Imagination at work. EMMOS Conference Energy Storage Rick Cutright, ES Product Management [email protected] © 2014 General Electric Company. All rights reserved.. GE 2MW / 10 MWh ES System Energy Management Application, Japan

Transcript of GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter...

Page 1: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

Imagination at work.

EMMOS Conference

Energy Storage Rick Cutright , ES Product Management [email protected]

© 2014 General Electric Company. All rights reserved..

GE 2MW / 10 MWh ES System Energy Management Application, Japan

Page 2: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Multiple applications served by an Energy Storage System

Enable integration of more renewables

Improve integration of energy generated from photovoltaic

and wind turbines and maximize returns from these assets

Optimize transmission and distribution systems

Defer upgrades, relieve congestion, control voltage, provide

reserves, and improve grid reliability

Enable micro-grid development

Create a new and more flexible grid by combining smart devices and local generation with energy storage

Reduce energy costs

Enable demand side load management to reduce demand

charges and take advantage of differential energy prices

Page 3: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Issues Facing T&D Operators…

• Integration of increasing penetration of variable renewable generation

• Increase in distributed generation

• Aging infrastructure and capital allocation

• Rapid Load growth

• Threat from self-generation

© 2014 General Electric Company. All rights reserved..

Page 4: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Issues Facing Building Owners...

• Increasing demand charges

• Increasing frequency of power outages

• Participation in demand response programs

• Significant changing time of use energy charges

• Threat of net-metering changes reducing effectiveness of installed PV

© 2014 General Electric Company. All rights reserved..

Page 5: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Issues Facing Renewable Operators…

• Increasing Ramp Rate Requirements imposed by Grid Connection Codes

• High Grid Connection Charges

• Day Ahead Prediction Requirements

• Declining Subsidiaries

• Output Curtailment

• Frequency Control Rules

• Increased location restrictions

© 2014 General Electric Company. All rights reserved..

Page 6: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2012 General Electric Company.

GE Energy Storage in the 1990’s

20 MW / 14 MWh

Puerto Rico(‘94)

Grid Optimization

• Spinning reserve

• Frequency Response

• Voltage Control

• Blackstart

5 MW / 3.5 MWh

Vernon, CA(‘95)

Energy Management

• Critical Load Support

• Peak Shaving

1.2 MW / 1.2 MWh

Metlakatla, AK(‘96)

Renewable Integration

• Spinning reserve

• Frequency response

• Voltage Support

• Diesel Optimization

Page 7: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

100

1,000

10,000

100,000

1,000,000

'96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16 '17 '18 '19 '20 '21 '22 '23 '24 '25

Source: GE Analysis

$1000/kWh

$250/MWh

$150/MWh

$50/MWh

$6/watt

$1/watt

$3/watt

$65/MWh

$800/kWh

$500/kWh

An

nu

al M

W in

sta

lled

Wind

Solar PV

Energy Storage (high) (average) low)

$55/MWh Conventional LCOE

LCOE

CapEx

CapEx

$2,000/kWh

Energy Storage Market growth

In a recent worldwide survey*, 94% of utility executives predict complete transformational or important changes to the power utility business model until 2030

*Source: 13th PwC Annual power and utilities survey

Page 8: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

What is an Energy Storage System?

8

GE 1MW / 2 MWh ES System Wind Farm, Prince Edward Island

© 2014 General Electric Company. All rights reserved..

Page 9: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

PV + Storage Solution

Page 10: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Anatomy of an Energy Storage System

Battery Cabinet Interface Cabinet

DC Block

Inverter

Controls Interface

Electrical Interface

MBM PCS Controller

Site Controller

Energy Storage System (ESS)

AC Block

SCADA / Gateway / Network Controls

Transformer/ Switchgear

BMS 1 BMS 2 BMS 3 BMS N

Grid

Ba

tt 1

Ba

tt 2

Ba

tt 3

Ba

tt N

Page 11: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Inverter

Convert DC – AC Bi-Directional 4 Quadrant LVRT, HVRT

GE 1.0 MW Brilliance Inverter

Page 12: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Scalable DC Block (Batteries)

kWh System MWh System

Base Unit 5 Durathon E620 Modules + Battery Enclosure

+ Interface Enclosure 50 Durathon E620 Modules + Battery Enclosure

+ Interface Enclosure

Power / Energy 50 kW / 100 kWh 0.5 MW / 1.0 MWh

Expansion Unit 5 Durathon E620 Modules + Battery Enclosure 50 Durathon E620 Modules + Battery Enclosure

Power / Energy 50 kW / 100 kWh 0.5 MW / 1.0 MWh

Max System Size 250 kW / 500 kWh 1.0 MW / 6.0 MWh

Base Unit Expansion Units

Page 13: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Extensible Solutions Custom solutions from standard building blocks

1 MVA / 6 MWh

1 MVA / 4 MWh

1 MVA / 2 MWh

0.5 MVA / 1 MWh

Page 14: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Sample Solution 10 MW / 20 MWh Plan Configuration

~62’

~110’

Page 15: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

• Voltage control

• Line drop compensation

• Power factor control, VAR control

• Power curtailment, Ramp rate control

• Power frequency droop control

Robust site level control

• SQL database, Std. Comm (OPC)

• Real-time data visualization

• Remote inverter control

• Metmast & substation interface

• Historical data analysis

Integrated SCADA

Site Level Controls

Based on GE Mark VIe controls platform … heart of GE’s wind & thermal power plant fleet • 250+ utility scale projects controlled • 100+ GW renewables feasibility studies • 40+ grid integration patents

Page 16: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Network Level Controls

Page 17: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Levels of Control BMS

Inverter-MBM

Site Controller

Network Controller

Market / ISO

Where does optimization occur?

