Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files ›...
Transcript of Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files ›...
![Page 1: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/1.jpg)
Gas CCS in the UK
UK CCSRC Gas CCS Meeting
Sussex University25th June 2014
![Page 2: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/2.jpg)
Tom Snow Design Development Engineer
![Page 3: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/3.jpg)
Agenda
• Overview of SSE
• Application of CCS to new build CCGT plant
• Peterhead CCS Project
• Overview of Peterhead Power Station
• Overview of Peterhead Carbon Capture Process
• Interfaces between Peterhead Power station and the carbon capture process
• Conclusions
3
![Page 4: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/4.jpg)
4
Overview of SSE
![Page 5: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/5.jpg)
5
![Page 6: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/6.jpg)
6
Wholesale – Generation• 11,500MW of electricity generation capacity in total (UK and
Ireland)
• Most diversity in fuel sources among UK generators
• 3,326MW of capacity for generating electricity from renewable sources
– Greater Gabbard Offshore Wind - 500MW
– Clyde Onshore Wind – 350 MW
– Hydro – 1500 MW
• 3,009MW of coal-fired capacity with biomass ‘co-firing’ capability
• 4,262MW of gas- and oil-fired capacity, including share of Marchwood, one of the UK’s most efficient gas-fired power stations
![Page 7: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/7.jpg)
7
Application of CCS to new build CCGT
![Page 8: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/8.jpg)
New CCGT plant permit applications must demonstrate CCS readiness
8
High level concept report typically prepared considering:
• Choice of capture technology – Post combustion scrubbing with amine
• Indicative CCS plant layout
• Pipeline route and storage site
• Economic assessment
![Page 9: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/9.jpg)
CCS readiness
9
• Exhaust duct take off
• Adaptability of steam extraction from steam turbine to supply CCS re-boilers
• Sufficient space in turbine building to allow for steam extraction and installation of additional equipment
• Provision for additional electrical auxiliary load
• Provision for additional cooling duty
• Raw water supply and waste water treatment
![Page 10: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/10.jpg)
CCS readiness
10
For more information see The ‘Carbon Capture Readiness’ DECC guidance note
![Page 11: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/11.jpg)
11
Peterhead CCS Project
![Page 12: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/12.jpg)
• July 2012 – Shell & SSE initial Bid toDECC
• October 2012 – DECC down select 4Bidders to take through the BidImprovement Process (BIP)
• January 2013 – Shell submittedImproved Bid on behalf of Shell & SSE
• March 2013 – Peterhead CCS and WhiteRose Projects selected by DECC to takeforward
• February 2014 – Negotiations finalisedwith DECC and FEED contract signed
• March 2014 – FEED contractcommences
12
History of project
![Page 13: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/13.jpg)
13
Project Execution
13
![Page 14: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/14.jpg)
14
Overview of Peterhead Power Station
![Page 15: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/15.jpg)
Peterhead Power Station CCGT Capacity 1180 MW 15
![Page 16: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/16.jpg)
Peterhead History
16
1973 1980 1985 1991 1998 2010 NOW
![Page 17: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/17.jpg)
Peterhead Power Station
17
![Page 18: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/18.jpg)
Peterhead Power Station ‘Block 1’ CCGT
18
![Page 19: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/19.jpg)
19
Overview of Peterhead Carbon Capture Process
![Page 20: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/20.jpg)
Why CCS at Peterhead, Why in Scotland?
Capture at Peterhead
• Existing Grid Connection, Utility capacity and fuel supply
• Existing available land
• Workforce
20
![Page 21: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/21.jpg)
Why CCS at Peterhead, Why in Scotland?
Transport and Store • Existing Pipeline Infrastructure
• Existing Platform (Goldeneye), Wells and Reservoir
• Goldeneye reservoir well studied – Good candidate for storage of CO2
21
![Page 22: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/22.jpg)
Overview of the Peterhead CCs project
• CO2 capture from one gas turbine flue gas stream (GT13) at Peterhead power station.
