GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of...

37
t"-x ^*- •.-; MERLEX ENGINEERING LTD., Consulting Geotechnical Engineers

Transcript of GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of...

Page 1: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

t"-x^*- •.-;

MERLEX ENGINEERING LTD.,Consulting Geotechnical Engineers

Page 2: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

MERLEX ENGINEERING LTD.' '

Reference No. 93/01/3000 MI111 *,______-31L10SWD002 63.6357 ANTOME Q.|Q

February 1S,.:1993

R.M. Blais ft Associates P.O. Box 237 .Pinewood Park Drive North Bay, Ontario P1B 8H2

Attention: Mr. R. M. Blais. P. Eng.

Re: Geotechnical Site Assessment

Kyanite Project .

Dear Sir:

As per your verbal authorization, we have carried out a site visit and

report on the factual data along with our comoents in this brief letter

report.

. .* f

On the oorning of January 25, 1993, the site was visited by a senior aeaber

of.our engineering staff to review the ground conditions at three testpits

put down during our attendance on site. Following this work, an additional

seven testpits (Testpits 4 to 10, inclusive) were put down by the client

and brief logs supplied to the undersigned.

The location of all testpits are shown on the enclosed Testpit Plan

supplied by the client. Elevations at the testpit locations were

interpolated from the topography data available on this plan.

120 PROGRESS COURT * P.O. BOX 886 * NORTH BAY. ONTARIO. PI B 8K1 * TEL: (705) 476-2560 . FAX: (705) 4764882

Page 3: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

!ef. Ho. 93/01/3000 -2- Date: February 15, 1993

SOIL CONDITIONS

* Detailed descriptions of the soils encountered a t'Testpits l to 3 are shown .-j

on the enclosed Testpit Data Sheets. A general description (supplied by

the client) of the soils encountered at Testpits 4 to 10 are also included

on this logs. At all testpit locations, an organic cover consisting 'i

x predoninantly of a fibrous sandy black organics (with roots, leaves and*

*. other forest cover) was encountered at the testpits. This deposit ranged

in thickness fro* l to greater than 7 feet (at the location of Testpit 9)

but generally was in the order of 2 to 3 feet thick.

Directly underlying this organic cover, soils were predominantly granular

consisting of sands with varying amounts of silts and gravels. It was

noted that at the location of Testpit l a sand and gravel was encountered

, at the interface with the bedrock. Refusal to further penetration of the* ^^

. - " backhoe (bedrock) was encountered at Testpits l, 2, 7, 8 and 10 at depths

ranging between 5 to 13 feet below grade (elevation 1029.0 to 1021.0). At

tile other testpit locations, either bedrock was not encountered, to the

depth at which the backhoe could excavate (i.e. approximately 15 foot

depth) or to the depth where rapid cave in of the granular soils prevented

further advance.

*

COMMENTS

Testpits put down under our direction encountered surface water inflow

which created difficulties in maintaining the testpits open and advancing

to the full capability of -the backhoe. Establishing an accurate

groundwater level was difficult, however, at this time of year it is

anticipated to be close to existing grade.

Page 4: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

Ref. Ho. 93/01/3000 -3- Date: February 15, 1993

The results of this investigation indicate that underlying the organic

deposits* soils are predominantly granular in nature and saturated at the

tine of this investigation. These materials can probably be successfully

excavated using a dragline operation to the depth at which bedrock was

encountered.

We trust that the factual data contained in this report and brief comments

a/e sufficient for your present requirements. We look forward to serving

you further on this project as your future requirements develop. Please do

not hesitate to contact the undersigned.

Yours very truly,

HERLEZ ENGINEERING LTD.

M. A. Merleau, P. Eng.

HAM/cl

End.

Page 5: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

.ef. No. 93/01/3000 TESTPIT DATA SHEETS Page l of 2

Testpit No. l Grade 1034.0

O - 1.5' SANDY ORGANICs - black 1.5 - 3.0 Fine and medium SAND - coarse layer at bedrock surface

(see Grainsize No. 1)3.0 BEDROCK - sloping to 5' depth at north end of testpit

End of Testpit

Testpit No. 2 Grade 1034.0

. O - 1.0* SANDY ORGANICS - black 1.0 - 13.0 FINE SANDS - some silt, gravel, cobble and occasional

boulder, wet below 3* 13.0 BEDROCK

End of Testpit

Testpit No. 3 Grade 1035.0

O - 1.0' SANDY ORGANICS - black 1.0 - 10.0 Fine and medium SANDS - some silt, gravel and occasional

cobble 10.0 End of Testpit due to rapid cave-in

Testpit No. 4 Grade 1035.4

O - 2.0' SANDY ORGANICS - black 2.0 - 15.0 SANDS - medium and fine sands, trace of silt

