Gatton Infrastructure Upgrade Project
Consideration:
The Gatton Infrastructure Upgrade Project is a multi-stage project comprised of:
1. Upgrading of the electrical connection to the Gatton campus from 11kV to 33kV;2. Developing a Central Energy Plant (CEP) for the central academic core of the campus;3. Construction of a Thermal Energy Storage (TES) tank;4. Reticulating chilled water to the central academic core buildings and connect them to the CEP chiller station.
This submission relates to the building and structures that form stages 1 to 3 above. Stage 4 is expected to occur within the existing buildings.
This project aligns with the University’s Sustainability Goals including the vision for UQ Gatton to become an Energy Neutral campus. It is forecast that the site electrical load and renewable energy generation will increase over the next few years requiring the introduction of a 33kV electrical connection to the Energex grid. A change to 33kV simplifies the strict compliance burden we have with the current conditions of our Electrical Connection Agreement. We have presently reached a working ceiling on the capacity of renewable energy on the campus with our existing 11kV connection. This project provides the required infrastructure to permit further development (buildings and renewable energy) of the campus and to support life cycle replacement of air conditioning plant on the campus.
Description:
The Central Energy Plant and 33kV Substation are combined into a single building located between the Inner and Outer Ring Roads on campus beside the existing 11kV substation and above the design flood level. The Thermal Energy Storage tank is to be constructed beside the new building. The building will be constructed to a similar form and using the same materials (concrete masonry and profiled metal cladding) as the existing neighbouring building. The upper section includes metal louvres to provide visual and acoustic screening to the air conditioning cooling towers. The tank will be constructed of bolted galvanised steel plates with internal insulation. The proportions of the tank reflect the requirement to have a thermal stratification of the chilled water stored.
Proposed Substation
+ Chiller Plant
CA
AS
WAY
CO
NTA
INM
EN
TC
IRC
LE
OLD FOREST HILL ROAD
PROPOSED SITE PLAN1:7500 @ A3
UQ GATTON SUBSTATION & CHILLER PLANT
2 10 November 2016
8162
81128108
8107
8150
Existing Substation
Existing Veterinary
Science Building
Proposed Substation
+ Chiller Plant
Proposed
Thermal Energy
Water Storage
Tank
DETAIL SITE PLAN1:1000 @ A3
UQ GATTON SUBSTATION & CHILLER PLANT
3 10 November 2016
RL +99,590
33kV / 11kV
Transformer 2
RL +97,340
33kV / 11kV
Transformer 1
RL +97,340RL +96,625RL +96,625
Control Room
RL +98,700
Fire Pump
Room
RL +98,700
RL +98,700
33kV
Switchroom
+96,625
+97,400
98
97
97.5
98.5
96.5
96.5
97.5
99
99.5
Chiller Plant
11/0.43kV 11/0.43kV
Transformer 1 Transformer 2
LV MSBThermal Energy Storage
Tank 17m dia.
