1 Gestione dei Sistemi Logistici e Produttivi Starting pack ‐ a.y. 2016/17 Roberto Cigolini [email protected] Department of Management, Economics and Industrial Engineering Politecnico di Milano

Transcript of GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... ·...

Page 1: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

1

Gestione dei Sistemi Logistici e ProduttiviStarting pack ‐ a.y. 2016/17

Roberto [email protected]

Department of Management, Economics and Industrial Engineering Politecnico di Milano

Page 2: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

2

Gestione dei Sistemi Logistici e Produttivi

InstructorsRoberto Cigolini Department of Management, Economics and Industrial Engineering, room 1.43 Phone +39.02.2399.2735, +39.366.5670142 (whatsapp available) Mail: roberto.cigolini”at”polimi.it, cigolini”at”mip.polimi.itSkype: roberto.cigolini

Rossella PozziUniversità Carlo Cattaneo – LIUCScuola di Ingegneria IndustrialeEdificio Torre Primo PianoTelefono: 0331 572587 E‐Mail: [email protected]

Page 3: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

3

Gestione dei Sistemi Logistici e Produttivi

Textbooks• Lectures

Sianesi, A. «La gestione del sistema di produzione» ETAS (in Italian) 

Chase, R.B., Jacobs, R.F., Aquilano, N.J., Grando, A., Sianesi, A. «Operations management nella produzione e nei servizi» 3° edizione, McGraw‐Hill (in Italian)

• Exercises Pero, M., Rossi, T., “Esercizi di Gestione dei

Sistemi Produttivi”, Cusl (in Italian) Associazione Amici di Francesco Turco, 

“Esercizi di Gestione della ProduzioneIndustriale”, Cusl (in Italian)

Page 4: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

4

Gestione dei Sistemi Logistici e Produttivi

Textbooks• Lectures

Sianesi, A. «La gestione del sistema di produzione» ETAS (in Italian) 

Argomenti del corso: Cap 1  Cap 2 Cap 4 Cap 5 Cap. 7, in particolare 7.3.9

Letture consigliate Par. 3.4 Par. 3.7 Par. 6.7, 6.8, 6.9

Page 5: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

5

Gestione dei Sistemi Logistici e Produttivi

Further main readings• Chase, R.B., Aquilano, N.J., Jacobs, F.R. (1998) “Production and operations 

Management”, McGraw‐Hill, 8th Edition (Chapters: 8, 14‐16) Very useful textbook, easy to understand; it covers almost all the subjects

• Slack, N., Chambers, S., Harland, C., Harrison, A., Johnston, R. (1998) “Operations management”, Pitman, 2nd Edition (Chapters: 10‐15) The most popular textbook to learn OM&SCM within MBA programs; concepts 

and approaches are emphasized; weak on the side of quantitative methods• Stadtler, H., Kilger, C. (2002) “Supply chain management and advanced planning”, 

Springer, 2nd Edition (Chapters: 7‐8, 10) Very specific and useful to deepen some issues of planning. It interestingly 

highlights the links between planning and IT tools• Krajewski, L.J., Ritzman, L.P. (1999) “Operations management”, Addison‐Wesley, 5th

Edition (Chapters: 13‐16).• Russell, R.S., Taylor, B.W. (1998) “Operations management”, Prentice Hall 

(Chapters: 11‐13, 15) Both are useful textbooks; they cover almost all the subjects; model and 

mathematical‐related concepts are emphasized

Page 6: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

6

Gestione dei Sistemi Logistici e Produttivi

Further additional readings• Silver, E.A., Pyke, D.F., Peterson, R. (1998) “Inventory management and production 

planning and scheduling”, Wiley, 3rd Edition (Chapters: 5, 7, 13, 15‐16).• Nahmias, S. (1997) “Production and operations analysis”, Irwin, 3rd Edition 

(Chapters: 3‐6, 12). Both are focused on inventory planning, scheduling etc., they follow a strong 

operational research oriented approach (lot of formulas, derivatives, probabilities etc.)

