GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

15
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011

Transcript of GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

Page 1: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

GEO Work Plan Symposium 2011

Infrastructure

May 5, 2011

Page 2: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

Infrastructure

• Preamble text is needed for each of the three sections proposed in Work Plan V0.

• Infrastructure includes:

– GEOSS Common Infrastructure

– Earth Observing Systems

– Earth Data Sets

– GEOSS Communication Networks

– Standards and Interoperability

• Gap Analysis, Capacity Building, User Engagement to be addressed in each of the IN tasks

Page 3: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

6 GEOSS Design and

Interoperability

6 GEOSS Design and

Interoperability

V01 GEOSS Common

Infrastructure

V01 GEOSS Common

Infrastructure

1 GEOSS Common

Infrastructure

1 GEOSS Common

Infrastructure

V03 Earth Data Sets

V03 Earth Data Sets

4 GEOSS Communication

Networks

4 GEOSS Communication

Networks

V05 Gap Analysis

V05 Gap Analysis

V02 Earth Observing Systems

V02 Earth Observing Systems

2 Earth Observing Systems

2 Earth Observing Systems

3 Earth Data Sets

3 Earth Data Sets

V0

Break-out Recommendation

V04 GEOSS Communication

Networks

V04 GEOSS Communication

Networks

To be addressed in

each task

V1 proposal

Page 4: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

Presentation of each 2012-2015 Work Plan Task

• Target-based Definition, Deliverables and underpinning Leads and Priority Actions

• 2009-2011 sub-task re-organization• Related 2009-2011 Work Plan implementation

progress• Inclusion of new proposals• Estimation of resources available• Issues, gaps and possible measures

Page 5: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-01 GEOSS Common Infrastructure

• Definition: Text to be modified: Focus will be on the operations, maintenance, and enhancement of GEOSS Common Infrastructure. Split-out of GEOSS design/requirements/research into a new Task

• Deliverables: Text to specify contributions from multiple sources (e.g. DSTF), Gap analysis to be included.

• Related Tasks: Add Data Sharing task and Quality Assurance task, Move WIS to EO Systems (under IN-03)

Page 6: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-01, continued

• New Proposals: None• Resources Available: GCI Component Operators are

responsible for operations and enhancement through 2015; adding EuroGEOSS, GENESI-DEC. Upcoming GEO-WOW FP project funded through Sept 2014

• Issues and Gaps: Propose close relationship with GEOSS Design and Interoperability task (new task); Engagement with users, Communication with data providers

• Performance indicators: Provided earlier to M&E

Page 7: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-02 Earth Observing Systems

• Definition: re-ordered to reflect highest priority activities• Deliverables: Inserted User Interface language and

other editorial changes; Gap analysis to be included.• Related tasks: Include WIS, Add crowd-sourcing• New Proposals: Discussion indicated no discrepancies• Resources Available: Not discussed• Issues and Gaps: Increased advocacy for sustained

EO networks and increased coordination for in situ networks; alignment between deliverables and definition; coordination with Earth Data Sets

• Performance Indicators: No additions

Page 8: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-03 Earth Data Sets

• Definition: Additional words provided by UIC related to sustainability; ADC: common vocabulary, core metadata, and registration

• Deliverables: Clarify to encourage development of data sets rather than develop directly

• Related tasks: No changes.• New Proposals: Discussion indicated no

discrepancies• Resources Available: Not discussed.• Issues and Gaps: Coordination with EO Systems,

overlap with global data sets (DS/IS)• Performance Indicators: Not discussed

Page 9: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-04 GEOSS Communication Networks

• Definition: Editorial changes proposed• Deliverables: added focus on targeted users• Related tasks: WIS moved to EO Systems (IN-02)• New Proposals: Discussion indicated no

discrepancies• Resources Available: Not discussed.• Issues and Gaps: Data Democracy Task could move

to Institutions• Performance Indicators: Not discussed.

Page 10: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-05 Gap Analysis

• To be incorporated in all other IN Tasks

Page 11: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-06 GEOSS Design and Interoperability

• Addresses the evolutionary technical architecture (design) of GEOSS and contributed EO data and service resources.

• Primary focus on enabling a sustainable GEOSS• Success will be demonstrated by the research, evaluation,

deployment, population, and sustained operations of a user-friendly and accessible GEOSS and its Common Infrastructure, including the core components, functions, and data sufficient to readily respond to scientific and societal demands.

• Incorporates the annual Architecture and Implementation Pilot and Standards and Interoperability Forum (SIF).

Page 12: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-06 continued

• Deliverables:– A ‘living’ technical architecture document that

describes and illustrates the components of GEOSS

– Annual review or revision of the GEOSS Tactical and Strategic Guidance and new tutorial documents

– Annual execution and documentation of the Architecture Implementation Pilot and related research activities

– A register of Interoperability Agreements (Standards and Special Arrangements)

Page 13: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-06, continued

• Related tasks: – Enabling Deployment of GEOSS Architecture– Architecture and Implementation Pilot– Sensor Web Enablement for In-Situ Observing

Network Facilitation – Model Web Development– Data Integration and Analysis Systems – Standards and Interoperability Forum

Page 14: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

IN-06, continued

• Resources Available: Not discussed.• Issues and Gaps: Interaction clarify, no overlaps with

GCI Task (IN-01)• Performance Indicators: Not discussed.

Page 15: GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.

Questions and Discussion