GERMANNA COMMUNITY COLLEGE BOARD SEPTEMBER 21, 2017 AGENDA
DANIEL TECHNOLOGY CENTER – ROOM 118
18121 Technology Drive, Culpeper, VA 22701
3:00 p.m. – 4:30 p.m. Committee Meetings
Academic Affairs/Workforce/Student Success – Room 104C
Cybersecurity AAS Degree -------------------------------------------------------------------------- Page 2
Policy 10160: Fund-Raising & Canvassing ---------------------------------------------------- Page 15
Student Success Snapshot ------------------------------------------------------------------------ Page 18
Executive/HR – Conference Room 118
Annual Housing Stipend --------------------------------------------------------------------------- Page 23
Finance/Facilities – Room 123
Year End Financials – FY17 ----------------------------------------------------------------------- Page 24
Financials Ending August 30, 2017 ------------------------------------------------------------- Page 33
FY19 Local Budget ---------------------------------------------------------------------------------- Page 41
Budget Amendment #1 --------------------------------------------------------------------------- Page 51
Budget Amendment #2 --------------------------------------------------------------------------- Page 52
Facilities Report ------------------------------------------------------------------------------------- Page 53
4:30 - 4:50 p.m. – Program Update ---------------------------------------------------------------------- Page 55
Veterans Services, presented by Robert Dixon, Veterans Support Counselor
5:00 p.m. – Regular Meeting
1. Call to Order/Determination of Quorum
2. Public Comment
3. Celebrations: Professor Emeritus
4. Approval of Minutes
A. May 18, 2017 - #309 -------------------------------------------------------------------------- Page 71
B. August 17, 2017 - #310 ---------------------------------------------------------------------- Page 78
5:10 p.m. – Committee Discussion/Action
5. Academic Affairs/Workforce/Student Success: Cleo Coleman, Chair
6. Executive/HR: William Thomas, Chair
7. Finance/Facilities, Teri McNally, Chair
5:45 p.m. – Informational Items/Other Business
8. President’s Report
9. Chair’s Report
10. Calendar of Events---------------------------------------------------------------------------------- Page 81
11. Other Business
6:00 p.m. – Adjournment
2
3
4
March 2, 2017
5
6
7
8
9
10
11
12
13
VCCS Form 102 - AS&R(0107)
REQUEST FOR NEW CURRICULUM (VCCS-102)
College: Germanna Community College College Code: GC297 FICE Code: _____
1. Title of Curriculum: AAS in Cyber Security
2. Proposed Initiation Date: Fall X Spring Year 2013
3. Program Leve Transfer: _____AA ___AS _____AA&S Occupational/Technical: ____XX_AAS _____AAA _____Diploma
4. Additional funding required: New funds required: Facilities $_______ Equipment $_______ Funded through Perkins and current equipment Operations $_______Other _________
5. Faculty required: Additional Faculty First year: _____FT _____Adjunct No new faculty required ___X__ Required Second Year: _____FT ____Adjunct
6. Costs to be funded by: X increased enrollments in existing courses taught at the college (Check all that apply) savings through program restructuring./discontinuances
savings through attrition from other programs X enrollments in new courses
other
7. FTES Enrollment Projections: 1st year _15____ 2nd year __25____ 3rd year ___35___ If after 3 years the program does not sustain an enrollment of __6__ FTES, the program willbe analyzed to determine whether or not it should be continued.
8. Will courses in the program be offered through distance education? Yes _X___ No _X___ Will the students be able to complete the entire program through distance education Yes ____ No __X__
9. Estimated Annual Job Openings Source and Date of Data Local over 500 in 50 mile range Virginia Workforce Connection State 20276 Burning Glass 2015
COLLEGE APPROVAL:
VICE PRES./PROVOST (s/) Date: __________________
COLLEGE PRESIDENT (s/) Date:___________________
LOCAL BOARD (s/) Date: __________________
VCCS OFFICE USE ONLY
VCCS Program Title ________________________________________
VCCS Curriculum Code NCES/CIP Code VCCS Cluster Code _______________
Program Levels: (Circle) 0 1 2 3 4 5 6 7 8 9
STATE ACTION:
_______________ (Approved/Disapproved) By________________________ ____ System Office Date
Chancellor Approval Date: SBCC Approval Date: ______________________________
SCHEV Approval Date: SCHEV S.O.R. Date:_______________________________
14
15
16
17
Enrollment Management Workgroup “Enrollment is everyone’s job at Germanna”
• Formed on July 28, 2017 (Originally Started as the Recruitment Team)
o Cross section of members from across the college – See attached
o Align enrollment management with the Guided Pathways approach
Recruit – Admit – Retain – Complete
o Prepare for Implementation of EAB Navigate
More on that at the next College Board meeting
• Move from a budget-based model to a person-focused predictive model based on Fall 2016 trend with
a goal for a 5% increase in enrollment – See attached
• Existing Strategies
o Phone Bank – See attached
o Business Office Phone Calls
735 Payment related calls
Thousands of emails sent
• New Strategies
o VCCS Pilot Project - Blackboard Call Center
Students who enrolled in the past but not currently enrolled
Results
• 2,374 Called – Yield 12.5% one week after campaign ended
• Control group – Yield 9.1% one week after campaign ended
o Identification of Barriers and Development of Solutions
Caller ID for Germanna Phones was “VT Info Tech”
Not enough people answering the Welcome Center phones
Students dropped for non-payment multiple times
Students owing less than $300 dropped for non-payment
Automatic textbook fees added late
No waitlist for full classes
On-boarding strategies and marketing materials revised
Long wait time at Welcome Center on Fredericksburg campus
• Counseling developed an “Alternatives to Waiting in Line at FAC” Flyer for
those students who would prefer other options to waiting;
• More rigorous triage of students waiting in line;
• Revising the flowcharts used by Welcome Center staff for students in line
during peak periods;
• Setting up computers in the lobby for quick registration issues.
Calls by Admissions and Records; Welcome Center; Success Coaches; Counselors
• Results – See attached
o Germanna and John Tyler are the only colleges right now to have positive FTE growth when
dual enrollment is excluded from the numbers.
o Numbers do not include all the Dual Enrollment from our largest school divisions
Headcount numbers should go up by at least 200 and FTE will rise slightly, since
these students are traditionally only taking one or two courses. It takes 5 students
taking one course to increase our FTE by 1.
o Inching towards goal of 3,785 FTE – Update at Board meeting
18
Chair Jan GullicksonVice‐Chairs Jeanne Wesley / Scott KempHuman Resources Representative Needed
Dean of Arts and Sciences Shashuna GrayDual Enrollment Coordinator Tim KonhausDean of Technical & Prof. Studies Denise TalleyDean of Allied Health & Nursing Patti LiskFaculty Representative Needed
Dean of Student Development Pam FrederickAssistant Dean of Student Development Sarah SomervilleAssistant Dean of Student Development Mark HainesDisability Services Coordinator Win StevensCareer Counselor Marie HawleyFinancial Aid Outreach Becky MorrisVeterans Center Liaision Shaun BlackmonRegistrar /Director of A & R Cheri MaeaWelcome Center Administrator Anita NewhouseAssociate Registrar Jenn ElksRecruiter Kim ViarellaPerkins Recruiter Heidi DavisFaculty Advising Coordinator Carolyn BynumDiversity/Inclusion Rep Judi Bartlett
PR and Marketing Specialist Jim SolomonPublic Information Officer Mike ZitzFoundation Office Manager Jessica Thompson
Student Financial Supervisor Laura McDonaldIT Manager Jeremy Lam
Business and Career Coordinator Kim RodenbergAssociate VP for Workforce Dev. Martha O'KeefeAdult Career Coordinator Deborah Huntsinger
Student RepresentativeNeeded
Enrollment Management Workgroup
Academic Affairs
Student Success
Foundation/Marketing/PR
Finance/Administration/IT/Facilities
Workforce Development
Updated: 9/12/2017
19
Updated: 9/11/2017
622 84
3 1029 1195 14
85 1787 1961 2086 2265 2414 26
27 2937 31
49
3567
3979
3669 4575
5115
5490 57
40 5814 60
08 6101 6205
366 502 620 725 91
3 1116 1223 1307 1414 1507 1655 18
78 2010 22
92 2569
2446
2993
3332 35
30 3663
3669
3726
3734
3709
4643
5270
5848
5848 60
43 6163
6163 64
24 6624
6624 6688
6731
6737 6820
6820
6811
6802
6800
6797
6797
6793
6788
6784
6779
6775
3075
3400
3725
3725
3730
3735
3735
3757
3785
3785
3800
3803
3806
3810
3810
3805
3800
3799
3797
3797
3795
3792
3790
3787
3785
0
1000
2000
3000
4000
5000
6000
7000
8000
2017 Fall Enrollment Goal ‐ 3785 FTE ‐ 6775 HeadcountOne FTE = 15 Credits
Headcount‐Actual FTE‐Actual Headcount‐Goal FTE‐Goal
Augu
st 21 ‐1
6WK; 8WK1
; 4WK1
Septem
ber 5
‐14
WK
Septem
ber 2
0 ‐4
WK2
Octobe
r18‐8
WK2
;4WK3
Novembe
r15‐4
WK4
20
Phone Bank for Fall 2017 Semester
Results as of 7/26/17
• Operational from July 5 to August 3.
• Budget:o $19,679 for the Call Centero $8,172 for additional counseling staff to deal with the increased load during the summer
• Targeted Groups:o Applied to Germanna but had not yet enrolled: 1616 calls madeo Contacting graduated nursing students to determine employment: 97 calls madeo Identified as being at risk for being dropped for non-payment: 1799 calls madeo Students dropped for non-payment: 975 calls madeo Students recalled from the applied but not enrolled group and the dropped for non-payment: About
400 recallso TOTAL: 4,887 Students in 18 days
• Results:o Applied but not enrolled group
325 students ended up enrolling= 20% yield
Common responses:
• Yes, I plan on enrolling soon
• Yes, I plan on enrolling but I still need to do my placement test(s)-64 students
• Yes, I plan to enroll but I am waiting for my financial aid to be processed-51
• Yes, but I didn’t know if I was accepted
• No, I am having transportation issues
• No, I do not plan on enrolling because I am going to another community college orUniversity-19 students
o Payment Issue Phone Calls 578 students ended up re-enrolling= 59% yield
Common Responses for those at risk of being dropped for non-payment:
• Already paid (In between the time the query was run and receiving the call)• Has financial aid questions (some transferred to Student Account and
Financial Aid Center, others wish to come in in-person)• Applied for FA late and waiting to see if it goes through or if payment out of
pocket is needed• Waiting to set up payment plan• Will be paying prior to the deadline, just waiting as long as possible• Academic issues (Waiting for Dean approval for adding a class and then will
pay)• Personal issues• Exploring payment options
Common responses for dropped for non-payment:
• Issues with financial aid (Didn’t turn in required docs or realize otherdocumentation was needed)
• Issues with payment plan• 3rd party issues (were supposed to pay but did not)• GI Bill not showing (only a few)• Is aware, didn’t have the money and will re-enroll• Out of state tuition-doesn’t have the money• Had a loan but not enrolled in enough credits• Has gotten re-enrolled and paid
21
Questions about this report should be directed to Dr.Catherine Finnegan, Assistant Vice Chancellor for Research & Reporting, at [email protected].
Current term data shown in this report come from SIS Query as of the morning the report was run. Prior year data come from SAS data files built the previous year, also from SIS. Only credit
enrollments are included. Audit enrollments are excluded.
The purpose of this report is to compare enrollments on the day the report is run with enrollments from the previous year at the same point in the semester. Changes from year to year may be due
to a number of factors other than actual increase/decrease in enrollment, such as changes in college registration dates, or when colleges enter dual enrolled students into SIS, etc. Daily/weekly
fluctuations in enrollment are typical throughout a semester. These are preliminary numbers. We urge caution in their interpretation.
