Gbh Sefico Powerpoint

download Gbh Sefico Powerpoint

of 28

Transcript of Gbh Sefico Powerpoint

  • 8/13/2019 Gbh Sefico Powerpoint

    1/28

    Grupo Beraza Hermanos

    and Affiliated Companies

  • 8/13/2019 Gbh Sefico Powerpoint

    2/28

    Grupo Beraza Hermanos Inc.

    GBH Board of Directors

    President:

    Jose Maria Beraza

    CEO:

    Pablo Antoniazzi

  • 8/13/2019 Gbh Sefico Powerpoint

    3/28

    Past Activities

    Banking

    Construction

    Aircraft Manufacturing

    Communications

    Printing

    Packing Plants

    Retailing

  • 8/13/2019 Gbh Sefico Powerpoint

    4/28

    Current Activities

    FarmingAgriculture Companies with a Net worth of:$ 166,825,112 million dollars.

    ServicesAeronautic Maintenance.

    DistributionDistribution, Maintenance and overhaul of Turbines and

    Helicopters.Manufacturing

    Aeronautic Companies with a Net worth of:$ 43,109,590 million dollars.

  • 8/13/2019 Gbh Sefico Powerpoint

    5/28

    ChemicalGBH is on the implementation stageof an Ammonia & Urea FertilizerPlant, located on the FederativeRepublic of Brazil.

    Security

    Brijot Imaging Systems Inc.

    www.Brijot.com

  • 8/13/2019 Gbh Sefico Powerpoint

    6/28

    Communications

    One Planet Communications Inc. Long Distancein Argentina an is on the stage of gettinglicenses to operate.

    GSR Inc. making research of satellite networks.

    USA Long Distance carrier in negotiations atthis stage.

    GNT MOBILE an associated European company

    now implementing projects in Africa.

  • 8/13/2019 Gbh Sefico Powerpoint

    7/28

    ConstructionAs a result of the previous developmentsassociations with different constructionscompanies.

    Energy

    Association with Atlantic Pacific Energy Ltd. Todevelop a 2000 MW Electric Power Plant inTurkey.

    Waste to Energy Plants in association withSEFICO www.sefico.com

  • 8/13/2019 Gbh Sefico Powerpoint

    8/28

    Consortium formed by these two companies

  • 8/13/2019 Gbh Sefico Powerpoint

    9/28

    Improved Thermal Conversionplants

    One Million Tons of Waste

    Produces the same electricityas 1 Million Barrels of Oilwould.

    Experience in the Municipal Field since 1961

  • 8/13/2019 Gbh Sefico Powerpoint

    10/28

    Every Ton of Wasteused to generatepower, saves 1.5barrels of Oil.

    Latin America alonegenerates 500,000tons of waste perday.

    Equivalent to the useof 750,000 barrels ofOil per day just togenerate power.

  • 8/13/2019 Gbh Sefico Powerpoint

    11/28

    Applied and proven technology

  • 8/13/2019 Gbh Sefico Powerpoint

    12/28

    Conceptual rendering of a plantThere are no high smoke stacks, no air pollutants,only water vapor is released

  • 8/13/2019 Gbh Sefico Powerpoint

    13/28

    Efficient elimination of solid wastes via gasificationwithout creating any odors

    Do not produce any contamination

    Power generation using solid wastes as fuel, withoutmassive utilization of fossil fuels

    Use of inert residues for improvement of road basesand as concrete additives

    Recycling during the process, not before

  • 8/13/2019 Gbh Sefico Powerpoint

    14/28

    TYPES OF WASTES THAT WE

    CAN PROCESS MunicipalIndustrial

    Toxic

    Medical

    Pathological

    Tires

    PlasticsHydrocarbons

    Liquids and Solids

  • 8/13/2019 Gbh Sefico Powerpoint

    15/28

    Current Projects of W 2 E

    Brazil

    Spain

    Venezuela

    Dominican Republic

    Peru

    Ecuador

  • 8/13/2019 Gbh Sefico Powerpoint

    16/28

    Other Projects in development by

  • 8/13/2019 Gbh Sefico Powerpoint

    17/28

    Airport Albacete-La Roda SpainWorld Wide, air transport keeps growing.

    This airport, located less than 150 Km. S E

    from Madrid, near Valencia, will be a CargoHub in Spain with daily shipments to America,Europe, Africa & Asia.

    Cargo will be its main objective, it will not bea byproduct of commercial air traffic.

    Open 365 days a year.

  • 8/13/2019 Gbh Sefico Powerpoint

    18/28

    Phase I

    12 operations at peak time

    14 Parking positions

    36,000 sq. Meters of cargo area

    350,000 sq. Meters of Land Development

  • 8/13/2019 Gbh Sefico Powerpoint

    19/28

    Phase II

    25 operations at peak time

    34 Parking positions84,000 sq. Meters of cargo area

    700,000 sq. Meters of Land Development

    Phase II

  • 8/13/2019 Gbh Sefico Powerpoint

    20/28

    Phase III

    12 operations at peak time

    77 Parking positions

    200,000 sq. Meters of cargo area

    1,800,000 sq. Meters of Land Development

    Phase III

  • 8/13/2019 Gbh Sefico Powerpoint

    21/28

    LOCATION

  • 8/13/2019 Gbh Sefico Powerpoint

    22/28

    Estimated Project Cost 400 Million.

    Airport type 4F.

    Landing strip 4,500 meters.

    Will handle airplanes F type.

    Loading Platform of 13 Million squaremeters, the largest in Europe.

  • 8/13/2019 Gbh Sefico Powerpoint

    23/28

    AIR CARGO

    Period between2002 & 2010

    Growth of 6.5%/yrOperating profit 30%

    More than passenger

    Operating cost 50%

    Less than passenger

  • 8/13/2019 Gbh Sefico Powerpoint

    24/28

    Health related ProjectsDRGER SIEMENS

    World Wide Hospital Financing

    GISSA

    Proximity Family RetirementHouses

  • 8/13/2019 Gbh Sefico Powerpoint

    25/28

    Housing in association withQuinton Finance

    DAKAR GATE, SENEGALMINISTRY OF HOUSING, VENEZUELA

    HOSPITAL, CHINA

    HOG ISLAND RESORT, GRENADA W.I.

  • 8/13/2019 Gbh Sefico Powerpoint

    26/28

    Trading / Shipping in BulkSCRAP METAL

    IRON ORECOAL

    OIL PRODUCTS

    PETROTANK

  • 8/13/2019 Gbh Sefico Powerpoint

    27/28

    General ConstructionProjects

    BUS TERMINAL, LIMA PERU

    PINNACLE INDUSTRIAL HOLDING,PERU

  • 8/13/2019 Gbh Sefico Powerpoint

    28/28