(see Grainsize No. 2) 15.0 End of Testpit - No Refusal

Testpit No. 5 Grade 1038.0

0-2.0' SANDY ORGANICS - black 2.0 - 15.0 SANDS - brown sands with gravel some silt

(see Grainsize No. 3) 15.0 End of Testpit - No Refusal

Testpit No. 6 Grade 1034.8

O - 3.0' SANDY ORGANICS - black3.0 -11.0 SANDS

11.0 End of Testpit - No Refusal

Page 6: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

ef. No. 93/01/3000 TESTPIT DATA SHEETS Page 2 of 2

Testpit No. 7 Grade 1033.7

0-2.0' SANDY ORGANICS - black 2.0 - 8.0 SANDS

8.0 BEDROCKEnd of Testpit

Testpit No. 8 Grade 1036.3

O - 3.0' SANDY ORGANICS - black 3.0 -*9.0 SANDS

9.0 BEDROCKEnd of Testpit

^

Testpit No. 9 Grade 1036.0

O - 7.0* ORGANICS - black7.0 - 12.0 SAND ft SILT (see Grainsize No. A)

12.0 End of Testpit - No Refusal

Testpit No. 10 Grade 1039.0

O - 4.0' ORGANICS - black 4.0 - 8.0 SANDS

8.0 BEDROCKEnd of Testpit

Page 7: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

rLIST OF ABBREmTlOHS * DESOmTIOH OF TERMS

The abbreviations and tens commonly employed on the borehole logs, figures and la the report ara aa follows:

on the

1. SAMPLE TTPES

AS Auger SamplesCS Chunk SampleDO Drive OpenDS Denison Type SampleFS Foil SamplePH Sampler advanced by

hydraulic pressure PH Soapier advanced by

manual pressure BC Rock Core with Size and

Percentage of Recovery ST Slotted Tube TO Thin-walled. Open TP Thin-walled. Piston WU Sampler advanced by

static weight US Wash Sample

2. PENETRATION RESISTANCE/"!!''

Dynamic COM Penetration Resistance:

A continuous profile showing the number of blows for each foot of penetration of a 2" diameter 900 point cone driven by a 140-pound hammer falling 30 inches. Plotted aa e a e *

Standard Penetration Resistance or "N" Value:

The number of blowa of a 140 pound falling 30 Inches required to sdvance a 2 inch O.D. drive open sampler one foot into undisturbed soil. Plotted as "O*

3. SOIL DESCRIPTION

a) Cohesionless Soils:

"M" (blows/ft) Relative Density

O to 44 to 1010 to 3030 to 50over 50

b) Cohesive Soils:

tlndrslned Shear Strength k.e.f.

Less than 0.25 0.25 to 0.50 0.50 to 1.0 1.0 to 2.0 2.0 to 4.0 over 4.0

very la loose compact dense very dense

Consistency

very softsoftfirmstiffvery stiffhard

c) Method of Determination of Undrained Shear Strength of Cohesive Soils:

*3.2 - Field vane test in borehole.

The number denotea the sensitivity to remoulding.

A- Laboratory Vane Test

Q- Compression test in laboratory.

For a saturated cohesive soil the undralned shear strength Is taken as one-half of the undralned compressive strength.

4. TERH1MOLOCT

Terminology used for describing soil strsta Is based on the proportion of individual particle slses present!

Trace, or occasional Less than 10ZSome lOto 20ZWith 20 to 30ZAdjective (e.g. silty or sandy) M to 40ZAnd (e.g. sand and gravel) 40 to 60S

5. LABORATORY TESTS

P - Standard Proctor Test A - Atterberg Limit Test

GS-- taralirSlie WstrlWtioa- H - Hydrometer Analysis C - Consolidation Test

MERLEX ENGINEERING LTD.

Page 8: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

ENC

LOSU

RE

fc.

TESTPIT

LOCA

TION

PLA

NKyanite

Proj

ect

- Butler/Antoine

MER

LEX

EN

GIN

EE

RIN

G L

TD.

CO

MW

niM

OIO

ttC

MM

CM

IM

Wf f

M

Page 9: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

't

100

90 ao TO

QI 6

0

i

SO

fi 40

1 3

0

20 10 0

——

——

——

——

——

——

——

——

s

\ "

' ' ' '

GRAI

N SI

ZE D

ISTR

iajJT

ION

\ '

\ v'

0 R

A V

E L

CO

AR

SE

F

INE

fZfe

V

IV

fV

V

H

T s\ \

1

\ Ss \\ \

1

k

*v \\

1 1

1

\\,

100

10

PHOJ

ECTi

Kya

nite

Pro

ject

LOCA

TIO

N'

Bu

tle

r -

Anto

ine

BOR

EHO

LE

N* -

SAM

PLE

N*'

DE

PTH*

EL

EVAT

ION

.