Office of Research and Reporting____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Fall 2017 Point-in-Time FTE Enrollments Compared with Fall 2016Compare Dates: September 11, 2017 with September 12, 2016
College
Fall
2017
Total
FTE
Fall
2016
Total
FTE
Total
FTE
Change,
N
Total
FTE
Change,
%
Fall
2017
Regular
FTE
Fall
2016
Regular
FTE
Regular
FTE
Change,
N
Regular
FTE
Change,
%
Fall
2017
Dual FTE
Fall
2016
Dual FTE
Dual FTE
Change,
N
Dual FTE
Change,
%
Fall
2016
Final FTE
Fall 2016
Final FTE
Change,
N
Fall 2016
Final FTE
Change,
%
Blue Ridge 2,266 2,336 -70 -3.00 2,041 2,087 -46 -2.21 225 248 -24 -9.58 2,333 -67 -2.89
Central Virginia 2,285 2,342 -57 -2.44 1,592 1,731 -140 -8.06 693 611 82 13.47 2,334 -49 -2.08
Dabney S. Lancaster 564 650 -86 -13.22 496 518 -23 -4.35 68 131 -63 -48.23 762 -198 -26.01
Danville 1,743 1,862 -119 -6.39 1,180 1,344 -165 -12.24 564 518 46 8.79 1,932 -188 -9.75
Eastern Shore 329 365 -36 -9.94 250 288 -38 -13.24 79 77 2 2.33 369 -40 -10.74
Germanna 3,709 3,727 -17 -0.46 3,404 3,371 33 0.99 306 356 -51 -14.19 3,755 -45 -1.21
J. Sargeant Reynolds 5,126 5,702 -576 -10.09 4,533 5,317 -783 -14.74 593 385 208 54.02 5,698 -572 -10.04
John Tyler 5,237 5,032 205 4.07 4,352 4,205 147 3.49 885 827 58 6.99 4,926 312 6.33
Lord Fairfax 3,434 3,077 358 11.63 2,688 2,696 -8 -0.31 747 380 366 96.25 3,803 -368 -9.68
Mountain Empire 1,510 1,538 -28 -1.82 1,162 1,191 -29 -2.43 348 347 1 0.31 1,611 -101 -6.26
New River 2,757 2,654 104 3.91 1,993 2,021 -28 -1.41 764 632 132 20.88 2,703 54 2.01
Northern Virginia 27,877 28,393 -516 -1.82 26,904 27,559 -655 -2.38 973 834 139 16.64 29,065 -1,187 -4.09
Patrick Henry 1,540 1,699 -158 -9.32 1,056 1,205 -148 -12.32 484 494 -10 -2.01 1,696 -155 -9.15
Paul D. Camp 683 630 53 8.43 451 457 -6 -1.23 232 173 59 33.92 758 -75 -9.88
Piedmont Virginia 2,695 2,721 -26 -0.95 2,100 2,113 -12 -0.59 595 608 -13 -2.18 2,754 -59 -2.13
Rappahannock 1,233 1,105 128 11.58 875 914 -39 -4.26 359 192 167 87.10 1,819 -585 -32.19
Southside Virginia 2,031 2,105 -74 -3.53 1,004 1,162 -158 -13.60 1,026 943 84 8.87 2,306 -276 -11.95
Southwest Virginia 1,464 1,509 -44 -2.94 1,218 1,352 -134 -9.90 246 156 90 57.27 1,604 -140 -8.72
Thomas Nelson 4,274 4,820 -546 -11.33 4,227 4,799 -573 -11.93 47 21 27 126.75 5,069 -795 -15.68
Tidewater 12,980 14,021 -1,041 -7.43 12,718 13,723 -1,005 -7.32 262 298 -36 -12.09 14,245 -1,265 -8.88
Virginia Highlands 1,443 1,465 -23 -1.54 1,084 1,113 -29 -2.64 359 352 7 1.95 1,492 -49 -3.29
Virginia Western 3,069 3,295 -226 -6.86 2,957 3,180 -223 -7.02 112 114 -3 -2.34 4,193 -1,124 -26.81
Wytheville 1,559 1,558 2 0.10 1,082 1,115 -33 -2.96 477 443 35 7.82 1,550 9 0.58
VCCS 89,812 92,607 -2,795 -3.02 79,367 83,463 -4,096 -4.91 10,445 9,144 1,301 14.23 96,775 -6,963 -7.20
22
23
Germanna Community College
Local Funds Financial Analysis
For Financial Statements as of and for the Twelve Months Ended June 30, 2017
FINANCIAL ANALYSIS Restricted Funds
Year-to-date (YTD) revenues of $19,866 consist of $19,636 receipts for one private scholarship – the
Carter Scholarship - plus income earned on investments of $230. Expenses of $59,529 include
scholarship disbursements from the Carter Scholarship ($56,102) and endowments ($1,500). Restricted
cash is $55,957, about $40,000 less than one year ago (which is good; we do not wish to carry excess
Restricted Fund cash balances; we should use it for its intended purpose). This fund is the depository
for most federal Title IV funds (Pell, SEOG, Work-Study) and then funds are distributed to the State or
Local restricted grant and disbursed to students, bookstore, college, etc. from there. There is typically a
timing difference in any given month or year of a small amount but this net activity amounts to zero
once all receipts are recorded and distributions made. As of year-end, all federal funds received were
disbursed, and the fund balance is composed of balances for future disbursements of Carter Bennett
($27,175) and endowments ($28,783).
Loan Funds
No activity.
Endowment Funds
The endowment funds increased by interest earned of $193. The $22,560 of endowment funds consists
of one true endowment (permits use of interest only) with $4,000 corpus and quasi-endowments (can
disburse both interest and corpus) of $18,560. These endowments consist of funds donated to the
college 15-20 years ago, and we have been unable to locate the donors. Scholarships of $1,500 per
year will be disbursed from the quasi-endowments as specified until the remaining funds have been
consumed.
Plant Funds
The College maintains a small Maintenance Reserve fund to help with smaller scale facilities projects
such as sidewalk repairs, emergency work on the HVAC system or boilers, roofs, etc.
Total revenues for the year amount to $439,157. Of this, $206,500 were appropriations from
Spotsylvania County and the City of Fredericksburg to assist with site development costs for the Science
& Engineering Building, Information Commons. We also received Maintenance Reserve contributions of
$200,000 from Stafford towards the new site, and a total of $2,528 from Caroline, Madison, and Orange
counties. An additional $25,000 was contributed by Fredericksburg for the new Fred-CAT center.
Expenses of $179,785 were incurred during the year for debt service for the Foundation loan that
secured site development money for the Science & Engineering Building, Information Commons.
Investment Income
At the close of Fiscal Year 2016, funds were moved from the Virginia Local Government Investment Pool
(LGIP) into Davenport Investments as a move to achieve better returns while still adhering to the strict
investment guidelines for state agencies. The majority of the funds in Davenport Investments are held
24
in high-grade corporate bonds. Overall, interest income for the current year (after deducting all fees)
was $22k compared to only $1k last year, a vast improvement.
Unrestricted Funds
Net Assets – Unrestricted Fund Balance/Net Assets increased by $771,394 during the fiscal year.
Of this, $362,547 was in the Vending Fund, $140,460 in the Parking Auxiliary Fund, $83,742 in
the Operating Fund, $7,896 in Student Activities, and $176,749 in the Facilities Auxiliary Fund. A
summary of each fund follows:
Local Operating/College Board Fund – The local governments made good on their appropriation
pledges for the year, providing us $112,224. The primary expense was $12,397 for Physical
Plant which included electrical maintenance and storm water management. We also spent
$7,342 on student recruitment and $3,692 on student development. Employee relations
spending dropped from $16,263 last year to only $2,560 this year based on spending cuts
associated with Learning Day.
Vending Fund – Bookstore commissions ($345,968) fell short of the original budget of $500,000,
but came in near the revised budget of $350,000. Textbook programs continue to evolve with
the push for on-line materials and a focus on reducing textbook costs for students.
Additionally, commission revenues are tiered based on volume, so as volume goes down –whether due to declines in enrollment or spending on textbooks – the commission rate declines
as well. The largest expense was $11,215 for Auxiliary Plant Maintenance, which included
salad bar fixtures and exhaust fans and ventilation repairs for the food service operation.
Student Activity Fund – Revenues/fees collected exceeded budget by $15,780 and last year by
$29,640. The change from year-to-year is associated with a change in accounting for deferred
revenue for activity fees. Since these fees are not revenue per se, but rather are fees collected
for use by student activities, the fees are now recorded on a cash basis with no deferral. As
such, the fees for the current year include deferred revenue from the prior summer term as well
as fees collected for the current summer term. Expenses, in total, were less than budgeted.
This fund was projected for a $25,000 decline in fund balance (expenses exceeding revenue) and
actually ended with a $7,896 increase in fund balance.
Parking Auxiliary Fund – We generated $197,073 in revenues and spent $56,613, resulting in an
increase in fund balance of $140,460. Revenue is down only slightly from last year.
Facilities Auxiliary Fund – Revenues of $633,472 were $43,472 more than the $590,000
budgeted. Expenses of $456,723 were less than the $496,308 budgeted, resulting in a $176,749
increase in fund balance.
