Generation Report 09-09-2015

11
Generation and Reservoirs Statistics 09 th September 2015 PUBLIC UTILITIES COMMISSION OF SRI LANKA

description

Load curve, reservoir stat

Transcript of Generation Report 09-09-2015

Page 1: Generation Report 09-09-2015

1

Generation and Reservoirs Statistics

09th September 2015

PUBLIC UTILITIES COMMISSION OF SRI LANKA

Page 2: Generation Report 09-09-2015

2

09th September 2015

Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included

Cumulative Dispatch From 01st September – 09th September

Category Dispatch (MWh)

CEB Hydro 69,331 22.08%

CEB Thermal Oil 53,454 17.02%

CEB Coal 94,460 30.08%

IPP Thermal 87,521 27.87%

SPP Wind 9,259 2.95%

Total 314,025

Note: Generation from Mini Hydro, Solar and Biomass power plants in July, August and September is

not included in annual cumulative renewable generation figure.

8931

5121

11030

9750

1341

Generation Mix in MWh

CEB Hydro

CEB Thermal Oil

CEB Coal

IPP Thermal

SPP Wind

Total Generation - 36,173MWh

From 01st January – 09th September

Category Dispatch (GWh)

CEB Hydro 2,992 33.82%

CEB Thermal Oil 741 8.38%

CEB Coal 3,431 38.79%

IPP Thermal 951 10.75%

Renewable 730 8.26%

Total 8,845

Page 3: Generation Report 09-09-2015

3

0

1000

2000

3000

4000

5000

6000

7000

Rated Capacity

Available

Dispatched

Dispatch on 09th September 2015

MWh

Page 4: Generation Report 09-09-2015

4

0

50

100

150

200

250

300

InstalledCapacity

AvailableCapacity

Night Peak Load

Night Peak Contribution on 09th September 2015

MW

Page 5: Generation Report 09-09-2015

5

Day Peak Demand – 1,802.0MW

Minimum Recorded Demand – 975.6MW

Note: Hydro Reservoir Storage Capacity as at 09th September 2015 –568.8GWh (45.2%)

1061.4

174.3

514

318.1 66

Contribution to the Night Peak in MW

CEB Hydro

CEB Thermal Oil

CEB Coal

IPP Thermal

SPP Wind

Night Peak - 2133.8MW

41.6%

47%

64.6%

43.2%

37.8%

39.4%

0

30

60

90

120

150

180

210

Castlereigh Maussakelle Kotmale Victoria Randenigala Samanalawewa

Reservoir Storage Levels ( As at 06.00 hr on 10th September 2015) GWh

Page 6: Generation Report 09-09-2015

6

0

200

400

600

800

1000

1200

2012

2013

2014

2015

Comparison of Reservoir Storage Levels GWh

Page 7: Generation Report 09-09-2015

7

Note: Contribution from Mini Hydro, Solar and Biomass is not included

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

24001

-Jan

8-J

an

15

-Jan

22

-Jan

29

-Jan

5-F

eb

12

-Fe

b

19

-Fe

b

26

-Fe

b

5-M

ar

12

-Mar

19

-Mar

26

-Mar

2-A

pr

9-A

pr

16

-Ap

r

23

-Ap

r

30

-Ap

r

7-M

ay

14

-May

21

-May

28

-May

4-J

un

11

-Ju

n

18

-Ju

n

25

-Ju

n

2-J

ul

9-J

ul

16

-Ju

l

23

-Ju

l

30

-Ju

l

6-A

ug

13

-Au

g

20

-Au

g

27

-Au

g

3-S

ep

Demand Variation 2015

Nigh Peak

Day Peak

MinimumDemand

MW

Page 8: Generation Report 09-09-2015

8

Note: Contribution from Wind, Mini Hydro, Solar and Biomass is not included

0

300

600

900

1200

1500

1800

2100

CEB Hydro

IPP Thermal

CEB Thermal Oil

CEB Coal

Load Curve for 08th September 2015

Time of Day

MW

Page 9: Generation Report 09-09-2015

9

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

2014 2015

SPP Wind

IPP

CEB Coal

CEB Oil

CEB Hydro

Comparison of Cumulative Dispatch from 01st January - 09th September

GWh

Year

Page 10: Generation Report 09-09-2015

10

Note: Generation from SPP Mini Hydro, Solar and Biomass is not included

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

11000

12000

2014

2015

Comparison of Cumulative Dispatch GWh

Page 11: Generation Report 09-09-2015

11

List of Power Stations

Power Station Capacity (MW) Primary Fuel

CEB Hydro

Victoria 210

Ukuwela 40

Kotmale 201

Randenigala 122

Rantambe 49

Bowatenna 40

Nilambe 3.2

Upper Kotmale 150

Old Laxapana 50

New Laxapana 115

Polpitiya 75

Wimalasurendra 50

Canyon 60

Samanalawewa 120

Kukuleganga 75

Inginiyagala 10

Udawalawe 6

CEB Thermal

Sapugaskanda 1 72 Heavy Fuel

Sapugaskanda 2 72 Heavy Fuel

Kelanitissa Small Gas Turbines 68 Auto Diesel

GT 7 - Kelanitissa 115 Auto Diesel

Kelanitissa CCY 165 Naptha & Diesel

Lakvijaya (Puttalam Coal) 285 Coal

Lakvijaya (Puttalam Coal) Stage II 285 Coal

Lakvijaya (Puttalam Coal) Stage III 285 Coal

New Chunnakam 24 Heavy Fuel

Private Thermal (IPPs)

Asia Power 51 Heavy Fuel

AES Kelanitissa 163 Auto Diesel

West Coast 270 Low Sulphur Furnace oil

Northern Power 27 Auto Diesel