Transcript of GITAU JOHN PORTFOLIO
-
Experience
Selected works
Work Experience
GITAU JOHNP.O Box 941Ruiru
Cell:[email protected]
GITA
U JO
HNP.
O Bo
x 941
Ruiru
Cell:0
7124
5639
9
g.hu
ck@
live.
com
-
Experience
Selected works
Work Experience
Project ExperienceLoresho villas - Loresho Nairobi
City park Apartmaents-Parklands Nairobi
Shanzu Waterfront - Shanzu
Ravine Park Apartmants - Rhapta rd ,Westlands Nairobi
Karuri Residence - Karen Hills Housing Project, Karen Nairobi
Terrace Close Apartmants - Terrace Close ,Westlands Nairobi
Bros Portico Mall - Juba, South Sudan
George Residence - Kisii TownDoris wambui residence - Ruiru
Thingira hotel - Ruiru
Kitengela Heights - Kitengela
Professional Experience
Architectural TechnitianUtilize Architecture and Landscape Architecture principles/Concepts on a daily basis in conduction with the interdisplinary teamResearch into multiple Green/ Sustainable Materials and technologiesalong with integration and coordination with overall project design and team.
Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and approval for construction process per code and development condotions.
Intergration and research of passive Housing techniques,Systems and materials
STUDIO ARCHITECTTO / ARCAID ARCHITECTS
Architectural TechnitianUtilize Architecture and Landscape Architecture principles/Concepts on a daily basis in conduction with the interdisplinary teamResearch into multiple Green/ Sustainable Materials and technologiesalong with integration and coordination with overall project design and team.
Prepare and create all Technical and Coordination documents for integration of interdisciplinary team and approval for construction process per code and development condotions.
Intergration and research of passive Housing techniques,Systems and materials
ELEGANT PROPERTIES
Communication and Organization of Future/ Client Developments
Educational BackgroundJANUARY 2009 - NOVEMBER 2011 : Student Undertaking Diploma in architecture at Kenya Polytechnic University CollegeJANUARY 2006 - NOVEMBER 2007 : Student at Jamhuri High School - C+ In KENYA CERTIFICATE OF SECONDARY EDUCATION
JANUARY 2004 - NOVEMBER 2005 : Student at Karima Boys High School -TransferredJANUARY 1998 - NOVEMBER 2003 : Student at Naivasha Boys Boarding School -A in KENYA CERTIFICATE OF PRIMARY EDUCATIONJANUARY 1995 - NOVEMBER 1997 : Student at St. Brigids Primary School.Transferred
Computer skills
Archicad
Autodesk Revit
Artlantis
3ds max
RecommendationTALIAN OLANG (Principal Partner)
ODESEY INTERNATION LTD0724840050
0724274139
NAIROBI
ARCH REUBEN KABBAU
DREAMS ARCHITECTSP.O Box 52428 - 00200
NAIROBI
FERUZ ABUBAKAR
VERBATIM CONSORTIUM0722654499
NAIROBI
-
Experience
Selected works
Work Experience
WAMBUI RESIDENCE
-
Experience
Selected works
Work Experience
GSPublisherEngine 5.0.100.100
1.This drawing is protected under the copyright act and cannot be used orreproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaleddimensions, any discrepancies to be reported to the architect before workcommences
3.All construction work to comply with the latest standard codes ofpractice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above all doorsand windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron at everyalternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under all walls150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation to bedetermined on site and should not be less than 1200mm.provide one row of600x600x50mm precast concrete paving slabs around the building unlessotherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to be providedunder ground floor slab
10.Plinth level to be minimum 300mm from proposed parking level or groundlevel
11.All surface beds to be cast on well compacted and well consolidated filling
12.Depth of foundation to be minimum 600mm below reduced ground level
13.All pipes and services to be 450mm minimum below reduced ground level
14.All inspection chambers within building area,drive way and parking areas tobe heavy duty ,double seal air tight covers.Drains under building ,drive wayand parking to be pvc pipes encased in 150mm concrete sorround