• Dobler, D.W., Burt, D.N. (1996) “Purchasing and supply management”, McGraw‐Hill, 6th Edition (Chapters: 22‐23). It focuses on SCM in terms of customer‐supplier relationship. It provides a brief 

and synthetic overview of the major subjects. Not useful for deepening.• Salvendy, G. (1992) “Handbook of industrial engineering”, Wiley, 2nd Edition 

(Chapters: 76‐79). It is an handbook, useful to get an idea of many subjects in a very short time 

span

Page 7: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

7

Gestione dei Sistemi Logistici e Produttivi

Further additional readings• Johnsen, T., Howard, M. (2014) “Purchasing and Supply Chain Management: A 

Sustainability Perspective” Routledge• Baroncelli, C., Ballerio, N. (2016) “WCOM (World Class Operations management) –

why you need more than lean”, Springer• Cigolini, R., Deshmukh, A., Fedele, L., McComb, S. (2009) “Recent advances in 

maintenance and infrastructure management”, Springer

Page 8: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

8

Gestione dei Sistemi Logistici e Produttivi

To deepen more• Pisano, G.P., Shih, W.C. (2009), “Restoring American Competitiveness”, Harvard 

Business Review, July–August• Lee, H. (2004) “The triple‐A supply chain”, Harvard Business Review, October, 

pp.102‐112.• Slone, R.E. (2004) “Leading a supply chain turnaround”, Harvard Business Review, 

October, pp. 114‐121.• Liker, J.K., Choi, T.Y. (2004) “Building deep supplier relationships”, Harvard Business 

Review, December, pp. 104‐113.

• Butman, J. (2002) “A pain in the (supply) chain”, Harvard Business Review, May, pp. 31‐36

Page 9: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

9

Gestione dei Sistemi Logistici e Produttivi

To deepen more (continued)• Kimura, O., Terada, H. (1981) “Design and analysis of pull system, a method of 

multistage production control”, International Journal of Production Research, Vol. 19, No. 3, pp. 241‐253.

• Schonberger, R.J. (1982) “Japanese Manufacturing Techniques ” Macmillan, London• Imai, M. (1986) “Kaizen: the key to Japan's competitive success”, McGraw‐Hill.• Womack, J.P., Jones, D.T.,  Roos, D. (1991) “The machine that changed the world: 

the story of lean production”, HarperBusiness

• Masuchun, W., Davis, S., Patterson, J.W. (2004) “Comparison of push and pull control strategies for supply network management ina make‐to‐stock environment”, International Journal of Production Research, Vol. 42, No. 20, pp. 4401‐4419

• Koh, S.C.L., Saad, S.M., Jones, M.H. (2002) “Uncertainty under MRP‐planned manufacture: review and categorization”, International Journal of Production Research, Vol. 40, No. 10, pp. 2399‐2421 

Page 10: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

10

Gestione dei Sistemi Logistici e Produttivi

To deepen even more• Cigolini, R., Cozzi, M., Perona, M. (2004) “A new framework for supply chain 

strategies: conceptual models and empirical test”, International Journal of Operations and Production Management, Vol. 24, No. 1, pp. 7‐41. 

• Perona, M., Cigolini, R., Adani, M., Biondi, R., Guzzetti, S., Jenna, R., Chessa, M., Angellara, S. (2001) “The integrated management of logistic chains in the white goods industry. A field research in Italy”, International Journal of Production Economics, Vol. 69, pp. 227‐238.

• Cigolini, R., Grillo, G. (2003) “Linking strategic planning to operations management: the competitive histograms approach and an empirical study”, Production Planning and Control, Vol. 14, No. 6, pp. 517‐532.

Page 11: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

11

Gestione dei Sistemi Logistici e Produttivi

To deepen even more• Caridi, M., Cigolini, R. (2002) “Improving materials management effectiveness: a 

step towards agile enterprise”, International Journal of Physical Distribution and Logistics Management, Vol. 32, No. 7, pp. 556‐576.

• Caridi, M., Cigolini, R. (2002) “Managing safety and strategic stocks to improve materials requirements planning performances”, Journal of Engineering Manufacture Vol. 216, No. B7, pp. 1061‐1066.

