5
GMR Highways project Office: GMR Kishangarh Udaipur Ahmedabad Expressways Limited Rajasthan Regional Chapter. Udaipur Centre. ITP. Opposite Oevendra Oham. Bhuvana. Udaipur 313 001. Rajasthan T +91294 2440185 F +91 294 2440195 Wwww.gmrgroup.in Ref: GKUAEL/UDR-SPV /PIU/079 Dated: 09 th July 2012 To The Team Leader MIs Euroestudios, S.L. 13, Machla Magra Scheme, Patel Circle to Kishnapole road Udaipur, Rajasthan Subject: Six Laning of Kishangarh-Udaipur-Ahmadabad Section of NH-79A, NH-79, NH-76 and NH-8 including New Udaipur Bypass in the States of Rajasthan and Gujarat (approx. Length 555.500 kms) on DBFOT (Toll) under NHDP Phase V Project- Reg. - Project Status Report Jun 2012 Ref.: Your letter no. Theme-Euro/UDR/6-lane/GMR/2012-13/58 dated 19.06.12 Dear Sir, With reference to the above stated letter, the status report of the project for the month of June' 2012 is herewith enclosed. This..is for your information & record please. Thanking you and assuring best of cooperation at all times. For GMR Kishangarh Udaipur Ahmedabad Expressways Ltd. Chandrapal Mehta (General Manager) Cc: po, NHAI, lO-A, Panchavati, Udaipur, Rajasthan (For information) Regd. Office: 4th Floor. Birla Tower. 25. Barakhamba Road. New OelhHlOOOl Corporate Office: IBC Knowledge Park. Phase 2. "0" Block. 10th Floor. 4/1. Airports I Energy I Highways I Urban Infrastructure I Foundation Bannerghatta Road. Bangalore 560 029

Transcript of GMR Highways - nhai.org.innhai.org.in/spw/ConcessionaireDetails/079_GMR_Project Status Report... ·...

Page 1: GMR Highways - nhai.org.innhai.org.in/spw/ConcessionaireDetails/079_GMR_Project Status Report... · GMR Highways GMR Kishangarh Udaipur Ahmedabad Expressways Limited ... Airports

GMR Highways project OfficeGMR Kishangarh Udaipur Ahmedabad Expressways Limited Rajasthan Regional Chapter Udaipur Centre ITP Opposite Oevendra Oham Bhuvana Udaipur 313 001 Rajasthan T +91294 2440185 F +91 294 2440195 Wwwwgmrgroupin

Ref GKUAELUDR-SPV PIU079 Dated 09th July 2012

To The Team Leader MIs Euroestudios SL

13 Machla Magra Scheme Patel Circle to Kishnapole road Udaipur Rajasthan

Subject Six Laning of Kishangarh-Udaipur-Ahmadabad Section of NH-79A NH-79 NH-76 and NH-8 including New Udaipur Bypass in the States of Rajasthan and Gujarat (approx Length 555500 kms) on DBFOT (Toll) under NHDP Phase V Project- Reg - Project Status Report Jun 2012

Ref Your letter no Theme-EuroUDR6-laneGMR2012-1358 dated 190612

Dear Sir With reference to the above stated letter the status report of the project for the month of June 2012 is herewith enclosed

Thisis for your information amp record please

Thanking you and assuring best of cooperation at all times

For GMR Kishangarh Udaipur Ahmedabad Expressways Ltd

~ Chandrapal Mehta (General Manager)

Cc po NHAI lO-A Panchavati Udaipur Rajasthan (For information)

Regd Office 4th Floor Birla Tower 25 Barakhamba Road New OelhHlOOOl Corporate Office IBC Knowledge Park Phase 2 0 Block 10th Floor 41

Airports I Energy I Highways I Urban Infrastructure I Foundation Bannerghatta Road Bangalore 560 029

~ ~ GMR Kishangarh - Udaipur - Ahmedabad Expressways Limited

Institute of Town Planners Rajasthan Regional Chapter - Udaipur Center Opposite Devendra Dham Bhuwana Udaipur Rajasthan 313001 Web Site wwwgmr99_llilJll