REVISIONS ADDITIONS & ALTERATIONSNO DATE DESCRIPTION BY
NOTES
PROJECT
PROPOSED BUILTUP AREA
Drawing type
DESIGN AND DRAWNGHETAO J.H ([email protected])
CHECKED REG .NO SIGN
DRAWING NO SCALE DATE01 N.T.S1 :100 FEB 2014
CLIENT
Client Signature
CONSULTANTS
Contacts :0712456399Email:info @artetoarch.co.ke
PROPOSED RESIDENTIAL HOUSEon plot no. L.R. RUIRU/RUIRU WEST BLOCK 4/91
DORIS WAMBUI MWANGI
A A
B BC CD DE E
F F
G G
1
1
2
2
3
3
4
4
5
5
18 x 167 = 3,000
1 2 3 4 5 6 7 8 9
10
1112131415161718
23
5
6
1,525
1,500
1,775
350
2,500
350
500
1,000
1,000
375
1,800
375
1,350
200
4,600
200
2,800
200
1,700
200
600
200
2,150
200
1,150
200
1,100
3,800
1,500
1,500
1,500
5,000
14,40
0
400 1,000 200 6,700 2,700 550 350
200 1,400 200 6,300 200 2,500 200 700 200
1,700 1,300 3,700 3,500 700 1,000
11,900
1,000
375
1,800
375
2,95 0
1,00 0
1,50 0
500
1,52 5
1,50 0
1,87 5
200
800
200
2,15 0
200
2,75 0
200
2,80 0
200
4,70 0
200
1,10 0
3,80 0
1,50 0
1,50 0
1,50 0
5,00 0
14,4 0
0
400 1,000200
1,300 2,200 200 1,300 200 3,500 250 1,000 350
200 1,400200
1,100 200 2,000 200 1,300 200 3,300 200 1,400 200
1,700 1,300 3,700 3,500 700 1,000
11,900
200
6,100
200
2,800
200
200 2,000 200 1,300 200 3,300 200 1,400 200
200
1,700
200
4,300
200
200 4,800 200
A/8
A/8
A/9
A/9
PV PV
P V
PVPVPV
PV
PV
PV
PV
PV
PV
BEDROOMff tiles
BEDROOMff parquet
WC/SHff tilesWC/SH
ff tiles
B ALC
O NY
ff til e
sPV
PV
PV
P V
P V
P V
200 1,400 200 6,300 200 2,600
F
RG
A A
B BC CD DE E
F F
G G
1
1
2
2
3
3
4
4
5
5
18 x 167 = 3,000
1 2 3 4
23
5
6
3,700 800 200 3,300 200 700100
3,700 800 200 3,300 200 700100
3,700 800 200 3,300 200 700100
9,000
6,300
1,500
1,200
7,90 0
5,20 0
200
3,40 0
200
2,80 0
200
4,70 0
200
3,60 0
3,80 0
1,50 0
1,50 0
1,50 0
5,00 0
16,9 0
0
700 1,500 500 1,500 1,500 2,700 800 200
200 4,800 200 3,300 200 700
1,300 3,700 3,500 700
200
3,700
1,500
1,900
3,200
500
1,000
2,800
1,500
600
200
3,300
200
3,600
200
2,800
200
2,500
200
3,500
200
3,600
3,800
1,500
1,500
1,500
4,900
9,450
16,90
0
200
5,000
3,600
200
200 4,800 200 3,300 200
200 4,800 200 3,300 200
200
3,300
200
3,600
200
1,200
100
200 3,500 200
200
2,800
200
1,000
200
3,500
200
200 4,800 200
200
2,500
200
3,500
200
200 1,200 200 1,900 200
200 4,000 200
- 150
PV
PVPVPV
PV
PV
PV
PV
PV
BEDROOMff tiles
SUNKEN LOUNGEff parquet
WC/SHff tiles
DINING ROOMff parquetP
V
PV
PV
FOYERff tiles
PV PV
PV
PV
PV
PVPV
PV
PVPV
PV
PV
PV
PV
DECKff tiles
KITCHEN
ff tiles
PANTRYff tiles
1
2
3
A/8
A/8
A/9
A/9
ELEVATION 01SCALE 1:100
RANDOM RUBBLE CLADDINGTO ARCHITECTS APPROVAL .
COLOURED CONCRETE ROOFING TILESON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARDFINISHED & PAINTED TO ARCHITECTSAPPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUTMASONRY STONES PLASTERED & PAINTEDTO ARCHITECTS APPROVAL.
YELLOW BUSH HAMMERED STONETO ARCHITECTS APPROVAL .
STEEL CASEMENT WINDOWSTO WINDOW & DOOR SCHEDULE
PV PVPV
PVPVPV
ELEVATION 02SCALE 1:100
RANDOM RUBBLE CLADDINGTO ARCHITECTS APPROVAL .
COLOURED CONCRETE ROOFING TILESON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARDFINISHED & PAINTED TO ARCHITECTSAPPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUTMASONRY STONES PLASTERED & PAINTEDTO ARCHITECTS APPROVAL.
YELLOW BUSH HAMMERED STONETO ARCHITECTS APPROVAL .
STEEL CASEMENT WINDOWSTO WINDOW & DOOR SCHEDULE
PV
PV PV PV
PV
ELEVATION 03SCALE 1:100
RANDOM RUBBLE CLADDINGTO ARCHITECTS APPROVAL .
COLOURED CONCRETE ROOFING TILESON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARDFINISHED & PAINTED TO ARCHITECTSAPPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUTMASONRY STONES PLASTERED & PAINTEDTO ARCHITECTS APPROVAL.
YELLOW BUSH HAMMERED STONETO ARCHITECTS APPROVAL .
PV
PV
PV
ELEVATION 04SCALE 1:100
RANDOM RUBBLE CLADDINGTO ARCHITECTS APPROVAL .
COLOURED CONCRETE ROOFING TILESON TIMBER TRUSS MEMBERS TO S.E DET
225 X 25mm TIMBER FASCIA BOARDFINISHED & PAINTED TO ARCHITECTSAPPROVAL
200 mm THICK MEDIUM SIZE MACHINE CUTMASONRY STONES PLASTERED & PAINTEDTO ARCHITECTS APPROVAL.
YELLOW BUSH HAMMERED STONETO ARCHITECTS APPROVAL .