Booster
Cabinet
Equipment
Landing
Area
RL +98,700
EXISTING SUBSTATION
BUILDING
BUILDING
8113
Existing
Veterinary
Science
Building
(8114)
Existing Dairy
Complex (8162)
Existing Substation
(8167)
Proposed Substation
& Chiller Plant
ProposedThermal
Energy Water Storage
Tank
GROUND LEVEL PLAN 1:500 @ A3
UQ GATTON SUBSTATION & CHILLER PLANT
4 10 November 2016
EXISTING SUBSTATION BUILDING
RL 96,625
STORAGE TANK
RL 101,720
RL 103,965RL 104,540
RL 108,755
PROPOSED SUBSTATION BUILDING & CHILLER PLANT
RL 97,340
THERMAL ENERGY
METAL CLADDING TO
MATCH ADJACENTSUBSTATION
LOUVRES TO ENCLOSURE
LOUVRE GRILLE
PREFINISHED
COMPRESSED FIBRE
CEMENT CLADDING
LOUVRE GRILLE
EXISTING COMMS TOWER
ROLLER DOORROLLER DOOR
EXISTING SUBSTATION BUILDING
RL 96,625
RL 103,965
RL 108,755
PROPOSED SUBSTATION BUILDING & CHILLER PLANT
RL 99,590
ELEVATIONS 1:250 @ A3
UQ GATTON SUBSTATION & CHILLER PLANT
5 10 November 2016
THERMAL ENERGYSTORAGE TANK
LOUVRES TO ENCLOSURE
METAL CLADDING TO
MATCH ADJACENT
SUBSTATION
PREFINISHED
COMPRESSED FIBRE CEMENT
EAST ELEVATION (VIEW FROM OUTER RING ROAD)
WEST ELEVATION (VIEW FROM INNER RING ROAD)
RL 96,625
RL 103,965
RL 108,755
RL 99,730
RL 98,700
LOUVRES TO
ENCLOSURE
CHAINLINK MESH
CLADDING ON STEEL SUPPORT FRAME
STAIR BEHIND
SHOWN DASHED
METAL CLADDING TO
MATCH ADJACENT SUBSTATION
EXISTING COMMS
TOWER
RL 96,625
RL 103,965
RL 108,755
LOUVRES TO
ENCLOSURE
METAL CLADDING TO
MATCH ADJACENT SUBSTATION
EXISTING
COMMS TOWER
SOUTH ELEVATION
ELEVATIONS 1:250 @ A3
UQ GATTON SUBSTATION & CHILLER PLANT
6 10 November 2016
NORTH ELEVATION
8114
8179
8106
8105
8167
INN
ER
RIN
GR
OA
D
8103A8162
8113
81118117A
8116
8110
8109
8107
81088112
8150
8103
Existing Substation
(8167)
Inner Ring Road
PERSPECTIVE 1 EXISTING (LOOKING SOUTH)
UQ GATTON SUBSTATION & CHILLER PLANT
7 10 November 2016
8114
8179
8106
8105
8167
INN
ER
RIN
GR
OA
D
8103A8162
8113
81118117A
8116
8110
8109
8107
81088112
8150
8103
Existing Substation
(8167)
Inner Ring Road
PERSPECTIVE 1 PROPOSED (LOOKING SOUTH)
UQ GATTON SUBSTATION & CHILLER PLANT
8 10 November 2016
8114
8179
8106
8105
8167
INN
ER
RIN
GR
OA
D
8103A8162
8113
81118117A
8116
8110
8109
8107
81088112
8150
8103
Inner Ring Road
PERSPECTIVE 2 EXISTING (LOOKING NORTH)
UQ GATTON SUBSTATION & CHILLER PLANT
9 10 November 2016
Inner Ring Road
8114
PERSPECTIVE 2 PROPOSED (LOOKING NORTH)
UQ GATTON SUBSTATION & CHILLER PLANT
10 10 November 2016
8179
8106
8105
8167
INN
ER
RIN
GR
OA
D
8103A8162
8113
81118117A
8116
8110
8109
8107
81088112
8150
8103
8114
8179
8106
8105
8167
INN
ER
RIN
GR
OA
D
8103A8162
8113
81118117A
8116
8110
8109
8107
81088112
8150
8103
Existing Animal
Health Laboratory
(8103A)
PERSPECTIVE 3 EXISTING (LOOKING WEST)
UQ GATTON SUBSTATION & CHILLER PLANT
11 10 November 2016
8114
8179
8106
8105
8167
INN
ER
RIN
GR
OA
D
8103A8162
8113
81118117A
8116
8110
8109
8107
81088112
8150
8103
Existing Animal
Health Laboratory
(8103A)
PERSPECTIVE 3 PROPOSED (LOOKING WEST)
UQ GATTON SUBSTATION & CHILLER PLANT
12 10 November 2016