• Brandolese, A., Cartegni, E., Cigolini, R. (2001) “Improving materials productivity by using strategic inventories: theoretical issues and field results”, International Journal of Production Research, Vol. 39, No. 18, pp. 4179‐4196.

• Brandolese, A., Cigolini, R. (1999) “A new model for the strategic management of inventories subject to peaks in market demand”, International Journal of Production Research, Vol. 37, No. 8, pp. 1859‐1880.

• Rossi, T., Pozzi, R., Pero, M., Cigolini, R. (2017) “Improving production planning through finite‐capacity MRP”, International Journal of Production Research, Vol. 55, No. 2, pp. 377‐391

Page 12: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

12

Gestione dei Sistemi Logistici e Produttivi

Exam rules ‐ general• L’esame consiste in una prova orale che 

si tiene nel giorno dell’appello formale o in uno di quelli immediatamente successivi.

• Molto spesso, in funzione di ragioni specifiche e/o della numerosità di iscritti potrebbe essere richiesto di sviluppare preliminarmente una (o più) domande in forma scritta, da integrare successivamente con un colloquio orale (normalmente nello stesso giorno).

• L’esame riguarda, salvo diversa indicazione, l’intero programma svolto, compresi casi,esercizi, testimonianze ecc.

Page 13: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

13

Gestione dei Sistemi Logistici e Produttivi

Exam rules – mid‐term & early‐bird• Nel semestre sono previste due prove 

intermedie in corrispondenza della settimana di sospensione e alla fine del corso). 

• Una tipica prova intermedia consiste in 3‐4 esercizi numerici e 2‐3 domande aperte.

• Di solito le prove intermedie sono individuali e svolte a libri chiusi• In caso di esito positivo (voto pari o maggiore a 18) o non completamente 

positivo (voto è pari a 16 o 17), viene proposto un voto complessivo (normalmente – ma non necessariamente – la media delle due valutazioni)

• Tale proposta di voto dà accesso diretto (cioè senza domande iniziali scritte) all’orale (tipicamente al primo appello utile dopo la fine del corso) in forma “semplificata”, per tenere conto della buona prova già data nelle prove intermedie

Page 14: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

14

Gestione dei Sistemi Logistici e Produttivi

Exam rules – miscellaneous• Una prova orale è sempre comunque 

a disposizione degli studenti, che potrebbero voler migliorare il proprio risultato. 

• L’esito di tale prova potrebbe anche determinare una riduzione del voto proposto (ovvero nessun incremento) quando non un esito complessivamente non positivo.

• Parimenti, non è detto che due esiti positivi nelle prove intermedie determinino “per forza” la proposta di un voto e/o la proposta della media aritmetica dei due risultati: ad esempio 16 e 20 (o viceversa) non è detto che determinino una proposta di 18 e lo stesso è vero per 18 e 30, 16 e 30 ecc. 

• Analogamente, potrebbe verificarsi la circostanza per cui una proposta di 18 che scaturisca da un esito complessivamente non del tutto sufficiente venga considerata come solo «da confermare».

Page 15: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

15

Gestione dei Sistemi Logistici e Produttivi

Tentative timetable 

Gestione dei Sistemi Logistici e Produttivi

a.y. 2016 ‐ 17, Management Engineering class

# Date Room Area Subject Sianesi Who1 7 March a.m. B211  Footprint Introduzione al corso, programma, i sistemi produttivi cap 1 RC2 8 March a.m. L03 Footprint Le decisioni produttive ‐ esercizi di costi per le decisioni cap 1 RP3 14 March a.m. B211  Footprint I sistemi distributivi cap 1 RC4 15 March a.m. L03 Footprint I flussi produttivi ‐ Caso Car Tyre cap 2 RP5 21 March a.m. B211  Performance Le prestazioni di servizio e di produttività cap 2 RC6 22 March a.m. L03 Performance le prestazioni ‐ Caso Frigo Maker cap 2 RP7 28 March a.m. B211  Forecasting La previsione della domanda cap 5 RC8 29 March a.m. L03 Forecasting Previsione della domanda ‐ esercizi cap 5 RP9 4 April a.m. B211  Planning Il ciclo di pianificazione: S&OP, MPS cap 5 RC10 5 April a.m. L03 Planning MPS‐MTS practice ‐ Sampson Game cap 5 RP11 11 April a.m. B211  Planning MPS‐MTO practice ‐ Falben case & learning curves cap 5 RP12 12 April a.m. L03 Planning Modelli matematici per l'MPS; Bike Plast case cap 5 RC

