Geotermia:
una energía sostenible
Producción de electricidad mediante geotermiaAlexander Richter – Green Energy Group AS
Madrid, 14 de marzo de 2013
![Page 2: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/2.jpg)
• Established in January 2008
• Geothermal expertise from Iceland and the
proven concept of modular technology from
the oil and gas industry
• Unique modular geothermal well head pow
er plant (patent pending) with 3.2 to 6.4
MW per unit, but importantly based on
existing technology
• First major contracts with Kenya Electricity
Generating Company (KenGen) totaling
nearly USD 100 million secured in early 2012
• Full power online for the first 6.4 MW pilot
plant in February 2012.
Green Energy Group
![Page 3: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/3.jpg)
• Global news
• Job Portal
• Geothermal Power
Plant Map
• Social media
• iPhone app
• Free pictures
• Services
www.ThinkGeoEnergy.
com
![Page 4: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/4.jpg)
www.PiensaGeotermia.
com
• Now also in
Spanish
• Recent partnership
agreement with
Chilean
ACHEGEO
![Page 5: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/5.jpg)
Depth in km
Geothermal systems
Hydrothermal/ Conventional Geothermal EGS
1
2
3
4
5
6
![Page 6: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/6.jpg)
Geothermal energy utilization
Binary
Geotherm.
Power
Plants
Fruit &
Vegetable
Drying
Mushroom
Culture
Geotherm.
Heat
Pumps
Soft Drink
Carbon-
ation
Cement &
Aggregate
Drying
Onion &
Garlic
Drying
Food
Process.
Snow
Melting
& De-icing
Pulp &
Paper
Process.
(Fish)
Aqua-
culture
Lumber
Drying
Concrete
Block
Curing
Bathing
Refriger-
ation &
Icemaking
Fabric
Dyeing
Green-
houseing
&
Soil
Sterilizat.
Building
Heating &
Cooling
&
Water
Heating
Soil
Warming
Ethanol,
Biofuel
Prod.
Beet Sugar
Evaporat.
& Pulp
Drying
Blanching,
Cooking
&
Pasteur-
ization
Biogas
Process
Source: http://www.utpb.edu/ceed/renewableenergy/applications.htm
Conv-
entional
Power
Plants
Ho
t W
ate
rS
atu
rate
d S
team
Electricity
200 C/ 392 F
150ºC/ 302 F
120ºC/ 248 F
100ºC/ 212 F
80ºC/ 176 F
60ºC/ 140 F
40ºC/ 104 F
20ºC/ 68 F
0ºC/ 32 F
Food & rel. Heating & rel. Other
![Page 7: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/7.jpg)
Geothermal heat at depth
Temp.
at Depth
3.5 km
![Page 8: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/8.jpg)
Geothermal heat at depth
Temp.
at Depth
5.5 km
![Page 9: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/9.jpg)
Geothermal heat at depth
Temp.
at Depth
7.5 km
![Page 10: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/10.jpg)
Geothermal heat at depth
Temp.
at Depth
9.5 km
![Page 11: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/11.jpg)
What is needed?
Heat
Fluid
1
2
Permeability2
![Page 12: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/12.jpg)
Dry steam
power plant
Geothermal power generation technologies
![Page 13: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/13.jpg)
Flash steam
power plant
Geothermal power generation technologies
![Page 14: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/14.jpg)
Binary cycle
power plant
Geothermal power generation technologies
![Page 15: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/15.jpg)
Geothermal power plant evolution
Source: Emerging Energy Research (2009)
![Page 16: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/16.jpg)
Geothermal technology deployment
Source: Emerging Energy Research (2009)
MW
insta
lled
Time
![Page 17: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/17.jpg)
Geothermal technology mix
25% 45% 14% 9% 7% 0%
Dry
Steam
Single Flash
Dual Flash
Binary
Hybrid
EGS
Source: Emerging Energy Research (2009)
![Page 18: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/18.jpg)
Suppliers
Flash systems Binary systems
Flash systems Flash systems
![Page 19: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/19.jpg)
Development pipeline
1
16
7
24
29
56
0
52
82
82
88
166
204
167
536
575
843
628
958
1,904
1,197
3,093
40
35
45
60
60
75
150
120
190
200
240
200
290
530
535
800
920
1,240
1,140
2,500
3,500
5,400
Australia
France
Ethiopia
China
Portugal
Papua New Guinea
Chile
Guatemala
Russia
Turkey
Nicaragua
Costa Rica
El Salvador
Kenya
Japan
Iceland
Italy
New Zealand
Mexico
Philippines
Indonesia
United States
2010
2015e
![Page 20: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/20.jpg)
Development
Year 1 2 3 4 5 6 7 8 9 10 …
Geological
Research
Drilling
Evaluation
Construction
Operation
![Page 21: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/21.jpg)
Wellhead power plant solution
Year 1 2 3 4 5 6 7 8 9 10 …
Geological
Research
Drilling
Evaluation
Construction
Operation
![Page 22: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/22.jpg)
• Modular design
• Optimal power generation
• Rapid deployment
• Scalability
• Accelerated return on investment
C64 wellhead condensing power plant
![Page 23: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/23.jpg)
C64 Wellhead Condensing Plant
Two C32 gensets with
6.4 MW in total
Delivery in 3.2 MW
(one genset) or 6.4
MW (two gensets)
Flash-based (>160 C)
Modular design
allowing independent
power generation from
individual wells
Olkaria plant in construction by Green Energy Group AS, March 1, 2013
![Page 24: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/24.jpg)
Pilot Plant – Olkaria
• Well-head power plant built for
KenGen, Kenya’s state utility
• 6.4 MW pilot plant of Green
Energy Group started operation
in January 2012.
• Valuable experience gained
• Adaptation of set up and
technical components
• New specifications for turbine
and other components
• Basis of won tender for 15
additional units of 70-85 MW for
KenGen
![Page 25: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/25.jpg)
0%
10%
20%
30%
40%
50%
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Financing of power plants
0%
10%
20%
30%
40%
50%
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
$4.8bn TOTAL
Development
bank
46%
Commercial
lender
22%State-owned
entity
20%Pension fund 8%
Government 4%
Source: Bloomberg New Energy Finance
Annual new-build debt investment as proportion
of total for past decade, 2002–2012
![Page 26: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/26.jpg)
Energy that never runs out – Geothermal Energy
![Page 27: Geothermal Presentation, March 14, 2013, Madrid/ Spain](https://reader035.fdocuments.net/reader035/viewer/2022062419/559cd1fe1a28ab5a7f8b4680/html5/thumbnails/27.jpg)
Green Energy Group AS - Contact
Norway - Headquarter
C.J. Hambros Plass 2C
0164 Oslo - NORWAY
Main: +47 22996073
Fax: +47 22996010
E-mail: [email protected]
Iceland - Research &
Development
Green Energy Iceland ehf.
Kringlan 5
IS-105 Reykjavik - ICELAND
Phone +354 512 8090
Kenya - Office
7th floor, Purshottam Place,
Westlands
P.O. Box 66217-00800,
Westlands, Nairobi
Indonesia - Office
Indonesia Stock Exchange
Tower 2, 17/F
Jl. Jend. Sudirman Kav. 52-53
Jakarta 12190 - INDONESIA
Phone: +62 21 515 7705
Fax : +62 21 515 7799
Singapore – Office
37th Floor, Singapore
50 Raffles Place
Singapore 048623
Phone: +65 6829 7058
Fax: +65 6829 7070
United Kingdom – Office
43-45 Portman Square
Alexander Richter – Marketing & Communication Director
Mobile: +354 618 5304
E-mail: [email protected]