Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

23
Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009

Transcript of Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

Page 1: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

Georgia Infrastructure Transformation (GAIT) 2010

Service Levels and Operational Metrics

July 2009

Page 2: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

2

GAIT Initiative Milestones2009 2010

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

What to expect 7/1 8/31: July• Asset refresh planning continues, pilots begin• Server and Storage Consolidation Design• Draft Disaster Recovery Plans• Point of Service Surveys (Results)• Initial MNS Management Reports available• Continued DDM Deployment

August• Change Management Training • Initial MNS SLA Performance Reports available• Online Service Request Deployment via Maximo• Server and Storage Consolidation Planning • True-up Activity• Server Tools Schedule Development and Pilot • Service Catalog Improvements

4/1: IBM Commencement• EUC Service Catalog implemented• GETS Portal activated• Personnel transitioned• Initiated BAU Unless Strategy• Solution Request Process introduced• Baseline Customer Satisfaction Survey• Invoices available online

5/1 – AT&T Commencement• Service Desk - Regional Operation Center Support• Network Mgmt moved to Raleigh• Voice/Data Service Catalog implemented

Begin Stand-up of Steady State Processes Process/Tool Maturation and Continuous Improvement

Chargeback Implementation

Begin Server & Storage Consolidation

Strategic Technology Plan

Agreement to Information Security Control Document

DOR Print Shop Move

MNS Asset Inventory Complete

Initial MNS SLA Performance Reports Available

6/1 – Consolidated Service Desk “go live”•Point of Service Surveys (Service Desk)•Service Catalog “go live” (ordering) •EUC Services Transformation •Asset Inventory Continued•GETS Print Shop Move

Page 3: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

3

Agenda

• Introduction to Service Levels▪ What are they?

▪ Why are they important?

• SLA Reporting and Contract Documents

• SLAs for Key Areas▪ Service Desk

▪ End User Computing

• Consolidated Service Desk Update▪ Metrics

• Local and Network Printing Strategy

• Appendix▪ SLA Terminology

Page 4: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

4

What are the three types of Service Levels?

Critical Measurements• Essential to the welfare of State of Georgia• Financial Service Level Credits are due for Service Level Default • Represented by an Expected and a Minimum Level

Key Measurements• Services are meaningful to State of Georgia business• Financial Service Level Credits NOT DUE for failure to attain• May be candidates for Critical Service Levels• Same format (Expected / Minimum) as Critical Service Level

Critical Deliverables (One time)• Usually one-time deliverables such as: service management

manuals, disaster recovery plans and technology plans

Page 5: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

5

Communication Management

Performance Management

Knowledge Management

Data Management

(Oversight)

SLA & metrics handling considerations The broader picture

Sharing information with the world

•SLA reporting communication strategy & framework•Report content, design, creation, approval, delivery, distribution sequence

Socializing SLAs in our environment

•SDO meetings•Online•Webinars / training•Agency Head mtgs•Agency Advisory Council meetings

Managing behaviors

•SLA methodology - Flexibility of SLAs - Adding SLAs - Continuous improvement•Credits & earnback•SP variable compensation

Managing the data

Oversight•Data validation•Tracking•Data access•Data query

Three metrics types

Operational•No minimum or expected values•Leading – daily/weekly/monthly•Some required by contract

Key SLAs•Minimum and expected values•No financial penalties

Critical SLAs•Minimum and expected values•Financial penalties

Our focus today

Page 6: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

6

Service Level Management and Reporting Details

Defined measurements and tools for Service Levels

Publish Service Level reports in the ESP Web Portal

Financial credits for non-performance or poor performance

Contract calls for continuous improvement annually

Improved visibility for all services throughout the enterprise with standardized reporting tools

Page 7: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

7

Service Level AgreementsService Desk

End User Computing

Page 8: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

88

Service Desk SLAs

Service Desk Services

Designation SLA Time Measurement Expected Minimum

*First Call Problem Resolution ***Resolved during first phone call 80% 75%

*Percentage of Problems Resolved ***48 hour Resolution 90% 85%

*Call Abandoned Not Applicable No more than 6% No more than 8%

**Speed to Answer 60 seconds 90% 85%

*Critical Measurement**Key Measurement***Calls measured are those which are considered resolvable at the Service Desk