25
Business Unit: GC297 - GermannaReport ID: AGL00008 - College Balance Sheet - LocalFiscal Year: 2017As of Date: 2017-06-30Scope: Local Funds
Unrestricted Restricted Plant Loan Endowment Agency
Assets:Cash 1,440,641.00 55,932.22 623,501.20 0.00 (0.75) 73,721.29Petty Cash 1,000.00 0.00 0.00 0.00 0.00 0.00Cash Equivalents 1,571,404.14 25.22 618,761.06 0.00 818.64 0.00
Investments 2,130,957.79 0.00 0.00 0.00 21,742.27 0.00
Current Receivables 25,536.71 0.00 0.00 0.00 0.00 0.00
Current A/R Allowance (6,070.00) 0.00 0.00 0.00 0.00 0.00
Non-current Receivables 0.00 0.00 0.00 0.00 0.00 0.00
Non-current A/R Allowance 0.00 0.00 0.00 0.00 0.00 0.00
Interest Receivable 0.00 0.00 0.00 0.00 0.00 0.00
Loans Receivable 0.00 0.00 0.00 0.00 0.00 0.00Notes Receivable 0.00 0.00 0.00 0.00 0.00 0.00Inventory 0.00 0.00 0.00 0.00 0.00 0.00Prepaid Expense 0.00 0.00 0.00 0.00 0.00 0.00Due From Other Funds 106,179.08 0.00 0.00 0.00 0.00 0.00Investment in Plant Assets 0.00 0.00 1,277,531.00 0.00 0.00 0.00
Total Assets: 5,269,648.72 55,957.44 2,519,793.26 0.00 22,560.16 73,721.29
Liabilities:Accounts Payable - Current (14,982.07) 0.00 0.00 0.00 0.00 0.00Accounts Payable - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Accrued Leave Current 0.00 0.00 0.00 0.00 0.00 0.00Accrued Leave Non-current 0.00 0.00 0.00 0.00 0.00 0.00Deferred Revenue - Current 0.00 0.00 0.00 0.00 0.00 0.00Deferred Revenue - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Loans Payable - Current (14,304.13) 0.00 0.00 0.00 0.00 0.00Loans Payable - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Notes Payable - Current 0.00 0.00 0.00 0.00 0.00 0.00Notes Payable - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Deposits Pending 0.00 0.00 0.00 0.00 0.00 0.00Due to Other Funds 0.00 0.00 0.00 0.00 0.00 0.00
Fund Balances 5,240,362.52 55,957.44 2,519,793.26 0.00 22,560.16 73,721.29
Total Liabilities and Fund Balances: 5,269,648.72 55,957.44 2,519,793.26 0.00 22,560.16 73,721.29
Local Operating / College Board 259,433.84Vending 2,703,385.37Student Activities 13,382.79Parking Auxiliary 480,619.31Faciliaties Auxiliary 1,783,541.21
Total Unrestricted Funds 5,240,362.52
FS Page 1
26
Business Unit: GC297 - GermannaReport ID: AGL00009 - Stmt of Changes - Local FundsFiscal Year: 2017As of Date: 2017-06-30Scope: Local Funds
Unrestricted Restricted Loan Endowment Plant
Revenues:Unrestricted Current Fund Revenue 1,499,625.62Local Appropriations - Restricted 0.00 0.00 0.00 434,028.00Federal Grants and Contracts - Restricted 0.00 0.00 0.00State Grants and Contracts - Restricted 0.00 0.00 0.00 0.00Local Grants and Contracts - Restricted 0.00 0.00 0.00 0.00Private Grants and Contracts - Restricted 19,636.00 0.00 0.00 0.00Private Gifts 0.00 0.00 0.00 0.00Investment Income 48.77 0.00 35.22 5,128.64Endowment Income 175.22 0.00 0.00 0.00U.S. Government Advances 0.00Interest on Loans Receivable 0.00Expended for Plant Facilities 0.00Retirement of Indebtedness 0.00Recovery of Writeoffs 0.00Other Sources 0.00 6.32 0.00 158.20 0.00
Total Revenues and Other Additions: 1,499,625.62 19,866.31 0.00 193.42 439,156.64
Expenditures:Educational and General 214,895.00 59,528.59Auxiliary Enterprise Expenditures 513,336.36Indirect Costs Recovered 0.00Refunded to Grantors 0.00 0.00Administrative and Collection Costs 0.00Loan Cancellations and Write-Offs 0.00Expended for Plant Facilities 179,784.84Disposal of Plant 0.00Retirement of Indebtedness 0.00Interest on Indebtedness 0.00Liquidation of Endowment 0.00Other Expenditures/Deductions 0.00 0.00 2,740.10 6.32 0.00
Total Expenditures 728,231.36 59,528.59 2,740.10 6.32 179,784.84
Transfers among funds
Net Increase/(Decrease) for the Year 771,394.26 (39,662.28) (2,740.10) 187.10 259,371.80
Fund Balances 4,468,968.26 95,619.72 2,740.10 22,373.06 2,260,421.46
Fund Balances at the End of Year 5,240,362.52 55,957.44 0.00 22,560.16 2,519,793.26
FS Page 2
27
Description
Current Period
Actual
Annual
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
LC1 Spotsylvania County 14,474$ 57,895$ 57,895$ -$
LC2 Stafford County - 26,070 26,070 -
LC3 Caroline County - 6,539 6,539 -
LC4 King George County - - - -
LC5 Culpeper County - 1,000 1,000 -
LC6 Orange County - 8,875 8,875 -
LC7 Madison County - 3,126 3,126 -
LC8 City of Fredericksburg - 8,719 8,719 -
LC10 Other Sources - - - -
LC11 Investment Income 328 2,000 (2,491) (4,491)
LC12 Total Revenues 14,802$ 114,224$ 109,733$ (4,491)$
Expenditures
LC13 Employee Relations -$ 16,000 2,560$ 13,440$
LC14 Student Development Programs 164 15,000 3,692 11,308
LC15 Student Recruitment 2,116 7,500 7,342 158
LC16 Operating Contingency Reserve - 40,724 - 40,724
LC17 Dean of Institutional Effectiveness - - - -
LC18 Commencement - Coffeewood - 3,000 - 3,000
LC19 Physical Plant - 30,000 12,397 17,603
LC20 Total Expenditures 2,280$ 112,224$ 25,991$ 86,233$
LC21 Net Increase / (Decrease) 12,522$ 2,000$ 83,742$ 81,742$
LC22 Transfers from other funds - - - -
LC23 Transfers to other funds - - - -
LC24 Beginning Fund Balance 175,692 175,692 - LC24 Current Fund Balance 177,692$ 259,434$ 81,742$
Germanna Community CollegeLOCAL OPERATING/COLLEGE BOARD FUND ANNUAL BUDGET
Through June 30, 2017AIS General Ledger Inquiry
FS Page 3
28
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
CA1 Bookstore Commissions 36,501$ 350,000$ 345,968$ (4,032)$
CA2 Food Service Commissions 119 12,000$ 1,526 (10,474)
CA3 Investment Income 7,626 7,000$ 21,074 14,074
CA4 Other Income - 400 - (400)
CA5 Total Revenues 44,246$ 369,400$ 368,567$ (833)$
Expenditures
CA6 Regional Activities -$ 4,000$ 5,674$ (1,674)$
CA7 Commissions Contingency Reserve - 105,000 - 105,000
CA8 Bad Debt - 1,000 - 1,000
CA9 President's Discretionary 59 3,000 2,210 790
CA10 Cash Over/Under - 200 17 183
CA11 Fiscal Operating (1,062) 3,000 (13,096) 16,096
CA12 Travel and Meals - excess - 200 - 200
CA13 Auxiliary Plant Maintenance 3,976 35,000 11,215 23,785
CA14 Plant Operation and Maintenance - - - -
CA15 Debt Service - 220,000 - 220,000
CA16 Scholarships - - - -
CA17 Commencement - - - - CA18 Total Expenditures 2,973$ 371,400$ 6,020$ 365,380$
CA19 Net Increase / (Decrease) 41,273$ (2,000)$ 362,547$ 364,547$
CA20 Transfers from other funds - - - -
CA21 Transfers to other funds - - - CA22 Beginning Fund Balance 2,340,838 2,340,838 -
CA23 Current Fund Balance 2,338,838$ 2,703,385$ 364,547$
Germanna Community CollegeVENDING FUND ANNUAL BUDGET
Through June 30, 2017AIS General Ledger Inquiry
FS Page 4
29
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
SA1 Student Activity Fees 18,429$ 175,000$ 190,780$ 15,780$
SA2 Investment Income - - - -$
SA3 Total Revenues 18,429$ 175,000$ 190,780$ 15,780$
Expenditures
SA4 Student Activity Contingency -$ -$ -$ -$
SA5 Student Activities - 39,500 38,895 605
SA6 Student Organizations 232 30,000 28,458 1,542
SA7 Student Projects 3,247 40,000 34,226 5,774
SA8 Dean of Student Services - 27,000 25,225 1,775
SA9 Lecture and Culture 9,685 25,000 24,669 331
SA10 Student Recognition Program 358 2,000 1,012 988
SA11 Wellness & Recreation 26,641 31,500 30,399 1,101
SA12 Co-Curricular Programs - 5,000 - 5,000
SA13 Total Expenditures 40,164$ 200,000$ 182,884$ 17,116$
SA14 Net Increase / (Decrease) (21,734)$ (25,000)$ 7,896$ 32,896$
SA15 Transfers from other funds - - - -
SA16 Transfers to other funds - - - -
SA17 Beginning Fund Balance 5,487 5,487 - SA18 Current Fund Balance (19,513)$ 13,383$ 32,896$
Germanna Community CollegeSTUDENT ACTIVITY FUND ANNUAL BUDGET
Through June 30, 2017AIS General Ledger Inquiry
FS Page 5
30
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
PA1 Parking Auxiliary Fees 20,706$ 169,000 194,795$ 25,795
PA2 Parking Auxiliary Invest Income 677 - 2,278 2,278 PA3 Total Revenues 21,383$ 169,000$ 197,073$ 28,073$
Expenditures
PA4 Parking Auxiliary Enterprise 6,282$ 107,067$ 56,613 50,454
PA5 Total Expenditures 6,282$ 107,067$ 56,613$ 50,454$
PA6 Net Increase / (Decrease) 15,101$ 61,933$ 140,460$ 78,527$
PA7 Transfers from Facilities Aux - - -
PA8 Transfers to Local Plant Fund - - - - PA9 Beginning Fund Balance 340,159 340,159 -
PA10 Current Fund Balance 402,092$ 480,620$ 78,527$
Germanna Community CollegePARKING AUXILIARY FUND BUDGET
Through June 30, 2017AIS General Ledger Inquiry
FS Page 6
31
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
FA1 Facilities Auxiliary Fees 67,358$ 590,000 619,559$ 29,559$
FA2 Facilities Auxiliary Invest Income 4,103 - 13,913 13,913 FA3 Total Revenues 71,461$ 590,000$ 633,472$ 43,472$
Expenditures
FA4 Facilities Auxiliary Enterprise 7,018$ 496,308$ 456,723 39,585$ FA5 Total Expenditures 7,018 496,308 456,723 39,585
FA6 Net Increase / (Decrease) 64,444$ 93,692$ 176,749$ 83,057$
FA7 Transfers to Local Parking Maint - - - -
FA8 Transfers to State Plant Fund - - - - FA9 Beginning Fund Balance 1,606,792 1,606,792 -
FA10 Current Fund Balance 1,700,484 1,783,541 83,057
Germanna Community CollegeFACILITIES AUXILIARY FUND BUDGET
Through June 30, 2017AIS General Ledger Inquiry
FS Page 7
32
Germanna Community College
Local Funds Financial Analysis
For Financial Statements as of and for the Two Months Ended August 31, 2017
FINANCIAL ANALYSIS Restricted Funds
Year-to-date (YTD) revenues reflect $207,392 in receipts for private scholarships to date with
scholarship disbursements of $185,240. Restricted cash is $78,109, up $22,152 from June 30 due to
scholarship receipts pending future disbursement.
Loan Funds
No activity.
Endowment Funds
No activity.
Plant Funds
$137,272 was received, composed of $50,000 from Stafford, $1,574 from Orange County, and $698
from Caroline County for their contributions to the Maintenance Reserve fund. Another $35,000 was
received from Fredericksburg for the FAC Science & Engineering Building and Information Commons
(SEBIC), as well as $50,000 from Fredericksburg for the FredCat project. FredCat lease expenses to date
have been paid from grant funds, with locality contributions being held for future rental expenses.
Expenses of $29,964 were incurred for debt service related to the Foundation loan that secured site
development money for the Science & Engineering Building, Information Commons.
During FY’2018, the debt service on the FAC building project includes a final balloon payment for total
payments of $448,940 in this year. The current fund balance, plus projected local appropriations for
the current year, is sufficient to cover the required payments.
Unrestricted Funds
Net Assets – Unrestricted Fund Balance/Net Assets decreased by $56,669 during the first two
months of the fiscal year. A summary of each fund follows.
Local Operating/College Board Fund – Local appropriations of $33,343 were received. $1,250 in
expenses were recorded for summer camp lunches recorded in student development programs.
Vending Fund – We have received $18,699 in bookstore commissions and $335 in investment
income for the year. Expenses are minor to date.
Student Activity Fund – $36,505 has been collected, which is 21% of budgeted fees. Expenses
are typically light until September or October.
Parking Auxiliary Fund – $42,601 or 19% of budgeted revenues have been collected. Expenses
of $4,301 were recorded, primarily utilities.
Facilities Auxiliary Fund – Revenues of $136,458 were collected, 20% of the annual budget.
Expenses total $318,933, including a $318,113 annual debt service payment as the majority of
the expense.
