of Gasification ProcessGasificationProcess

Max Biomethane

Cold Gas Efficiency Gasification reactor 84.2 % 69.0 %Cold Gas Efficiency Gasification process 76.5 % 62.7 %

Total Efficiency(Cold Gas + District heating)

85.4 %

Heat Losses 14.6 %

Heat Loss to Flow Gas 2,0%Heat Loss to Cooling Water 9,6%Heat Loss to Surrounding 3,0%

• The gasification process has been successfully demonstrated for syngas production of up to 6900mn

3/h

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

Page 19: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

SVEBIO17/09/2015 Malin Hedenskog

Page 20: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

GoBiGas – where vision becomes reality

Conclusions

• GoBiGas is now online

• Major hurdles have been solved in the gasification stage and the gasifier now operates at full load.

- Alkali needs to be in balance to achieve sufficient reduction and simplification of tars

- Fuel feeding into the bed needs attention and reconstruction is probably required to enable 8000h/year operation

• Optimization of carbon filter beds for benzene removal now restricts the unit to go to full load

Page 21: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Forest residues reception & conveying – 2016(wood chips, feb 2016)

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

Page 22: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Commercial Success or not ? Phase 2 ?Variable Oil Prices

IEA Bioenergy 27/10/2015 Ingemar Gunnarsson

ProjectStart

Pilot Study Investment Decision

Construction of Plant

Start Up and Operation

Page 23: GoBiGas-20151116 - Jonas Dahl 3- Utan extra › ckfinder › userfiles › files › GoBiGas-20151116-Jonas-D… · • 2014 - 2015 Start-up - 15/12 2014, 18:40, The first delivery

Thank you for your attention!