Appcndix - A

Progress Report for the Month of June 2012

1 Condition Precedent Status

The details pertaining to Financial Closure have been submitted to your office vide our letter 21stNo GKUAElUDR-SPVPIU074 dated June 2012 Further the acceptance of NHAI

confirming financial closure has also been submitted vide this letter

2 Applicable Permits The details pertaining to Applicable Permits have been submitted to your office vide our letter No GKUAElUDR-SPVPIU078 dated 04th July 2012 In addition to the details submitted vide our letter permission from mining department for Samodi mining area amp Consent to establish crusher at village- Baran Tehsil- Banera Dist - Bhilwara is herewith enclosed

3 Utility Shifting - LT Lines a) Rajasthan State (Ajmer Bhilwara Chittorgarh Udaipur amp Dungarpud - Estimates have

been returned to AVVN l for necessary compliance as per observations of NHAL b) Gujarat State (Sabarkantha amp Gandhinagar) - Presently estimates are with IE for

verification

- HT Lines a) Rajasthan State (RVPNL) -NHAI has deposited the processing fees of Rs 85 lacs to RVPNl

on 30th Apr12 Survey amp Estimates preparation for HT lines by RVPNl is in progress 20t h b) Gujarat State (GETCO) - NHAI has deposited the processing fee Rs 240 lacs on

Feb2012 to GETCO After completion of survey by GETCO for all HT lines GETCO has further requested NHAI to inform about acquisition of land required for shifting of pylons beyond ROW so that estimate can be submitted NHAI has forwarded the ROW details to GETCO

- Water Pipe Line a) Ajmer amp Bhilwara - Estimates have been submitted to PIU Udaipur to forward the same

to HQ after verification by IE b) Chittorgarh - Estimate prepared by concerned department and forwarded to NHAI c) Udaipur - Estimate prepared by concerned department and forwarded to NHAI d) Dungarpur - Estimate prepared by concerned department and forwarded to NHAI e) Sabarkantha amp Gandhinagar - Estimates have been submitted to PIU Udaipur to forward

the same to HQ after verification by IE

- Gas Pipe Line a) Ajmer - 04 crossing have been identified NHAI has written letters to GAil Bharat Gas

HPCl amp IOCl on 02 nd May12 to take protective measures b) Bhilwara Chittorgarh Udaipur amp Dungarpur - No gas lines have been identiifed c) Sabarkantha amp Gandhinagar - 05 locations have been identified Protection lork fo onmiddot

crossing of Gas line at Ch 507+755 has been completed by GSPl balance 4 numbers to be shifted protected as and when required

--- - -- - - shy

~R GMR Kishangarh - Udaipur - Ahmedabad Expressways Limited

Institute of Town Planners Rajasthan Regional Chapter - Udaipur Center Opposite Devendra Dham Bhuwana Udaipur Rajasthan 313001 Web Site wwwgmr9lQIlLo

---- - --- - - ----- _- -_

4 Design Status Attached as Appendix B (Status of Survey amp Investigation) amp Appendix C (Status of Design amp Drawing)

5 Information Gathered Regarding Status of Land Acquisition a) Ajmer - Amended 3(a) submitted to CALA for verification b) Bhilwara - Verified 3(D) from CALA has been submitted to PIU Udaipur for further action c) Chittorgarh - 3(D) of Mangalwar Re-alignment has been processed by NHAI HQ for

Gazette Publication d) Udaipur - 3(D) of Udaipur Bypass is under process by NHAI HQ and shall be forwarded to

Ministry for Gazette Publication by next week Verified 3(A) for Additional Land requirement has been forwarded to PIU Udaipur by CALA

e) Dungarpurmiddot Verified 3(A) for Additional Land requirement has been forwarded to PIU Udaipur by CALA

f) Sabarkantha - JMS verification for 3(D) for 42 villages out of 45 is completed balance are in progress

g) Gandhinagar - Verified 3(D) for Project Highway land has been forwarded to PIU Udaipur by CALA for further action

h) Additional Land requirement assessment for the project highway and faciliti es are in

progress

6 Information Gathered Regarding Status of Forest a) Ajmer - Case is now reached to the office of PCCF Jaipur b) Bhilwaramiddot Case is now reached to the office of PCCF Jaipur c) Chittorgarh - Case is now reached to the office of PCeF Jaipur d) Udaipur (North) - Case is still in the office of DFO Udaipur North awaiting for the NOC

from District Collector Udaipur e) Udaipur (South) - Case is still in the office of DFO Udaipur North awaiting for the NOC

from District Collector Udaipur f) Dungarpur - Case is now reached to the office of PCCF Jaipur g) Sabarkantha - DFO forwarded the case to CCF Mehsana for further submission h) Gandhinagar - DFO forwarded the case to CCF Gandhinagar for further submission