33
Business Unit: GC297 - GermannaReport ID: AGL00008 - College Balance Sheet - LocalFiscal Year: 2018As of Date: 2017-08-31 printed on 2017-09-01
Scope: Local Funds
Unrestricted Restricted Plant Loan Endowment Agency
Assets:Cash 1,348,595.48 78,109.26 730,850.72 0.00 (45.25) 204,749.19Petty Cash 1,000.00 0.00 0.00 0.00 0.00 0.00Cash Equivalents 1,500,722.23 0.00 618,761.06 0.00 22,605.41 0.00
Investments 2,202,322.69 0.00 0.00 0.00 0.00 0.00
Current Receivables 12,123.15 0.00 0.00 0.00 0.00 0.00
Current A/R Allowance (6,070.00) 0.00 0.00 0.00 0.00 0.00
Non-current Receivables 0.00 0.00 0.00 0.00 0.00 0.00
Non-current A/R Allowance 0.00 0.00 0.00 0.00 0.00 0.00
Interest Receivable 0.00 0.00 0.00 0.00 0.00 0.00
Loans Receivable 0.00 0.00 0.00 0.00 0.00 0.00Notes Receivable 0.00 0.00 0.00 0.00 0.00 0.00Inventory 0.00 0.00 0.00 0.00 0.00 0.00Prepaid Expense 0.00 0.00 0.00 0.00 0.00 0.00Due From Other Funds 125,000.00 0.00 0.00 0.00 0.00 0.00Investment in Plant Assets 0.00 0.00 1,277,531.00 0.00 0.00 0.00
Total Assets: 5,183,693.55 78,109.26 2,627,142.78 0.00 22,560.16 204,749.19
Liabilities:Accounts Payable - Current 0.00 0.00 0.00 0.00 0.00 0.00Accounts Payable - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Accrued Leave Current 0.00 0.00 0.00 0.00 0.00 0.00Accrued Leave Non-current 0.00 0.00 0.00 0.00 0.00 0.00Deferred Revenue - Current 0.00 0.00 0.00 0.00 0.00 0.00Deferred Revenue - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Loans Payable - Current 0.00 0.00 0.00 0.00 0.00 0.00Loans Payable - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Notes Payable - Current 0.00 0.00 0.00 0.00 0.00 0.00Notes Payable - Non-current 0.00 0.00 0.00 0.00 0.00 0.00Deposits Pending 0.00 0.00 0.00 0.00 0.00 0.00Due to Other Funds 0.00 0.00 0.00 0.00 0.00 0.00
Fund Balances 5,183,693.55 78,109.26 2,627,142.78 0.00 22,560.16 204,749.19
Total Liabilities and Fund Balances: 5,183,693.55 78,109.26 2,627,142.78 0.00 22,560.16 204,749.19
Local Operating / College Board 291,477.08Vending 2,722,279.20Student Activities 49,952.68Parking Auxiliary 518,918.69Faciliaties Auxiliary 1,601,065.90
Total Unrestricted Funds 5,183,693.55
FS Page 1
34
Business Unit: GC297 - GermannaReport ID: AGL00009 - Stmt of Changes - Local FundsFiscal Year: 2018As of Date: 2017-08-31 printed on 2017-09-01
Scope: Local Funds
Unrestricted Restricted Loan Endowment Plant
Revenues:Unrestricted Current Fund Revenue 267,940.34Local Appropriations - Restricted 0.00 0.00 0.00 137,272.00Federal Grants and Contracts - Restricted 203,198.32 0.00 0.00State Grants and Contracts - Restricted 0.00 0.00 0.00 0.00Local Grants and Contracts - Restricted 0.00 0.00 0.00 0.00Private Grants and Contracts - Restricted 4,174.00 0.00 0.00 0.00Private Gifts 0.00 0.00 0.00 0.00Investment Income 4.20 0.00 0.00 41.66Endowment Income 15.08 0.00 0.00 0.00U.S. Government Advances 0.00Interest on Loans Receivable 0.00Expended for Plant Facilities 0.00Retirement of Indebtedness 0.00Recovery of Writeoffs 0.00Other Sources 0.00 0.00 0.00 0.00 0.00
Total Revenues and Other Additions: 267,940.34 207,391.60 0.00 0.00 137,313.66
Expenditures:Educational and General 1,375.11 185,239.78Auxiliary Enterprise Expenditures 323,234.20Indirect Costs Recovered 0.00Refunded to Grantors 0.00 0.00Administrative and Collection Costs 0.00Loan Cancellations and Write-Offs 0.00Expended for Plant Facilities 29,964.14Disposal of Plant 0.00Retirement of Indebtedness 0.00Interest on Indebtedness 0.00Liquidation of Endowment 0.00Other Expenditures/Deductions 0.00 0.00 0.00 0.00 0.00
Total Expenditures 324,609.31 185,239.78 0.00 0.00 29,964.14
Transfers among funds
Net Increase/(Decrease) for the Year (56,668.97) 22,151.82 0.00 0.00 107,349.52
Fund Balances 5,240,362.52 55,957.44 0.00 22,560.16 2,519,793.26
Fund Balances at the End of Year 5,183,693.55 78,109.26 0.00 22,560.16 2,627,142.78
FS Page 2
35
Description
Current Period
Actual
Annual
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
LC1 Spotsylvania County -$ 57,895$ -$ (57,895)$
LC2 Stafford County 3,692 26,070 3,692 (22,378)
LC3 Caroline County 6,539 6,539 6,539 -
LC4 King George County - - - -
LC5 Culpeper County 6,000 6,000 6,000 -
LC6 Orange County 8,722 8,875 8,722 (153)
LC7 Madison County - 3,181 - (3,181)
LC8 City of Fredericksburg 8,359 8,359 8,359 -
LC10 Other Sources - - - -
LC11 Investment Income 32 1,000 32 (968)
LC12 Total Revenues 33,343$ 117,919$ 33,343$ (84,576)$
Expenditures
LC13 Employee Relations -$ 18,000 -$ 18,000$
LC14 Student Development Programs 1,250 15,000 1,250 13,750
LC15 Student Recruitment 50 7,500 50 7,450
LC16 Operating Contingency Reserve - 41,000 - 41,000
LC17 Dean of Institutional Effectiveness - - - -
LC18 Commencement - Coffeewood - 3,000 - 3,000
LC19 Physical Plant - 30,000 - 30,000
LC20 Total Expenditures 1,300$ 114,500$ 1,300$ 113,200$
LC21 Net Increase / (Decrease) 32,043$ 3,419$ 32,043$ 28,624$
LC22 Transfers from other funds - - - -
LC23 Transfers to other funds - - - -
LC24 Beginning Fund Balance 259,434 259,434 - LC24 Current Fund Balance 262,853$ 291,477$ 28,624$
Germanna Community CollegeLOCAL OPERATING/COLLEGE BOARD FUND ANNUAL BUDGET
Through August 31, 2017AIS General Ledger Inquiry
FS Page 3
36
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
CA1 Bookstore Commissions 18,699$ 425,000$ 18,699$ (406,301)$
CA2 Food Service Commissions - 5,000$ - (5,000)
CA3 Investment Income 335 5,000$ 335 (4,665)
CA4 Other Income - 400 - (400)
CA5 Total Revenues 19,034$ 435,400$ 19,034$ (416,366)$
Expenditures
CA6 Regional Activities -$ 4,000$ -$ 4,000$
CA7 Commissions Contingency Reserve - 150,000 - 150,000
CA8 Bad Debt - - - -
CA9 President's Discretionary 140 4,500 140 4,360
CA10 Cash Over/Under 0 250 0 250
CA11 Fiscal Operating - 3,000 - 3,000
CA12 Travel and Meals - excess - 200 - 200
CA13 Auxiliary Plant Maintenance - 20,000 - 20,000
CA14 Plant Operation and Maintenance - - - -
CA15 Debt Service - 220,000 - 220,000
CA16 Scholarships - - - -
CA17 Commencement - - - - CA18 Total Expenditures 140$ 401,950$ 140$ 401,810$
CA19 Net Increase / (Decrease) 18,894$ 33,450$ 18,894$ (14,556)$
CA20 Transfers from other funds - - - -
CA21 Transfers to other funds - - - CA22 Beginning Fund Balance 2,703,385 2,703,385 -
CA23 Current Fund Balance 2,736,835$ 2,722,279$ (14,556)$
Germanna Community CollegeVENDING FUND ANNUAL BUDGET
Through August 31, 2017AIS General Ledger Inquiry
FS Page 4
37
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
SA1 Student Activity Fees 36,505$ 175,000$ 36,505$ (138,495)$
SA2 Investment Income - - - -$
SA3 Total Revenues 36,505$ 175,000$ 36,505$ (138,495)$
Expenditures
SA4 Student Activity Contingency -$ -$ -$ -$
SA5 Student Activities - 40,000 - 40,000
SA6 Student Organizations - 32,000 - 32,000
SA7 Student Projects (65) 37,000 (65) 37,065
SA8 Dean of Student Services - 28,000 - 28,000
SA9 Lecture and Culture - 25,000 - 25,000
SA10 Student Recognition Program - 2,000 - 2,000
SA11 Wellness & Recreation - 31,000 - 31,000
SA12 Co-Curricular Programs - 5,000 - 5,000
SA13 Total Expenditures (65)$ 200,000$ (65)$ 200,065$
SA14 Net Increase / (Decrease) 36,570$ (25,000)$ 36,570$ 61,570$
SA15 Transfers from other funds - - - -
SA16 Transfers to other funds - - - -
SA17 Beginning Fund Balance 13,383 13,383 - SA18 Current Fund Balance (11,617)$ 49,953$ 61,570$
Germanna Community CollegeSTUDENT ACTIVITY FUND ANNUAL BUDGET
Through August 31, 2017AIS General Ledger Inquiry
FS Page 5
38
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
PA1 Parking Auxiliary Fees 42,569$ 220,000 42,569$ (177,431)
PA2 Parking Auxiliary Invest Income 32 - 32 32 PA3 Total Revenues 42,601$ 220,000$ 42,601$ (177,399)$
Expenditures
PA4 Parking Auxiliary Enterprise 4,301$ 229,203$ 4,301 224,902
PA5 Total Expenditures 4,301$ 229,203$ 4,301$ 224,902$
PA6 Net Increase / (Decrease) 38,299$ (9,203)$ 38,299$ 47,502$
PA7 Transfers from Facilities Aux - - -
PA8 Transfers to Local Plant Fund - - - - PA9 Beginning Fund Balance 480,619 480,619 -
PA10 Current Fund Balance 471,416$ 518,919$ 47,502$
Germanna Community CollegePARKING AUXILIARY FUND BUDGET
Through August 31, 2017AIS General Ledger Inquiry
FS Page 6
39
Description
Current Period
Actual
Year to Date
Budget
Year to Date
Actual
Year to Date
Variance
Revenues
FA1 Facilities Auxiliary Fees 136,142$ 672,000 136,142$ (535,858)$
FA2 Facilities Auxiliary Invest Income 316 - 316 316 FA3 Total Revenues 136,458$ 672,000$ 136,458$ (535,542)$
Expenditures
FA4 Facilities Auxiliary Enterprise 318,933$ 484,590$ 318,933 165,657$ FA5 Total Expenditures 318,933 484,590 318,933 165,657
FA6 Net Increase / (Decrease) (182,475)$ 187,410$ (182,475)$ (369,885)$
FA7 Transfers to Local Parking Maint - - - -
FA8 Transfers to State Plant Fund - - - - FA9 Beginning Fund Balance 1,783,541 1,783,541 -
FA10 Current Fund Balance 1,970,951 1,601,066 (369,885)
Germanna Community CollegeFACILITIES AUXILIARY FUND BUDGET
Through August 31, 2017AIS General Ledger Inquiry
FS Page 7
40
Germanna Community College Local Budget FY’2019 Analysis
1. The budget represents the fiscal year beginning July 1, 2018 and ending June 30, 2019. The budget is prepared
for review and approval at this meeting to formalize the funding requests to be submitted to localities beginning
in the fall of 2017 according to the application process for each locality.
2. Operating budget requests are based on the three-year enrollment (full-time equivalents) for the locality,
extended by a rate per FTE. The rate is established using the previous year rate adjusted for inflation using the
consumer price index. The inflation adjustment for the period from June 2016 to June 2017 is 1.6%, for a
current year rate per FTE of $36.87. Details can be found on page 7 of the local budget packet.
3. Maintenance Reserve and Construction requests are based on on-going pledges for operations in the locality as
well commitments to a particular facility (like FredCat) that are extended for a specified duration. Details on
the locality requests by category and by locality can be found on pages 5 and 6 of the local budget packet.
4. Construction of a new facility at the Locust Grove Campus may begin during this budget period. This budget
includes no provision for special pledges for that project, nor for matching funds that will be required to fund
land improvements. The exact timing and amounts are unknown at this time, and specifics depend on
completion of the design phase of the project.
5. Significant changes from prior year:
a. Bookstore Commissions are projected to continue to decline due to the conversion to on-line and low-
cost or free course materials available through Open Education Resource initiatives.
b. In prior years, an amount was provided for debt service for the FAC building project. All debt service for
that project, including a final balloon payment, will be disbursed in Fiscal Year 2018. Therefore, the
provision for debt service under “Auxiliary Commissions” is no longer required.c. Expenses for parking auxiliary increased $100,000 for major repairs (resurfacing) for the FAC lot.
6. The student activities budget exceeds projected revenues by $25,000. The excess over budget funds the
Fredericksburg transit (bus) annual contribution. Carry-over cash balances have funded this deficit in prior
years, however projected ending cash will be insufficient in FY’2019. This will require a transfer from otheroperating funds to cover the deficit in FY’2019. Germanna has one of the lower activity fees in the VCCS, with
only 7 of the 23 community colleges with lower activity fees. The Board may wish to consider an adjustment to
the activity fee for the 2018-19 academic year.