18 April a.m. Easter break ‐ no classes13 19 April a.m. L03 Inventory La domanda indipendente: EOQ, IE, SS cap 4 RC

25 April a.m. Italy's Liberation day ‐ no classes 26 April a.m. TbD Mid term exam2 May a.m. Spring break ‐ no classes3 May a.m. Spring break ‐ no classes

14 9 May a.m. B211  Inventory Esercizi di EOQ; ABC incrociate; Caso Newmat cap 4 RP15 10 May a.m. L03 Inventory Caso Caffè Oro + Caso Chair Ter cap 4 RC16 16 May a.m. B211  MRP La domanda dipendente: l'MRP e l'effetto Forrester  cap 5 RC17 17 May a.m. L03 MRP I limiti del MRP e il NWMech Game cap 5 RC18 23 May a.m. B211  MRP Esercizi di MRP cap 5 RP19 24 May a.m. L03 Lean il lean thinking cap 7 RP20 30 May a.m. B211  Lean Il JIT e il Kanban; Esercizi di lean manufacturing cap 7 RP21 31 May a.m. L03 Lean Il modello di Kimura e Terada; caso El Dorado cap 7 RC22 6 June a.m. B211  Lean Shop floor control: programmazione operativa; riepilogo cap 7 RC23 7 June p.m. L03 MRP Il manufacturing Game cap 5 RP24 13 June a.m. B211  Esercizi conclusivi (temi d'esame) RP

14 June a.m. Buffer ‐ no classes20 June a.m. Buffer ‐ no classes

25 21 June a.m. TbD Early bird exam

Page 16: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

16

Gestione dei Sistemi Logistici e Produttivi

Focusing on the initial half 

# Date Room Area Subject Sianesi Who1 7 March a.m. B211  Footprint Introduzione al corso, programma, i sistemi produttivi cap 1 RC2 8 March a.m. L03 Footprint Le decisioni produttive ‐ esercizi di costi per le decisioni cap 1 RP3 14 March a.m. B211  Footprint I sistemi distributivi cap 1 RC4 15 March a.m. L03 Footprint I flussi produttivi ‐ Caso Car Tyre cap 2 RP5 21 March a.m. B211  Performance Le prestazioni di servizio e di produttività cap 2 RC6 22 March a.m. L03 Performance le prestazioni ‐ Caso Frigo Maker cap 2 RP7 28 March a.m. B211  Forecasting La previsione della domanda cap 5 RC8 29 March a.m. L03 Forecasting Previsione della domanda ‐ esercizi cap 5 RP9 4 April a.m. B211  Planning Il ciclo di pianificazione: S&OP, MPS cap 5 RC10 5 April a.m. L03 Planning MPS‐MTS practice ‐ Sampson Game cap 5 RP11 11 April a.m. B211  Planning MPS‐MTO practice ‐ Falben case & learning curves cap 5 RP12 12 April a.m. L03 Planning Modelli matematici per l'MPS; Bike Plast case cap 5 RC

18 April a.m. Easter break ‐ no classes13 19 April a.m. L03 Inventory La domanda indipendente: EOQ, IE, SS cap 4 RC

25 April a.m. Italy's Liberation day ‐ no classes 26 April a.m. TbD Mid term exam

Page 17: GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y ... 2016-17... · GestionedeiSistemiLogisticie Produttivi Starting pack ‐a.y. 2016/17 ... • Krajewski, L.J., Ritzman,

17

Gestione dei Sistemi Logistici e Produttivi

Scheduled exam calls of the incoming session

• 5 luglio• 18 luglio