Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency,...

12
Page 1 Transmission Transparency, 13.12.2007 Gas Regional Initiative North-West Transmission System Operators Transmission Transparency Project Project Plan The Hague, 13 December 2007 Contact: Oliver Altenhoff E.ON Gastransport AG & Co. KG Kallenbergstr. 5 45141 Essen GERMANY Oliver.altenhoff@eon- gastransport.com

Transcript of Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency,...

Page 1: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 1Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Transmission Transparency Project

Project Plan The Hague, 13 December 2007

Contact:Oliver AltenhoffE.ON Gastransport AG & Co. KGKallenbergstr. 545141 [email protected]

Page 2: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 2Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Overview

Introduction Information to be published List of Participating Operators Interconnection Points Time Schedule Specific Time Schedule of Implementation Monitoring of Implementation Cost Statements

Page 3: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 3Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Introduction

• At SG meeting in Dublin, TSOs announced the development of a project plan for best practices based on requests of market participants

• EFET wish list established (Requirements go beyond current legislative requirements)

Transparency questionnaire responses and Ofgem-Workshop

A high-level plan published by TSO: commitment to the wish list

Detailled plan shows the implementation process

Page 4: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 4Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Information to be published

The following information refers to Interconnection Points

Max technical capacity of the transmission system Daily commercial firm and interruptible capacity Interruptions /Interrupted flows Daily flow / aggregated allocations (D+1) Daily prompt allocation information to each shipper Daily aggregate day-ahead nominations (D-1) Historic gas flow information database

Page 5: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 5Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

List of Participating Operators

Netherlands

United Kingdom

Germany Belgium

France Ireland

Sweden

Northern Ireland

Denmark

Page 6: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 6Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Interconnection Points

0 0 1

74

10 10

14

20

5

02

0

5

9

0 00

0

0

0

11

9

0

0

23

5

6

3

0

0

0

5

10

15

20

25

30

Swedeg

as

Svens

ka K

raft

Bord

Gais

Nation

al Grid

Inte

rcon

necto

r

Energ

ienet

.dk

GTS

Fluxys

DEP

BEB Tra

nspo

rt

E.ON G

T

RWE T

NG

WIN

GAS Tra

ns.

Ontra

s

GdFDT

GRTgaz

confidential

publicly available

69 points publ. avbl.

57 points confid.

Page 7: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 7Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

2007 2008

Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Identification areas of quick

wins

High level plan

Feedback

TSOs finalization on plans

Detailed project plan

Implementation at each TSO

Result

Time Schedule

First wins Later wins Final wins

Page 8: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 8Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Specific Time Schedule of Implementation

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Max technical capacity

Interruption

Daily commercial firm andinterruptible capacity

Daily flow / aggregatedAllocation

Daily prompt allocationinformation

Daily aggregate day-aheadnominations

Historic gas flow informationdatabase

in place

earlier

later

final

no answer

Page 9: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 9Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Specific Time Schedule of Implementation

E.ON GT FluxysSvensk Kraftnät

RWE TNGNational

GridInterconnect

orBGE

WINGAS Transport

Ontras GRTgazEnergien

et.dkBEB DEP

Swedegas

GdFDT GTS

Max technical capacity in place earlier in place in place in place earlier in place in place in place earlier in place in place earlier in place in place

Interruption later final final in place in place later earlier in place earlier later later earlier in place in place

Daily commercial firm and interruptible capacity

in place earlier later final in place earlier in place in place in place earlier in place in place later in place in place

Daily flow / aggregated Allocation

earlier earlier later later in place in place later earlier earlier in place earlier earlier earlier earlier earlier in place

Daily prompt allocation information

earlier final later in place in place in place in place in place in place in place in place in place in place in place in place

Daily aggregate day-ahead nominations

later in place later later final in place later earlier earlier later earlier in place

Historic gas flow information database

later final later later in place in place later earlier earlier in place in place earlier later later in place in place

April 2008 earlierOctober 2008 laterJanuary 2009 final

Page 10: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 10Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Monitoring of Implementation

TSO will send progress reports to RCC

First progress report in May 2008

Mid-term report in February 2008

Second progress report in November 2008

Mid-term report in July 2008

Final progress report in January 2009

Page 11: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 11Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Cost statements

Operators will have first cost estimations in Jan/Febr. 2008 for discussion with RCC.

Should be handled on the national level first

Page 12: Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, 13.12.2007 Transmission Transparency Project Project.

Page 12Transmission Transparency, 13.12.2007

Gas Regional Initiative North-WestTransmission System Operators

Transmission Transparency Project

Contact:Oliver AltenhoffE.ON Gastransport AG & Co. KGKallenbergstr. 545141 [email protected]

Thank you!