Gas entec ppt for_gis 2016_distribution
-
Upload
brandon-shin -
Category
Business
-
view
5.052 -
download
1
Transcript of Gas entec ppt for_gis 2016_distribution
-
LNG Engineering Solutions for
LNG Fuelled Ships and
Small-Mid Scale LNG Carriers
Brandon Shin General Manager
Solutions for Gas Engineering
-
LNG TREND
35,000 MW for Indonesia
WHY LNG Conversion to NG:
Reduction of Ship Emissions
Elimination of Particulate Matter (PM)
Reduction of SOx, NOx, CO2
National Mid-Term Development Plan 2015-2019 35,000MW or 7,000MW/year
Green Energy Source LNG and Small/ Mid Scale LNG Solution
p2
[ Source: PLN ]
[ Source: TOTE ]
-
Establishment : Feb, 2013
No. of Employees : 45 Persons
Address : #2701-2707, KNN Tower, Centumseo-ro 30, Haeundae-gu, Busan, Korea
Main Business : SOLUTIONS FOR LNG ENGINEERING
COMPANY INTRODUCTION
Small LNG FSRU Small/Mid Scale LNG Carrier Fuel Gas Supply System
(FGSS) LNG Storage Solution
p3
Major Clients & Partners:
-
ENGINEERING SERVICE
p4
Scope of Work
Tender Document for Shipyard
Invitation & Evaluation
Outline Building Specification
General Arrangement
Light Weight Calculation
Shipbuilding Master Schedule
Quotation base formats
Technical Bid Evaluation (TBE)
Shipyard selection & Shipbuilding
cost negotiation
Major Equipment vendor
selection
Pre-Engineering
Basic & Detail Design for
Small/ Mid LNG Carrier
Hull & Structure
Cargo Containment System (CCS)
Cargo Handling System (CHS)
Hull & Machinery Outfitting
Electric & Automation
Procurement & Practice
Purchasing Order Specification
Equipment for Cargo Handling
System
Shipbuilding Engineering & Design
Master & Sub. Build scheduling
Shipbuilding supervising for
CCS & CHS
Coordination for Owner,
Shipyard, Class Society, Vendor
and third party authorities.
Project Management
-
Maritime LNG Value Chain
p5
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p6
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p7
-
Floating Regasification Unit (FRU) SMALL LNG FSRU
Bali 50mmscfd LNG FRU
Project Images 2
Project Images 1
The Worlds First Floating Regasification Unit
for Bali Benoa Port to supply LNG to Power Plant
Year of Contract (Delivery): 2015 (2016) Client: JSK Shipping (Indonesia) Shipyard: KangNam Corporation Classification: KR Scope of Work: EPC Contractor Dimension of Vessel/ Barge
LOA : 46.0 m / Breadth: 12.0 m / Depth: 4.7/ 5.2 m Characteristics of LNG Buffer Tank
Qty x Capacity: 1 x 400 m3 LNG feed pump: 2 x 100m3/h x 260 mlc, Electric
motor driven, Barrel Type Regasification System
LNG flow to skid: 50 mmscfd Inlet/ Outlet temp.: appr. -158 / min. 5 NG outlet pressure: 900 kPa.g
KR: Korea Register
p8
-
Floating Regasification Unit (FRU) SMALL LNG FSRU
p9
userCompany Logo
-
Floating Regasification Unit (FRU) SMALL LNG FSRU
p10
LNG Buffer Tank
Control Room
Re-gasification Unit, Compressor & Feed Pump Room
Machinery Room
userCompany Logo
-
Floating Regasification Unit (FRU) SMALL LNG FSRU
p11
FRU & LNGC
Arrangement for FRU & LNGC (as temporary LNG Storage)
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p12
-
Floating Storage Unit (FSU)
Bali 26K LNG FSU
Project Images 2
Project Images 1
Floating Storage Unit for Bali Benoa Port
to supply LNG to FRU
Year of Contract (Delivery): 2015 (2016) Client: JSK Shipping (Indonesia) Shipyard: (TBD) Classification: KR Scope of Work:
FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
Dimension of Vessel/ Barge LOA : 119.1 m/ Breadth: 27.1 m/ Depth: 16.4 m
Characteristics of LNG Storage Tank Qty x Capacity: 2 x 13,000m3 CCS: MK-III Membrane type