HC

OAR

SE

1 M

EDA

ND

JM

l F

INE

OUR

LT ft

CLA

Y

l*rifD

t0

*-

BB

RB

CM

rt

V

3W

TB

nC

JV

W

p —

CLAs

smam

aN

STS00

0

irm

I^H

W*

4 8

10

16

20

30 4

O

SO 6

0 KX

) M

O

200

US.

ST

ANDA

RD

S lev

* SI

ZES

J a N^

B s

^ s*5— -^

l

— —

--^

~T-

iTP

1

^

1

COEF

FtCi

ENT

OF

COEF

FICI

ENT

OF

ClaM

iftao

f*O

NTA

RIO

1

1011

5— — ,i— "x -^

1"—

i •~.—

- * x — .

\

\ tx.

•^-^

.

i i

\ \\ \

\^

" ' .

-* —

— --

T \ >

Gram

Ste

In M

llllm

efcr

v '

UN

FDR

MTT

Yi

CU

RM

OU

RC

'

30

Of

SO

I

PRO

VING

!*1

stlL

txjT

npta

and

Gr

oup

Sym

bols

di

STAN

DAR

D S

PE

CIF

ICA

TIO

N

SUBG

RAD

E M

ATE

RIA

L

a

.001

PLAS

TIC

PR

OPC

HTES

UO

UO

U

MIT

%

'

PLA

STC

LMC

T ^

* P

LAS

DC

mr

K3E

X %

*

MO

ISTU

RE

CONT

ENT

%

"i

MER

LEX

EN

GIN

EE

RIN

G L

TD.

Page 10: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

* *

100

•0 so TO

9 6

0

f

90

|

SO to 10 0 —

——

——

——

——

——

——

——

——

——

——

——

t S

A.

. X

\

s ,. '^

,

" ''\-

G

RAJN

'.SIZ

E bl

S

1 G

RAVE

L|

CO

AR

SE

S1 r V4 \

lZ i \

FINE

"X,.;"

.;

,

k Vfi*

CO

ARSE

ueoii

y i

PINE

' *

" l1

V

V V

4

B 10

M

20

SO

40

9060

10

0 14

0

S s s s s \\

ss

s

100

10

PROJ

ECT!

K

yani

te P

roje

ct

LOCA

TION

' Bu

tler

- A

ntoi

ne

BORE

HOLE

N*

' SA

MPL

E N

*i

DEPT

H-

ELEV

ATIO

N i

-*s^

— 'N

TP

4

^,

1

COEF

FICI

ENT

OF

COEF

FICI

ENT

OF

V ^N ^

^ *.V

i \ •*

Grain

UMFC

RM

CURN

ATiN S **^ "**

,

Sb m JN

\\ I\

"\ **,

\ 1

— —

— ,\ \ *, \ \

k

\*

- .

* h

Milli

met

er*

' ft

E-

'u. v

vT

**

' b

*

- SI

LT m

CLA

Y Mf*

OUR

D

ML

MM

tW|

x 7

CLA

SM

nC•T

ION

ST

S1

000

TH

200

Ut.

STA

ND

AR

D

SIC

VC

S

IZD

T m

H•M

^P^

Clas

slfico

tton

of S

amp*

and

Gr

oup

Sym

bol t

ON

TAR

IO P

RO

VIN

CIA

L ST

AND

ARD

SP

EC

IFIC

ATI

ON

S

1010

GR

ANU

LAR

"B

" TY

PE

I

ja

.001

PLAS

TB

PRO

PERT

CS

UO

UO

LI

MIT

%

*

PLA

SnC

LSM

T ^ '

pLAs

ncm

r SC

EX

* -

MO

ISTU

RE

CONT

ENT

% '

i to

MER

LEX

ENG

INEE

RIN

G L

TD.

Page 11: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

o ! o lO iro

wt3 i

o

S K

.i

f

;. ^

u .^ r

an .5*

tiJ *i* -j ^

-

-

^

"^ ^—

fc*-^"

0 0 0 Ot

JS•"

oa

;

fx

X4 —— . —— . ———

xx

Xx

x

o o o o

fiU|9SOd |l

JJs

/|7

X

-

— - . .. — . ^-.. .O 0 O C W N —

naiad

100 10

PROJECT. Kyanite Project LOCATION. Butler - Antoine

BOREHOLE N* ' SAMPLE M*.DEPTH-

ELEVATION '

ENCLOSURE Mi.

