Gas/Electric Partnership Conference · Customer Installation Unit Type No. Motor/VFD Speed Order...
Transcript of Gas/Electric Partnership Conference · Customer Installation Unit Type No. Motor/VFD Speed Order...
J Fagg 1February 2009Gas Electric Conference
MAN Turbo Pipeline & Storage Compression
Gas/Electric Partnership ConferenceFebruary 10-11, 2009
Gas/Electric Partnership ConferenceFebruary 10-11, 2009
J Fagg 2February 2009Gas Electric Conference
MAN Turbo Pipeline & Storage Compression
New Product DevelopmentsNew Product Developments
J Fagg 3February 2009Gas Electric Conference
MAN Turbo Pipeline & Storage Compression
New Product DevelopmentsLooking Forward and
Looking Back
New Product DevelopmentsLooking Forward and
Looking Back
4J Fagg February 2009Gas Electric Conference
Customer Installation Unit Type No. Motor/VFD Speed Order
Units Supplier RPM HP kW YearTransco, USA Station 100, USA MOPICO RM 40 1 ALSTOM/Ross Hill 10'000 8'000 6'000 1990
EWE AG; GER Nüttermoor,GER HOFIM RB 22 1 ALSTOM/Hill Graham 20'000 2'800 2'100 1991Wingas, GER Bunde;GER MOPICO RM 30 1 ALSTOM/Hill Graham 12'700 4'600 3'400 1992Columbia Gas, USA Rutledge, USA MOPICO RM 40 3 ALSTOM/Ross Hill 10'000 4'600 3'400 1994BG Transco, UK Peterstow,UK MOPICO RM 40 3 ALSTOM/Hill Graham 10'000 10'700 8'000 1995BG Transco, UK Lockerley,UK MOPICO RM 40 1 ALSTOM/Hill Graham 10'000 10'700 8'000 1995
TransCanada PL, CDN Lachenaie,CAN MOPICO RM 40 1 ALSTOM/Ross Hill 10'000 9'400 7'000 1997BG Transco, UK Lockerley,UK MOPICO RM 40 1 ALSTOM/Hill Graham 10'000 10'700 8'000 1998ARCO, USA Point Mac, USA HOFIM RB 31+RB 28 1 ALSTOM/Ross Hill 14'000 9'500 7'100 1998NAM, NED Pernis West,NED HOFIM RB 31 1 ALSTOM/ALSTOM 14'000 6'300 4'700 1998TransCanada PL, CDN East Hereford,CAN MOPICO RM 40 1 ALSTOM/Ross Hill 10'000 9'400 7'000 1998NAM, NED Barendrecht,NED HOFIM RB 31 1 ALSTOM/ALSTOM 15'000 6'300 4'700 1999
APEL/EMGS, UK Hole House,UK HOFIM RB 31 1 ALSTOM/Hill Graham 14'200 7'100 5'300 1999Thyssengaz. GER Hunenpipe 3,GER HOFIM RV 040 1 ALSTOM/ALSTOM 12'700 8'000 6'000 1999NAM, NED Gaag,NL HOFIM RB 31 1 ALSTOM/ALSTOM 14'700 6'300 4'700 2000Petrobras, BR Namorado,BR HOFIM RB 28 1 ALSTOM/Robicon 18'500 2'700 2'000 2000PPP/eCORP, USA Stagecoach,USA HOFIM Sealed RB 31 3 ALSTOM/Robicon 12'000 7'800 5'800 2000
NAM 2001, NED Botlek,NED HOFIM RB 31 1 ALSTOM/ALSTOM 14'700 6'300 4'700 2001EWE, AG, GER Nüttermoor,GER HOFIM Sealed RB28-6+RB28-6 1 ALSTOM/Robicon 10'500 8'000 6'000 2002Gaz de France, F Cherré;F MOPICO RM 40 2 ALSTOM/ALSTOM 10'000 6'700 5'000 2002KBR/BP Azerbeijan Shah Deniz,AZB MOPICO RM 40 2 ALSTOM/Robicon 12'000 9'400 7'000 2003NETRA/Ruhrgas AG, GER Wardenburg,GER MOPICO RM 40 3 ALSTOM/Robicon 12'000 9'400 7'000 2003
APEL/EMGS, UK Hole House,UK HOFIM Sealed RB45-4+RB45-4 1 ALSTOM/Robicon 9'000 14'600 10'900 2003Gaz de France, F Cherré,F MOPICO RM 40 2 ALSTOM/ALSTOM 10'500 7'900 5'900 2005Gaz de France, F Cuvilly,F MOPICO RM 40 2 ALSTOM/ALSTOM 7'700 8'700 6'500 2005Gasunie, NL Grijpskerk,NED MOPICO RM 40 2 ALSTOM/Robicon 8'100 8'900 6'600 2005
Power
Reference list of high speed magnetic levitatedpipeline and gas storage compressor systems
5J Fagg February 2009Gas Electric Conference
Customer Installation Unit Type No. Motor/VFD Speed Order
Units Supplier RPM HP kW Yearnot public,GER HOFIM Sealed RB45 1 ALSTOM/ALSTOM 8,230 11,000 8,200 2006EWE, GER Nüttermoor,GER HOFIM Sealed RB28-6+RB28-6 2 ALSTOM/SIEMENS 9,315 9,400 7,000 2006not public,UK HOFIM Sealed RB35-5 3 CVT/CVT 10,500 9,400 7,000 2007NETRA/E.ON Ruhrgas AG, GERWardenburg,GER MOPICO RM40 2 CVT/SIEMENS 12,000 9,400 7,000 2007Gasunie, NL Wijngaarden,NED MOPICO RM50 5 CVT/CVT 8,700 14,100 10,500 2007EDF,F Etzel,GER HOFIM Sealed RB45-5+RB45-5 2 CVT/CVT 8,900 14,500 10,800 2008BP Etzel,GER HOFIM Sealed RB35-7; RB35-4 3 CVT/CVT 9,830 10,500 7,830 2008NUON,NL EPE,GER HOFIM Sealed RB35-5; RB35-5 2 CVT/CVT 8,920 11,500 8,540 2008EWE, GER Nüttermoor,GER HOFIM Sealed RB28-6+RB28-6 3 MAN/SIEMENS 9,315 9,400 7,000 2008
TOTAL 62
TOTAL HOFIM/HOFIM SEALED 30
TOTAL MOPICO 32
Power
Reference list of high speed magnetic levitatedpipeline and gas storage compressor systems
6J Fagg February 2009Gas Electric Conference
Residential Installation – Compressor Operation Commenced 1995
MOPICO Station: Green Compression!