Cargo Handling Equipment Main CP: 4sets (2sets/ tank), 200 m3/hr, 155 mlc Stripping/Spray pump: 2sets (1set/ tank), 50 m3/hr, 155 mlc Return gas compressor: 2 x 2,000 m3/hr
Nitrogen Generator Plant Capacity PSA plant: 2 x 40 m3/hr at 97 vol %
CCS: Cargo Containment System CP: Cargo Pump PMC: Project Management Consultancy PSA: Pressure Swing Adsorption p13
SMALL LNG FSRU
-
Floating Storage Unit (FSU)
p14
SMALL LNG FSRU
userCompany Logo
-
Floating Storage Unit (FSU)
p15
SMALL LNG FSRU
FRU, FSU and Small LNG Carrier Arrangement
To Bali LNG Power Plant
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p16
-
Floating Storage Regasification Unit (FSRU) SMALL LNG FSRU
Reference List 30K LNG FSRU
Project Images 2
Project Images 1
Floating Storage Regasification Unit for Caribbean Island
to supply NG to Power Plant
Dimension of Vessel/ Barge
LOA : 102.77 m/ Breadth: 29.39 m/
Depth: 23.00 m/ Draft: 7.54 m
Characteristics of LNG Storage Tank
Qty x Capacity: 2 x 15,000m3
CCS: MK-III Membrane type
LNG feed Pump: 4 x 100m3/h x 155mlc,
Electric motor driven & Submerged type
Booster Pump: 2 x 50m3/h x 210mlc,
Electric motor driven & Barrel type
Regasification System
Gas flow to power plant: 1,440m3/day (190MW)
Inlet/ Outlet temp: appr. -158 / min. 5
NG outlet pressure: 10 bar.g
. CCS: Cargo Containment System
p17
-
Floating Storage Regasification Unit (FSRU) SMALL LNG FSRU
p18
userCompany Logo
-
LNG Storage Tank
Floating Storage Regasification Unit (FSRU) SMALL LNG FSRU
p19
Liquid in
to GCU
Sea Water in
Sea Water Out
Steam
Steam
BOG Compressor
Forcing Vaporizer
Regasification Unit
Glycol Water Tank
Glycol Water Pump
Heat Exchanger
to Generator
to Boiler
Vapor In/Out
to Power Plant
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p20
-
FSRU Conversion Using Existing LNG Carrier SMALL LNG FSRU
p21
Reference List 125K LNGC to FSRU
Project Images 2
Project Images 1
Feasibility Study for Conversion of
Existing Old LNG Carrier to FSRU
Dimension of Vessel/ Barge
LOA : 268.0 m / Breadth: 44.0 m /
Depth: 25.0 m / Draft: 11.5 m
Required work for FSRU Conversion
[ Install ]
Re-gasification unit (abt. 100mmscfd) x 2 sets
Dual Fuel Genset x 2 sets
Daily LNG Buffer Tank 500m3 x 2 units
Sea Water Lift Pump 2,000m3/Hr x 4 sets
Re-Gas Handling System
Custody transfer & Measuring System
Boil-off Gas Compressor
[ Retrofit & Repair ]
Cryogenic Pipe and Outfitting
Main Switchboard and Elec. Power Routing
Insulation Part, etc.
-
FSRU Conversion Using Existing LNG Carrier SMALL LNG FSRU
p22
+
Activity
Conversion Schedule (Month)
M0 M1 M2 M3 M4 M5 M6 M7 M8 M9
Regas. Unit
Old Ship Repair
Dry Dock
Contract Delivery
Liquid in to Power Plant
Steam
Steam BOG Compressor
Vent Master
LNG Storage Tank
High Pressure Pump
BOG Heater
Forcing Vaporizer
HCR Fuel Gas Heater
( Depends on Ship Condition )
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p23
-
LNG Bunkering Barge
The first LNG bunker barge for the marine market
in North America
Year of Contract (Delivery): 2015 (2015) Client: Conrad Orange Shipyard (USA) Shipyard: Conrad Orange Shipyard Classification: ABS Scope of Work:
Total Engineering IAS, CTMS, ESD Package
Dimension of Barge LOA : 70.7m/ Breadth: 14.8 m/ Depth: 4.78 m
Characteristics of LNG Cargo Tank Qty x Capacity: 1 x 2,197m3 at 100% CCS: GTT MARK III membrane type
Cargo Handling Equipment Main CP: 500 m3/h@155 mlc x 2sets Stripping/Spray pump : 8m3/h@121 mlc x 1set Return gas compressor: 2 x 6,700 m3/hr
LNG vaporizer heating capacity: 120.5 kW x 1set (DongHwa Entec) Re-liquefaction plant: Stir SPC-4RL, 43.6 kg/h(unit), 6sets Nitrogen generator : 38 m3/h@2sets