STEEL CASEMENT WINDOWSTO WINDOW & DOOR SCHEDULE
PV PV
PV
PV
PV
PV
PV
PV
15,40
0
30,800
TO SE
PTIC
TANK
SOAK
PIT
ICIC
ICIC
IC IC
IC
OF F
KIA
MBU
RU
IRU
RO
AD
WAMBUI RESIDENCE
-
Experience
Selected works
Work Experience
GSPublisherEngine 5.0.100.100
PROPOSED RESIDENTIAL HOUSEon plot no. L.R. RUIRU/RUIRU WEST BLOCK 4/91
1.This drawing is protected under the copyright act and cannot be used orreproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaleddimensions, any discrepancies to be reported to the architect before workcommences
3.All construction work to comply with the latest standard codes ofpractice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above all doorsand windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron at everyalternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under all walls150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation to bedetermined on site and should not be less than 1200mm.provide one row of600x600x50mm precast concrete paving slabs around the building unlessotherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to be providedunder ground floor slab
10.Plinth level to be minimum 300mm from proposed parking level or groundlevel
11.All surface beds to be cast on well compacted and well consolidated filling
12.Depth of foundation to be minimum 600mm below reduced ground level
13.All pipes and services to be 450mm minimum below reduced ground level
14.All inspection chambers within building area,drive way and parking areas tobe heavy duty ,double seal air tight covers.Drains under building ,drive wayand parking to be pvc pipes encased in 150mm concrete sorround
REVISIONS ADDITIONS & ALTERATIONSNO DATE DESCRIPTION BY
NOTES
PROJECT
PROPOSED BUILTUP AREA
Drawing type
DESIGN AND DRAWNGHETAO J.H ([email protected])
CHECKED REG .NO SIGN
DRAWING NO SCALE DATE02 N.T.S1 :100 FEB 2014
CLIENT
Client Signature
CONSULTANTS
Contacts :0712456399Email:info @artetoarch.co.ke
DORIS WAMBUI MWANGI
A
A
B
B
C
C
D
D
E
E
F
F
G
G4,900 1,500 1,500 1,500 3,800 3,600
3,000
2,700
WALL CLADDED TO ARCHITECTSAPPROVAL
PORTUGUESE CLAY ROOFING TILESON TIMBER TRUSS MEMBERS TO S.EDETAILS
225 X 25mm TIMBER FASCIA BOARDFINISHED & PAINTED TO ARCHITECTS APPROVAL
ROOF LEVEL
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
PV PVPV PV PV
PV PV PVPVPV PV PV PV
PURPOSE MADE STEEL CASEMENTWINDOWS TO WINDOW & DOORSCHEDULE
150 mm THICK R.C FLOOR SLAB ON1000g D.P.M TREATED WITH ANTI-TERMITESOLUTION ON HARDCORE & BLINDING
LAYER TO S.E DETAILS.
600X 200 mm R.C STRIP FOUNDATION FOOTING ON BLINDING LAYER &FOUNDATION DEPTH TO BEDETERMINED ON SITE TO S.E DETAILS.
RC STAIRCASE TO S.E DET18 RISERS@150MMTREADS@300MM
PURPOSE MADE SLIDDINGDOOR TO WINDOW & DOORSCHEDULE
5
5
4
4
3
3
2
2
1
1
700 3,500 3,700 1,300
3,000
2,700
1,900
2,100
ROOF LEVEL
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
PV
PORTUGUESE CLAYROOFING TILESON TIMBER TRUSSMEMBERS TO S.EDETAILS
225 X 25mm TIMBER FASCIABOARDFINISHED & PAINTED TOARCHITECTS APPROVAL
WATER TANK LEVEL
PV
PV PV
PVPV
TOP ROOF LEVEL
POSITION OF COLD WATER TANKS ON APPROVED TIMBER SUPPORTS TO S.E
DETAILS & TANKS CAPACITY TO M.ESPECIFICATION.
PURPOSE MADE STEEL CASEMENTWINDOWS TO WINDOW & DOORSCHEDULE
150 mm THICK R.C FLOOR SLAB ON1000g D.P.M TREATED WITH ANTI-TERMITE
SOLUTION ON HARDCORE & BLINDING LAYER TO S.E DETAILS.
600X 200 mm R.C STRIP FOUNDATION FOOTING ON BLINDING LAYER &FOUNDATION DEPTH TO BEDETERMINED ON SITE TO S.E DETAILS.
RC STAIRCASE TO S.E DET18 RISERS@150MM
TREADS@300MM
450
600 600 900 600 600
100
100
2,400
200
530
EQEQ
EQEQ
EQ
2, 700
3,300
485
165
100
5075
0
600
50
640
Door pull handles to schedule
18mm thick post-formed laminated mdf doors toapproval.
Shoe rack to approval
2no. drawer on unitson rollers,consisting of 25mm softwood
sides and mdf bottom with 18mmthick mdf front
20mm dia chrome pipe hanging rail
Mirror fixed on the back sideof door to architect's approval
100x12mm skirting
Extra space to receive a fixed varvished mdf panel toapproval.
20mm thick shelving
Scale 1:25
ELEVATION 01LOCATION: Bedroom (guest)
Light fitting with a pull switch to Eng's details.
Mirror fixed to wall with foam backing to approval
100
100
2,400
200
100
100
2, 400
200
2, 700
550 550 550 5502,200
Door pull handles to schedule
18mm thick post-formedlaminated mdf doors toapproval.
Shoe rack to approval
2no. drawer on unitson rollers,consisting of 25mm softwoodsides and mdf bottom with 18mmthick mdf front
20mm dia chromepipe hanging rail
Mirror fixed on the back sideof door to architect's approval
100x12mm skirting
Extra space to receive afixed varvished mdf panelto approval.
20mm thick shelving
LOCATION: Bedroom 2
1,200 900 1,200
600
3,300
20mm dia chrome pipehanging railShoe rack to det
2no. drawer on unitson rollers,consisting of 25mm softwoodsides and mdf bottom with 18mmthick mdf front
18mm thick post-formedlaminated mdf doors to approval.
LOCATION: Bedroom (guest)
L[76]05
2,200550 550 550 550
600
01
20mm dia chrome pipehanging railShoe rack to det
2no. drawer on unitson rollers,consisting of 25mm softwoodsides and mdf bottom with 18mmthick mdf front
Scale 1:25
18mm thick post-formedlaminated mdf doors to approval.