7. The most significant source of revenues are fees assessed to students. These total $820,000 and consist of:
a. Student Activity fees of $1.50 per credit hour
b. Parking auxiliary fees of $1.75 per credit hour
c. Facilities Auxiliary fees of $5.50 per credit hour
8. Local appropriations of $592,874 are the second greatest source of revenues. Refer to the Revenue Summary
on Page 8 of the local budget packet.
9. The most significant expenses are those for maintenance of facilities and parking, totaling $794,929. These
expenses are funded by the facilities and parking fees. Refer to the Expense Summary on Page 9 of the local
budget packet.
41
9/6/2017
Depart- FY 2019 FY 2018 FY 2018 FY2017 FY 2016 FY 2015 2014
Fund ment Request Approved Request Actual Actual Actual Actual
Local GovernmentsRevenues:
Spotsylvania County 40001 401000 58,476$ 59,020$ 59,020$ 57,895$ 58,082$ 57,957$ 43,106$
Stafford County 40001 401010 48,238$ 26,070$ 48,858$ 26,070$ 26,070$ 26,070$ 31,638$
Caroline County 40001 401020 5,998$ 6,539$ 6,097$ 6,539$ 7,070$ 7,391$ -$
King George County 40001 401030 -$ -$ -$ -$ -$ -$ -$
Culpeper County 40001 401040 12,843$ 6,000$ 12,847$ 1,000$ 1,000$ 1,000$ 1,000$
Orange County 40001 401050 8,714$ 8,722$ 8,722$ 8,875$ 9,056$ 9,214$ 9,310$
Madison County 40001 401060 3,466$ 3,181$ 3,181$ 3,126$ 2,605$ 2,605$ 2,961$
City of Fredericksburg 40001 401080 8,050$ 8,359$ 8,359$ 8,719$ 8,325$ 8,325$ 8,325$
Interest Income 40001 406030 1,000$ 1,000$ 1,000$ (2,491)$ (6,114)$ 1,775$ 16$
Reserve for unfunded appropriations (30,285)$ (2,391)$ (31,584)$ -$ -$ -$ -$
Total Revenues Local Governments 116,500$ 116,500$ 116,500$ 109,733$ 106,094$ 114,337$ 96,356$
Expenses
Employee Relations/L.Bourne 40001 440000 15,000$ 18,000$ 18,000$ 2,560$ 16,263$ 12,068$ 15,164$
Student Development /P.Frederick 40001 450101 15,000$ 15,000$ 15,000$ 3,692$ 9,114$ 9,467$ 7,500$
Student Recruitment/S.Kemp 40001 450240 8,000$ 7,500$ 7,500$ 7,342$ 9,651$ 7,461$ 7,333$
Contingency/J.Warnacut 40001 460090 40,000$ 41,000$ 41,000$ -$ -$ -$ -$
Dean of Institutional Effectiveness/J.Davis 40001 460120 -$ -$ -$ -$ -$ -$
Commencement Coffeewood/S.Kemp 40001 460270 -$ 3,000$ 3,000$ -$ -$ -$ -$ Physical Plant/G.Fenwick 40001 470010 30,000$ 30,000$ 30,000$ 12,397$ 12,507$ 24,957$ 29,044$
Total Expenses, Local Governments 108,000$ 114,500$ 114,500$ 25,991$ 47,535$ 53,953$ 59,041$
Net, Revenue/Expenses Local Governments 8,500$ 2,000$ 2,000$ 83,742$ 58,559$ 60,384$ 37,315$
Germanna Community CollegeLocal Operating Funds ONLY (does not include Maint Res. Or Construction)
For the Fiscal Year 2018-2019
FY18 Budget Request - Page 1
42
9/6/2017
Germanna Community CollegeLocal Operating Funds ONLY (does not include Maint Res. Or Construction)
For the Fiscal Year 2018-2019
Depart- FY 2019 FY 2018 FY 2018 FY2017 FY 2016 FY 2015 2014
Auxilliary Commissions Fund ment Request Approved Request Actual Actual Actual Actual
Revenues:
Bookstore Commission 40002 406015 325,000$ 425,000$ 425,000$ 345,968$ 404,348$ 482,993$ 370,417$
Food Service Commission 40002 406016 1,500$ 5,000$ 5,000$ 1,526$ 2,049$ 11,275$ 5,776$
Interest and Miscellaneous 40002 406017 19,000$ 5,000$ 5,000$ 21,074$ 4,584$ 6,241$ 891$
Other Sources 40002 406020 -$ 400$ 400$ -$ -$ 320$ 44$
Total, Revenues Auxilliary Operations 345,500$ 435,400$ 435,400$ 368,567$ 410,981$ 500,829$ 377,128$
Expenses
Regional Activities/J.Warnacut 40002 460200 5,000$ 4,000$ 4,000$ 5,674$ 3,728$ 3,528$ 3,674$
Commissions Contingency Reserve/ J.Warnacut 40002 460210 150,000$ 150,000$ 150,000$ -$ -$ -$ -$
Bad Debt /J.Warnacut 40002 460220 -$ -$ -$ -$ -$ -$ -$
President's Discretionary/ P.Duff 40002 460230 6,000$ 4,500$ 4,500$ 2,210$ 3,548$ 5,005$ 2,969$
Cash over/under/J.Warnacut 40002 460240 250$ 250$ 250$ 17$ 195$ 13$ 169$
Miscellaneous Operating/J.Warnacut 40002 460250 2,500$ 3,000$ 3,000$ (13,096)$ (3,005)$ 3,545$ 2,334$
Travel and Meals - excess/J.Warnacut 40002 460260 200$ 200$ 200$ -$ -$ -$ 168$
Auxilliary Plant Maintenance/G.Fenwick 40002 470030 20,000$ 20,000$ 20,000$ 11,215$ 13,452$ 13,353$ 18,165$
Plant Operations and Maintenance/G.Fenwick 40002 470040 -$ -$ -$ -$ -$ -$ -$
Debt Service /J.Davis 40002 470050 -$ 220,000$ 220,000$ -$ -$ -$ -$ Total, Expenses Auxilliary Operations 183,950$ 401,950$ 401,950$ 6,020$ 17,918$ 25,444$ 27,479$
Net Revenues/Expenses Auxilliary Commissions 161,550$ 33,450$ 33,450$ 362,547$ 393,063$ 475,385$ 349,649$
FY18 Budget Request - Page 2
43
9/6/2017
Germanna Community CollegeLocal Operating Funds ONLY (does not include Maint Res. Or Construction)
For the Fiscal Year 2018-2019
Depart- FY 2019 FY 2018 FY 2018 FY2017 FY 2016 FY 2015 2014
Student Activities Fund ment Request Approved Request Actual Actual Actual Actual
Revenues
Student Activity Fees 40003 400020 175,000$ 175,000$ 175,000$ 190,780$ 161,140$ 175,284$ 157,299$
Total, Revenues Student Activities 175,000$ 175,000$ 175,000$ 190,780$ 161,140$ 175,284$ 157,299$
Expenses
Student Activity Contingency/J.Warnacut 40003 450200 -$ -$ -$ -$ 248$ -$ -$
Student Activities/P.Frederick 40003 450210 40,000$ 40,000$ 40,000$ 38,895$ 38,786$ 38,440$ 34,623$
Student Organizations /P.Frederick 40003 450220 35,000$ 32,000$ 32,000$ 28,458$ 31,652$ 29,942$ 29,504$
Student Projects/P. Frederick 40003 450230 33,000$ 37,000$ 37,000$ 34,226$ 45,076$ 49,879$ 49,856$
Dean of Student Services /P.Frederick 40003 450250 28,000$ 28,000$ 28,000$ 25,225$ 25,624$ 1,922$ 2,146$
Lecture and Culture/P.Frederick 40003 450255 25,000$ 25,000$ 25,000$ 24,669$ 25,717$ 21,613$ 21,909$
Student Recognition/P.Frederick 40003 450260 4,000$ 2,000$ 2,000$ 1,012$ 285$ 651$ 1,000$
Wellness and Recreation/P.Frederick 40003 450265 30,000$ 31,000$ 31,000$ 30,399$ 30,102$ 29,901$ 35,061$ Co Curricular / P.Frederick 40003 450266 5,000$ 5,000$ 5,000$ -$ -$ -$ 2,830$
Total, Expenses Student Activities 200,000$ 200,000$ 200,000$ 182,884$ 197,490$ 172,348$ 176,929$
Net Revenues/Expenses Student Activities (25,000)$ (25,000)$ (25,000)$ 7,896$ (36,350)$ 2,936$ (19,630)$
Depart- FY 2019 FY 2018 FY 2018 FY2017 FY 2016 FY 2015 2014
Auxilliary Operations Fund ment Request Approved Request Actual Actual Actual Actual
Parking Auxilliary
Revenues 40203 409000 200,000$ 220,000$ 220,000$ 197,073$ 199,746$ 174,194$ 172,300$ Expenses/G.Fenwick 40203 490000 314,601$ 229,203$ 229,203$ 56,613$ 161,171$ 190,318$ 389,725$
Net Revenue/Expenses Parking (114,601)$ (9,203)$ (9,203)$ 140,460$ 38,575$ (16,124)$ (217,425)$
Facilities Auxlliary
Revenues 40206 409001 625,000$ 672,000$ 672,000$ 633,472$ 762,005$ 692,804$ 701,487$ Expenses/G.Fenwick (Includes Debt Service) 40206 490001 480,328$ 484,590$ 484,590$ 456,723$ 442,936$ 450,418$ 452,520$
Net Revenues/Expenses Facilities 144,672$ 187,410$ 187,410$ 176,749$ 319,069$ 242,386$ 248,967$
Expenses for Expired Accounts
FY18 Budget Request - Page 3
44
9/6/2017
Germanna Community CollegeLocal Operating Funds ONLY (does not include Maint Res. Or Construction)
For the Fiscal Year 2018-2019
Summary Operating Funds FY 2019 FY 2018 FY 2018 FY2017 FY 2016 FY 2015 2014
Request Approved Request Actual Actual Actual Actual
Total Revenues 1,462,000$ 1,618,900$ 1,618,900$ 1,499,625$ 1,639,966$ 1,657,448$ 1,504,570$
Total Expenses 1,286,879$ 1,430,243$ 1,430,243$ 728,231$ 867,050$ 892,481$ 1,105,694$
Total Net Revenues/Expenses 175,121$ 188,657$ 188,657$ 771,394$ 772,916$ 764,967$ 398,876$
FY 2019 FY 2018 FY 2018 FY2017 FY 2016 FY 2015 2014Request Approved Request Actual Actual Actual Actual
GRAND TOTAL REVENUE SUMMARY
Maintenance Reserve Revenue from Localities 227,874$ 227,711$ 228,596$ 227,528$ 53,237$ 52,585$ 52,071$
Construction Request from Localities 248,500$ 248,500$ 248,500$ 248,500$ 248,500$ 206,500$ 206,500$
Locality operations revenue 116,500$ 116,500$ 116,500$ 109,733$ 106,094$ 114,337$ 96,340$
Student Activities Revenue 175,000$ 175,000$ 175,000$ 190,780$ 161,140$ 175,284$ 157,299$
Aux Commissions Revenue 345,500$ 435,400$ 435,400$ 368,567$ 410,981$ 500,829$ 377,128$ Aux Operations Revenue 825,000$ 892,000$ 892,000$ 830,545$ 961,751$ 866,998$ 873,787$
Grand total all revenues 1,938,374$ 2,095,111$ 2,095,996$ 1,975,653$ 1,941,703$ 1,916,533$ 1,763,125$
Note 1: Parking Aux has prior year funds available not shown on this document, it it is not over budget.