Sections I Chainage

Km 0 to Km 555

Km 0 to Km 90

Km 90 to Km 185

Km 185 to Km 309

Km 309 to Km 363

Km 363 to Km 434

Km 434 to Km 555480

middot----------------~

Appendix - 8

Status of Survey amp Investigation Topogarphic Geo-Tech Pavement

Design Consultant Survey Investigation Investigation

CEG-GDC General Design Consultant

GMR Infrastructure Ltd 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 74 Completed 100 Completed

Feedback Infra 100 Completed 72 Completed 100 Completed

AECOM 100 Completed 85 Completed 100 Completed

LampT Ramboll 100 Com pleted 65 Completed 100 Completed

Appendix - I C I

Status of Designs amp Drawings Sections I Minor

TCS Plan amp Profile Major Bridge PUP VUP Flyover Interchange CulvertChainage Bridges

Submitted Review Total Review Total Review Total Review Total Review Total Review Total Review Total Review Total

Review

Km 0 to Km 90 Review 59 Kms 90 Kms 11 1316 2222 44 33 - 63105

Km 90 to Km 185 Review 95 Kmsl 95 Kms - 030 2727 66 12 - 0182

Km 185 to Km 309 Review 124 Kmsl 124 Kms - 1221 2425 99 22 - 53179

23 Kms(UdaipurKm 309 to Km 363 Review 12 414 1717 44 11 02 28170

Bypass)54 Kms

Km 363 to Km 434 Review 31 Kmsl71 Kms 11 17 1313 33 77 - 1196

Km 434 to Km Review 121 Kmsl121 Kms 23 034 1010 1212 813 - 16170

555480

Overall Progress - 453555480 57 30122 113114 3838 2228 02 1611002

Submitted- To Independent Engineer Review- Under review by Concessionaire

Page 2: GMR Highways - nhai.org.innhai.org.in/spw/ConcessionaireDetails/079_GMR_Project Status Report... · GMR Highways GMR Kishangarh Udaipur Ahmedabad Expressways Limited ... Airports

~ ~ GMR Kishangarh - Udaipur - Ahmedabad Expressways Limited

Institute of Town Planners Rajasthan Regional Chapter - Udaipur Center Opposite Devendra Dham Bhuwana Udaipur Rajasthan 313001 Web Site wwwgmr99_llilJll

Appcndix - A

Progress Report for the Month of June 2012

1 Condition Precedent Status

The details pertaining to Financial Closure have been submitted to your office vide our letter 21stNo GKUAElUDR-SPVPIU074 dated June 2012 Further the acceptance of NHAI

confirming financial closure has also been submitted vide this letter

2 Applicable Permits The details pertaining to Applicable Permits have been submitted to your office vide our letter No GKUAElUDR-SPVPIU078 dated 04th July 2012 In addition to the details submitted vide our letter permission from mining department for Samodi mining area amp Consent to establish crusher at village- Baran Tehsil- Banera Dist - Bhilwara is herewith enclosed

3 Utility Shifting - LT Lines a) Rajasthan State (Ajmer Bhilwara Chittorgarh Udaipur amp Dungarpud - Estimates have

been returned to AVVN l for necessary compliance as per observations of NHAL b) Gujarat State (Sabarkantha amp Gandhinagar) - Presently estimates are with IE for

verification

- HT Lines a) Rajasthan State (RVPNL) -NHAI has deposited the processing fees of Rs 85 lacs to RVPNl

on 30th Apr12 Survey amp Estimates preparation for HT lines by RVPNl is in progress 20t h b) Gujarat State (GETCO) - NHAI has deposited the processing fee Rs 240 lacs on

Feb2012 to GETCO After completion of survey by GETCO for all HT lines GETCO has further requested NHAI to inform about acquisition of land required for shifting of pylons beyond ROW so that estimate can be submitted NHAI has forwarded the ROW details to GETCO