LOCATION: Bedroom 2
GSPublisherEngine 0.0.100.100
A A
B
B
F1
200 800 200 D 200 800 200
200
600
200
200
500
200
300
F2
E
500
3M
VA
RIES (3-6M
)
150
100
600
150
A 100 B 100 C
Invert level of
incoming drain
125mm RC cover slab
to engineer's detail
600x450mm cover
and frame
Sub-soil drain
190mm thick masonry
stone wall with 10mm
rendering to approval
150mm thick base slab
600x450mm cover
and frame
12mm dia. ms bars
at 150mm
c/c bothways
200mm dia. stone blocks
for loose ground or where
specified
1:3:6 conc.
140mm thick
masonry wall
600x450mm MH cover & frame
150mm rc cover slab
Outlet
manhole
Inlet
manhole
10mm water proofing
rendering to approval
TWL
Section A-A
SEPTIC TANK DETAILS
Floor plan
Section B-B
B
SOAK PIT
Floor plan
1.Soak pits o be used
on soils with good absorption
eg sand,red soil etc
2.Depth to be specified
NB.
EA C
B 6000
3000
1400
C
1200
E
3600
F2
80020 2 1400 1200 1400 1500
1400 4000 20002D
1500 1400
12000
30
DIMENSIONS IN MM
40 800 1600
3000
1400 4000 24002E
A
NO. OF
PERSONS
1500 1300
15000 50 800
2
1600
2800
800 1400
CAPACITY
IN
LITRES
8600 36001.5G
1500 1200
45000
DESLUDGING
INTERVAL
(YEARS)
180036001200
200 800 5600 2040
2
1500
1000
H 67500 300 7600 3800 4000 2260 150011600
I 90000 400 8800 4400 13400 4600
3000 1850 15003600100F 22500 1.5 800 1800 5600
2380
1.5 800
15001.5 800
10 800 1000 800 1400
F1D
inlet
GL GL
Typical section
9000
TYPE
WAMBUI RESIDENCE
-
Experience
Selected works
Work Experience
GEORGE RESIDENCE
-
Experience
Selected works
Work Experience
KITENGELA HEIGHTS
-
Experience
Selected works
Work Experience
THINGIRA HOTEL
-
Experience
Selected works
Work Experience
SHANZU WATERFRONT
-
Experience
Selected works
Work Experience
SHANZU WATERFRONT
-
Experience
Selected works
Work Experience
F
22 x 152 = 3,350
1234567
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
WDR
L
L
L
L
L
L
L
L
L
3,300 200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 1,800 200
23,200
20,100
200 1,000 200 6,050 100 2,300 100 3,700 2,500 100 6,750 200 1,800 200 600 200
25,200
1,640
2,760
500
1,775
300
1,750
300
1,775
500
4,400
3, 500
1,400
3,900 1,200 1,800 1,200 900 600 3,100 600 1,100 750 2,800 750 500 2,000 2,000
1,200 500 1,200 1,800 1,200 2,000 600 1,650 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600
4,400
1,900
2,600
500
1,600
4,400
200
4, 700
200
4, 200
200
1,500
200
2,900
200
1,600
200
2, 050
100
2,050
200
4, 500
200
500
3,600
1,000
1,000
300
200
300
3,600
300
2,850
100
1,250
200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 200
200 1,000 200 1,900 200 2,450 100 1,400 100
1,200
200
1,800
200
1,200
200
1,000
200
1,250
2,100
200
600
200
4,200
200
6,400
200
4,200
200
4,500
200
600
200
200 3,800 200
1,250
100
3,150
1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
4,400
4,800
1,200
600
4,400
4,700
1,750
100
300
1,000
1,2006,600
4,900 100 1,100 100 600 1,200 600 100
1,200 6,600
1,400
1,000
1,200
600
100 600 1,300 1,200
600
600
1,000
450
100
2,050
1,600 100 2,000
1,550
400
900
600 100 1,900 100 1,500 100 1,100 100
20,300
x x
01
02
03
04
wc
whb
sh
wrd
wardrobe
sink
dhobi sink
fridge
cooker
worktopworktop
EnsuiteBedroom
EnsuiteBedroom
Lift Shaft
Kitchen
Dhobi
Pantry
Sitting Room
EnsuiteBedroom
MasterBedroom
walk in closet
whb
wc
sh
whb
ff.cer.tiles
ff.cer.tiles
ff.cer.tiles
(ff.cer.tiles)
ff.cer.tiles
(ff.cer.tiles)
(ff.cer.tiles)
arch
arch
arch
GROUND FLOOR
W4
W1
D1-pv
Lobby
ff.cer.tiles
pcc ven
ts
Bal cony
Balcony
ic
ic
ic
ic
ic
ic
gt
ic
gt
To Bio-Digester/Treatment Plant
shelves
A B C D E F G H I J K L
1
2
3I
4
5
6
C1 F1 H1
island
wc
sh
Balcony
D2-pv
D2-pv
D2-pv
D3
D2-pv D2-pv
D3
whb
D4-pv
D4-pv
D6-pv
Clk rm
(ff.cer.tiles)
Clk rmwc
arch
arch
arch
W2
W2
W3 W3
W4 W5
W3 W3
vents
vents
vents
vents
3
W3 W3W4
W4
ic
W5 W5
arch
bath tub
D2-pv
W7
ic
gt
Elec Duct
Lobby
sh
(ff.cer.tiles)
Clk rm
(ff.cer.tiles)
Clk rm
D4-pv
arch
Foyer
ff.cer.tiles
Dining
ff.cer.tiles
D3
Void Above
Void Above
Void Above
arch
D7-pv
wrd
tv
ac
ac
tv
tv
ac
tv
actv
ac
tv
dryer washer
ac
wardrobe
wardrobe
war drobe
22 x 152 = 3,350
1234567
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
FWDR
L
L
L
L
L
L
L
x x
01
02
03
04