Note 2: Locality revenues include $42,000 for Caroline County deposited in State funds to offset rent
FY18 Budget Request - Page 4
45
9/6/2017
FY19 FY18 FY18 FY17 FY16 FY 15 FY14Locality Request Approved Request Actual Actual Actual Actual
Locality Operating Funds
Spotsylvania County $58,476 $59,020 $59,020 $57,895 $58,082 $57,957 $43,106
Stafford County 48,238 26,070 48,858 26,070 26,070 26,070 31,638
Caroline County 5,998 6,539 6,097 6,539 7,070 7,391 0
King George County 0 0 0 0 0 0 0
Culpeper County 12,843 6,000 12,847 1,000 1,000 1,000 1,000
Orange County 8,714 8,722 8,722 8,875 9,056 9,214 9,310
Madison County 3,466 3,181 3,181 3,126 2,605 2,605 2,961
City of Fredericksburg 8,050 8,359 8,359 8,719 8,325 8,325 8,325
Reserve for Unfunded Approps (30,285) 0 (31,584) 0 0 0 0
Total, Locality Op funds $115,500 $117,891 $115,500 $112,224 $112,208 $112,562 $96,340
Maintenance Reserve
Caroline County $740 698 $768 $698 $691 $571 $0
Culpeper County $0 0 $0 0 0 0 0
King George County $0 0 $815 0 734 448 448
Madison County $465 $439 $439 399 395 395 473
Orange County $1,669 $1,574 $1,574 1,431 1,417 1,171 1,150
Spotsylvania County $0 0 $0 0 0 0 0
Stafford County 200,000 200,000 200,000 200,000 50,000 50,000 50,000City of Fredericksburg (FredCat) 25,000 25,000 25,000 25,000 0 0 0
Total, Maint Reserve $227,874 $227,711 $228,596 $227,528 $53,237 $52,585 $52,071
470010
Phase III Construction
Spotsylvania County $171,500 171,500$ $171,500 $171,500 $171,500 $171,500 $171,500
Caroline County 42,000 42,000 42,000 42,000 42,000 0 0
City of Fredericksburg 35,000 35,000 35,000 35,000 35,000 35,000 35,000
King George 0 0 0 0 0 0 0
Stafford (see Maint Reserve) 0 0 0 0 0 0
Total Construction $248,500 $248,500 $248,500 $248,500 $248,500 $206,500 $206,500
Total By Activity and Locality $591,874 $594,102 $592,596 $588,252 $413,945 $371,647 $354,911
FY 2018-19 Local Government Budget Request
FY18 Budget Request - Page 5
46
9/6/2017
FY19 FY18 FY18 FY17 FY16 FY 15 FY14Locality Request Approved Request Actual Actual Approved Actual
Caroline County $48,738 $49,237 $48,865 $49,237 $49,761 $7,962 $0
Culpeper County 12,843 6,000 12,847 1,000 1,000 1,000 1,000
King George County 0 0 815 0 734 448 448
Madison County 3,931 3,620 3,620 3,525 3,000 3,000 3,434
Orange County 10,383 10,296 10,296 10,306 10,473 10,385 10,460
Spotsylvania County 229,976 230,520 230,520 229,395 229,582 229,457 214,606
Stafford County 248,238 226,070 248,858 226,070 76,070 76,070 81,638
City of Fredericksburg 68,050 68,359 68,359 68,719 43,325 43,325 43,325
Total Contribution $622,159 $594,102 $624,180 $588,252 $413,945 $371,647 $354,911
FY 19 FY18 FY 18 FY17 FY 16 FY 15 FY14Activity Request Approved Request Actual Actual Approved Actual
Operating funds $115,500 $117,891 $115,500 $112,224 $112,208 $112,562 $96,340
Maintenance Reserve 227,874 227,711 228,596 227,528 53,237 52,585 52,071
Construction 248,500 248,500 248,500 248,500 248,500 206,500 206,500
Total by Activity $591,874 $594,102 $592,596 $588,252 $413,945 $371,647 $354,911
Local Government Total Contribution
Local Government Summary by Activity
FY18 Budget Request - Page 6
47
9/6/2017
3-Year
Amount Enrollment AFTES2
Locality Requested Rate1
Average Pct 2016-17 2015-16 2014-15
Spotsylvania County $58,476 $36.87 1,586 40.11% 1508 1,583 1,667
Stafford County 48,238 36.87 1,308 33.09% 1242 1,319 1,364
Caroline County 5,998 36.87 163 4.11% 162 154 172
King George County (3)0 0.00 148 0.00% 140 150 154
Culpeper County 12,843 36.87 348 8.81% 329 354 362
Orange County 8,714 36.87 236 5.98% 222 234 253
Madison County 3,466 36.87 94 2.38% 99 89 94City of Fredericksburg 8,050 36.87 218 5.52% 207 211 237
$145,785 4,102 100.00% 3,909 4,094 4,303
1 Rate is increased by the rate of inflation over the prior year's rate.
Previous year rate per FTES $36.29Inflation (CPI-U all items) 1.6% (measured from June 2016 to June 2017)
Current Year Rate (per AFTES) $36.87
2 AFTES = annualized full-time equivalent students computed as total credit hours divided by 30. 30 credit hours per year is deemed a full-time student course load.
3 As a shared community, King George County funds operational support for Rappahannock Community College and capital support only for Germanna.
Germanna Community CollegeRequested Locality Participation in Local Budgets for Use in FY 2018-19 Budget Development
FY18 Budget Request - Page 7
48
9/6/2017
Operating Maint Reserve Construction Total Revenues
Local Gov't Appropriations 116,500$ 227,874$ 248,500$ 592,874$
Bookstore Commission 325,000$ 325,000$
Miscellaneous Commission 20,500$ 20,500$
Student Activity Fees 175,000$ 175,000$
Parking Auxiliary Fees 200,000$ 200,000$
Facility Auxiliary Fees 625,000$ 625,000$ Total 1,462,000$ 227,874$ 248,500$ 1,938,374$
Germanna Community CollegeFY 2018-19 Revenue Summary
FY18 Budget Request - Page 8
49
9/6/2017
Expense Category
Facilities Auxiliary 480,328$
Debt Service -$
Student Activities 175,000$
Parking Auxiliary 314,601$
Physical Plant 20,000$
Fred Transit 25,000$
Employee Relations 15,000$
Commissions Contingency 150,000$
Operating Contingency 40,000$
All other 66,950$ Total Expenses 1,286,879$
470010
Germanna Community CollegeFY 2018-19 Expense Summary
FY18 Budget Request - Page 9
50
FY18 Budget Amendment Page 1
Germanna Community College
Local Funds
Fiscal Year 2017-2018
Budget Amendment #1 September 21, 2017
Justification: The College is requesting approval for a loan/advance from local funds to cover State expenditures for design work for the Locust Grove building project. The project has been approved, however, the State does not have immediate funding for the total $1.4 estimate for the design work on the project. Reimbursement may be made within the current fiscal year or the following fiscal year depending on State revenues and cash position. The System Office of the Virginia Community College System has indicated some availability of funds but has not determined the final design cost nor the amount that would need to be advanced from Germanna local funds pending future reimbursement.
The project is the third priority in the 2018-2020 biennium. In order to begin construction in 2019, design work will need to take place in the current year.
This request would authorize the Interim Vice President for Administrative Services and Director of Finance to manage advances from local funds to pay for design work for up to $1.0 million.
Necessary Actions: Move funds from reserves to Local Plant budgets for the Locust Grove Campus project as required up to $1,000,000.
This Request: Establish funds in department 774180 (Locust Grove Campus) and Fund 79001 (Local Plant) from Local Operating reserves up to the amount of $1,000,000 for FY18 as necessary for the design work on the building replacement project.
51
Investment Account Resolution Page 1
Germanna Community College
Local Funds
Resolution of the Board Investment Account
September 21, 2017
Justification: The College has contracted with Davenport & Company LLC to manage the investments of the College’s Local Funds (any or all fund groups). Davenport requires a Board resolution authorizing Germanna staff to conduct transactions with Davenport (per attached document). A board resolution dated May 19, 2016 permitted staff to name the positions authorized to act on behalf of the College. The resolution document required by Davenport will contain the names of the staff and requires the signature of the Board Secretary each time a staff person changes but it would not require a separate Board resolution each time a staff person leaves and is replaced by another.
However, as the College now has a new Secretary, it is appropriate to file an updated resolution authorized by the current Secretary, Dr. Jan Gullickson.
Necessary Actions: Approve a resolution identifying which Germanna staff have authority to conduct transactions on behalf of the College with Davenport & Company LLC.
This Request: Authorize the Vice President for Administrative Services, currently Dr. John Davis, the Director of Finance, currently Joyce Warnacut, and the Senior Accountant, currently Nancy Smith, to act on behalf of the College with all matters associated with investments with Davenport & Company LLC with no limits to amount. Additionally, appoint the Director of Finance, currently Joyce Warnacut, as Transfer Agent for the purposes of this account relationship.
52
Germanna Community College Board
Facilities Report
September 21 2017
1. V. Earl Dickinson Fire Alarm Replacement, Fredericksburg:
Past: The stairwell pressurization fans are the last item to be installed to complete the project.
We are waiting final approval of the drawings and specifications from the Bureau of Capital
Outlay Management (BCOM).
Present: We received final approval from BCOM in the middle of June. The fans had a 10 week
lead time from the vendor. The contractor is scheduled to install September 8.
2. Stafford Center:
Past: Met with Va. Properties to discuss our concerns that the space would not be ready until
late January. Va. Properties agreed that we will take possession May 1, 2018. Va. Properties is
working on providing a construction schedule for our space and a color scheme to be approved.
Present: The facility is under construction with the shell of the facility completed. The interior
walls are under construction. The A/E firm has provided us the color scheme for the space. I am
traveling there monthly to monitor progress and will begin bi-monthly visits soon.
3. Fredericksburg Nature/Exercise Trail
Past: To date the rough trail has been completed. Will begin removing trip hazardous thru out
the trail. Asked John Stroffolino to provide me a list of equipment to purchase. Expecting the list
after the Spring Semester.
Present: The trail is clear. Waiting to mulch the area until equipment is put in place. I have had
a difficult time finding a vendor who would respond to us about the equipment. I recently found
a vendor. Received the quote but we are waiting on cut sheets on the equipment so I can have
John Stroffolino review and approve. This project is running behind schedule.
4. Demand Response Program
March 30, 2017 we signed on with PJM to participate in there Demand Response Program.
Program Type: Limited
Period: June 1,, 2017 – May 31, 2018
Potential Event Hours: 12:00PM + 8:00PM
Event Notification Time: 120 Minutes
We have the ability not to participate in an event if we have something happening on-campus or
we feel we just can’t participate that day. The only penalty to us is we don’t get paid because we
didn’t participate. In this first year we have the potential to make approximately $9,300. We arescheduled to participate in a load drop test on June 22nd from 2-3pm. We will be paid for our
participation.
In this first year, I plan to manage the load drop by strictly using the Building Automation
System.
Present: We participated in the load drop test on June 22 for one hour. By my rough estimates
we met our KW drop but we need to see what PJM’s readings were. Things we learned: Start pre-condition earlier. Up to 30 minutes earlier.
Our start and end times didn’t match PJM. We need to adjust our times to offset a latestart time by PJM.
53
We couldn’t meet our load drop numbers by only using the Building AutomationSystem. The staff had to go around and turn off lights in rooms not in use, hallways, and
lounges.
If fall classes were session I am pretty confident we would not meet our numbers
without causing uncomfortable conditions in the buildings.
Being our first attempt at a demand response we didn’t fail miserably but we didn’t knock it out of the park either. We have lots of things to think about and plenty of room for improvement so
we’ll give another try next year.
54
STUDENT VETERANS & MILITARY AFFILIATED AT GCC
GCC College Board Update
September 21, 2017
Robert M. Dixon, M.A. Student Veterans Support CounselorGermanna Community College
55
Purpose
• To provide an annual summary of our Student Veteranand military-affiliated student population here atGermanna Community College
56
Veterans Education Nationally57
Veterans by Period of Service Nationally58
What Do We Do For Our Veterans?