SI

- g o

ozGC Ul UlZozLUXLJU

CE LU

Page 12: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

100

•0 so TO

9 S

O

9

80

S 40

f

mn

CO 10 0 —

——

——

——

——

——

——

——

——

——

——

——

i *

' *

"4RA

JN S

IZE

DIST

RBUn

ON

* \

' ' 'J

A

1 C

OA

RS

E

1 F

INE

(C

OAR

SE

1 M

ED

IUM

1

FIN

Es-

ztkz-

AT

r V

Iff

S*

4 s

10

is 20

MO

10

PROJ

ECT-

K

yanite

Pro

ject

LO

CATI

ON i

Butler

- A

ntoi

ne

BORE

HOLE

N*i

SA

MPL

E N

*'

DEPT

H*

ELEV

ATIO

N i

i

1

COEF

FICI

ENT

OF

COEF

FICI

ENT

OF

ai^

K) H40 ^F

WI^B

^

1

SILT

S)

C

LAY

IW

*

\ i

OUM

Hs

^PER

^l^lC

s? ^s

P tj*m

* w

.'"^

WD

10

1.

CLA

SW

riCA

TlO

N

SY

tlJOQ.

rtH

H^W

56

0

KX

) M

O

20

0

Ut.

S

TAN

DA

RD

S

lfV

t S

IZn

P 9

i i

A

Grain

Ste

m M

llllm

rtw*

'

OM

MV

TUIC

'

!r l

CloM

lftaon

on o

f Son

npw

oftd

Gro

up S

ymbo

ls

PLAS

TIC

PRO

PERT

CS

UO

UO

LI

MIT

%

'

PLA

Snc

UM

T

*

* PL

ASnC

fTY

SOEX

%

*

MO

ISTU

RE C

ONT

ENT

%

*1

MER

LEX

ENG

INEE

RIN

G L

TD.

Page 13: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

IS

\. l 1/4 d .

V. P4

A.(*2-

^"-40

Page 14: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

\\

o) vn0\

Page 15: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.
Page 16: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

to

vn

\

Page 17: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

\

(A i i

iiid

S

"O

fr

i/i R ri! e T)

IA

.^cff t

*Jl r

O

BU

TL

BG

•^^

Q

t

Page 18: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

3!

/s

Page 19: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

MERLEX ENGINEERING LTD.CONSULTING GEOTECHNICAL ENGINEERS

*

INVOICEftef. No. 93/01/3000 Inv. MD. 93-OOB February 26, 1993

R. M. Blais d Associates P.O. Box 237 Pinewood Park Drive Nbrth Bay, Ontario P1B BH2

Attention; Mr. R. M. Blais. P. Enq.

f For professional services rendered in connection with the geotechnical site assessment for Butler/Antoine Kyanite Project, Antoine Township. OUR G.S.T. R1O3642344

ENGINEERING:

a. Senior Engineer - involved in sitevisit and testpit excavation, meetings,and preparation of report.8.O hr at * llO.OO/hr * 88O.OO

b. Mileage - senior engineer's travel to and from site. 16O.O km at * 0.30/km 48.OO

* 928.00

LABORATORY TESTING PROGRAM:

a. Grain Size Analysis4 at * 55.00 each 22O.OO

b. Natural Moisture Contents4 at * 4.50 each 18.0O

238.00

* 1,166.00

G.S.T. 81.62

TOTAL ATONT OF INVOICE * 1,247.62

Terms: Invoices are due when rendered. 4 Interest is charged at Z/, per month after. 3O days.

120 PROGRESS COURT * P.O. BOX 885 * NORTH BAY. ONTARIO. PI B 8K1 * TEL: (705) 476-2550 * FAX: (70S) 47641882

Page 20: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

Blais ft Associates Umited Civil and Mining Engineers

PINEWOOD PARK DRIVE P.O. BOX 237

NORTH BAY. ONTARIO P1B8H2

Office: 705-474-4110 Home: 705-474-4793

July 21, 1992

Kyanite Mining CorporationP.O. Box 486Dillwyn, Virginia, U.S.A.23936

RE: INVOICE JULY 1992BUTLER - ANTOINE KYANITE PROJECT ASSESSMENT WORK - Province of Ontario

COMSULTTMC-gTBT.P SUPERVISION R.M. Blais, P.Eng. June 10/92 - June 30/92

10 days e $350.00

Supply driller-operator - Dave Lott

11 days @ 150.00

GST 7%

$3,500.00

1.650.00$5,150.00

360.50

$5,510.50

R.M. Blais 6 Assoc. Ltd.

Truck 4x4 Chev-10 days @ $50.00 $ 500.00Chainsaw - 11 days @ S20.00 220.00Drill bits 6 drill steel 300.00

$1,020.00 GST 7% 71.40

$1,091.40 $1,091.40

Page 21: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

- 2 -

Bay Blasting Ltd.Powder and capsRental lead wires, blastingMachine b Meter $l,119.19 $l,ll9.19

North Bay Rent-All185 CFM Compressor150 feet hose, oiler2 Jack Hammer 419.75 419.75

$8 / 140.84

Page 22: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

BelatechINDUSTRIES LTD.