Page 18: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

What can I do with an Energy Storage System?

18 GE 2MW / 8 MWh ES System

Energy Management Application, Japan © 2014 General Electric Company. All rights reserved..

Page 19: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Grid Pain and Gains Multiple Segments, Multiple Pains – Opportunity for Gain

T&D Network Reliability / Resiliency Congestion Renewable Integration Power Quality Asset Deferral

Energy Management Demand Charges Power Outages Lower Electric Bills Energy Independence Self Use PV Power

Renewable Power Generation Interconnection Requirements Balancing Charges Curtailment Flexible Generation Improved Efficiency Increased Annual Output and Revenue

Page 20: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Energy Storage Applications What Does the Battery Actually Do?

T&D Network • Load Management • Harmonic Suppression • Voltage Support • Power Quality

Energy Management

• Peak Demand Reduction

• Power Back Up

• PV Self Consumption

• Power Quality

Renewable Power Generation • Ramp Rate Control • Frequency Response / Regulation • Energy Shifting • Curtailment Avoidance

Microgrid

• Grid Management

• PV Integration

• Grid Optimization

Page 21: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Services split into categories Voltage Power Energy Contingency

Each Energy Storage system can be configured for a combination of services:

(Service Selection)

• Energy Service: Shift, Peak Management

• Power Service 1: Firming, Frequency Regulation, Spin/Ramp, Smoothing

• Power Service 2: Firming, Frequency Regulation, Spin/Ramp, Smoothing

• Voltage Service: Power Factor, Voltage Support

• Contingency Service: Responsive Reserves, Backup Power, Demand Response, Capacity

Source: GE Analysis

Page 22: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Main Segments with their Major Applications

Energy App: Peak Management Power Apps: Freq. Regulation Spin/Ramp Contingency: Capacity Replaces: Single cycle gas turbine

Digital Peaker

Energy App: Shift Power Apps: Freq. Regulation Responsive Reserves Contingency: Capacity Replaces: Less flexible Gas turbine

Thermal Hybrid

Energy App: Shift Power Apps: Firming Freq Regulation Contingency: Responsive Reserves Replaces: No direct substitute

Renewable Hybrid

Energy App: Freq Regulation Power Apps: Response Reserve Peak management Contingency: Capacity Voltage: Voltage support Replaces: Substation upgrades & line capacity

Energy App: Peak Management Power Apps: Smoothing Contingency: Back up Voltage: Voltage support Replaces: Substation upgrades & line capacity

D- Sub. & CES

Energy App: Shift Power Apps: Smoothing Contingency: Back Up Voltage: Power Factor Replaces: Other Batteries

Residential

Energy App: Shift Power Apps: Peak Management Contingency: Back Up Voltage: Power Factor Replaces: Building energy efficiency & DB back up

Commercial

Energy App: Shift Power Apps: Peak Management Contingency: Back Up Voltage: Power Factor Replaces: Building energy efficiency & DB back up

Microgrid

T- Substation

Generation Transmission End User & Microgrid

Page 23: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Segment: Commercial

Position in Grid: Behind the Meter

Energy App: Shift

Power App:

Peak Management

None

Contingency: Backup Power

Voltage: Power Factor

Replaces Building energy efficiency

tech & DG Back Up

Sample Operating Profile Energy Management

NYC Hotel

Source: GE Analysis

Page 24: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Sample Operating Profile ES Peaker Plant

• Energy Service: Peak Management

• Power Service 1: Frequency Regulation

• Power Service 2: Ramp Rate / Spinning Reserves

• Voltage Service: None

• Contingency Service: Capacity 10 Year NPV of benefits

Source: GE Analysis

Page 25: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Durathon Grid Systems Expanding Global Presence and Grid Applications

4 MW / 18 MWh

Energy

Management

(5x) 50 kW / 100 kWh

T&D Network Support

1 MW / 2 MWh

Wind Integration

(3x) 200 kW / 400 kWh

Integrated Wind Turbine

(2x) 10 kW / 20 kWh

Energy Management

1 MW / 2 MWh

T&D Network Support

100 kW / 200 kWh

Distribution Utility

1

5

3

6

7 8

9

10 11

0.25 MW / .5 MWh

Energy Management

0.5 MW / 1 MWh

Energy

Management

~40 MWh of Grid & Micro-grid projects

2

50 kW / 100 kWh

Energy Management

4

250 kW / 500 kWh

Microgrid

Commissioned or in commissioning process

Recent order or being built

3MW / 6 MWh

PV/Storage Microgrid

12

13

200kW/1MWh

T&D Network Support

14

1 MW / 2 MWh

Energy

Management

100kW/200kWh

Microgrid, Solar

Integration

15

Page 26: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid

© 2014 General Electric Company. All rights reserved.

Bringing the strengths of GE to Energy Storage

Gas Turbines

Combined Cycle

Nuclear

Wind Solar

2,000GW+ GE power generation

Power Gen Services

Gas Engines

Broad, diversified portfolio

Long-term, valued brand

Stable & reliable partner

100+ years powering the world … optimizing our future with energy storage

GE Energy Storage well-positioned

GE Energy Financial Services

Water

GE Global Research Center

Aero

© 2014 General Electric Company. All rights reserved..

Page 27: GE Renewables Customer Pitch - EMMOS Advances in Utility... · Position in Grid: Behind the Meter Energy App: Shift Power App: Peak Management None ... 250 kW / 500 kWh Microgrid