Gestamp Renewables (eng)

18
GESTAMP RENEWABLES October 2015| 1

Transcript of Gestamp Renewables (eng)

Page 1: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 1

Page 2: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 2

INDEX1. Gestamp Solar

2. Gestamp Wind

3. Gestamp Biomass

Page 3: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 3GES

TAM

P R

ENEW

AB

LES

–GLO

BA

L P

RES

ENCE

Page 4: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 4GES

TAM

P R

ENEW

AB

LES

–VA

LUE

CHA

IN

Design, engineering and manufacturing of

industrial components

• Systems of precisely defined processes, including equipment, tools and control procedures.

• Line design and stress calculation of them.

• Preparation of basic projects and legal approval.

• Design and calculation for metal structures.

Development

• Location of sites• Feasibility studies• Project definition• Management of permits and licenses• Financial and investment analysis

Construction

• Earth removal.• Design and manufacture of

structures. • Modules supply• Transport and assembly.• Wiring.• Negotiation with suppliers• Project legal approval

• Plant Operation.• Plant monitoring and

Maintenance.• Compiling of information for

investors about planned activity.• Fuel management

Maintenance

Page 5: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 5

Page 6: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 6GES

TAM

P S

OLA

R –

LIN

ES O

F A

CTIV

ITY

Solar Plants

Roof top Projects

Gestamp Solar has participated in more than 600 MW of photovoltaic installations, manufacturing and supplying steel structures

to support this capacity

Employs over 150 people.

Solutions for solar systems

Page 7: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 7

... And 120MW projected, mostly on parking shelters. Gestamp solar hasinstalled over 75W of PV electricity generation facilities on some of themost important automobile makers in the world.

+ 75 MW in large Roof Tops

1 Vehicle and material protection against weather hazards

2 Insurances cost reduction

3 Infrastructure improvements

4 Green and Eco-friendly image

5 Energy availability

GES

TAM

P S

OLA

R –

LIN

ES O

F A

CTIV

ITY

Page 8: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 8GES

TAM

P S

OLA

R –

GLO

BA

L P

RES

ENCE

Page 9: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 9GES

TAM

P S

OLA

R –

EVO

LUTI

ON

477 mw

2011 2012 2013 2014

390 mw 514 mw 613 mw

Page 10: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 10GES

TAM

P S

OLA

R –

VA

LUE

CHA

IN

Development

• Location of sites• Feasibility studies• Project definition• Management of permits and licenses• Financial and investment analysis

Construction

• Earth removal.• Design and manufacture of

structures. • Modules supply• Transport and assembly.• Wiring.• Negotiation with suppliers• Project legal approval

• Plant Operation.• Plant monitoring and

Maintenance.• Compiling of information for

investors about planned activity.• Fuel management

Maintenance

Page 11: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 11

Page 12: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 12GES

TAM

P W

IND

–KE

Y T

O S

UCE

SS

Development Construction Maintenance

Gestamp Wind’s mission is to develop, construct, and operate its own wind farms through out the world, with the goal of becoming a significant player in the Wind Energy sector over the next few years.

In order to achieve this, Gestamp Wind has to rely on the international platform and industrial capabilities of Corporación Gestamp as well as in a team of highly qualified and experienced professionals.

Gestamp Wind is composed by a work force with extensive experience in the renewable energy sector especially in developing wind energy in the international market.

Design

Construction

Operation & Maintenance

Page 13: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 13GES

TAM

P W

IND

–V

ALU

E CH

AIN

Development Construction MaintenanceEnergy

saleTowers

construction

Page 14: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 14GES

TAM

P W

IND

–G

LOB

AL

PR

ESEN

CE

Page 15: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 15

Page 16: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 16GES

TAM

P B

IOM

ASS

–P

RO

DU

CTIO

N Biomass energy production (GJ)

Sold

315.407,162014

installed

153,97

Spain

Sold

39.700,47

Installed

279,25

USA

2014

Management• > 60.000 forest hectares• 6.000 agricultural hectares

Garray’s plantPower: 17,02 MWe

Annual Generation: 99.000 MWhe

Berlín’s NH plantPower: 77,570 MWe

Annual Generation: 33.400 MWhe

Page 17: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 17GES

TAM

P B

IOM

ASS

–G

LOB

AL

PES

ENCE

Page 18: Gestamp Renewables (eng)

GESTAMP RENEWABLES October 2015| 18

October 2015