EXPLORATION t MIMES DIVISION

1364 FrankHn StnMtNorth Bay, Ontario

P1B2M3Phone: BIN: 4744077 or R*K 4724790

INVOICE

Date:

To:*

RE:

July 28, 1992

R.M. Blab A Associates Ltd. Box 237, North Bay, Ontario P1B8H2

STRIPPING, DRILLING A BLASTING OPERATIONS KYANITE PROPERTY

June 11/92

June 15/92

June 16/92

June 17/92

June 18/92

MOB TO SITE Roads to Pit #1 - stripping Backhoe 10 hrs @ 530.00 Operator 10 hrs @ 517.00 Service Track

Move Compressor to site Stripping/Drilling Backhoe 10 hrs @ 530.00 Operator 10 hrs @ 517.00 Service Track

Stripping/Drilling Backhoe 11 hrs @ 530.00 Operator 11 hrs @ Si 7.00Service Truck

DrillingBackhoe H [email protected] Operator 11 hrs @ Si 7.00 Service Track

DrillingBackhoe 10 hrs @ 530.00 Operator 10 hrs @ 517.00 Service Track

5300.00170.0050.00

5520.00

5300.00170.0050.00

520.00

330.00187.0050.00

567.00

330.00187.0050.00

567.00

.5300.00170.0050.00

5520.00

520.00

567.00

567.00

520.00 520.00

Page 23: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

June 19/92

June 20/92

7une 22/92

June 23/92

June 24/92

June 25/92

EXPENSES

Test Pits tailings Area Backhoe 10 hrs @ (30.00 Operator 10 hrs @ S17.00 Service Track

Test Pits - tailings area Backhoe 8 hn @ 530.00 Operator 8 hn @ SI 7.00 Service Track

Drilling - Start blasting Backhoe H [email protected] Operator 11 hrs @ (17.00 Service Track

Loading/Blasting Backhoe 5 hn @ (30.00 Blaster 10 hrs @ (17.00 Service Track

Loading - Blasting Backhoe 4 hn @ (30.00 Blaster l hn @ (17.00 Service Track

Finish Blasting Load 45 gallon drums Haul to Yard Backhoe 6 hrs @ (30.00 Blaster 8 hrs @ (17.00 Service Track

(300.00170.0050.00

520.00

(240.00136.0050.00

426.00

330.00187.0050.00

567.00

150.00170.0050.00

370.00

120.00136.0050.00

306.00

(180.00136.0050.00

366.00

Sub-Total of Time ft Equipment

Fuel - Backhoe ft Service Track Meal- 11 days (10.00 Float Charges - 45 gallon drums Float Charges - Backhoe / Mobilize Float Charges - Backhoe / Demobilize

(361.55 110.00 150.00 192.60 192.60

520.00

426.00

567.00

370.00

306.00

366.00

(5.249.00

Sub - total of Expenses (1,006.75

Page 24: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

INVOICE SUMMARY

FEES FOR LABOUR A EQUIPMENT TO GAT. applicable

Total Fees

EXPENSES AS LISTED ABOVE 7* G.S.T. applicable

* *

Total Expenses

55,249.00367.43

S5.616.43

J l,006.75 70.47

51.077.22

J5.616.43

Sl.077.22

TOTAL INVOICE DUE t6.693.6S

' Respectfully

BB/lf

Page 25: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

GEORGE'S SSSSSS&EQUIBMENT RENTAL 6 EXCAVATING

' . R.R. 81. ^CALLANDER. ONTARIO POH IHO

(705)474-1959

-*

Page 26: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

CONSTRUCTION . fi. LF- QINQ LTD.

P.O. BOX 1153NORTH BAY. ONTARIO RIB 8K4 TELEPHONE (70S) 47*2513 FACSMLE (70S) 47*2286

INVOICE

NO. 06563

rBelatech Petroleum Products 1354 Franklin Street North Bay, Ontario P1B 2M3

MVOCEOME

January 2 2. 1993OURORDBtMX

YOUR ORDER MX

On Receipt

G. ChadbournPPO.( B COL

To invoice for equipment rental without operator ' bill 09519:

16 hours 4 hours

G.S.T.

