General Indormation Dan Rappoport Period. 8 Architecture 1 •Name of The Building - Synergy at Dockside Green •Location - Victoria, BC, Canada •Building Type - Retail, Multi- Unit residential •Building Use - Ecology Center •Type of Construction- New Construction •Dates - Completed March 2008 and won

Transcript of General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside...

Page 1: General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside Green Location- Victoria, BC, Canada Building Type-

General IndormationDan Rappoport

Period. 8 Architecture 1•Name of The Building- Synergy at Dockside Green•Location- Victoria, BC, Canada•Building Type- Retail, Multi- Unit residential•Building Use- Ecology Center•Type of Construction- New Construction•Dates- Completed March 2008 and won the award in 2009•Architects- Busby Perkins and Will

Page 2: General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside Green Location- Victoria, BC, Canada Building Type-

Ecological Materials and Resources Used

• Recycled Materials- used biodegradable materials• Locally Produced or Manufactured Materials-

Twenty Four percent of the Dockside was used by manufactured materials.

• Natural Resources- is bamboo and cork• Low Maintenance Materials- materials that are

volatile organic compounds

Page 3: General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside Green Location- Victoria, BC, Canada Building Type-

Energy Efficiency• Low water flow fixture- rainwater capture and wastewater treatment lessen the use

of potable water and related operating costs. Green building reduces by 30-50%• Solar Orientation of building for passive solar or shading, cooling and ventilation-

shade south windows with exterior louvers, awnings, or trellises.• Automatic lighting and water controls- Use large exterior windows and high ceilings

to increase day lighting. Use building elements to redirect daylight and control glare.

• Heat pumps, geo-thermal, solar heat, heat exchangers, efficient heating and cooling equipment- use high-efficiency, condensing oil or gas boilers and furnaces. Use hot water heat distribution. Also they used a cogeneration system.

• Low VOC equipment- use very low or no-VOC paints• Natural Ventilation to minimize AC loads and use- provide access to operable

windows and ventilation rates meet or exceed ASHRAE Standard 62-1999• Construction and demolition waste management- fewer materials end up in

landfills and the local economy benefits from reducing the extraction and processing of non-localized virgin resources.

• Green Roofs- Power generating wind turbines, also drought resistant native plant materials to create wildlife habitat

• Life cycle Thinking- 30-50% in energy saved

Page 4: General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside Green Location- Victoria, BC, Canada Building Type-

Site Ecology

• Water retention, detention, soil and sedimentation control- Landscape with indigenous vegetation, landscape with edible plants.

• Use of impervious surfaces should be minimized- 30 to 40% fly ash in concrete mix reduces carbon dioxide emission associated with cement use while strengthening the concrete.

• Draught resistant plants, natural landscape, and local plantings- Select plants for drought tolerance, Recycle gray water for landscape irrigation.

• Gardens for food production- Minor vegetation• Foot and bike paths, access to bus and train transportation -

minimized need for automobiles- Secure bike storage, Close to public transit and Galloping Goose Trail, Car share program, Parking stall in parkade for car share, Mini transit system, Harbour ferry to downtown Victoria

Page 5: General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside Green Location- Victoria, BC, Canada Building Type-

Water Resources

• Rainwater collectors- Rainwater is collected in onsite naturalized creek and pond features, Non-potable water use for landscaping and water features.

• Low water fixtures for W/C, laves, chillers- dual-flush toilets, drip irrigation, and native and adapted landscaping.

• Automatic fixture water controls- use portable water and filters reusable water recycles water, providing 50,000 gallons per day for toilets and irrigation.

• Local plants and drip irrigations with controls for use of the natural rain- Residual treated water will recharge the naturalized waterway that flows across the site and collects rainwater as it flows towards the inner harbour.

• Gray water systems- for landscape irrigation

Page 6: General Indormation Dan Rappoport Period. 8 Architecture 1 Name of The Building- Synergy at Dockside Green Location- Victoria, BC, Canada Building Type-

• Years to payback cost of ecological changes- about 8-10 years

• Yearly energy savings anticipated- 30-50% Energy 35% Carbon Emission 40% Potable Water 70% Solid Waste

• Other Values- Health at Dockside is better than a regular building because it does not have COV furniture that is harmful to you and it does not have gases that expose to you.

Cost Implications