1,200 600 1,600 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750500
850 1,150 4,000
1,100 200 1,800 1,300 1,200 1,800 1,200 1,450600
1,400 1,200 1,350600
1,275 750 2,275 1,200 2,600 1,200 600 2,000
200 1,000 200 1,800 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200
1,640
2,760
500
1,7 75
300
1,750
300
1 ,775
5 00
3 ,000
1 ,200
1 ,400
2 ,100
1 ,400
2 00
4,200
200
6 ,400
200
4 ,200
2 00
4,5 00
2 00
200 1,000 200 5,450 100 2,300 100 2,300 100 5,250 200 1,800 200 3,800 200
6,300
200
2,400
200
3001 ,0 00
3,600
1 ,4 00
2 00
4,700
2 00
4 ,2 00
2 00
4 ,6 00
200
1 ,0 00
200
4 ,8 00
200
4 ,500
200
500
3,600
700
1,000
6002 00
300
3,600
300
1,200 800 2,000 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
4,400
4,800
1,800
4,400
4 ,7 00
100
1,750
100
300
1,000
4,900 100 1,100100
600 1,200 600 100
1,600 100 2,000
2,850
100
1,250
1,4 50
100
400
9 00
600 100 1,900 100 1,500 100
1,250
100
3,150
2 0,30 0
800 25,200
600
1,400
1,000
1,200
600
600 1,300 1,200 1,250 600
200 1,800 200 3,100 200 2,450 100 3,150 1,800 200 7,800 200 5,800
1,200 6,600
EnsuiteBedroom
MasterBedroom
ff.cer.tiles ff.cer.tiles
arch
arch
FIRST FLOOR
LiftShaft
pcc ven
ts
Balcony
Balcony
Balcony
swp
wp
swp
wp
A B C D E F G H I J K LC1 F1 H1
fr idg
ecooker
worktopworktop
Kitchen (ff.cer.tiles)
island
sink
dhobi sink
Dhobi
shelves
D2-pv
D2-pv
W2
vents
W1
Pantry
walk in closet
whb
wc
sh
whb
(ff.cer.tiles)
D2-pv
D3
Clk rm (ff.cer.tiles)Clk rmwc
bath tub
D2-pvLobby
sh
W4W7
W4swp
D3
D6-pv
W3 W3W5
W3 W3
ElecDuct
wc
whb
shwardrob
e
EnsuiteBedroom
EnsuiteBedroom
ff.cer.tiles ff.cer.tiles
D2-pv D2-pv
D3 D4-pv
W3 W3W4 W4 W5 W5
(ff.cer.tiles)Clk rm
swp
vents
D1-pv
W2
Lobby ff.cer.tiles
Foyer ff.cer.tiles
arch
arch
arch
arch
arch
D4-pv
D4-pv
Sitting Room ff.cer.tiles
Dining ff.cer.tiles
1
2
3I
4
5
6
3
A1A4
A3A2
VoidBelow
VoidBelow
VoidBelow
wc
sh
whb (ff.cer.tiles)
Clk rm D7-pv
tvac
ac
tv
tv
ac
tv
actv
ac
dryer washer
ac
tv
wardrob
e
wardrob
e
ward rob
e
22 x 152 = 3,350
1234567
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
F
WDR
L
L
L
L
L
L
L
L
L
x x
01
02
03
04
1,200 1,300 1,200 1,800 1,200 1,200600
1,650 1,200 1,350600
1,275 750 2,275 1,200 2,600 1,200 600 2,000
200 1,000 200 6,050 100 2,300 100 3,700 100 2,400 100 6,750 200 1,800 200
2,150
300
1,900
550
1 ,775
3 00
1,750
300
1,7 75
500
4,2 00
200
2,100
3 00
2,100
200
900 1,200 1,400 1,200 1,250 600 2,850 600 1,100 750 2,800 750 500 2,000 6,000
200 5,350 100 2,300 100 2,300 100 5,250 200 1,800 200 5,800 200
4,600
1,700
2,600
500
1 ,000
600
1,600
1 ,400
1,6 00
4,700
200
4,200
200
4,600
200
6 ,000
200
4,500
2 00
200 3,100 200 2,450 100 2,950 200 1,800 200 7,800 200 3,800 4,000 200
1,250
2,100
1,250
200
2 ,100
3,900
2,000 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
4,400
4,800
1,800
4,4 00
4 ,700
100
1,750
100
300
1,000
4,900 100 1,100100
600 1,200 600 100
1,600 100 2,000
1,250
100
3,150
600
1,400
1,0 00
1,200
600 1,300 1,200 1,250 600
825
100
1,000100825
100
1,250
1,550
4 00
900
4,750 600 100 1,900 100 1,500 100
1,200 6,600
25,200
200
4,150
250
6,400
200
4,2 00
200
4 ,500
200
20,300
arch
arch
LiftShaft
SECOND FLOOR
pcc ven
ts
Ba lcony
Balcony
Ba lcony
swp
wp
swp swp
1
2
3
4
5
6
wp
EnsuiteBedroom
MasterBedroom
ff.cer.tiles ff.cer.tiles
fridg
e
cooker
worktopworktop
Kitchen (ff.cer.tiles)
island
sink
dhobi sink
Dhobi
shelves
D2-pv
D2-pv
W2 Pantry
walk in closet
whb
wc
sh
whb
(ff.cer.tiles)
D2-pv
D3
Clk rm (ff.cer.tiles)Clk rmwc
bath tub
D2-pvLobby
sh
D3
D6-pv
vents
arch
arch
arch
A B C D E F G H I J K LC1 F1 H1
A2
A1A4
arch
A3
wc
whb
shwardrob
e
EnsuiteBedroom
EnsuiteBedroom
ff.cer.tiles ff.cer.tiles
D2-pv D2-pv
D3 D4-pv
W3 W3 W4 W4 W5 W5
(ff.cer.tiles)Clk rm
swp
D4-pv
D4-pv
wc
sh
whb (ff.cer.tiles)
Clk rm D7-pv
ElecDuct
Sitting Room ff.cer.tiles
Dining ff.cer.tiles
W4W7
W4W3 W3
W5W3 W3
D1-pv
W1W2
tvac
ac
tv
tv
ac
tv
actv
ac
dryer washer
ac
tv
wardrob
e
wardrob
e
wa rdrob
e
22 x 152 = 3,350
1234567
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
F
123456
7
8
9
10
11
12
13
14
15
16
17
18
19
20
WDR
L
L
L
L
x x
01
02
03
04
05
1,200 4,050 750 600 750 600 750 1,450 1,200 1,350 600 1,275 750 2,275 1,200 2,600 1,200 600 850 1,150