• ~400MW post combustion retrofit
• Capture rate of 1m tonnes p.a. for anticipated 10-year period
• Capacity for at least 20m tonnes CO2 in the Goldeneye reservoir with significant expansion potential in the aquifer
22
![Page 23: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/23.jpg)
Overview of Full CCS Chain
23
![Page 24: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/24.jpg)
Overview of Full CCS Chain
24
![Page 25: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/25.jpg)
Capture Plant Location
25
Capture Plant
Location
Dense Phase Compression
GT13
![Page 26: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/26.jpg)
Interfaces between Peterhead and CCP Plant
26
![Page 27: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/27.jpg)
CCS steam requirements and options of supply
• CCS steam requirements ~50% Low pressure steam (3.5bar/150oC)
• Utilise block 1 in current configuration with minimal changes to the steam turbine
• Block 1 steam turbine re-sizing
• New steam turbine
• Positioned on the existing unit 2 plinth
• A standalone new steam turbine house
• A boiler
27
![Page 28: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/28.jpg)
Steam Cycle Simplified – ‘Block 1’ CC2/3
28
HRSG LP steam
![Page 29: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/29.jpg)
Unit 1 Steam Turbine
• U1 is a 660 MW GEC machine. Two main process/mechanical constraints – HP and LP stages
• HP swallowing capacity too large for low ‘CC1’ steam flow rates
• Risk of windage heating, HP exhaust trip level 420oC, P.R < 1.4
• CS cold reheat pipework creep damage risk
• LP cylinder (2x double-flow, LD66 7.8 m2 annuli), 20% recommended minimum exhaust flowrate:
• Last stage blade vibration leading to fatigue cracking
• Casing and blade overheating due to windage
29
![Page 30: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/30.jpg)
Unit 1 Steam Turbine Resizing and CCS
• HP constraint will be addressed by HP/IP resizing (Contract signed)
• CC1 will be possible, GT min load LP exhaust flowrate (just) > 20%
• But, if CCP steam extraction taken, LP flowrates < 20%
• Sensitivity of low flows on LD66 37” blades has recently increased with issues elsewhere in the fleet
• Conclusion: CC1+CCP not recommended on U1
• LP resizing considered but ruled out due to wide operating range required: CC1+CCP to CC3 no CCP
30
![Page 31: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/31.jpg)
Unit 1 Steam Turbine Resizing and CCS
• CC2/CC3+CCP operation possible, but which steam source?
• IP/LP crossover pipe not practical, size and location
• IP (HRH) steam 15 bar minimum
• Not very efficient way to supply LP steam to CCP
31
![Page 32: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/32.jpg)
New Steam Turbine ‘ST13’ options
32
![Page 33: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/33.jpg)
Steam turbine operational regime post CCS• New Steam Turbine ST13
• Operating in ‘CC1’ mode with GT/HRSG 13
• Steam extraction from IP/LP crossover
• Remainder of Block 1 to operate in CC1 or CC2 modes
33
![Page 34: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/34.jpg)
Gas Turbine Exhaust Gas
• GT exhaust gas
• Quite Important for the process with its CO2
• Tapping downstream of HRSG with booster fan
• GT13 flue left open with Fan pressure control, some leakage ‘up or down’ inevitable, but lower risk for HRSG ductwork integrity
34
![Page 35: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/35.jpg)
Selective Catalytic Reduction
• Shell wish to minimise NO2 to reduce amine solvent degradation and production of by-products
• HRSG is ‘SCR ready’ with space
• ST design pressure influencing factor on flue gas temperature
35
![Page 36: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/36.jpg)
Cooling Water
• Current abstraction licence based on 2x 660MW Rankine Units gives flexibility
• Block 13 and Block 1
• CCP and Compression & Conditioning Plant
• Various options still under investigation, all involve new pipework to CCP
• Upgrade CW pump(s) for higher head, including extensive modifications in ‘pit’
• Unmodified CW pumps, retain condenser philosophy of syphonic system, more complicated CCP cooling circuits
• Unmodified CW pumps with CCP booster pump station
36
![Page 37: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/37.jpg)
Cooling Water
37
![Page 38: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/38.jpg)
38
Conclusions
![Page 39: Gas CCS in the UK UK CCSRC Gas CCS Meeting Sussex University … › sites › default › files › documents › ... · 2016-05-27 · Gas CCS in the UK UK CCSRC Gas CCS Meeting](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f1468b901fe190ab339496a/html5/thumbnails/39.jpg)
• CCGT Technology has an important part to play to help meet the UK’s electricity demand in a ‘low carbon’ future
• CCS on CCGT technology must be demonstrated to prove technology at an industrial scale
• If demonstration successful there is potential for further roll out• Work undertaken to date by SSE/Shell confirms the suitability of
Peterhead PS to provide necessary materials and interfaces for a CCGT CCS demonstration project