G’Day!

Stefan Hörnlund

University of South [email protected]

Page 2: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Planning ahead

Page 3: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Learning Objectives

After this lecture you should be able to;• explain why we need to plan for the completion of a

building project• break down a project into a number of activities• prepare a chart (precedence diagram) showing how

these activities relate to each other, i.e. that some must be completed in a certain order whilst others can be carried out independently

• list some of the many considerations that the planner must take into account

Page 4: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Why do project planning?

• To achieve a stated objective in the way best suited to the particular project.

• To estimate what resources, like materials and labour, are needed and when they are needed.

• To provide a method of measuring and comparing actual progress with what was planned.

• To foresee problems and prepare for them.

Page 5: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Planning versus Control

Planning decisions set the objectives to be accomplishedand an agreed program of the activities required toaccomplish that objective. In other words - we must do A,B and C etc to achieve our objective.

Control decisions check the accomplishment of theactivities and the agreed procedure for further activities oreven changes to the objective, if the outcome of eachactivity is not in accordance with the planning decisionsalready made.

Page 6: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Constructability

Constructability is the optimum

integration of construction knowledge

and experience in planning, engineering,

procurement and field operations to

achieve overall project objectives.

(CII 1983)

Page 7: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

No Door?

Page 8: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

List of activities for a ‘Project’

A. Getting upB. Going to the bathroomC. Getting dressedD. Making breakfastE. Collecting the newspaperF. Eating breakfastG. Reading the paperH. Washing upI. Get briefcaseJ. Leave and lock door

Page 9: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Precedence diagram

A B C D E F

G H I J

Page 10: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Who does the planning?

• Senior management

• Client organization

• Estimating department

• Design team

• Site management team

• Subcontractors

Page 11: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Construction Description or Work List

- Describe your activities- State any assumptions made

Page 12: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Method statement

• Method study techniques

Page 13: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Erection of timber framed partitions in two-storey blocks of units.

Framing material: Timber 35-45 x 90-120 mm.Activity contentStarting point: Material in materials storage areaContent: Transportation Erection of frame including bottom plate, studs, top plate and noggins.Finishing point: Frame ready for claddingWork timeAccumulated work time (t) in hours/m2 for 5000 m2 wall areaAverage area (m2) of each panel 4 5 7 10 15Transportation of materials 0.01 0.01 0.01 0.01 0.01Erection of frames with studs at centres: 0.4 m 0.33 0.30 0.26 0.24 0.21 0.6 m 0.29 0.25 0.22 0.19 0.17 0.9 m 0.25 0.22 0.19 0.16 0.14 Quantity of workCorrection factors for work time at different total quantity of workQuantity of work (m2) 500 1000 2000 5000 10000Correction factor 1.27 1.18 1.10 1.00 0.93

Slower Faster

Page 14: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Learning curve

Time/unit

Number of units

Page 15: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Special considerations

• Small site

• Geotechnical problems

• Remote location

• etc

Page 16: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Activities networks

Precedence network

A B C D E

F G

Arrow & Node network

1 2 3 5 6 7

4

Page 17: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Barchart

Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 DayExcavationFormworkReinforcingConcretingCuringForm stripping

Page 18: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Heartbeat diagram

Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 DayExcavationFormworkReinforcingConcretingCuringForm stripping

Page 19: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Calendar 2007 March April 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12Activity M T W T F S S M T W T F S S M T W T F S S A H B O C L D I

E D F A Y

Page 20: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Linked Barchart (Gantt chart)

A

B

C

D

E

Page 21: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Activity Draw a bar chart based on the following information

Activity Duration (days) Depends on--------------------------------------------------------------------A 5 Can start immediatelyB 5 AC 12 AD 3 CE 6 B and 2/3 of CF 8 B and 2/3 of CG 14 AH 5 D, E, F and G

Page 22: G’Day! Stefan Hörnlund University of South Australia stefan.hornlund@unisa.edu.au.

Solution

5 10 15 20 25 30

A

B

C

D

E

F

G

H