Geohazards in Transportation Liberty Vehicular Tunnels Lynchburg, VA

Transcript of Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade...

Page 1: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Geohazards in Transportation

Liberty Vehicular Tunnels

Lynchburg, VA

Page 2: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Project Location: Liberty University, Lynchburg, VA

Page 3: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Design Constraints:

Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft

long tunnels Construct a long-term, low maintenance

transportation facility per NS design criteria Design for and satisfy railroad concerns

• No freezing, grouting, cut-and-cover, SEM/NATM or jacking

• No shut down in operation of yard or main-line • AREMA must control structural design

Page 4: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Subsurface Conditions:

Page 5: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Subsurface Conditions:

Page 6: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Construction Concept:

• Confine the embankment • Avoid embankment “Blowout” • Mitigate settlement

Page 7: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Construction Concept:

• Pull the box not push it • Provide confinement • Engage passive resistance

Page 8: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Construction Methods:

HDD for spiling and tendon casing Auger boring for storm sewer Soil nail wall for temporary SOE Box jacking (pulling) for two tunnels Controlled excavation face with spiling

installed at tunnel heading

Page 9: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Spiling:

Page 10: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Spiling:

Page 11: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Soil Nail Wall:

Page 12: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Tendon Casings:

Page 13: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Tendon Casings:

Page 14: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Base Slab:

Page 15: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Shield:

Page 16: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Box Construction:

Page 17: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Box Construction:

Page 18: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Box Construction:

Page 19: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Box Construction:

Page 20: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Reaction Wall:

Page 21: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Reaction Wall:

Page 22: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Jacking System:

Page 23: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Jacking System:

Page 24: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Box Jacking:

Page 25: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Box Jacking:

Page 26: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Excavation:

Page 27: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Geohazards:

Page 28: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Jacking Forces:

Page 29: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Jacking Forces:

Page 30: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Jacking Forces:

Page 31: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Production Rate:

Page 32: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Box Jacking:

Page 33: Geohazards in Transportation - Marshall University · 2016. 3. 25. · Eliminate the at-grade crossing Construct 2, 32-ft wide by 20.5 ft high by 130 ft long tunnels Construct a long-term,

Acknowledgements: Jeremiah Jezerski, PE Liberty University

• Charles Spence • Brad Barber

Southland Contracting, Inc. • Clay Griffith • John Marcantoni • Tim Winn

TGS Engineers • Leonard Fletcher, PE

NS Railroad Elwyn & Palmer

• Mike Palmer, PE