Advocacy Payments/Benefits
Certification of BenefitsAdjustments & TroubleshootingTuition/FeesVocational RehabMilitary Tuition AssistanceVMSDEPFinancial AidScholarships
Advising/Counseling
Program SelectionProgram AdjustmentsClass SelectionTailored Career & Transfer“Success Coach”Transition IssuesInformation & ReferralDisability ServicesEmployment
Academic & Support Services
Enrollment and RegistrationApplication for benefitsPrior Learning AssessmentPlacement Testing WaiversRecruitmentFaculty & Staff TrainingTutoringSocial Engagement & Student Activities
InternalDeans & Depts.A&RBusiness OfficeFinancial AidFacultyThreat AssessmentCommitteesMarketingPublic RelationsDisability Services
ExternalUS Dept. of Veteran AffairsDVSEducation OfficersBook StoreVVFSVEC
59
Most Used Benefit Programs• Post 911/Chapter 33 GI Bill (75% of all Student Veterans)
• Generally 100% tuition paid to GCC
• Living stipend: $1691/month for full-time
• Book allowance: $41/credit hour up to $1000 AY
• Transferable to family members before separation
• Other Programs:
• Chapter 35 – Dependents Education Assistance (DEA)
• For spouses & children of 100% disabled veterans
• Flat rate of $1024 per month, student pays all tuition & fees
• Chapter 31 – Vocational Rehabilitation (10%+ or more Service Connected Disability)
• Full tuition and fees, support equipment, living stipend
• Chapter 1606 – Montgomery GI Bill Selective Reserve
• Drilling reservists of all reserve services and the National Guard
• Virginia Military Survivors Dependents Education Program (VMSDEP)
• Commonwealth Department of Veterans Services
• Spouse & children of 90% or greater disabled Virginia veterans*
• Full-tuition + stipend – 4 years
*VMSDEP has very specific qualifications for residency and service
60
Post 911 GI Bill (Chapter 33)
Recent Improvements“Forever GI Bill”
Extends benefit availability for lifefor veterans separating on/after January 1, 2013
Expanded Yellow Ribbon Program for family members
Expansion to pay 100% to otherwise qualifying Purple Heart recipients
Extended benefits for certain STEM degree programs
Expanded eligibility for reserve and National Guard
Re-instatement of eligibility for those affected by institutional closures(ex. ITT closure)
61
How Do We Stack Up?
Source:
Virginia -4 Year Public Institutions
Old Dominion University 3266
George Mason University 2180
James Madison University 1436
Virginia Commonwealth University 1356
Virginia Polytechnic Institute and State University 949
University of Mary Washington 318
Virginia Community Colleges
Northern Virginia Community College 2970
Tidewater Community College 2214
Thomas Nelson Community College 1272
Germanna Community College 601
John Tyler Community College 567
Piedmont Virginia Community College 196
Lord Fairfax Community College 131
https://www.vets.gov/gi-bill-comparison-tool
Queried 9/11/17
GCC remains #4
GCC grads +
62
Financial Impact To GCC
• Most benefit users are full-time students:
• Fall 2017
• 384 benefit users
• 384 x 12 credits/term x $156/credit = approx. $700k+gross tuition income/term
• Approximately $1.5M per year gross tuition income
• Most users also qualify for Federal Financial Aid programs
• Allows users to save GI Bill for more expensive follow-on programs
63
Total Users By Program Fall 2017
Benefit Program FALL 2015 FALL 2016 FALL 2017
Chapter 33 (100%) 335 272 235
Chapter 35 DEA 47 45 52
Chapter 33(<100%) 42 27 32
Chapter 31 VOCREHAB 15 13 17
Chapter 35 + VMSDEP 14 24 15
Chapter 1606 9 12 10
VMSDEP 8 3 8
TA Active-Duty 9 6 5
MyCAA 3 0 4
TA Other 0 0 3
Chapter 30 MGIB-AD 5 3 2
FRY Scholarship 2 1 1
Total Program Users 489 406 384 21% decrease FA 2015-2017
Most used program
64
How Are We Doing?
VA Reported Benefit Program Graduates
65
Program Improvements
• Staffing Increase
• Full-time Student Veterans Support Counselor - Bob Dixon
• Full-time VERITAS* Liaison - Shaun Blackmon
• Full-time School Certifying Official (SCO) – Dominique Slaughter
• Part-time School Certifying Official – Erica Bryant
• 5 VA funded Work-studies
• V3 Educator Certification• March 2017, recognition by the Governor
• Military/Veteran Success Plan (MVSSP)
• V3 Employer Certification
*Veterans Education Resource Initiative for Transition, Advising, and Success
66
Program Improvements• Recruiting
• Targeted recruiting
• Better tracking of prospects
• Continued community engagement• Department of Veteran Services
• Virginia Employment Commission
• Targeted Career & Transfer• Student Veteran orientations at UMW
• Student Veteran career & transfer guidance
• Prior Learning & Assessment• Credits-to-Careers (C2C) Veteran Portal (VCCS wide)
• Prior Learning Assessment Committee
67
Program Improvements
• VPT Placement Test Waiver Pilot
• Allows Veterans to opt out of math & or English tests
• Student Success
• SAILS and TIPS
• Expanded coverage at other locations
• Improved flexibility to support college-wide
• Social• Involvement with community partners
• Expanded on-campus social events
• Student Veterans of America
68
Challenges
• Sustainability of the Veteran Mentor Program
• Access to key locations for recruiting
• Fostering growth in Student Veteran enrollment in theWestern Region
69
Questions?70
GERMANNA COMMUNITY COLLEGE BOARD
MAY 18, 2017
MINUTES #309
Members Present: Mr. William Thomas Ms. Sarah Berry Mr. Baron Braswell Ms. Cleo Coleman Dr. Victor Gehman Mr. Simon Gray Ms. Cathy Washington
Members Absent: Mr. Sam Kessler Ms. Teri McNally
Staff Present: Dr. David Sam Ms. Laurie Bourne Chief Craig Branch Dr. John Davis Ms. Pam Duff Mr. Garland Fenwick Mr. Scott Kemp Dr. Jeanne Wesley Mr. Michael Zitz Beckham
Work Sessions Human Resources Update Ms. Laurie Bourne, Associate Vice President of Human Resources, provided an overviewof the 2016 Human Resources Annual report, highlighting the organizational structure, employment groups, demographics, compensation by base salary, educational aid and continuous learning, faculty promotions, employee turnover rates, and results from 2015 Climate Survey.
Meeting
I. Call to Order – Mr. William Thomas, Chair, presiding. The Germanna Community College Board met on May 18, 2017 in Room 114 of the Locust Grove Campus, located at 2130 Germanna Highway, Locust Grove, VA. Mr. Thomas called the meeting to order at 5:01 p.m. A quorum was present.
II. Public Comments There were no public comments.
71
2
III. Celebrations Phi Theta Kappa Special Award The Board recognized Michael Kuchinski (absent) for five years of continuous service as an advisor for Germanna’s Phi Theta Kappa chapter. Dr. Sam was also recognized for receiving the Phi Theta Kappa Michael Bennett Lifetime Achievement Award, which has only been awarded to nine other college presidents in America.
Multi-Year Appointments The Board recognized the following faculty and professional faulty who received multi-year appointments, effective August 2017:
Faculty: Leigh Hancock – 5 years (absent) Marie Hawley – 5 years David Marsich – 3 years Jessica Matheson – 5 years (absent) April Morgan – 3 years (absent) Camille Mustachio – 5 years (absent) Debra Rezendes – 3 years (absent) Emily Sperlazza – 3 years (absent) Martha Turner – 5 years (absent) Debbie VanNortwick – 5 years Eric Vanover – 3 years (absent) Tracey Williams – 3 years Trudy Witt – 5 years
Promotions: Faculty Rank The Board recognized the following faculty and administrative professional faculty members who received promotions effective August 2017:
John Castellarin (absent), from the rank of Instructor to Assistant Professor; and
Win Stevens (absent), from the rank of Assistant Professor to Associate Professor.
VCCS Certified Crime Prevention Campus Chief of Police, Craig Branch, announced that the Virginia Criminal Justice Services Board unanimously approved Germanna’s application as a Certified Crime Prevention Campus. Germanna is the first community college to receive this distinguished recognition. Publication of this recognition must await the release by the VCJSB. The Board commended Chief Branch and his department for their hard work and commitment to excellence.
Physical Therapist Assistant Accreditation by CAPTE
72
3
The Board commended Laurie Daigle and Tracey Williams for their hard work and dedication in successfully obtaining initial accreditation of Germanna’s Physical Therapy program from the Commission on Accreditation in Physical Therapy Education (CAPTE).
Gossweiler Professorship Award The Board recognized Kellie Bradshaw, the 2017 recipient of the Richard Gossweiler Professorship Award, which may be awarded each year to a full-time faculty member whose career and teaching demonstrate the characteristics exemplified by Professor Richard Gossweiler throughout his lifetime and career. The Gossweiler Professorship provides financial support for an honorary appointment for one academic year.
Special Recognition of College Board Member The Board recognized Cathy Washington, whose term expires on June 30, 2017, for 8 years of service and leadership on Germanna’s College Board.
Special Recognition of President The Board recognized Dr. David Sam for 10-years of leadership at the College. The Board presented him with a plaque in honor of his President Emeritus status, a framed certificate of service, as well as a handcrafted wooden change bowl and a handcrafted wooden pen made from one of the thirteen original trees at Ferry Farm.
IV. Action Items Minutes #306 – March 16, 2017 Ms. Cathy Washington moved to approve Minutes #306, dated March 16,
2017 as presented; seconded by Mr. Vic Gehman. The motion carried
unanimously.
Minutes #307 – April 5, 2017 Ms. Sarah Berry moved to approve Minutes #307, dated April 5, 2017 as
presented; seconded by Ms. Cleo Coleman. The motion carried
unanimously.
Minutes #308 – April 6, 2017 Ms. Sarah Berry moved to approve Minutes #308, dated April 6, 2017 as
presented; seconded by Mr. Simon Gray. The motion carried
unanimously.
Election of Officers Ms. Cathy Washington announced that the Executive Committee
nominates Mr. William Thomas as Chair, Dr. Victor Gehman as Vice
Chair, and Dr. Janet Gullickson as Secretary for the 2017-18 academic
year. Mr. Thomas opened the floor for nominations. Hearing none, Ms.
Cleo Coleman moved to close the floor for nominations. The motion was
seconded by Sarah and unanimously approved. The nominations were
unanimously approved as presented.
73
4
Waiver of Second Readings: Mr. Baron Braswell announced that the Academic Affairs and Workforce
Committee recommended waiving the second reading on the following
items: Engineering Technology Certificate; General Studies Degree: Pre-
BSN; Policy 80430: Financial Aid Bookstore Purchasing; and Policy
XXXXX: Tuition Refund Appeals Policy. The motion passed
unanimously.
Engineering Technology Certificate Mr. Baron Braswell announced that the Academic Affairs and Workforce
Committee recommends approval of the new Engineering Technology
Certificate, effective Fall 2017. The motion carried unanimously.
General Studies Degree: Pre-BSN Mr. Baron Braswell announced that the Academic Affairs and Workforce
Committee recommends approval of the Pre-BSN General Studies
Degree, effective Fall 2017. The motion carried unanimously.
Policy 80430: Financial Aid Bookstore Purchasing Mr. Baron Braswell announced that the Academic Affairs and Workforce
Committee recommends approving revisions to Policy 80430: Financial
Aid Bookstore Purchasing as presented. The motion carried
unanimously.
Policy XXXXX: Tuition Refund Policy Mr. Baron Braswell announced that the Academic Affairs and Workforce
Committee recommends approving Policy XXXXX: Tuition Refund Policy as presented. The motion carried unanimously. Note: Policy number to be assigned by the President’s Office.
Financials Ending April 30, 2017 Mr. Simon Gray announced that the Finance and Facilities Committee
recommends approval of the financials for the period ending April 30,
2017, as presented. The motion passed unanimously.
IV. Informational Items Facilities Report Mr. Garland Fenwick, Facilities Manager, reported on the status of various facilities projects, including the fire alarm replacement at the Dickinson Building, the leased space for the new Stafford Center, the installation of LED lighting at the Fredericksburg Area Campus, the Locust Grove Campus and the Daniel Technology Center, the nature/exercise trail at the Fredericksburg Area Campus and Germanna’s participation with PJM to participate in a Demand Response Program. The FredCAT ribbon cutting ceremony will be held on June 6, 2017 at 5:00 p.m.