- Water Pipe Line a) Ajmer amp Bhilwara - Estimates have been submitted to PIU Udaipur to forward the same

to HQ after verification by IE b) Chittorgarh - Estimate prepared by concerned department and forwarded to NHAI c) Udaipur - Estimate prepared by concerned department and forwarded to NHAI d) Dungarpur - Estimate prepared by concerned department and forwarded to NHAI e) Sabarkantha amp Gandhinagar - Estimates have been submitted to PIU Udaipur to forward

the same to HQ after verification by IE

- Gas Pipe Line a) Ajmer - 04 crossing have been identified NHAI has written letters to GAil Bharat Gas

HPCl amp IOCl on 02 nd May12 to take protective measures b) Bhilwara Chittorgarh Udaipur amp Dungarpur - No gas lines have been identiifed c) Sabarkantha amp Gandhinagar - 05 locations have been identified Protection lork fo onmiddot

crossing of Gas line at Ch 507+755 has been completed by GSPl balance 4 numbers to be shifted protected as and when required

--- - -- - - shy

~R GMR Kishangarh - Udaipur - Ahmedabad Expressways Limited

Institute of Town Planners Rajasthan Regional Chapter - Udaipur Center Opposite Devendra Dham Bhuwana Udaipur Rajasthan 313001 Web Site wwwgmr9lQIlLo

---- - --- - - ----- _- -_

4 Design Status Attached as Appendix B (Status of Survey amp Investigation) amp Appendix C (Status of Design amp Drawing)

5 Information Gathered Regarding Status of Land Acquisition a) Ajmer - Amended 3(a) submitted to CALA for verification b) Bhilwara - Verified 3(D) from CALA has been submitted to PIU Udaipur for further action c) Chittorgarh - 3(D) of Mangalwar Re-alignment has been processed by NHAI HQ for

Gazette Publication d) Udaipur - 3(D) of Udaipur Bypass is under process by NHAI HQ and shall be forwarded to

Ministry for Gazette Publication by next week Verified 3(A) for Additional Land requirement has been forwarded to PIU Udaipur by CALA

e) Dungarpurmiddot Verified 3(A) for Additional Land requirement has been forwarded to PIU Udaipur by CALA

f) Sabarkantha - JMS verification for 3(D) for 42 villages out of 45 is completed balance are in progress

g) Gandhinagar - Verified 3(D) for Project Highway land has been forwarded to PIU Udaipur by CALA for further action

h) Additional Land requirement assessment for the project highway and faciliti es are in

progress

6 Information Gathered Regarding Status of Forest a) Ajmer - Case is now reached to the office of PCCF Jaipur b) Bhilwaramiddot Case is now reached to the office of PCCF Jaipur c) Chittorgarh - Case is now reached to the office of PCeF Jaipur d) Udaipur (North) - Case is still in the office of DFO Udaipur North awaiting for the NOC

from District Collector Udaipur e) Udaipur (South) - Case is still in the office of DFO Udaipur North awaiting for the NOC

from District Collector Udaipur f) Dungarpur - Case is now reached to the office of PCCF Jaipur g) Sabarkantha - DFO forwarded the case to CCF Mehsana for further submission h) Gandhinagar - DFO forwarded the case to CCF Gandhinagar for further submission

Sections I Chainage

Km 0 to Km 555

Km 0 to Km 90

Km 90 to Km 185

Km 185 to Km 309

Km 309 to Km 363

Km 363 to Km 434

Km 434 to Km 555480

middot----------------~

Appendix - 8

Status of Survey amp Investigation Topogarphic Geo-Tech Pavement

Design Consultant Survey Investigation Investigation

CEG-GDC General Design Consultant

GMR Infrastructure Ltd 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 74 Completed 100 Completed

Feedback Infra 100 Completed 72 Completed 100 Completed

AECOM 100 Completed 85 Completed 100 Completed

LampT Ramboll 100 Com pleted 65 Completed 100 Completed

Appendix - I C I

Status of Designs amp Drawings Sections I Minor

TCS Plan amp Profile Major Bridge PUP VUP Flyover Interchange CulvertChainage Bridges

Submitted Review Total Review Total Review Total Review Total Review Total Review Total Review Total Review Total