2,200 CBM LNG Bunkering Barge
Project Images 2
Project Images 1
CCS: Cargo Containment System CTMS: Custody Transfer Measuring System ESD: Emergency Shut-down System IAS: Integrated Automation System
p24
SMALL/ MID SCALED LNGC
-
LNG Bunkering Barge
p25
SMALL/ MID SCALED LNGC
Under construction at Conrad Shipyard, Orange, Texas
userCompany Logo
-
P&ID- Cargo Piping System
LNG Bunkering Barge
p26
SMALL/ MID SCALED LNGC
P&ID Nitrogen System
One Line Diagram
Room & Machinery Arrangement
userCompany Logo
-
LNG Bunkering Barge
p27
SMALL/ MID SCALED LNGC
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p28
-
Small/ Mid LNG Carrier
Project Images 2
Project Images 1
32K CBM LNG Carrier
Engineering Development of 32,000cbm LNG Feeder to supply LNG fuel
to LNG Bunkering Station/Barge in US area
Year of Contract (Delivery): 2013 (2014)
Client: GTTNA (USA)
Scope of Work: Engineering Development for
FEED
PMC
Dimension of Vessel/ Barge
Length OA : 176.0 m/ Breadth: 28.8 m/
Depth: 18.0 m
Basic Design including;
Schematic Diagram, P&ID
Master Schedule
CCS & Commissioning Schedule
Cost Estimation
p29
SMALL/ MID SCALED LNGC
-
Small/ Mid LNG Carrier
p30
SMALL/ MID SCALED LNGC
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p31
-
LNG Bunkering Ship
Project Images 2
Project Images 1
8,000 CBM LNG Bunkering Ship
Engineering Development of 8,000cbm LNG Bunkering Ship
to supply LNG fuel in Singapore area
Client: RS Platou ASA (Singapore)
Scope of Work: Engineering Development for
Total Engineering
CAMS
Dimension of Vessel/ Barge
Length OA : 105.4 m/ Breadth: 18.8 m/
Depth: 10.7 m
Basic Design including;
General Arrangement
P&ID
Cost Estimation
p32
SMALL/ MID SCALED LNGC
-
LNG Bunkering Ship
p33
SMALL/ MID SCALED LNGC
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p34
-
LNG Fuelled Vessel (FGSS + Storage Solution)
LNG fuelled Log Bulk Carrier to operate in North America
Client: CLEANSHIPS Scope of Work:
Fuel Gas Supply System LNG Fuel Tank, Membrane System Engineering Service for ABS AIP
Dimension of Vessel/ Barge LOA: 181.00 m/ LBP: 29.39 m/
Breadth: 30.40 m/ Depth: 14.70 m Characteristics of FGSS
Feed Pump: 3m3/h @ 140 MLC HP LNG Pump: 1,200kg/h @ 310bar A HP LNG Vaporizer: 1,200kg/h, -145~+45 LP Forcing Vaporizer: 250kg/h, -163~-100 Fuel Gas Heater: 250kg/h, -100~+50 BOG Compressor: 320m3/h @ 6.5 bar A BOG Heater: 250kg/h, -140~+5
Characteristics of LNG Storage Tank Qty x Capacity: 1 x 2,600m3 CCS: MK-III Membrane type
37.5K DWT Bulk Carrier
Project Images 2
LNG FUELLED SHIP (LFS)
p35
-
LNG Fuelled Vessel (FGSS + Storage Solution) LNG FUELLED SHIP (LFS)
p36
userCompany Logo
-
LNG Fuelled Vessel (FGSS + Storage Solution) LNG FUELLED SHIP (LFS)
p37
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p38
-
LNG Fuelled Vessel (FGSS + Storage Solution)
Mini Container Vessel Operating in the Baltic and North Sea area
Shipyard: CIMC Raffles Yantai
Dimension of Vessel/ Barge
LOA: 152.90 m/ LBP: 146.30 m/
Breadth: 19.50 m/ Depth: 11.20 m
Scope of Work: (Proposed)
FGSS + Fuel Tank Package
Hull Section Fabrication
Characteristics of FGSS
LNG feed pump : 15M3/h x 2 sets
LNG Vaporizer : Steam direct medium
ESDS & CAMS
Characteristics of LNG Storage Tank
Qty x Capacity: 1 x 440m3
CCS: MK-III Membrane type
800 TEU LNG Fuelled Container Ship
Project Images 2
LNG FUELLED SHIP (LFS)
p39
CHS: Cargo Handling System CAMS: Control, Alarm and Monitoring System
-
800 TEU LNG Fuelled Container Ship
LNG Fuelled Vessel (FGSS + Storage Solution) LNG FUELLED SHIP (LFS)