74
5
Economic Impact Analysis Dr. John Davis provided an overview of the College’s impact on its service region. Dr. Davis advised that specific information on each locality will be made available to each Board member very soon.
Nelnet Service Fee Dr. John Davis, Interim Vice President of Administrative Services, announced that student payments made by credit card are processed through Nelnet Business Solutions, a third party provider contracted by VCCS for all colleges in the system. As part of that contract, a 2.7% service fee is accessed for credit card transactions. This service fee has historically been paid by the College and equates to approximately $100,000 per year. Germanna proposes to follow the lead of many colleges and universities in the area to modify the service fee program with Nelnet Business Solutions to assess service fees to the payer. Dr. Davis and Mr. Scott Kemp, Interim Vice President of Student Services, presented the proposal to the Student Government Association (SGA), who supported its implementation. In light of recent budget constraints, the Board recognized the need to recoup the service fee assessed for credit card payments and accepted the College’s decision to pass the fee on to students.
President’s Report Dr. Sam provided an update on budget, raises and implications on budget, enrollment, collaboration with incoming President Dr. Janet Gullickson, and upcoming high school ceremonies for Germanna’s early scholar students. Dr. Sam thanked the Board for the honor to serve the College for the past 10 years and for their confidence in him over the years.
Calendar of Events
Date / Time Event Description Location
May 18 –
3:00 p.m.
Committee Meetings
Academic Affairs and
Workforce
Executive Committee
Finance and Facilities
Locust Grove
Campus
Room 202
Room 100
Room 106A
May 18 –
4:00 p.m.
College Board Meeting Room 114 – Locust
Grove Campus
May 23 –
5:00 p.m.
Foundation Board Meeting Central Park Office
1311 Central Park
Boulevard
Fredericksburg, VA
22401
May 29 Memorial Day All locations closed
75
6
June 6 –
5:00 p.m.
FredCAT Ribbon Cutting
Ceremony
RSVP by May 30th to
1325 Central Park
Blvd,
Fredericksburg, VA
22401
June 15 –
6:00 p.m.
VIP reception honoring Dr. Sam Stevenson Ridge
6901 Meeting Street
Spotsylvania, VA
22553
Chair’s Report Mr. Thomas announced that the President’s Transition team will conduct an organizational meeting via Webex on May 30. Mr. Thomas noted that he as honored to attend several College events recently, including the Academic Awards Ceremony and the Great Expectations Milestone Ceremony.
Announcement of Board Committees for 2017-18 Term Mr. William Thomas announced the following Committee Assignments for 2017-18:
Executive Committee William Thomas, Chair Victor Gehman, Vice Chair Sarah Berry Janet Gullickson, Secretary
Finance and Facilities Teri McNally, Chair Simon Gray Baron Braswell Vice President of Administrative Services, Staff Garland Fenwick, Staff
Academic Affairs and Workforce Cleo Coleman, Chair Sam Kessler Manya Rayner Scott Kemp, Staff Jeanne Wesley, Staff
VI. Other Business None
VII. Adjournment The meeting adjourned at 6:30 p.m.
Minutes approved on ______________________
76
7
__________________________ William Thomas, Chair
__________________________ David A. Sam, Secretary
77
1
GERMANNA COMMUNITY COLLEGE BOARD
AUGUST 17, 2017
RETREAT MINUTES #310
Members Present: Mr. William Thomas, Chair Ms. Sarah Berry Mr. Baron Braswell Mr. Simon Gray Mr. Sam Kessler Ms. Teri McNally Ms. Manya Rayner
Members Absent: Dr. Victor Gehman, Vice Chair Ms. Cleo Coleman
Staff Present: Dr. Janet Gullickson Ms. Pam Duff
The Germanna Community College Board conducted a retreat on Thursday, August 17, 2017, beginning at 10:00 a.m.in Conference Room 100 of the Locust Grove Campus, located at 2130 Germanna Highway, Locust Grove, VA. The retreat focused on team effectiveness and goals and objectives for the 2017-18 academic year. Former College Board member, Ann Tidball, facilitated the retreat.
The outcomes of the retreat were as follows:
Clarify that the role of College Board is to provide feedback from each of theirlocalities to the President, as well as to provide feedback on programs, service andofferings to best meet the needs of the communities Germanna serves;
Provide additional training for committee members (review business model ofcommunity colleges);
Consolidate technology fee, student activity fee, parking auxiliary fee and facilitiesfee under “Student Fee”;
Clarify the rubric needed to evaluate the President;
Explore ways to increase community engagement;
Expand upon Board recognition of new employees;
Provide more feedback from committee meetings on action items listed under theconsent agenda at Board meetings;
Continue financial support of Education Foundation events;
Schedule a concurrent retreat with the Education Foundation Board; and
Continue to communicate information to Board members who miss meetings.
78
2
The retreat adjourned at 4:00 p.m. A reception for former College Board members was held at the conclusion of the retreat at the Visitor’s Center Museum of the Historic Germanna Colonies.
Minutes approved on ____________________________.
William Thomas, Chair
Janet Gullickson, Secretary
79
3
80
1
2017-2018 Upcoming Events
Date / Time Event Description Location
September 14 –
12:00 p.m.
Annual Educational Foundation Golf
Tournament – One of the two major
fundraisers organized by the Educational
Foundation. Donations support student
scholarships.
Fredericksburg Country Club
September 14 –
6:00 p.m.
Taste of the South –Held immediately after
the golf tournament, the dinner features a
range of appetizers and entrees from across
the south, such as alligator sausage from
Florida, crawdads from Louisiana, and Virginia
ham. You do not need to play golf to attend.
Donations support student scholarships.
Fredericksburg Country Club
September 19 –
9:00 a.m. to
12:00 p.m.
Convocation (formerly known as Learning Day)
is an opportunity for all employees to hear
updates from the President and her Cabinet.
Celebrations of success will be held, as well as
Service Awards presentation.
College will be closed
Daniel Technology Center,
Culpeper, VA
September 21 –
3:00 p.m.
Committee Meetings
Academic Affairs/Workforce/Student Success
Executive Committee/HR
Finance/Facilities
Daniel Technology Center,
Culpeper:
104C, 118, and 123
September 21 –
4:30 p.m.
College Board Meeting Room 118 Daniel Technology
Center, Culpeper, VA
September 26 –
5:00 p.m.
Educational Foundation Board Meeting Fredericksburg Country Club
September 26 –
6:00 p.m.
Educational Foundation Reception for
President Gullickson
Fredericksburg Country Club
October 9 –
6:00 p.m.
Foundation Board Awards Ceremony and
Reception with Germanna Scholars and
Parents and Faculty
BJs Restaurant, 1861 Carl D.
Silver Parkway, Fredericksburg,
VA
October 11-12 Chancellor’s Planning Retreat: Rethinking the
Enrollment Pipeline - Enrollment decline in
community colleges is a national
challenge. Hear from members of the
Chancellor’s Task Force on Enrollment Management about disruptive approaches
that could reshape the future of Virginia’s Community Colleges and rebrand our role in
Founders Inn, Virginia Beach, VA
81
2
meeting the commonwealth’s 21st century
workforce education needs.
November 3 –
6:00 p.m.
Disability Services Milestones Awards
Ceremony – Annual award ceremony to
recognize students who have hit specific
milestones in their academic career
Sealy Auditorium (Workforce
Building) Fredericksburg Area
Campus
November 16 –
3:00 p.m.
Committee Meetings
Academic Affairs/Workforce/Student Success
Executive Committee/HR
Finance/Facilities
Locust Grove Campus – Rooms
TBD
November 16 –
4:30 p.m.
College Board Meeting Room 100, Locust Grove
Campus
November 17 –
4:00
Educational Foundation Board Meeting TBD
November 18 –
6:00 p.m.
Distinguished Philanthropist of the Year –
Reception to recognize a member of the
community who has demonstrated evidence
of financial support to enhance the mission,
leadership to advance major fundraising
initiatives, and engagement in the form of
volunteerism and advocacy for the College.
TBD
November 23-25 Thanksgiving Break – College Closed All Locations
December 10–16 Final Exams; Last Week of Classes All Locations
December 14 –
2:00 p.m.
Health Technology Pinning (Nursing and
Dental Assisting) Ceremony – Formal
completion program for the nursing and
health technology students
Anderson Center, University of
Mary Washington
December 14 –
7:00 p.m.
***Plan to arrive
by 6:15
Commencement – Graduation ceremony for
students earning an Associate of Arts and
Sciences degree, Associate in Science degree,
Associate of Applied Science degree, or a
certificate or career studies certificate.
Anderson Center, University of
Mary Washington
December 22 –
January 1
Winter Break – College Closed All Locations
January 8 Spring 2018 Semester Begins All Locations
January 15 Martin Luther King Jr Day – College Closed All Locations
January 18 –
3:00 p.m.
Committee Meetings
Academic Affairs/Workforce/Student Success
Executive Committee/HR
Finance/Facilities
Fredericksburg Area Campus
R
January 18 –
4:30 p.m.
College Board Meeting Room 225 – Dickinson Building,
Fredericksburg Area Campus
February – June
***Dates to be
determined
Updates to Local Boards of Supervisors Caroline, Culpeper,
Fredericksburg, King George,
Madison, Orange, Spotsylvania,
Stafford
February 27 –
5:00 p.m.
Foundation Board Meeting TBD
82
3
February 27 –
6:00 p.m.
President’s Circle Pinning Ceremony and Reception
TBD
March 12 – 18 Spring Break – No Classes All Locations
March 15 –
3:00 p.m.
Committee Meetings Stafford Automotive Center,
Rooms TBD
March 15 –
4:30 p.m.
College Board Meeting Stafford Automotive Center,
Conference Room
End of March
(Date TBD)
Annual Workforce Advisory Meeting – Annual
meeting of business and industry leaders to
receive input on what training and services
the business community needs.
TBD
April 18 –
8:00 a.m.
Student Success Day – A day for students to
get connected and engaged with fellow
students, faculty and staff. No classes are
held to allow students to attend
presentations, participate in activities, and
meet with their advisors.
All Locations
April 21 –
6:00 p.m.
Scholarship Monte Carlo – one of two
fundraising events hosted by the Educational
Foundation. Donations received support
student scholarships.
Daniel Technology Center,
Culpeper, VA
End of April –
6:00 p.m.
Academic Awards Ceremony – Annual event
to recognize academic excellence. Reception
follow ceremony.
Daniel Technology Center,
Culpeper
First Week of
May
6:00 p.m.
Great Expectations Milestone Ceremony –
Annual event to celebrate the milestones of
students of foster care (current or previous,
aged 16-24).
Sealy Auditorium (Room 134) –
Workforce Building,
Fredericksburg Area Campus
May 3 – 9 Final Exams All Locations
May 4 –
9:00 a.m.
Faculty Teaching Awards – Awards for
teaching, scholarly and creative engagement,
institutional responsibility, and service to the
College and community are presented to full-
time teaching faculty.
Fredericksburg Area Campus
Rooms 211 & 212 – Dickinson
Bldg
May 4 –
11:30 a.m.
Retiree Celebration – Annual event to thank
retiring employees for their service and
dedication to the College.
Fredericksburg Area Campus
Rooms 211 & 212 – Dickinson
Bldg
May 11 –
(Tentative)
2:00 p.m.
Health Technologies Pinning (Nursing and
Dental Hygiene) Ceremony - Formal
completion program for the nursing and
health technology students
Contract with UMW is being
negotiated
May 11 –
(Tentative) 7:00
p.m.
***Plan to arrive
by 6:15
Commencement - Graduation ceremony for
students earning an Associate of Arts and
Sciences degree, Associate in Science degree,
Associate of Applied Science degree, or a
certificate or career studies certificate.
Contract with UMW is being
negotiated
May 17 – Committee Meetings Locust Grove Campus
83
4
3:00 p.m. Academic Affairs/Workforce/Student Success
Executive Committee/HR
Finance/Facilities
Rooms TBD
May 17 –
4:30 p.m.
College Board Meeting Room 114 – Locust Grove
Campus
May 22 –
5:00 p.m.
Foundation Board Meeting TBD
84