Review

Km 0 to Km 90 Review 59 Kms 90 Kms 11 1316 2222 44 33 - 63105

Km 90 to Km 185 Review 95 Kmsl 95 Kms - 030 2727 66 12 - 0182

Km 185 to Km 309 Review 124 Kmsl 124 Kms - 1221 2425 99 22 - 53179

23 Kms(UdaipurKm 309 to Km 363 Review 12 414 1717 44 11 02 28170

Bypass)54 Kms

Km 363 to Km 434 Review 31 Kmsl71 Kms 11 17 1313 33 77 - 1196

Km 434 to Km Review 121 Kmsl121 Kms 23 034 1010 1212 813 - 16170

555480

Overall Progress - 453555480 57 30122 113114 3838 2228 02 1611002

Submitted- To Independent Engineer Review- Under review by Concessionaire

Page 3: GMR Highways - nhai.org.innhai.org.in/spw/ConcessionaireDetails/079_GMR_Project Status Report... · GMR Highways GMR Kishangarh Udaipur Ahmedabad Expressways Limited ... Airports

~R GMR Kishangarh - Udaipur - Ahmedabad Expressways Limited

Institute of Town Planners Rajasthan Regional Chapter - Udaipur Center Opposite Devendra Dham Bhuwana Udaipur Rajasthan 313001 Web Site wwwgmr9lQIlLo

---- - --- - - ----- _- -_

4 Design Status Attached as Appendix B (Status of Survey amp Investigation) amp Appendix C (Status of Design amp Drawing)

5 Information Gathered Regarding Status of Land Acquisition a) Ajmer - Amended 3(a) submitted to CALA for verification b) Bhilwara - Verified 3(D) from CALA has been submitted to PIU Udaipur for further action c) Chittorgarh - 3(D) of Mangalwar Re-alignment has been processed by NHAI HQ for

Gazette Publication d) Udaipur - 3(D) of Udaipur Bypass is under process by NHAI HQ and shall be forwarded to

Ministry for Gazette Publication by next week Verified 3(A) for Additional Land requirement has been forwarded to PIU Udaipur by CALA

e) Dungarpurmiddot Verified 3(A) for Additional Land requirement has been forwarded to PIU Udaipur by CALA

f) Sabarkantha - JMS verification for 3(D) for 42 villages out of 45 is completed balance are in progress

g) Gandhinagar - Verified 3(D) for Project Highway land has been forwarded to PIU Udaipur by CALA for further action

h) Additional Land requirement assessment for the project highway and faciliti es are in

progress

6 Information Gathered Regarding Status of Forest a) Ajmer - Case is now reached to the office of PCCF Jaipur b) Bhilwaramiddot Case is now reached to the office of PCCF Jaipur c) Chittorgarh - Case is now reached to the office of PCeF Jaipur d) Udaipur (North) - Case is still in the office of DFO Udaipur North awaiting for the NOC

from District Collector Udaipur e) Udaipur (South) - Case is still in the office of DFO Udaipur North awaiting for the NOC

from District Collector Udaipur f) Dungarpur - Case is now reached to the office of PCCF Jaipur g) Sabarkantha - DFO forwarded the case to CCF Mehsana for further submission h) Gandhinagar - DFO forwarded the case to CCF Gandhinagar for further submission

Sections I Chainage

Km 0 to Km 555

Km 0 to Km 90

Km 90 to Km 185

Km 185 to Km 309

Km 309 to Km 363

Km 363 to Km 434

Km 434 to Km 555480

middot----------------~

Appendix - 8

Status of Survey amp Investigation Topogarphic Geo-Tech Pavement

Design Consultant Survey Investigation Investigation

CEG-GDC General Design Consultant

GMR Infrastructure Ltd 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 74 Completed 100 Completed

Feedback Infra 100 Completed 72 Completed 100 Completed

AECOM 100 Completed 85 Completed 100 Completed

LampT Ramboll 100 Com pleted 65 Completed 100 Completed

Appendix - I C I

Status of Designs amp Drawings Sections I Minor

TCS Plan amp Profile Major Bridge PUP VUP Flyover Interchange CulvertChainage Bridges

Submitted Review Total Review Total Review Total Review Total Review Total Review Total Review Total Review Total

