GEOMEC GROUP
2
• Geomec Engineering AS offers independent studies, consultancy, training and auditing for oil and gas operators, with an emphasis on compaction and subsidence, heavy oil, mud-loss management, sand management, water management and wellbore stability. It has been operative since 2002.
• Geomec Environmental Management AS is establishing an independent control centre for planning, real time monitoring and the daily follow-up of storage and IOR wells, to ensure safe permanent injection of cuttings, water and CO2. The company has been operative since 2008, and the centre will begin operations in 2010.
Geomec © 2010
© Geomec 2008
Geomec’s Technology Marguerite
3
multidisciplinarity is more than a word:It is a way of life
Geomechanics is a core discipline of oil and gas operations
Compaction and SubsidenceFracturingEtc.
Wellbore StabilityMud LossEtc.
Sand managementWater injectionEtc.
Natural fracturesCore damageEtc.
Waste managementLeakageEtc.
CompletionWell life expectancyEtc.
Over the years Geomec’s staffHas performed advanced(*) studies
In all domains of Petroleum Geomechanics
(*) Over 700 publications are co-authored by Geomec’s staff
GEOMEC METHODOLOGY
SERVICE UK MARKET
4
• An independent specialist-advisory centre for injection wells (cuttings, water and CO2).
• Planning/qualification, monitoring/analysing and reporting/advising for the pre-injection, injection and post-injection phases.
• Supplementary regulatory, laboratory and seminar/course services.
Geomec © 2010
REFERENCE UK MARKET
5
• Nexen (Aberdeen and London).
• Buzzard Field.
• Water Injection and Produced Water Reinjection.
Geomec © 2010
THE PROBLEM: LEAKAGES FROM INJECTION WELLS
6
• International water-leakage survey: Only operators not looking for leakages report having no leakages.
• Economic losses: Reduced life-span for injection wells, higher cost and lower gain for IOR wells; and loss of and possible compensation for loss of CO2 quotas.
• Environmental pollution: Short and long-term soil, sea, (ground-) water and air contamination; and risk of leakage-damages to injection facilities.
Geomec © 2010
OUR SOLUTION: INDEPENDENT SPECIALIST-ADVISORY CENTRE
7Geomec © 2010
PRE-INJECTION
INJECTION
POST-INJECTION
IOR & STORAGE(NEW & EXISTING)
REPORTING& ADVISING
MONITORING& ANALYSING
PLANNING & QUALIFICATION
PROJECT PHASES
PROJECT ACTIONS
GEOMEC INJECTION CENTRE
OPERATOR INJECTION WELLS
MONITORING-SYSTEM& WELL-DATABASE
TECH & REGULATORYEXPERT-SUPERVISION
LABORATORY &SEMINAR / COURSES
ONSHORE& OFFSHORE
NATIONAL & INTERNATIONAL
STAVANGER CENTRE FOR SAFE INJECTION (24/7)CUTTINGS, WATER & CO2
PRELIMINARY CHALLENGES
8
• Marketing (who and how) – Test on the mentor company.
• Decision Makers (who and how) – Test on the mentor company.
• Regulative support (who and how) – Door-opener in Norway !
• Growth resources (personnel and money) – Frame-agreements ?
Geomec © 2010