Page 9: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

99

End User Computing SLAs

End User Computing Services

Designation SLA Time Measurement Expected Minimum

Break/Fix  

Break/Fix Time to Respond Within 30 minutes during business hours 90% 85%

Tier 1 VIP 4 hour Resolution 90% 85%

Tier 2 VIP 8 hour Resolution 90% 85%

Tier 3/Campus(350 assets within a 15 mile radius*) Next Business Day Resolution 90% 85%

Tier 4/Remote (all other locations*) 3 Business Day Resolution 90% 85%

Service Request  

IMACs 5 Business Day Completion** 95% 90%

•Based upon RFP data, subject to change after the completion of the wall-to-wall inventory and True Up**Excludes new equipment orders that may take 2 – 3 weeks

Page 10: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

10

Consolidated Service Desk Status Update

Page 11: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

11

Speed to Answer Comparison

% Answered inless than 60 s

Target: 90%

Min Target: 85%

Jun-0

1Ju

n-0

2Ju

n-0

3Ju

n-0

4Ju

n-0

5Ju

n-0

6Ju

n-0

7Ju

n-0

8Ju

n-0

9Ju

n-1

0Ju

n-1

1Ju

n-1

2Ju

n-1

3Ju

n-1

4Ju

n-1

5Ju

n-1

6Ju

n-1

7Ju

n-1

8Ju

n-1

9Ju

n-2

0Ju

n-2

1Ju

n-2

2Ju

n-2

3Ju

n-2

4Ju

n-2

5Ju

n-2

6Ju

n-2

7Ju

n-2

8Ju

n-2

9Ju

n-3

0Ju

l-01

Jul-

02

Jul-

03

Jul-

04

Jul-

05

Jul-

06

Jul-

07

Jul-

08

Jul-

09

Jul-

10

50

60

70

80

90

100%

After Improvement

% of calls answered in less than 60 seconds (daily)

Process much more stable after improvement

Page 12: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

12

Metric Attainment Strategy

Dennis Quinto / Alisa Bettis Raise awareness Hourly/Daily aged ticket updates Dedicated queue monitors

Service Desk Resolved < 48 HoursMin: 85%Exp: 90%

Metric Action Items Owner

Speed to AnswerMin: 85% < 60 secondsExp: 90% < 60 seconds

Focus on call back and call handle time opportunities Deploy biometric password tool Utilize Maximo automation Identify and proactively identify derailments due to environment:

changes to infrastructure, seasonal volumes, etc Staff automation resource

Dennis Quinto / Alisa Bettis

AbandonMin: 8%Exp: 6%

Analyze impact of Priority 1 and 2’s Define Abandon rate threshold Frequent scheduling reviews Utilize optimal scheduling

Dennis Quinto / Alisa Bettis

Customer SatisfactionMin: 75%Exp: 80%

Deploy Right to Left Strategy Quicker CKM turn around time Formulate detection process Consistent performance management and feedback

Dennis Quinto / Alisa Bettis

First Call ResolutionMin: 75%Exp: 80%

Deploy Right to Left Strategy Quicker CKM turnaround Mine resolved Incidents for knowledge opportunity Measure CKM effectiveness

Dennis Quinto / Alisa Bettis

Dennis Quinto / Alisa Bettis Raise awareness Hourly/Daily aged ticket updates Dedicated queue monitors

Service Desk Resolved < 48 HoursMin: 85%Exp: 90%

Metric Action Items Owner

Speed to AnswerMin: 85% < 60 secondsExp: 90% < 60 seconds

Focus on call back and call handle time opportunities Deploy biometric password tool Utilize Maximo automation Identify and proactively identify derailments due to environment:

changes to infrastructure, seasonal volumes, etc Staff automation resource

Dennis Quinto / Alisa Bettis

AbandonMin: 8%Exp: 6%

Analyze impact of Priority 1 and 2’s Define Abandon rate threshold Frequent scheduling reviews Utilize optimal scheduling

Dennis Quinto / Alisa Bettis

Customer SatisfactionMin: 75%Exp: 80%

Deploy Right to Left Strategy Quicker CKM turn around time Formulate detection process Consistent performance management and feedback

Dennis Quinto / Alisa Bettis

First Call ResolutionMin: 75%Exp: 80%

Deploy Right to Left Strategy Quicker CKM turnaround Mine resolved Incidents for knowledge opportunity Measure CKM effectiveness

