Assembly Detail
1
4
5
6
10
11
Center Line of the Bridge
Plan
9
12
Thimble 17
10 12
85 50 85
Part No. 22a
2b
elding Details
1a 1b 3 1c 1d 13 2
125 375 200
Part No. 1
threads to be cleaned byheat blow aftergalvanization
11
6
9
7
7
8
8
14
Notes :
All fillet weld size 4 mm unless mentioned
otherwise
To obtain uniformity, use of templates and jigs is
mandatory for holing, bending and welding of
assembly.
All parts or bundles and packages with identical
parts have to be labelled or marked with the
respective part number by the workshop.
Produced by Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).Nepal
M36 13
BulldogGrip
18
4
13
10 12
4
Nuts & Bolts M16
Nuts & Bolts M16
2
Date : September 30, 2002 Drawing No. 44N
Bridge Name:
No: Bank: Span:
HMG / Ministry of Local Development
DoLIDAR / Short SpanTrail Bridge Standard
Assembly and Welding Details
Main Cable Anchoragefor Suspension Bridges
4 Main Cables mm (26 or 32 mm)
centre to centre distance : 3.50 m
Steel Drawing:
75
3
9 11
9
11
10
.........
....... x 4 Flats 100/6
for one cable anchor
*Determine required Nos of Flats from
Construction Drawing No :
44/1Ncon, 44/3Ncon, 44/5Ncon, 44/7Ncon,
44/9Ncon or 46Ncon
*