GARLOCK EXPANSION JOINT (MSDI-P13671)Systems Design Review
January 11th, 2013
Friday, January 11, 2013 P13671 - Garlock Expansion Joint 1
2
P13671 Members
Left to Right:
Allison Feinberg (Member)
Sam Kulpinski (Member)
Don Thompson (Member)
Wayne Evans (Customer)
Elspeth Ochs (Member)
Joseph Harkins (Team Lead)
Danny McCormick (Member)
Dr. Jason Kolodziej (Faculty)
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
3
Introduction to P13671
Timeframe: Winter & Spring quarter MSD
Objective: Design and build rig to test Garlock Expansion joints under high temperatures and actuation until failure while logging data
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
4
Project Schedule
Major Dates:• Detailed Design Review (DDR):
• 2012-2 Week 10 (around 2/8/13)
• Imagine RIT:• May 5, 2013
• Final Presentation:• 2012-3 Week 10 (around 5/8/13)
• Celebrate our success and graduation • After Final Presentation!
Link to our MS Project file: /public/Project Schedule.mpp
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
8
Risk Assessment
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
ID Risk Item Effect Cause Severity Likelihood Importance Action to Minimize Risk Owner
1 Project scope too large Project not completed in time Project improperly scoped 3 2 3Project scope discussed with
customer week 1Team Lead
2 Parts ordered too late Test rig can't be built on timeLong lead times not properly identified and accounted for
2 2 3Long lead time parts identified
and ordered by Week 6 of MSD ITeam Lead
3 Unsafe failure mode Potential burns to operator Improper safety precautions 3 1 3Ensure proper safety measures
around rigStructual Engineer
4 Poor team work ethicWork not done on time or
properlyPersonality conflicts, personal life conflicts
2 1 2Ensure constant communication
between team members with regards to personal conflicts
Team Lead
5Uneven distribution of temperature within EJ
Customer unsatisfied with product
Improper simulation of fluid flow within EJ
1 3 1Use CFD simulation to better
understand flow within EJFluid/Thermal
System Engineer
6 Failure of actuation methodUnable to satisfy customer
requirements Improper design of actuation
method1 2 2
Use FEM to model stresses in components and ensure proper usage of equipment to ensure
reliable operation
Actuation Method Engineer
11
System Overview
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
Test Fluid
Tank, Tubing & Piping
Pumping System
Heating System
Actuation System
EJ Installation
System
Broken down into major subsystem components:
• Fluid• Tank, Tubing & Piping • Pump• Heating Components• Actuation & EJ Mount
12
SYSTEM FLUIDConcept Generation & Selection
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
13
PEW Chart
Fluid Concepts
Selection CriteriaDynalene
LO170Dynalene
HCDynalene
SFParatherm MR
(Reference)Dowtherm
G Corn oil Canola oil
Max optimal Temp - - + 0 + - -
Cost - - - 0 + + +
Viscosity at 350 deg + 0 - 0 - - -
Availability 0 0 0 0 0 + +
Safety 0 0 0 0 0 0 0
Thermal Conductivity + - 0 0 + - -
Sum + 's 2 0 1 0 3 2 2
Sum 0's 2 3 3 6 2 1 1
Sum -'s 2 3 2 0 1 3 3
Net Score 0 -3 -1 0 2 -1 -1
Rank 2 7 4 2 1 4 4
Continue? No No No No Yes No No
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
14
Preliminary Fluid Selection• Dowtherm G
• Temperature Range – 20°F - 675°F• Cost – Unknown (Dr. Kandlikar said less than $5/gal)• Availability – Needs to be ordered (awaiting response from
supplier)• Low viscosity• Low Thermal Conductivity• Non-Toxic
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
15
TANK AND COMPONENTS, TUBING & PIPING
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
Concept Generation & Selection
17
Preliminary Selections
Tank: Parker SMS30• 30 gallon steel tank• Lowest price, can be bought locally• Easy installation of heat cartridges due to rectangular
shape
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
19
Preliminary Selections
Tank Insulation: High Temperature Fiberglass & rigid foam
• High Temperature Fiberglass close to tank• Temperature Range: 0°F to 450°F• High density
• Add cheap rigid foam to outer layer to help minimize heat loss over time
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
21
Preliminary Selections
Tank Mixer• TBD, depending on tank
Tubing & Piping• Metal rigid piping • Metal braided flexible tubing
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
22
PUMP SELECTION
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
Concept Generation & Selection
24
Preliminary Pump Selection
Gear Pump• Maximum temperature of up to 500°F• Maximum pressures from 250 psi to 500 psi• Maximum flow rates from 20 GPM to 120 GPM• Fluid Compatible• Small footprint – approximately 1 ft3 before motor• Maximum 1800 rpm
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
25
HEATING COMPONENTS
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
Concept Generation & Selection
27
Preliminary Selection
Cartridge Heaters• Using multiple smaller heaters helps increase power
potential and thus decrease time to heat the fluid• Relatively low cost per Watt (~ $0.03/Watt)• Using multiple heaters allows for even distribution of
temperature• Drill holes in sides of tank to attach heaters
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
28
Power Requirement
Cp Fluid = 1.878 KJ/kg*K
ρ Fluid = 973.25 kg/m3
Volume (30 gal) = .114 m3
ΔTemp = 200°CTime = 1 hr = 3600 s
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
29
ACTUATION COMPONENTS & EJ MOUNTING TECHNIQUE
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
Concept Generation & Selection
31
Preliminary Selection
Actuation & EJ Mount System: The Direct Mount Design
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
32
Estimated Project CostItem Price
Fluid $275.00 Tank $350.00 Solid Piping $250.00 Flex piping $1,325.00 Actuator $2,000.00 Pump $3,000.00 Fluid Mixer $500.00 Heating Element $250.00 Framing and stand $2,000.00 Total $9,950.00
Friday, January 11, 2013 P13671 - Garlock Expansion Joint
Subsystems:• Fluid• Tank, Tubing & Piping • Pump• Heating Components• Actuation & EJ Mount