TOTAL DUE THIS INVOICE

30.0065.00

5480.00260.00

5740.0051.80

$791.80

G.S.T.ffl100672880

Page 27: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

•'•?.- v

BBUMAN LEASING LTD.uttuoetrruL nwcrmi seimce

• SOD •BUCKS

P.O. BOX 1153'NORTH BAY. ONTARIO RIB 8K4

PHONE: (705) 476-2513

FOB TELEPHONE. HYDRO AND OA* UNES

- 09519

Page 28: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

T/fo/y *y. ^

101112l PI l

•o wu

Page 29: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

6ELATECHPETROLEUM PRODUCTS

k 1364 FRANKLIN STREET NORTH BAY, ONTARIO. Pi B 2M3

BUS: (706) 494-9660 * FAX: (705) 484-0662TEXACO

Ouali:y Lobdcanib

INVOICE

1164

SOLD TO: ^~

w* 'li) f*

Amount — Code No.,

ChoquoKo..6*2-

DATE SHHfEDVIA PROV. SALES TAX UC. NO. YOUR ORDER NO. TERMS

QUANTITY DESCRIPTION AMOUNT

r

W

G.S.T. f 123448100

TERMS: NET 30 DAYS UNLESS OTHERWISE STATED. CARRYING CHARGES AT 2* PER MONTH WILL BE CHARGED ON ALL OVERDUE ACCOUNTS. MINIMUM INTEREST CHARGE OF 96.00 PER MONTH.

(A DJV. OF BELATECH INDUSTRIES LTD.)

SUBTOTAL

G.S.T.

P.S.T.

TOTAL

Page 30: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

Ministry ofNorthern Development

1 MinesOntario

Report of Work Conducted After Recording Claim -

Mining Act

Transaction Number

. OOPPersonal information collected on this form is obtained under the authority of the Mining Act. This information win be used for correspondence. Questions about this collection should be directed to the Provincial (Manager. Mining Lands. Ministry of Northern Development and Mines, Fourth Floor. 159 Cedar Street, Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.

Instructions: - Please type or print and submit in dupli- Refer to the Mining Act and Regulation;

Recorder.- A separate copy of this form must be cc 57o —- Technical reports and maps must accompany this form in duplicate. 300- A sketch, showing the claims the work is assigned to. must accompany this form.

983 - - •4-74—<tJ/o

Work Performed (Check One Work Group Only)

Physical Work. Including Drilling

Rehabilitation RECORDED

Other Authorized Work •N 18 ONLY OCT141993Assays

Assignment from Reserve

Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)

(attach a schedule H necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.

Recorded Hofctocor Agent (Signature)

Certification of Work Reportcertify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after

Ms completion and annexed report is true.Natnt and Address of PBfson cjennymo

T'O-

Ifoo PiKjeuJtco

For Office Use OnlyTotal Value Cr. Recorded Date Recorded

RECEIVEDDeemeo Approval Date

ar\, \ ®

(XM1 (O3W1)

Page 31: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

1

Jlli

iif !

|!P

if1

i1

ri IPu)Co

^

tAVXJ^ VA)-G

5

V\

05IR—j

v\

8li!6

.^

r{vn -jw *p-

^AV)J^ O-4 (T*

^^^

\jjtri

SuJ-0

^

^03N UJ-O

Si

y\UOt1G^ e

^i**

(Ai

**M|l!iis ?f

IIIf*iCO WIr* 2.3S3 1

efi ^

0 lV

00*iJT

\.^O0

Vftfr

1.^ *

V^ 0o

io •^VK)

*

CX) OJ-^

, f' r

•^.00 u) ^

.

d(^ s^4N

-. . -,i~

^.foUJ^

oauo*

\TOK

g S*sff*

P

Qo|5

sil*

*00

ZM

^^

KCP

l \ 34

VP

V.

CXiv^^

UJV**-f^U3 ^ ^vA

N

1^\ ^l^

'k)

•^OoVXJ^

•*v.

OB\jj -^

"V.

C*vw-k

W*OgoS-— * * 3 S.

iff•io?&Z*9

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:

1. D Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. D Credits are to be cut back as priorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Examples of benefldal interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.

Note 2: H work has been performed on patented or leased land, please complete the following:

l certify that the recorded holder had a beneficial interest in the patented or leased land at the time the work was performed.

Signature

Page 32: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

-A-J-j0)

O CD^

SP

O

crCP

oCO

0 CO Pin00

O00

N

CO

So

o

tV1

rt1J b

8

J3

b0

wO6"0

-

(T

8ft

ii

88

*

~* '

88

1

*

fO O

Oo so0.

oc

T0 0,

0

.-

1oc

S0.

00

8oC

o"

q00

olHffi 2'

fill

If

3r

N)v

ofill

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (s) one of the following:1. D Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. D Credits are to be cut back as priorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Examples of benefldal Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.