p40
userCompany Logo
-
LNG Fuelled Vessel (FGSS + Storage Solution) LNG FUELLED SHIP (LFS)
p41
Scope of Supply
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p42
-
LNG Fuelled Vessel (FGSS + Storage Solution)
Project Images 2
Project Images 1
A study to estimate the cost and schedule of LNG fuel
System & tank to be fitted in a typical 63k BC for LNG fuelled propulsion
Year of Contract (Delivery): 2014 (2014)
Client: GTTNA (USA)
Scope of Work:
Feasibility Study of Retrofit
LNG Fuel System and Storage Tank
Dimension of Vessel/ Barge
Length OA: 198.5 m
Breadth: 32.3 m
Depth: 18.3 m
Engineering Study including;
Layout and P&ID
Master Schedule
Cost Estimation
3D Modeling
63K Bulk Carrier Jumboization
p43
LNG FUELLED SHIP (LFS)
-
LNG Fuelled Vessel (FGSS + Storage Solution)
p44
LNG FUELLED SHIP (LFS)
userCompany Logo
-
PROJECTS
N0. Client Project Supply Scope of GET
1 JSK Shipping (Indonesia)
50mmscfd LNG FRU EPC Contract
2 JSK Shipping (Indonesia)
26K LNG FSU
Engineering Service for FEED & PMC Shipbuilding Engineering & Design Cargo Handling Equipment Supply
3 GTT
(Caribbean Sea) 30K LNG FSRU
Proposal for - EPC Contract
4 JSK Shipping (Indonesia) FSRU Conversion
Feasibility Study for - Existing LNGC to FSRU
5 CONRAD Shipyard
(USA) 2,200 CBM LNG Bunkering Barge
Engineering Service for Basic & Detail Design (Cargo, Machinery, Electric) CAMS (Control, Alarm and Monitoring System)
6 GTTNA (USA)
32K CBM LNG Carrier Engineering Development - FEED & PMC
7 PLATOU
(Singapore) 8,000 CBM LNG Bunkering Ship
Engineering Consulting for LNG Barge Construction Re-liquefaction Process
8 CLEANSHIPS
(USA) 37.5K DWT Bulk Carrier
Engineering Service for FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
9 CIMC
(China) 800 TEU
LNG Fuelled Container Ship
Proposal FGSS (Fuel Gas Supply System) LNG Fuel Tank, Membrane System
10 GTTNA (USA)
63K Bulk Carrier Jumboization to LNG Fuelled Propulsion
Engineering Study - Feasibility Study of Retrofit - LNG Fuel System and Storage Tank
11 Keppel
(Singapore) 65T BP LNG Fuelled Tug Boat
Engineering Consulting for - LNG Fuel System Package
p45
-
LNG Fuelled Vessel (FGSS + Storage Solution)
The LNG Fuelled Tug boat
Client: Keppel
Scope of Work:
Fuel Gas Supply System
LNG Fuel Storage
Dimension of Vessel/ Barge
LOA: 30.30 m/ LBP: 26.50 m/
Breadth: 11.50 m/ Depth: 5.20 m
Characteristics of FGSS
Feed Pump: 1.3m3/h @ DP 10 bar x 2 sets
LNG Vaporizer: 1,200kg/h @ 45 x 2 sets
Master Gas Valve Unit: Open Deck, ESD
Gas Valve Unit (GVU): Enclosed with N2 Prurging
Characteristics of LNG Storage Tank
Capacity: Approx. 60m3
Type : Cylindrical (Type-C)
65T BP LNG Fuelled Tug Boat
Project Images 2
. FCS: Fuel Containment System
LNG FUELLED SHIP (LFS)
p46
-
LNG Fuelled Vessel (FGSS + Storage Solution) LNG FUELLED SHIP (LFS)
p47
userCompany Logo
-
LNG Fuelled Vessel (FGSS + Storage Solution) LNG FUELLED SHIP (LFS)
p48
-
GAS Entec Co., Ltd. #2701-2707, KNN Tower, Centumseo-ro 30, Haeundae-gu, Busan,
South Korea 48058 Telephone: (Tel) +82-51-714-3308 | (Fax) +82-70-7500-3979 E-mail : [email protected]
Please follow us on linkedin for further Business Update! www.linkedin.com/company/gas-entec-co-ltd
mailto:[email protected]://www.linkedin.com/company/gas-entec-co-ltdhttp://www.linkedin.com/company/gas-entec-co-ltdhttp://www.linkedin.com/company/gas-entec-co-ltdhttp://www.linkedin.com/company/gas-entec-co-ltdhttp://www.linkedin.com/company/gas-entec-co-ltdhttp://www.linkedin.com/company/gas-entec-co-ltdhttp://www.linkedin.com/company/gas-entec-co-ltd