200 1,000 200 8,450 100 3,700 100 2,400 100 6,750 200 1,800 200
1,640
2,760
6,800
1,966
300
1,934
2,860
2,040
900 1,200 1,400 1,200 1,300 600 2,800 600 1,100 750 2,800 750 300 200 1,800 200 6,000
200 5,350 100 2,300 100 7,650 200 1,800 200 5,800 200
4,600
1,700
2,600
500
1,000
600
3,000
1,400
200
4,700
200 3,100 200 1,750 100 3,650
200
6,400
200
4,200
200
825
100
1,000
100
825
100
600 100 1,900 100 1,500 100
600
1,400
1,000
1,200
600
200
1,600
100
200 1,750 100 600 1,250 1,950 1,250 600 200
3,150
100 3,100 100 2,450 2,600 100 1,100 100 600 1,200 600 100
1,600 100 2,000
1,250
100
3,150
200
4,200
200
6,400
200
4,200
200
4,500
200
20,300
1,550
400
900
200
4,200
200
4,600
200
1,600
200
4,200
200
4,500
200
25,200
1,200 800 1,200 800 1,200 2,100 1,700 900 1,100 2,000 600 1,400 1,200 1,400 1,400 2,100 1,900 4,000
4,400
4,800
1,800
4,400
4,700
arch
arch
Lift Shaft
PENT HOUSE LOWER FLOOR
pcc ven
ts
Balcony
Balc ony
Balcony
swp
wp
swp1
2
3
4
5
6
wp
wc
whb
sh
wardrob
e
EnsuiteBedroom
EnsuiteBedroom
ff.cer.tiles
ff.cer.tiles
D2-pv D2-pv
D3
D4-pv
W3 W3 W4 W4 W5 W5
(ff.cer.tiles)
Clk rm
swp
A B C D E F G H I J K L
C1 F1 H1
A2
A1
A4
A3
fridg
e
cooker
worktopworktop
Kitchen
(ff.cer.tiles)
island
sink
dhobi sink
Dhobi
shelves
D2-pv
D2-pv
W2
Pantry
vents
arch
arch
arch
arch
EnsuiteBedroom
ff.cer.tiles
walk in closet
wc
whb
D2-pv
(ff.cer.tiles)
Clk rm
bath tub
Lobby
sh
D3
D6-pv
Study
arch
wc
sh
whb (ff.cer.tiles)
Clk rm
D7-pv
Sitting Room
ff.cer.tiles
Dining
ff.cer.tiles
W7W4 W5
W3
W5 W5 W5
W3
D1-pv
W1W2
D4-pv
D4-pv
tvac
ac
tv
tv
ac
tv
actv
ac
dryer washer
ac
ElecDuct
wardrob
e
ward rob
e
GENERAL NOTES
1.This drawing is protected under the copyright act and cannot beused or reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaleddimensions, any discrepancies to be reported to the architect beforework commences
3.All construction work to comply with the latest standard codes ofpractice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above alldoors and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron atevery alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under allwalls 150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation tobe determined on site and should not be less than 1200mm.provideone row of 600x600x50mm precast concrete paving slabs around thebuilding unless otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to beprovided under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking levelor ground level
11.All surface beds to be cast on well compacted and well consolidatedfilling
12.Depth of foundation to be minimum 600mm below reduced groundlevel
13.All pipes and services to be 450mm minimum below reducedground level
14.All inspection chambers within building area,drive way andparking areas to be heavy duty ,double seal air tight covers.Drainsunder building ,drive way and parking to be pvc pipes encased in150mm concrete sorround
REVISIONS ADDITIONS & ALTERATIONS
NO DATE DESCRIPTION BY
CONSULTANTS
client
client signature
project
drawing type
DESIGN & DRAWN BY
CHECKED REG NO. SIGN
JOB NO. DRAWING NO. SCALE DATE
1:100
floor plans
Dec 201220 -12 -01
PROPOSED APARTMENTS ONPLOT No. MN/ I /16633SHANZU,MOMBASA
SHANZU WATERFRONT
-
Experience
Selected works
Work Experience
3 00
3,3 50
3 ,350
3,350
3,350
3 ,350
pcc coping on 900mm high parapet wall
pcc coping on 900mmhigh parapet wall
pcc vents
sliding windows to schedule
ground floor level
ground level
pv pv
pv
pv
FRONT ELEVATION 01
Ground Floor
First Floor
Second Floor
Lower Pent House Floor
Upper Pent House Floor
Terrace Level
pv
pv
pv pv
3 ,350
3,3 50
3,350
3 ,350
3,3 50
pcc coping on 900mm high parapet wall
pcc coping on 900mmhigh parapet wall
top hang windows to schedule
ground floor level
ground level
water tanks
pv pv
pv pv
pv pv
pv pv
SIDE ELEVATION 02
Ground Floor
First Floor
Second Floor
Lower Pent House Floor
Upper Pent House Floor
Terrace Level
pv pv pv pv
pv pv pv pv
pv pv pv pv
pv pv pv pv
pcc coping on 900mm high parapet wall
pcc coping on 900mmhigh parapet wall
sliding door to schedule
ground floor level
ground level
pv pv
pv pv