Note 2: If work has been performed on patented or leased land, please complete the following:

l certify that the recorded holder had a beneficial interest in the patented or leased land at the time the work was performed

Signature Date

Page 33: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

Ontario

Ministry ofNorthern Development--4 Mines

Ministere du Developpement du Nord et des mines

Statement of Costs for Assessment Creditttat des coQts aux fins du credit devaluation

Mining Act/Loi sur les mines

Transaction No./N* de transaction

Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining daim(s). Questions about this collection should be directed to the Provincial Manager. Minings Lands. Ministry of Northern Development and Mines. 4th Floor. 159 Cedar Street. Sudbury. Ontario P3E 6A5. telephone (705) 670-7264.

Les renseignements personnels contemn dans la presente formule sort recueiWs en vertu de la Lot sur le* mines et serviront a tenir a jour un registre des concessions mrnieres. Adresser toute quesiton sur la coHece de ces renseignements au chef provincial des terrains miniers. ministere du Developpement du Nord et des Mines. 159. rue Cedar. 4e etaga. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.

1. Direct Costs/CoOts directs

Type

WagesSalalres

Contractor's and Consultant's Fee* Drolls da ['entrepreneur et d* I'expert-

SuppSas Used) FownttunM

Equipment••i——*—*fwnm Location d*

Description

Labour Main-d'oeuvreField Supervision Supervision sur le terrain

Type

Type PowcMEe,GOP5

Type

Amount Montant

4-,-lDl,

4,854

SS4D-™4241-^(SIMS

Total Direct Costs Total des couts directs

Totals Total global

23/375

2. Indirect Costs/CoOts Indlrects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissiWes en tant que travaux d'evaluation.

Type

Transportation Transport

Food and LodgingNourrMureethttwrgement .Mobinzatlon and

HpbmMtton et

Description

Type

Amount Montant

Sub Total of Indirect Costs Total partM des coots Indirects

Amount ABowabta (not greater than 20* of Direct Costs) Montant admissible (n'excedant pas 20 H des couts directs)Total Valus of Assessment Cradi Vatour totals du cnWN (Total of Db*ct and AtowaM* d'evshiatlonktdraet CMtel (ToM dM eodte dracta

Totals Total global

53^535-

Ale**

24,oto•lin

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.

Note: Le titutaire enregistre sera tenu de verifier les depenses dernandees dans le present etat des couts dans les 30 jours suivant une demande a cet effet. Si la verification n'est pas eftectuee. le ministre peut rejeter tout ou une partie des travaux d'evaluation presentes.

FlUng Discounts Remises pour depot

1. Work filed within two years of completion is claimed at 1OXWb of the above Total Value of Assessment Credit.

1. Les travaux deposes dans les deux arts suivant tour achevement sort rembourses a 100 Sfc de la vateur Male susmentionnee du a*# devaluation.

2. Work filed three, four or five years atter completion is claimed at SOto of the above Total Value of Assessment Credit See calculations below:

Total Value of Assessment Credit Total Assessment Claimedx 0.50 -

2. Les travaux deposes trois. quatre ou cinq arts apres tour achevement sont rembourses a 50 46 de la vateur totale du credit d'evaluation susmentionne. Voir tes calaite ckJessous.

Vateur totale du ere* devaluationx 0.50 -

Evaluation totale demandee

Certification Verifying Statement of Costs Attestation de I'etat des coots

l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

J'atteste par la presente:quo les montants indiques sont le plus exact possible et que ces depenses cot ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.

that(Recorded Holder. Agent, l

to make this certification

i in Company)l am authorized Et qu'a tilre deH mm uv _________________ ie suis autorise

(mu4aire •nregnM. repreMrtant. poste occupe dans la compegnie)

a faire cette attestation.

0?12 (OV91I

:- '//74Nota : Dans cette lormufe. kxsqu'M design* des personnes. le masculin est utilise au sens neutre.

Page 34: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

IIIIIIIIMUI1UUTOWNSHIPS. BA3t LINES. ETC.

IBBV TWRWell reftt****

LOTS. MINING CUAIMS. PARCELS. ETC UNSURVEYED'LIMQS - - --

LOT LINESPARCEL BOUNOAfiYMINING CLAIMS,iTC

RAILWAY AND RlfBMT OF WAY UTILITY LINES

1 NON-PERENNIALFLOODING OR FLOODING RIGHTSSUBDIVISION OR (COMPOSITE PLANRESERVATIONSORIGINAL SHOREL-rtlEMARSH OR MUSKBE tZ3T^MINES '.TRAVERSE MONUMENT

*t••l******** *'••••If(MMBridflO

. 0*llr**4

•ulMi*t.