Review

Km 0 to Km 90 Review 59 Kms 90 Kms 11 1316 2222 44 33 - 63105

Km 90 to Km 185 Review 95 Kmsl 95 Kms - 030 2727 66 12 - 0182

Km 185 to Km 309 Review 124 Kmsl 124 Kms - 1221 2425 99 22 - 53179

23 Kms(UdaipurKm 309 to Km 363 Review 12 414 1717 44 11 02 28170

Bypass)54 Kms

Km 363 to Km 434 Review 31 Kmsl71 Kms 11 17 1313 33 77 - 1196

Km 434 to Km Review 121 Kmsl121 Kms 23 034 1010 1212 813 - 16170

555480

Overall Progress - 453555480 57 30122 113114 3838 2228 02 1611002

Submitted- To Independent Engineer Review- Under review by Concessionaire

Page 4: GMR Highways - nhai.org.innhai.org.in/spw/ConcessionaireDetails/079_GMR_Project Status Report... · GMR Highways GMR Kishangarh Udaipur Ahmedabad Expressways Limited ... Airports

Sections I Chainage

Km 0 to Km 555

Km 0 to Km 90

Km 90 to Km 185

Km 185 to Km 309

Km 309 to Km 363

Km 363 to Km 434

Km 434 to Km 555480

middot----------------~

Appendix - 8

Status of Survey amp Investigation Topogarphic Geo-Tech Pavement

Design Consultant Survey Investigation Investigation

CEG-GDC General Design Consultant

GMR Infrastructure Ltd 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 100 Completed 100 Completed

Sheladia Associates INC 100 Completed 74 Completed 100 Completed

Feedback Infra 100 Completed 72 Completed 100 Completed

AECOM 100 Completed 85 Completed 100 Completed

LampT Ramboll 100 Com pleted 65 Completed 100 Completed

Appendix - I C I

Status of Designs amp Drawings Sections I Minor

TCS Plan amp Profile Major Bridge PUP VUP Flyover Interchange CulvertChainage Bridges

Submitted Review Total Review Total Review Total Review Total Review Total Review Total Review Total Review Total

Review

Km 0 to Km 90 Review 59 Kms 90 Kms 11 1316 2222 44 33 - 63105

Km 90 to Km 185 Review 95 Kmsl 95 Kms - 030 2727 66 12 - 0182

Km 185 to Km 309 Review 124 Kmsl 124 Kms - 1221 2425 99 22 - 53179

23 Kms(UdaipurKm 309 to Km 363 Review 12 414 1717 44 11 02 28170

Bypass)54 Kms

Km 363 to Km 434 Review 31 Kmsl71 Kms 11 17 1313 33 77 - 1196

Km 434 to Km Review 121 Kmsl121 Kms 23 034 1010 1212 813 - 16170

555480

Overall Progress - 453555480 57 30122 113114 3838 2228 02 1611002

Submitted- To Independent Engineer Review- Under review by Concessionaire

Page 5: GMR Highways - nhai.org.innhai.org.in/spw/ConcessionaireDetails/079_GMR_Project Status Report... · GMR Highways GMR Kishangarh Udaipur Ahmedabad Expressways Limited ... Airports

Appendix - I C I

Status of Designs amp Drawings Sections I Minor

TCS Plan amp Profile Major Bridge PUP VUP Flyover Interchange CulvertChainage Bridges

Submitted Review Total Review Total Review Total Review Total Review Total Review Total Review Total Review Total

Review

Km 0 to Km 90 Review 59 Kms 90 Kms 11 1316 2222 44 33 - 63105

Km 90 to Km 185 Review 95 Kmsl 95 Kms - 030 2727 66 12 - 0182

Km 185 to Km 309 Review 124 Kmsl 124 Kms - 1221 2425 99 22 - 53179

23 Kms(UdaipurKm 309 to Km 363 Review 12 414 1717 44 11 02 28170

Bypass)54 Kms

Km 363 to Km 434 Review 31 Kmsl71 Kms 11 17 1313 33 77 - 1196

Km 434 to Km Review 121 Kmsl121 Kms 23 034 1010 1212 813 - 16170

555480

Overall Progress - 453555480 57 30122 113114 3838 2228 02 1611002

Submitted- To Independent Engineer Review- Under review by Concessionaire