pv pv
pv pv
pv pv pv
pv
pv
pv pv
pv
pv
pv
REAR ELEVATION 03
pv
pcc coping on 900mm high parapet wall
pcc coping on 900mmhigh parapet wall
ground floor level
ground level
pv pv pv
pv pv pv
pv pv pv
pv pv pv
SIDE ELEVATION 04
GENERAL NOTES
1.This drawing is protected under the copyright act and cannot beused or reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaleddimensions, any discrepancies to be reported to the architect beforework commences
3.All construction work to comply with the latest standard codes ofpractice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above alldoors and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron atevery alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under allwalls 150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation tobe determined on site and should not be less than 1200mm.provideone row of 600x600x50mm precast concrete paving slabs around thebuilding unless otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to beprovided under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking levelor ground level
11.All surface beds to be cast on well compacted and well consolidatedfilling
12.Depth of foundation to be minimum 600mm below reduced groundlevel
13.All pipes and services to be 450mm minimum below reducedground level
14.All inspection chambers within building area,drive way andparking areas to be heavy duty ,double seal air tight covers.Drainsunder building ,drive way and parking to be pvc pipes encased in150mm concrete sorround
REVISIONS ADDITIONS & ALTERATIONS
NO DATE DESCRIPTION BY
CONSULTANTS
client
client signature
project
drawing type
DESIGN & DRAWN BY
CHECKED REG NO. SIGN
JOB NO. DRAWING NO. SCALE DATE
1:100 Dec 2012
elevations
20 -12 -02
PROPOSED APARTMENTS ONPLOT No. MN/ I /16633SHANZU,MOMBASA
SHANZU WATERFRONT
-
Experience
Selected works
Work Experience 22 x 152 = 3,350
1234567
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
123456
7
8
9
10
11
12
13
14
15
16
17
18
19
20
L
L
L
L
LL
x x
02
04
200
4,200
200
5,800
200
4,800
200
4,500
200
800
3,000
800
1,700
2,600
500
1,000
600
300 1,000
1,600
1,000
700
4,600
200 1,800 200 6,800 200 1,800 200 3,800 200 3,800 200 3,800 200
200
1,150
2,100
1,350
2001,000
200
4,800
200
200 1,000 200 5,600 200 7,800200
200 11,500 200 3,800 200 1,900 200 1,700 200
200 1,000 200 8,450 100 5,050 200 7,800 200
1,200 4,050 750600
750600
750 3,400 750 2,350 8,000
23,200
20,300
200
4,200
2 00
10, 800
200
4 ,500
2 00
4 ,400
5 00
1,7 74
3 00
1 ,747
300
1,7 74
200
400
1,7 74
3 00
1 ,774
360
4,7 00
5,807 1,774 300 1,747 300 1,772 200 4,000 2,100 1,900
LiftShaft
PENT HOUSE UPPER FLOOR
Master Bedroom
ff.cer.tiles
ff.cer.tilesOpenTerrace
Balcony
Bar Area
pcc ven
ts
Closet
OpenTerrace
wardrob
e
wardrob
e
Walk-in-closet
arch
ff.cer.tilesWash Room
D1-pv
D2-pv arch
D8-pv
D2-pv
D2-pv D2-pv
arch
arch
arch
arch
a rch
arch
arch
arch
archarch
wc
whb
bath tub
sh
W1W2
W5 W5 W5 W5
D4-pv
D4-pv
W6
archarcharch
W8
W8
ac
tv
ac
ac
walkway
ElecDuct
350
3 ,350
3,350
3,3 50
3,350
3,350
350
3,0 00
350
3,000
350
3,000
350
3,000
350
3,000
350
900
300mm hollow pot rc. slab with 50mm coverto str. eng's details
300mm hollow pot rc. slab with 50mm coverto str. eng's details
150mm rc. slab to str. eng's details
900mm high balustradeson rc stair to str. eng's details
pcc vents
floor slab with BRC meshon 50mm blindingon well compacted hardcore Ground Floor
First Floor
Second Floor
Lower Pent House Floor
Upper Pent House Floor
Terrace Level
SECTION X-X
HIGH OCEAN WATER MARK
1625
1085
1622
1623
1624
10861087
10002
10003
10004
10942
10943
9262
92639264 9265
9266
9267
9268
4885
4886
4889
4890
MURRAM ROAD
MURRAM
ROAD
9127
8799 8802
8803
8801
8800
8804 8811 8812
8805
LOCATION PLAN(scale; 1:2500)
OCEAN
( MN/I/16633 )
1,200
1,200
1,200
12,238
5,400
1,415
26,255
32,330
20,100
23,000
32,585
34,400
8,175
20,100
23,000
20,100
23,000
23,000
20,100
2,960
2,970
6,380
23,000
20,100
15,400
8,422
20,100
23,00023,000
20,100
20,100
23,000
7,580
7,580
7,580
21,000
20,100
3,000
3,000
5,000
5,000
5,0 00
5 ,000
5,000
5,0 00
5,0005,0005,0005,0005,0005,0005,0005,000 5,0005,0005,0005,0005,0005,000