Three hermetically sealedMOPICO pipeline motor-compressors operating in series. Total station time nearing 100,000 hours in 2009.
7J Fagg February 2009Gas Electric Conference
Gas Storage Application Experience
High Performance Gas Storage Facility Commissioned in 2002
Three identical hermetically sealed HOFIM motor-compressorsoperating in parallel or in 2-into-1-series operation
Seventh year of operating gas-cooled motors at this location. Motors have never been opened for inspection or repair.
11J Fagg February 2009Gas Electric Conference
New Development Built Upon Two Decades of Operating Experience
12J Fagg February 2009Gas Electric Conference
Designed For Sub Sea Extremes
Wet Gas ApplicationsWet Gas Applications
Sour Gas ApplicationsSour Gas Applications
Offshore Unmanned InstallationsOffshore Unmanned Installations
Subsea InstallationsSubsea Installations
Revolutionary Motor Designed and BuiltBy MAN to Handle
HOFIM-Sealed Multi-Stage Motorcompressor
13J Fagg February 2009Gas Electric Conference
High performance rotor for “clean” (pipeline quality) gas applications.
Heavy duty rotor for wet or corrosive gas environment(subsea)
Sub Sea Design Reliability Assures Reliability in Conventional Storage and Pipeline Duty
16J Fagg February 2009Gas Electric Conference
Historic Concept with Current Technology
MAN Gas Engine
17J Fagg February 2009Gas Electric Conference
Historic Concept with Current Technology
MAN Gas Engine
Voith Vorecon VSD
18J Fagg February 2009Gas Electric Conference
Historic Concept with Current Technology
MAN Gas Engine
Voith Vorecon VSD
MAN Turbo-compressor
19J Fagg February 2009Gas Electric Conference
Historic Concept Using Current Technology
Benefits of this technology:High efficiency of the MAN gas engine – 45.5% thermal efficiency…. 5590 Btu/HP-HR
20J Fagg February 2009Gas Electric Conference
Historic Concept with Current Technology
Benefits of this technology:High efficiency of the MAN gas engine – 45.5% thermal efficiency…. 5590 Btu/HP-HR
High engine efficiency maintained at all power levels
21J Fagg February 2009Gas Electric Conference
Historic Concept with Current Technology
Benefits of this technology:High efficiency of the MAN gas engine – 45.5% thermal efficiency…. 5590 Btu/HP-HR
High engine efficiency maintained at all power levels
No altitude deration of power up to 1000 ft elevation; above 1000 feet the power reduction is significantly lower than gas turbine
22J Fagg February 2009Gas Electric Conference
Historic Concept with Current Technology
Benefits of this technology:High efficiency of the MAN gas engine – 45.5% thermal efficiency…. 5590 Btu/HP-HR
High engine efficiency maintained at all power levels
No altitude deration of power up to 1000 ft elevation; above 1000 feet the power reduction is significantly lower than gas turbine
Centrifugal compressor speed fully variable through Voith Vorecon step-up Variable Speed Drive (VSD)
23J Fagg February 2009Gas Electric Conference
Historic Concept with Current Technology
Benefits of this technology:High efficiency of the MAN gas engine – 45.5% thermal efficiency…. 5590 Btu/HP-HR
High engine efficiency maintained at all power levels
No altitude deration of power up to 1000 ft elevation; above 1000 feet the power reduction is significantly lower than gas turbine
Centrifugal compressor speed fully variable through Voith Vorecon step-up Variable Speed Drive (VSD)
Proven concept – arrangement with fixed ratio gear was first implemented on U.S. Pipeline over 50 years ago and multiple units are still operating.