Dennis Quinto / Alisa Bettis

Page 13: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

13

Data

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

1-Ju

n-09

2-Ju

n-09

3-Ju

n-09

4-Ju

n-09

5-Ju

n-09

6-Ju

n-09

7-Ju

n-09

8-Ju

n-09

9-Ju

n-09

10-J

un-0

9

11-J

un-0

9

12-J

un-0

9

13-J

un-0

9

14-J

un-0

9

15-J

un-0

9

16-J

un-0

9

17-J

un-0

9

18-J

un-0

9

19-J

un-0

9

Speed toAnswer(90% < 60s)

Mean

Upper ProcessLimit

Lower ProcessLimit

Parameter Result

• Mean• Upper Process Limit• Lower Process Limit

• 74.21%• 107.36%• 41.07%

Parameter Result

• Mean• Upper Process Limit• Lower Process Limit

• 93.66%• 103.02%• 84.29%

Speed to Answer (90% Answered in < 60 seconds)

Pre-Process Change Volumes

• Attained 90% or greater 1/15 days• Unstable process• Significant Moving Range variance from Mean

Post Process Change Volumes

• 90% or greater attainment on 9/10 days• Stable process• Note proximity of data points from Mean (less variance)

Data

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

22-J

un-0

9

23-J

un-0

9

24-J

un-0

9

25-J

un-0

9

26-J

un-0

9

27-J

un-0

9

28-J

un-0

9

29-J

un-0

9

30-J

un-0

9

1-Ju

l-09

2-Ju

l-09

3-Ju

l-09

4-Ju

l-09

5-Ju

l-09

6-Ju

l-09

7-Ju

l-09

8-Ju

l-09

9-Ju

l-09

10-J

ul-0

9

Speed toAnswer(90% < 60s)

Mean

Upper ProcessLimit

Lower ProcessLimit

Page 14: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

14

Abandoned Call Rate (Daily)

% Abandoned

Target: <6%

Jun-0

1Ju

n-0

2Ju

n-0

3Ju

n-0

4Ju

n-0

5Ju

n-0

6Ju

n-0

7Ju

n-0

8Ju

n-0

9Ju

n-1

0Ju

n-1

1Ju

n-1

2Ju

n-1

3Ju

n-1

4Ju

n-1

5Ju

n-1

6Ju

n-1

7Ju

n-1

8Ju

n-1

9Ju

n-2

0Ju

n-2

1Ju

n-2

2Ju

n-2

3Ju

n-2

4Ju

n-2

5Ju

n-2

6Ju

n-2

7Ju

n-2

8Ju

n-2

9Ju

n-3

0Ju

l-01

Jul-

02

Jul-

03

Jul-

05

Jul-

06

Jul-

07

Jul-

08

Jul-

09

Jul-

10

0.0

5.0

10.0

15.0

20.0

25.0

30.0%After Improvement

Process stable after improvement, target achieved.

Abandon Rate Comparison

Page 15: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

15

Data

-5.00%

0.00%

5.00%

10.00%

15.00%

20.00%

1-Ju

n-09

2-Ju

n-09

3-Ju

n-09

4-Ju

n-09

5-Ju

n-09

6-Ju

n-09

7-Ju

n-09

8-Ju

n-09

9-Ju

n-09

10-J

un-0

9

11-J

un-0

9

12-J

un-0

9

13-J

un-0

9

14-J

un-0

9

15-J

un-0

9

16-J

un-0

9

17-J

un-0

9

18-J

un-0

9

19-J

un-0

9

DailyAbandonRate

Mean

Upper ProcessLimit

Lower ProcessLimit

Parameter Result

• Mean• Upper Process Limit• Lower Process Limit

• 7.77%• 17.43%• -1.90%

Parameter Result

• Mean• Upper Process Limit• Lower Process Limit

• 2.30%• 7.25%• -2.64%

Abandon Rate (6%)

Post Process Change Volumes

• Scheduling based on agency skilling volumes, arrival patterns, and trending analysis• Stable process• Less Moving Range variance, points closer to Mean

Pre-Process Change Volumes

• No historical trending data available• Unstable process• Significant Moving Range variance from Mean

