GFRP reinforcement of the TBM launching cradle
4
GFRP reinforcement of the TBM launching cradle A1 Highway BO-FI Contractor Autostrade SpA
Transcript of GFRP reinforcement of the TBM launching cradle
![Page 1: GFRP reinforcement of the TBM launching cradle](https://reader031.fdocuments.net/reader031/viewer/2022012514/618dbb6b114b7535d81660ed/html5/thumbnails/1.jpg)
GFRP reinforcement of the TBM launching cradle
A1 Highway BO-FI
Contractor Autostrade SpA
![Page 2: GFRP reinforcement of the TBM launching cradle](https://reader031.fdocuments.net/reader031/viewer/2022012514/618dbb6b114b7535d81660ed/html5/thumbnails/2.jpg)
TBM launching ramp construction
GFRP fiberglass rebar
The ramp will be later partially demolished for
the construction of technical operating rooms
![Page 3: GFRP reinforcement of the TBM launching cradle](https://reader031.fdocuments.net/reader031/viewer/2022012514/618dbb6b114b7535d81660ed/html5/thumbnails/3.jpg)
![Page 4: GFRP reinforcement of the TBM launching cradle](https://reader031.fdocuments.net/reader031/viewer/2022012514/618dbb6b114b7535d81660ed/html5/thumbnails/4.jpg)
ATP
- via Casa Pagano, 31 - 84012 Angri (SA) - tel +39 081 94 77 77 (pbx) - fax +39 081 94 77 40 -