II**•M* ••lli*u roll*Cliff, PI t, PI l c

Coatoart

4*****l****

li** ri***•M

•^•idbr *Rotorvolr L JJ Rivor, ttroom.Coool

DISPOSmON OF CROWN LANDSControl Point!tf*rt***t*l

V*MI**I

Cuivort Poll*

IK* ri**'

- -S."^V-

Mr**tiM *l II**

KochW**ill***l i MtOOl s**

OF DOCUMIENTPATENT. SURFACK tr MINING RIGHTS

" .SURFACE EIGHTS ONLY . MINING WIGHTS ONLY —

LEASE. SURFACE * MINING RIGHTS" . SURFACE WIGHTS ONLY__——~. " , MINING RlfDHTS ONLY

LICENCE OF occummoN

Soot novation|l*k* *l***M***t

Fonco,Notf9*i Moll

Jowor WonvmlMlon Lino

Floodod Land teckNorth or Swamp *^* Mott Ir Mlno Hood Promo m Outcrop cC^v

ORDfR-IN COUNCIL ......__...........™._....—. OCRESERVATION CANCELLED

Utility Polo* WMrf , Oook, Pior W*odod Arco SAND ft GRAVEL.

NOT!: MININO MIOHW IN PARCCLt *AT|NTCO PfHOM TO MAY O.101 a virrvr M* OWIOINAL PATCNTM ov THOLAMOO ACT mJl e 1070. CHAP MO, 0*C 03. OUMIC 1

AREAS WITHDRAWN FROM DISPOSITION

M.R.O. - MINING RIGHTS ONLYI.RX). - SURFACE RIGHTS ONLYM.+ S. - MINING AND SURFACE RIGHTS

SCALE 1:20 000

SAND AND 8RAVEL

OMAVKL .*—-*—

MTC OBAV*VWT4C-ll

M.T.O. OMVfU fit 4C-00

l^-r-X U

THE IHFOHMoi THAT APPEARS ON TftfjB MAP HAS BEEN COMPILED FROM VAPVOUSAMD ACCUfUCT JB NOT GUARANTEES THOSE VMSHING TO MG CLAIMS SHOULD CON SULT WITH THE QJBMItlG RECORDER. MBOIKIWY OF NORTHERN VEVELOP

Ci for \La*t

DISTRICTADMIKUBTBATIVf

SUDBURYUNO TITUS.

NIP1SSIN6QIVISION

MTuiiatiyot

Page 35: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

T 56639S 323928

J STORAGE X AREA

S 323928S 345818

T 56638S 323927 MILL AREA

NFW 36' 0 CULVERT-S 323927S 345817

TAILINGS POND

CAPACITY 700,000 f1 J

CROCAN

W/LCRUSHING PLANT

( PORTABL

NEW 24' 0 r.iP-

PUMPHOUSE

T 56638S323927

S 323927 xS3458I7

T 56637S 323926

PONDvif/l 1021'

NFW 20 0CIP-

S 323926S 345816

"T

NOTESSEE DWG 07 96 ft DWG ()8 93

2 SPILLWAY - SFE DWG 08-93

o o o

o8

*l SOO N ——

21 000 N --

?O t)OO N

SITE PLANSHOWING

MINE AND MILL SITE TAILINGS POND AREA

BUTLER\ ANTOINE KYANITE PROJECT

TOWNSHIPS Oh ANTOINE a BUTLER

SUDBURY MINING DIVISION PROVINCE OF ONTARIO

FOR

KYANITE MINING CORPORATION

oo o

DRAWN

T~M BLAIS ft ASSOCIATES^LTD - Norlh Bay . Ontario~rT7otf~f!5' Tfe'^rT7 '' TDWG. oi-9i

Page 36: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

DWG No G-01

1 ;t - '

KYANITE CLAIM BOUNDARY

M li]liwily

i)'i)v*l logging r ood

•^ 5

Ontario

Ministry of Natural

220

•••Ml MIM

* itMOTIt

North American DMum 1t?7

20 17 6500 51500 t it ••l

AM

(i*) ' W

OrM m(*rvM 1000 nwKMl *9*na ana •iplanaMry noM* oM*in*M* from •uMc torvic* C*ntf* Umt*Ky ft* Natural

Ouaan * *ar* T

ITt to if 4*00 M*oo

*0 If •MX) ftlftOO

?0 17 MOO fti40O

Page 37: GEOTECH SITE ASSESSMENT · very soft soft firm stiff very stiff hard c) Method of Determination of Undrained Shear Strength of Cohesive Soils: *3.2 - Field vane test in borehole.

i

-ill lOSWOOli? 63 bit)/ANIi'INI

KYANITE MININGR M Blais H, Associates Ltd

..- ..North Bay Ontario

ANTOINE TOWNSHIPPROVINCE OF ONTARIO

DRAWN BY : RJU ^^ APPROVED BY "TMBSCALE

HAl 1000

W O ') l?

FILE NODRAWING NO