Data

-4.00%

-2.00%

0.00%

2.00%

4.00%

6.00%

8.00%

22

-Ju

n-0

9

23

-Ju

n-0

9

24

-Ju

n-0

9

25

-Ju

n-0

9

26

-Ju

n-0

9

27

-Ju

n-0

9

28

-Ju

n-0

9

29

-Ju

n-0

9

30

-Ju

n-0

9

1-J

ul-

09

2-J

ul-

09

3-J

ul-

09

4-J

ul-

09

5-J

ul-

09

6-J

ul-

09

7-J

ul-

09

8-J

ul-

09

9-J

ul-

09

10

-Ju

l-0

9

DailyAbandonRate

Mean

Upper ProcessLimit

Lower ProcessLimit

Page 16: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

16

First Call Resolution

• Calculated based on Service Requests opened and closed at IBM Service Desk while user is on the phone• Approximately 24,080 Service Requests opened at the IBM Service Desk (9,041 Service Requests closed at the IBM Service Desk)• Password resets approximately 50% of Service Requests closed at the IBM Service Desk• Other FCR categories: GETS Portal, GSMRT, Order Now, Legacy How To / Inquiry (Shines, SSL, etc.)• Right to Left Strategy will drive increase in FCR• Voice Trust automation will drive biometric password automation• NOTE: Data is approximation and not an official month end report

Parameter Result

• Mean• Upper Process Limit• Lower Process Limit

• Expected SLA• Minimum SLA

• 73.67%• 91.06%• 56.27%

• 80%• 75%

First Call Resolution (June 1, 2009 to July 6, 2009)Data

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

HDE

Mean

Upper ProcessLimit

Lower ProcessLimit

Page 17: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

17 17

First Call Resolution Examples

Request Type Resolution Candidates Resolver Group Referrals

Password Resets • Sharepoint, VPN-SSL Firepass, Windows XP, TSO, RACF (GOES), Shines, GroupWise, GETS, Maximo,

• Success, e-billing, GCIC, PeopleSoft, voicemail,

OS Support • Usage issues with Windows XP, 2000, Vista, Novell

• Mainframe, Unix,

Application/Platform Support

• Web Applications (ga.gov, teamgeorgia, PW reset, CDC SSL Certificate verification, Intranet connectivity/browser interface)

• Telephony (Media Player MP3)• Connectivity (desktop verification, my network

places, Device Manager, etc.)• Triage (GETS, Maximo, OrderNow)

• Web (extra net)• Telephony Break Fix.• Connectivity (ISR, Switch, router resets)

Page 18: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

18

GTA Service Desk Volumes

• GTA Service Desk show consistent saw tooth pattern• Volumes decrease as days in the week progress• Mondays are busiest days of the week• Fridays are least busy day of the week• Quarter/month end activities drove week 1 go live volumes• 4th of July volumes (week 5) fell below Mean

Parameter Result

• Mean• Upper Process Limit• Lower Process Limit

• 1,031.21 calls• 1,347.96 calls• 714.47 calls

GTA Service Desk Volumes (June 1, 2009 to July 10, 2009)

0

200

400

600

800

1000

1200

1400

1600

1-Ju

n-09

3-Ju

n-09

5-Ju

n-09

7-Ju

n-09

9-Ju

n-09

11-J

un-0

9

13-J

un-0

9

15-J

un-0

9

17-J

un-0

9

19-J

un-0

9

21-J

un-0

9

23-J

un-0

9

25-J

un-0

9

27-J

un-0

9

29-J

un-0

9

1-Ju

l-09

3-Ju

l-09

5-Ju

l-09

7-Ju

l-09

9-Ju

l-09

Calls Answered

Mean

Upper ProcessLimit

Lower ProcessLimit

Page 19: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

19

Local Printer Strategy

Page 20: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

20

Local Printer Support

• The Enterprise strategy is to reduce local printers and increase network printers for cost efficiency as well as environmental focus

• VIPs or those with business need will keep local printers; others will be mapped to a network printer

• Local printer failures will not be repaired/replaced if there is an available network printer nearby

• Network printers are being installed throughout the Enterprise as part of the PC Refresh

Page 21: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

21

Appendix

Page 22: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

22

Service Level Terminology

• Service Level Agreement (SLA) – An agreement that specifies “how well” we want the service provider to perform services

• Critical Measurement – Those service levels that are measured and have financial liability to the service provider if they are not performed ($$ at risk)

• Key Measurements – Those service levels that are measured and do NOT have financial liability to the service provider if they are not performed ($$ not at risk)

• Critical Deliverable – A one-time service level that must be met

Page 23: Georgia Infrastructure Transformation (GAIT) 2010 Service Levels and Operational Metrics July 2009.

23

• Expected Service Level – The average of past performance that the Service Provider must consistently meet

• Minimum Service Level – The minimum service level that the Service Provider must always remain above

Service Level Terminology