5,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,0005,000
5,000
5,000
5,000
5,000
5,0 00
5 ,000
5,000
5,0 00
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
5,000
161520
18
16
16
166
166
1A
2A3A4A
5A
1B
2B3B4B
5B
SITE PLAN(scale; 1:500)
swimming poolto later detail
landscaped garden
footpath footpath
footpat
h
footpath
parking parking parking
parking
parking
parking
parking
parking parking
gate to
detail
B1 B2
B3B4B5B6
B7
192.38M
89.07M
12.29M27.21M
57.83M
90.96M
108.05M
sewertreatmentplantD.S.Q
landscaped garden
PRIVATEBEACH
PRIVATEBEACH
Transformer,Generator&Switch room to
E.E.D's
Guardhouse&AdminOffices
Gym
DustbinCubicles
GENERAL NOTES
1.This drawing is protected under the copyright act and cannot beused or reproduced in part or in whole without authors consent
2.All dimensions to be checked on site,written rule over scaleddimensions, any discrepancies to be reported to the architect beforework commences
3.All construction work to comply with the latest standard codes ofpractice,local authority by-law and fire regulations
4.P.V. denotes permanent ventilation and must be provided above alldoors and windows where indicated or shown
5.All walls less than 200mm thick to be reinforced with hoop iron atevery alternate course
6.Water meter to be 300mm above g.l.
7.D.P.C. denotes one layer of bituminous felt to be provided under allwalls 150mm above g.l.
8.All r.c. works to structural engineers details depth of foundation tobe determined on site and should not be less than 1200mm.provideone row of 600x600x50mm precast concrete paving slabs around thebuilding unless otherwise shown
9.Heavy duty polythene sheeting and anti termite treatment to beprovided under ground floor slab
10.Plinth level to be minimum 300mm from proposed parking levelor ground level
11.All surface beds to be cast on well compacted and wellconsolidated filling
12.Depth of foundation to be minimum 600mm below reducedground level
13.All pipes and services to be 450mm minimum below reducedground level
14.All inspection chambers within building area,drive way andparking areas to be heavy duty ,double seal air tight covers.Drainsunder building ,drive way and parking to be pvc pipes encased in150mm concrete sorround
REVISIONS ADDITIONS & ALTERATIONS
NO DATE DESCRIPTION BY
CONSULTANTS
client
client signature
project
drawing type
DESIGN & DRAWN BY
CHECKED REG NO. SIGN
JOB NO. DRAWING NO. SCALE DATE
1:100
PROPOSED APARTMENTS ONPLOT No. MN/ I /16633SHANZU,MOMBASA
PROPOSED BUILT UP AREA IN sq m.
1.744Ha (approx)
440.08 sq m.
439.55 sq m.
442.85 sq m.
443.27 sq m.
397.47 sq m.
2,163.22 sq m.
21,632.2 sq m.
10 blocks X 2,163.22
Dec 2012
site & location plan pent house upper floor & section
20 -12 -03
existing main buildingand pool for demolition
Plot Area
Apartments BlocksGround Floor
First Floor
Second Floor
Lower Penthouse
Upper Penthouse
TOTAL PER BLOCK
No. of Blocks
GENERAL TOTAL
D.S.Q TotalGuard House and Office TotalGYM TotalPower room Total
887.22 sq m.
24.40 sq m.
79.95 sq m.
82.58 sq m.
GRAND TOTAL 22,706.35 sq m.CODE SIZE(MM) DESCRIPTION
W1
W2
W3
W4
W5
W6
W7
W8
2000X1500
1000X1500
1200X1500
600X1200
750X2000
3000X1500
1200X1600
1000X1000
Aluminium framed Sliding window
Aluminium framed Sliding window
Aluminium framed Sliding window
Aluminium framed Double Hung window
Aluminium framed Sliding window
Aluminium framed Double Hung window
Aluminium framed Double Hung window
Aluminium framed Double Hung window
WINDOW SCHEDULLE
CODE SIZE(MM) DESCRIPTION
D1-PV 2100X2400
900X2400
800X2100
4200X2400
6400X2400
4500X2400
1000X2400
1800X2400
Solid Panel h/wood door
DOOR SCHEDULLE
D2-PV
D3
D4-PV
D5-PV
D6-PV
D7-PV
D8-PV
Solid Panel h/wood door
Solid Panel h/wood door
Aluminium framed sliding door
Aluminium framed sliding door
Aluminium framed sliding door
H/wood framed with louvered panelled sliding door
Solid Panel h/wood door
existing staff quartersbuilding for demolition
SHANZU WATERFRONT
GITAU JOHN01 101.1 Layout01.2 Layout01.3 Layout01.4 Layout01.5 Layout01.6 Layout01.7 Layout01.8 Layout01.9 Layout01.10 Layout01.11 Layout01.12 Layout01.13 Layout